1
MILITARY STANDARD Inspection, Liquid Penetrant and Magnetic Particle, Soundness Requirements for Materials, Parts, and Weldments MIL-STD-1907, dated 26 September 2002, has been reviewed and determined to be valid for use in acquisition. Reviewer Activities: Army - AR, AT, CR4, TM Navy - OS Air Force - 24, 70, 84 NOTICE OF VALIDATION INCH-POUND MIL-STD-1907 NOTICE 4 16 December 2009 NOTE: The activities above were interested in this document as of the date of this document. Since organizations and responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at http://assist.daps.dla.mil. AMSC N/A AREA NDTI Custodians: Army - MI Navy - AS Air Force - 11 Preparing Activity: Army - MI Downloaded from http://www.everyspec.com

MIL-STD-1907_1989 - Military Standard_Inspection - Liquid Penetrant and Magnetic Particle - Soundness Requirements for Materials, Parts and Welds_Notice 4-2.pdf

Embed Size (px)

Citation preview

  • MILITARY STANDARD

    Inspection, Liquid Penetrant and Magnetic Particle, SoundnessRequirements for Materials, Parts, and Weldments

    MIL-STD-1907, dated 26 September 2002, has been reviewed anddetermined to be valid for use in acquisition.

    Reviewer Activities: Army - AR, AT, CR4, TMNavy - OSAir Force - 24, 70, 84

    NOTICE OFVALIDATION

    INCH-POUND

    MIL-STD-1907NOTICE 416 December 2009

    NOTE: The activities above were interested in this document asof the date of this document. Since organizations andresponsibilities can change, you should verify the currency ofthe information above using the ASSIST Online database athttp://assist.daps.dla.mil.

    AMSC N/A AREA NDTI

    Custodians: Army - MI Navy - AS Air Force - 11

    Preparing Activity: Army - MI

    Downloaded from http://www.everyspec.com