13
Workshop 1A: Design parameters and geographic constraints - Mitcham’s Corner to south of Woodhead Drive Milton Road Bus Priority Corridor Glenn Higgs Sept 2016

Milton Road Bus Priority Corridor · DESIGN PARAMETERS – MINIMUM WIDTHS Absolute minimum Preferred minimum m 6 5 4 3 2 1 1 2 3 4 5 6 m 6.0m 6.0m 1.8m 2.0m 1.5m For relatively short

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Milton Road Bus Priority Corridor · DESIGN PARAMETERS – MINIMUM WIDTHS Absolute minimum Preferred minimum m 6 5 4 3 2 1 1 2 3 4 5 6 m 6.0m 6.0m 1.8m 2.0m 1.5m For relatively short

Workshop 1A: Design parameters and geographic constraints -Mitcham’s Corner to south of Woodhead Drive

Milton Road Bus Priority Corridor

Glenn Higgs

Sept 2016

Page 2: Milton Road Bus Priority Corridor · DESIGN PARAMETERS – MINIMUM WIDTHS Absolute minimum Preferred minimum m 6 5 4 3 2 1 1 2 3 4 5 6 m 6.0m 6.0m 1.8m 2.0m 1.5m For relatively short

Key principles:• Bus lanes in one direction• Continuous provision for cyclists,

segregated where possible• Pedestrian & cycle crossing facilities• Enhancement to streetscape

Page 3: Milton Road Bus Priority Corridor · DESIGN PARAMETERS – MINIMUM WIDTHS Absolute minimum Preferred minimum m 6 5 4 3 2 1 1 2 3 4 5 6 m 6.0m 6.0m 1.8m 2.0m 1.5m For relatively short

CURRENT DESIGN PLANS: MITCHAM’S CORNER TO GILBERT RD

Raised entry

Parallel crossings

Shared-use bus stop

Raised (segregated) cycle lanes

Bus lane

Area outside highway boundary

Page 4: Milton Road Bus Priority Corridor · DESIGN PARAMETERS – MINIMUM WIDTHS Absolute minimum Preferred minimum m 6 5 4 3 2 1 1 2 3 4 5 6 m 6.0m 6.0m 1.8m 2.0m 1.5m For relatively short

Advanced Stop LineBus gate

Signalised junction

Two-way shared use path & verge/trees

Signalised junction

Road closure

Off road cycle path

New public/green spaces

Toucan crossing

Area outside highway

CURRENT DESIGN PLANS: GILBERT RD TO ELIZABETH WAY

Page 5: Milton Road Bus Priority Corridor · DESIGN PARAMETERS – MINIMUM WIDTHS Absolute minimum Preferred minimum m 6 5 4 3 2 1 1 2 3 4 5 6 m 6.0m 6.0m 1.8m 2.0m 1.5m For relatively short

Road closure

Signalised junction Verges/parking

Toucan crossing

Verges/parking

CURRENT DESIGN PLANS: ELIZABETH WAY TO WOODHEAD DR

Page 6: Milton Road Bus Priority Corridor · DESIGN PARAMETERS – MINIMUM WIDTHS Absolute minimum Preferred minimum m 6 5 4 3 2 1 1 2 3 4 5 6 m 6.0m 6.0m 1.8m 2.0m 1.5m For relatively short

Mitchams Corner

Signalised junctions

SUMMARY OF KEY FEATURES

Bus lanes

Verges/ footway parking

Bi-directional footway/ cycle lanesSegregated (raised) cycle lanes

Controlled crossings

Page 7: Milton Road Bus Priority Corridor · DESIGN PARAMETERS – MINIMUM WIDTHS Absolute minimum Preferred minimum m 6 5 4 3 2 1 1 2 3 4 5 6 m 6.0m 6.0m 1.8m 2.0m 1.5m For relatively short

DESIGN PARAMETERS: TYPICAL CROSS SECTIONS Cross Section near Herbert St

Existing view

Proposed plan

Page 8: Milton Road Bus Priority Corridor · DESIGN PARAMETERS – MINIMUM WIDTHS Absolute minimum Preferred minimum m 6 5 4 3 2 1 1 2 3 4 5 6 m 6.0m 6.0m 1.8m 2.0m 1.5m For relatively short

Cross Section near Arbury Rd

DESIGN PARAMETERS: TYPICAL CROSS SECTIONS

Existing view

Proposed plan

Page 9: Milton Road Bus Priority Corridor · DESIGN PARAMETERS – MINIMUM WIDTHS Absolute minimum Preferred minimum m 6 5 4 3 2 1 1 2 3 4 5 6 m 6.0m 6.0m 1.8m 2.0m 1.5m For relatively short

DESIGN PARAMETERS Degrees of separation from motor vehicles

Extract from London Cycling Design Standards

Fully segregated lane/track

Stepped track (‘raised cycleway’)

Light segregated lane

Advisory cycle lane Mandatory cycle lane

Page 10: Milton Road Bus Priority Corridor · DESIGN PARAMETERS – MINIMUM WIDTHS Absolute minimum Preferred minimum m 6 5 4 3 2 1 1 2 3 4 5 6 m 6.0m 6.0m 1.8m 2.0m 1.5m For relatively short

Degrees of separation from pedestrians

DESIGN PARAMETERS

Extract from London Cycling Design Standards

Shared-use path: separated

Shared-use path: fully shared

Page 11: Milton Road Bus Priority Corridor · DESIGN PARAMETERS – MINIMUM WIDTHS Absolute minimum Preferred minimum m 6 5 4 3 2 1 1 2 3 4 5 6 m 6.0m 6.0m 1.8m 2.0m 1.5m For relatively short

DESIGN PARAMETERS – MINIMUM WIDTHS

Absolute minimum Preferred minimumm 6 5 4 3 2 1 1 2 3 4 5 6 m

6.0m 6.0m

1.8m 2.0m

1.5m For relatively short lengths 2.0m

3.0m 4.0m

1.5m 2.0m

Shared-use: fully shared (two-way)3.0m 4.0m

Shared-use: seperated (two-way)4.8m 5.0m

4.0m 4.5m

Bus Stops (with one-way cycling)Floating bus stop

5.3m 1.8 (footway) 2.0 (footway) 5.5m

4.0m 4.0m

3.5m 3.5m2.02.0

Footway Parking

Shared-use (fully shared)

Shared-use (separated)

2.02.0

2.0 3.0 (cycle)

On footway

On carriageway

Mandatory & advisory cycle lanes

Raised cycleway: one-way

Raised cycleway: two-way

Cycle Facilities (assuming medium - high flow)

Carriageway

Footway

3.0 (cycle) 1.8

2.5 (parking)2.0 (parking)

1.5 (cycle) 2.0 (island)1.5 (cycle)2.0 (island)

1.5 (cycle)1.5 (cycle)

Page 12: Milton Road Bus Priority Corridor · DESIGN PARAMETERS – MINIMUM WIDTHS Absolute minimum Preferred minimum m 6 5 4 3 2 1 1 2 3 4 5 6 m 6.0m 6.0m 1.8m 2.0m 1.5m For relatively short

KEY CONSTRAINTS Scheme tie-ins

Mitcham’s Corner

Green End Road cycle scheme

Highways boundary

Access points

Underground utilities

Page 13: Milton Road Bus Priority Corridor · DESIGN PARAMETERS – MINIMUM WIDTHS Absolute minimum Preferred minimum m 6 5 4 3 2 1 1 2 3 4 5 6 m 6.0m 6.0m 1.8m 2.0m 1.5m For relatively short

Design parameters and geographic constraints

Milton Road Bus Priority Corridor

Glenn Higgs

Sept 2016