    MILLS OPERATION

  • 8/3/2019 Mills Operation

    2/11

    Bowl Mill Operational Features

    Pre Start

    Drive coupling must be properly aligned andlubricated

    All areas requiring lubrication should be checked

    for proper lubricant and levels

    Motor be bumped to check for proper rotation. Setting of roll to ring clearance

    Run the pulveriser with all rolls elevated by

    the journal stop bolts

    Ensure the rolls are not contacting therotating ring

    Lower one roll at a time by backing out the

    jack bolt until the roll begin to touch the

    rotating ring

  • 8/3/2019 Mills Operation

    3/11

    Raise the roll to just clear the bowl by approximately

    two flats on the jack screw bolt head (Ring to roll

    clearance - About 3 mm)

    Repeat the same for all rolls Carry out this each time when rolls and/or ring are

    replaced

    Spring settings

    Springs must be adjusted for proper compressionand position

    Compression must be set with a hydraulic lock

    device

    Tightly lock the lock nuts holding spring

    compression so that they will not move during

    operation

  • 8/3/2019 Mills Operation

    4/11

    Position the spring so that there is slight clearance

    between spring seat and journal head (0.5 mm)

    Periodically check spring setting for proper

    compression on each spring All the three springs must be equally loaded

    If they are vastly different unequal loads are applied to

    mill drive shaft causing excessive bending with

    possible damage to vertical shaft worm gear drive

    For extended period of low load operation special

    settings are required

  • 8/3/2019 Mills Operation

    5/11

    CLASSIFIER VANE SETTINGS.

    The vanes should be fully closed

    Measure each vane lever from a fixed point to ensure that

    all vanes will be in same position when set the same

    number on the classifier vane scale.

    After checking the vane position the pointer is set at the

    middle of the scale for initial start up

    Repeat this procedure after each major overhaul.

  • 8/3/2019 Mills Operation

    6/11

    LUB OIL

    Check the oil level and temperature in the gear

    case regularly.

    Check oil level in the journal during shutdown of the mill.

    While checking the oil on dip stick look for

    contaminants in the oil.

    Collect oil sample once in a month and send it

    for analysis.

    If the oil is contaminated drain oil from gear case

    Flush with new oil/solvent

    Refill the oil.

    NOW THE PULVERISER IS READY FOROPERATION

  • 8/3/2019 Mills Operation

    7/11

    PULVERISER INTERLOCK START PERMISSIVES

    MILL DISCHARGE VALVES ARE OPEN

    SEAL AIR VALVE IS OPEN

    COLD AIR DAMPER IS OPEN

    R.C.FEEDER INLET DAMPERS ARE

    OPEN

    TRAMP IRON HOPPER VALVE IS OPEN

    D.C.POWER TO FSSS IS AVAILABLE

    BURNER TILT IN HORIZONTAL

    POSITION AND BOILER AIR FLOWADJUSTED BETWEEN 30 TO 40% OF

    FULL LOAD AIR FLOW

    MILLOUTLET TEMP. IS LESS THAN

    930C

    P.A.PRESSURE IS ADEQUATE

    EITHER A MINIMUM OF 3 NEXT

    IMMEDIATE HO/LO NOZZLE VALVES

    ARE OPEN OR NEXT IMMEDIATE

    ELEVATION MILL IS WORKING AT

    GREATER THAN 50% LOAD AND

    BOILER LOAD IS GREATER THAN 30%

  • 8/3/2019 Mills Operation

    8/11

    PULVERISER INTERLOCK

    WHEN MILL IS STARTED IMPULSE SHALL BE

    GIVEN FOR

    PERMISSION TO OPEN HOT AIR GATE

    PERMISSION TO START R.C. FEEDER

    PERMISSION FOR REGULATORS IMPULSE TO ACT ON

    HOT AIR DAMPER

  • 8/3/2019 Mills Operation

    9/11

    Allow the pulveriser to run for several

    hours without load. Check lubricant flow and temperature.

    Check bearing for noise and vibration

    Recheck the rolls are not hitting the ring.

    Pulveriser warming.

  • 8/3/2019 Mills Operation

    10/11

    PULVERISER INTERLOCK

    HOT AIR GATE HOT AIR GATE WILL OPEN ONLY IF MILL IS ON

    IF THE HOT AIR GATE IS OPEN IMPULSE SHALL BE GIVEN TO

    RELEASE HOT AND COLD AIR DAMPER CONTROL TO REGULATE

    HOT AIR GATE WILL CLOSE AUTOMATICALLY AFTER 30 SEC.

    UNDER ANY OF THE FOLLOWING CONDITIONS

    MILL IS TRIPPED

    MILLOUTLET TEMP. IS VERY HIGH

    R.C. FEEDER STOPS WITHIN 5SEC. OF ITS START

    WHEN HOT AIR GATE IS CLOSED IMPULSE SHALL BE GIVEN FOR

    OPENING THE COLD AIR DAMPER PROVIDED IF THE MILL IS ON

  • 8/3/2019 Mills Operation

    11/11

    R.C. FEEDER INTERLOCK

    START PERMISSIVES

    NO BOILER TRIP CONDITION PREVAILS

    ELEVATION A.C. AND D.C. ARE AVAILABLE

    IGNITION ENERGY IS AVAILABLE

    MILL IS ON

    HOT AIR GATE IS OPEN

    FUEL AIR DAMPERS ARE CLOSED

    NO STOP SIGNAL