ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Mineral Avenue Corridor Assessment

Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

ITE 2017 Western District Annual Meeting

San Diego, CA June 21st

Mineral Avenue Corridor Assessment

Page 2: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Biography - Aaron Heumann, PE, PTOE

• Currently City of Littleton Transportation Engineering Manager

• 24 Years Combined Experience on the Public & Private Sides

• CO/WY Section Past President

• 2018 Joint Western District & Texas District Meeting Co-Chair

Page 3: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Presentation Outline

• Project Background

• Assessment Methodology

• Study Process

• Implementation Strategy

• Results

Page 4: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Background

• Mineral Avenue

• Study Area

• Neighborhoods

Page 5: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Study AreaNeighborhoods:

- Meadowbrook

- Polo Reserve-Polo Ridge Farms

- Polo Reserve-The Sanctuary

- Overlook at Platte Valley

- Pinnacle at Mountain Gate

- The Overlook Plateau

- Outlook (The Meadows at Platte Valley)

- Corridor Study Limits

- Mineral Ave Regional Trail

- City Limits

Page 6: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Methodology

• City Pilot Project

• Resident Engagement

• Community Meetings

• Cooperative/Iterative Process

Resident Input

Potential

Solutions

Concept Design

Phasing

Plan

Cost Estimates

Page 7: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Process

• Community Involvement

• Information Gathering

• Issues Assessment

• Preliminary Solutions

• Implementation Strategy

• Recommendations to City Council

• Implementation

Page 8: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Community Involvement

• Project Webpage on City Website

• Neighborhood Meetings

• Development of Mission, Goals & Users

• Identification of Issues & Concerns

• Feedback on Data, Assessment,

Solutions & Implementation Strategy

Page 9: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Info & Data

• Past Studies

• Physical Environment & Surrounding Land Uses

• Vehicular Volumes

• Pedestrian/Bicycle Activity

• Vehicle Speeds

• Vehicle Intersection Delays

• Corridor Accident History

• Police Enforcement History

• Transit & School Buses

Page 10: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Assessment

Key Resident Perceived Issues Identified:

• Traffic Growth for Commuting & Commercial Land Use

• Increased Number & Severity of Accidents

• Speed Traffic Creating Unsafe Conditions

• Delay Accessing Adjacent Neighborhoods

➢ Review with residents to verify issues being addressed

Page 11: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Preliminary Solutions

• Roadway Changes

• Intersection Modifications

• Side Street Improvements

• Access Revisions

• Traffic Control Considerations

➢ Review with residents to identify solutions to move forward with

Page 12: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Implementation Strategy

• Concept Design

• Phasing Plan

• Cost Estimates

➢Review with residents to develop an agreed upon strategy

Page 13: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Designs

• Mineral Avenue Modifications

• Platte Canyon Road Movements

• Side Street Improvements

Page 14: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Mineral Avenue Modifications• Recommended

• Right Turn Acceleration/Deceleration Lane• Lane Width Narrowing• Center Median Widening• Speed Limit Change• Specific U-turn Locations• Deter Vehicle Queues from Blocking Intersections

• Not Recommended• Median Nose Reduction• Constructability Issues• Cost Prohibitive

Page 15: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public
Page 16: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public
Page 17: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public
Page 18: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public
Page 19: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public
Page 20: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Platte Canyon Road Movements• Recommended

• Mineral Avenue Intersection• Dual NB & SB Left Turn Lanes• Traffic Signal Modifications• Channelized NB Right Turn Lane

• Mineral Drive Intersection• Full Movement Access

• Not Recommended• Meadowbrook Access to Platte Canyon Road• Not Supported by Residents• Cost Prohibitive

Page 21: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Min

era

l A

ve

N

Page 22: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Min

era

l A

ve

N Dual Left Turn

Lanes

Page 23: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Min

era

l A

ve

Dual Left Turn

Lanes

N

Page 24: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Min

era

l A

ve

N

Signal

Modifications

Page 25: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Min

era

l A

ve

Channelization

Island

N

Page 26: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Min

era

l A

ve

Full

Movement

N

Page 27: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Min

era

l A

ve

Channelization

Islands

N

Page 28: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Min

era

l A

ve

N

Dual Left Turn

Lanes

Channelization

Islands

Full

Movement

Channelization

Island

Signal

Modifications

Page 29: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Side Street Improvements• Provisional Revisions

– Crosswalk Striping– Trail Signage– Addition of Blank Out Signs on Polo Ridge Drive Pedestrian Signal

• Ultimate Alterations– Curb Extensions– Raised Crosswalk– Additional Landscaping

Page 30: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Mineral Avenue

Du

sk C

ou

rt

Page 31: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Du

sk C

ou

rt

RID

E

SA

FE

CR

OS

SIN

G

SL

OW

DO

WN

RID

E

SA

FE

CR

OS

SIN

G

SL

OW

DO

WN

Mineral Avenue

PROVISIONAL

Page 32: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Du

sk C

ou

rt Curb Extensions

RID

E

SA

FE

CR

OS

SIN

G

SL

OW

DO

WN

RID

E

SA

FE

CR

OS

SIN

G

SL

OW

DO

WN

Mineral Avenue

ULTIMATE

Page 33: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Mineral Avenue

Du

sk C

ou

rt

RID

E

SA

FE

CR

OS

SIN

G

SL

OW

DO

WN

RID

E

SA

FE

CR

OS

SIN

G

SL

OW

DO

WN

Raised Crosswalk

ULTIMATE

Page 34: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Mineral AvenueD

usk

Co

urt

Landscaping

RID

E

SA

FE

CR

OS

SIN

G

SL

OW

DO

WN

RID

E

SA

FE

CR

OS

SIN

G

SL

OW

DO

WN

ULTIMATE

Page 35: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Mineral Avenue

Du

sk C

ou

rt

RID

E

SA

FE

CR

OS

SIN

G

SL

OW

DO

WN

RID

E

SA

FE

CR

OS

SIN

G

SL

OW

DO

WN

ULTIMATE

Page 36: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Mineral Avenue

Du

sk C

ou

rt

RID

E

SA

FE

CR

OS

SIN

G

SL

OW

DO

WN

RID

E

SA

FE

CR

OS

SIN

G

SL

OW

DO

WN

ULTIMATE

Page 37: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Mineral Avenue

Du

sk C

ou

rt

RID

E

SA

FE

CR

OS

SIN

G

SL

OW

DO

WN

RID

E

SA

FE

CR

OS

SIN

G

SL

OW

DO

WN

ULTIMATE

Page 38: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Mineral Avenue

Du

sk C

ou

rt

RID

E

SA

FE

CR

OS

SIN

G

SL

OW

DO

WN

RID

E

SA

FE

CR

OS

SIN

G

SL

OW

DO

WN

ULTIMATE

Page 39: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Phasing Plan

• Phase 1• Side Street Provisional Improvements –

Crosswalks, Trail Signage & Blank Out Signs• Mineral Avenue Lane Reassignments

• Phase 2• Platte Canyon Road/Mineral Avenue

Intersection

• Phase 3• Platte Canyon Road/Mineral Drive Intersection• Side Street Ultimate Improvements – Raised

Crosswalks, Curb Extensions & Landscaping

Page 40: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Phase Project Improvements Cost

Cost Estimating

Page 41: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Phase Project Improvements Cost

1A Side Street Provisional Improvements

• Crosswalk Striping• Trail Signage• Blank Out Signs on Polo Ridge Drive Pedestrian Signal

$11,000

1B Mineral Avenue Lane Reassignment

• Right Turn Acceleration/Deceleration Lane• Lane Width Narrowing• Center Median Widening• Speed Limit Change• Specific U-turn Locations• Deter Vehicle Queues from Blocking Intersections

$35,000

Cost Estimating

Page 42: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Phase Project Improvements Cost

1A Side Street Provisional Improvements

• Crosswalk Striping• Trail Signage• Blank Out Signs on Polo Ridge Drive Pedestrian Signal

$11,000

1B Mineral Avenue Lane Reassignment

• Right Turn Acceleration/Deceleration Lane• Lane Width Narrowing• Center Median Widening• Speed Limit Change• Specific U-turn Locations• Deter Vehicle Queues from Blocking Intersections

$35,000

2A Platte Canyon Road/Mineral Avenue Intersection

• Dual NB & SB Left Turn Lanes• Traffic Signal Modifications• Channelized NB Right Turn Lane

$92,000

Cost Estimating

Page 43: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Phase Project Improvements Cost

1A Side Street Provisional Improvements

• Crosswalk Striping• Trail Signage• Blank Out Signs on Polo Ridge Drive Pedestrian Signal

$11,000

1B Mineral Avenue Lane Reassignment

• Right Turn Acceleration/Deceleration Lane• Lane Width Narrowing• Center Median Widening• Speed Limit Change• Specific U-turn Locations• Deter Vehicle Queues from Blocking Intersections

$35,000

2A Platte Canyon Road/Mineral Avenue Intersection

• Dual NB & SB Left Turn Lanes• Traffic Signal Modifications• Channelized NB Right Turn Lane

$92,000

3A Platte Canyon Road/Mineral Drive Intersection

• Full Movement Access $107,000

3B Side Street Ultimate Improvements

• Curb Extensions

• Raised Crosswalk

• Additional Landscaping

$246,000

Cost Estimating

Page 44: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Phase Project Improvements Cost

1A Side Street Provisional Improvements

• Crosswalk Striping• Trail Signage• Blank Out Signs on Polo Ridge Drive Pedestrian Signal

$11,000

1B Mineral Avenue Lane Reassignment

• Right Turn Acceleration/Deceleration Lane• Lane Width Narrowing• Center Median Widening• Speed Limit Change• Specific U-turn Locations• Deter Vehicle Queues from Blocking Intersections

$35,000

2A Platte Canyon Road/Mineral Avenue Intersection

• Dual NB & SB Left Turn Lanes• Traffic Signal Modifications• Channelized NB Right Turn Lane

$92,000

3A Platte Canyon Road/Mineral Drive Intersection

• Full Movement Access $107,000

3B Side Street Ultimate Improvements

• Curb Extensions

• Raised Crosswalk

• Additional Landscaping

$246,000

Total $491,000

Cost Estimating

Page 45: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Funding

• Public Works Operating Budget• Open Space Funds

• Capital Improvement Project Program

• State & Federal Grant Programs

Page 46: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Project Status To Date

• Community Engaged & Pleased with Process

• City Council Approved• Phase 1 Implementation

Complete• After Data Collected• Phase 2 & 3 Still to Come

Page 47: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

• Improved Operations Due to U-turn Relocation

• Reduced Speeds Due to Lane Narrowing, RT Accel/Decel & Lower Speed Limit

• Decrease Delays Due to Two-stage Left Turn Option

• Corridor Less Intimidating to Access

Resident Perceptions

Page 48: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

• Volume Increase by <5%• Slight Growth in Traffic at

Intersections• Decrease in Corridor Traffic

Speeds by ~5 mph• Comparable Delays• Fewer Reported Accidents &

Lower Incident of Injury Accidents

After Data Indications

Page 49: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

• Corridor Functioning Safer for Bicyclists & Peds• Corridor More Accessible for Side Streets• Minimal Impact to Vehicle Operations

➢ Demonstrated Benefits of Resident Involvement & Good Communication

➢ Safety Improvements with Minimal Impacts to Operations & Congestion

➢ City Applying Process to Other Projects

Project Takeaways

Page 50: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public

Comments or Questions