MILLS OPERATION
8/3/2019 Mills Operation
2/11
Bowl Mill Operational Features
Pre Start
Drive coupling must be properly aligned andlubricated
All areas requiring lubrication should be checked
for proper lubricant and levels
Motor be bumped to check for proper rotation. Setting of roll to ring clearance
Run the pulveriser with all rolls elevated by
the journal stop bolts
Ensure the rolls are not contacting therotating ring
Lower one roll at a time by backing out the
jack bolt until the roll begin to touch the
rotating ring
8/3/2019 Mills Operation
3/11
Raise the roll to just clear the bowl by approximately
two flats on the jack screw bolt head (Ring to roll
clearance - About 3 mm)
Repeat the same for all rolls Carry out this each time when rolls and/or ring are
replaced
Spring settings
Springs must be adjusted for proper compressionand position
Compression must be set with a hydraulic lock
device
Tightly lock the lock nuts holding spring
compression so that they will not move during
operation
8/3/2019 Mills Operation
4/11
Position the spring so that there is slight clearance
between spring seat and journal head (0.5 mm)
Periodically check spring setting for proper
compression on each spring All the three springs must be equally loaded
If they are vastly different unequal loads are applied to
mill drive shaft causing excessive bending with
possible damage to vertical shaft worm gear drive
For extended period of low load operation special
settings are required
8/3/2019 Mills Operation
5/11
CLASSIFIER VANE SETTINGS.
The vanes should be fully closed
Measure each vane lever from a fixed point to ensure that
all vanes will be in same position when set the same
number on the classifier vane scale.
After checking the vane position the pointer is set at the
middle of the scale for initial start up
Repeat this procedure after each major overhaul.
8/3/2019 Mills Operation
6/11
LUB OIL
Check the oil level and temperature in the gear
case regularly.
Check oil level in the journal during shutdown of the mill.
While checking the oil on dip stick look for
contaminants in the oil.
Collect oil sample once in a month and send it
for analysis.
If the oil is contaminated drain oil from gear case
Flush with new oil/solvent
Refill the oil.
NOW THE PULVERISER IS READY FOROPERATION
8/3/2019 Mills Operation
7/11
PULVERISER INTERLOCK START PERMISSIVES
MILL DISCHARGE VALVES ARE OPEN
SEAL AIR VALVE IS OPEN
COLD AIR DAMPER IS OPEN
R.C.FEEDER INLET DAMPERS ARE
OPEN
TRAMP IRON HOPPER VALVE IS OPEN
D.C.POWER TO FSSS IS AVAILABLE
BURNER TILT IN HORIZONTAL
POSITION AND BOILER AIR FLOWADJUSTED BETWEEN 30 TO 40% OF
FULL LOAD AIR FLOW
MILLOUTLET TEMP. IS LESS THAN
930C
P.A.PRESSURE IS ADEQUATE
EITHER A MINIMUM OF 3 NEXT
IMMEDIATE HO/LO NOZZLE VALVES
ARE OPEN OR NEXT IMMEDIATE
ELEVATION MILL IS WORKING AT
GREATER THAN 50% LOAD AND
BOILER LOAD IS GREATER THAN 30%
8/3/2019 Mills Operation
8/11
PULVERISER INTERLOCK
WHEN MILL IS STARTED IMPULSE SHALL BE
GIVEN FOR
PERMISSION TO OPEN HOT AIR GATE
PERMISSION TO START R.C. FEEDER
PERMISSION FOR REGULATORS IMPULSE TO ACT ON
HOT AIR DAMPER
8/3/2019 Mills Operation
9/11
Allow the pulveriser to run for several
hours without load. Check lubricant flow and temperature.
Check bearing for noise and vibration
Recheck the rolls are not hitting the ring.
Pulveriser warming.
8/3/2019 Mills Operation
10/11
PULVERISER INTERLOCK
HOT AIR GATE HOT AIR GATE WILL OPEN ONLY IF MILL IS ON
IF THE HOT AIR GATE IS OPEN IMPULSE SHALL BE GIVEN TO
RELEASE HOT AND COLD AIR DAMPER CONTROL TO REGULATE
HOT AIR GATE WILL CLOSE AUTOMATICALLY AFTER 30 SEC.
UNDER ANY OF THE FOLLOWING CONDITIONS
MILL IS TRIPPED
MILLOUTLET TEMP. IS VERY HIGH
R.C. FEEDER STOPS WITHIN 5SEC. OF ITS START
WHEN HOT AIR GATE IS CLOSED IMPULSE SHALL BE GIVEN FOR
OPENING THE COLD AIR DAMPER PROVIDED IF THE MILL IS ON
8/3/2019 Mills Operation
11/11
R.C. FEEDER INTERLOCK
START PERMISSIVES
NO BOILER TRIP CONDITION PREVAILS
ELEVATION A.C. AND D.C. ARE AVAILABLE
IGNITION ENERGY IS AVAILABLE
MILL IS ON
HOT AIR GATE IS OPEN
FUEL AIR DAMPERS ARE CLOSED
NO STOP SIGNAL