    MINING :Mining is a process of Mineralexploitation from the earthcrust;

  • 8/4/2019 Mines Presentation

    3/15

    MINING LEASE

    Surface rights have to be acquired first, if it is a

    private land.Application for Mining Lease to State Govt.

    Mining Plan to be approved by IBM.

    Lease grant by State Govt., Ind. &Comm. Dept.

    Royalty is to be paid @ Rs.45/-per MT ofLimestone.

    E.C to be obtained from MoEF, New Delhi.

    In this process EIA and EMP is to be submittedand P.H. is to be conducted.

    CFE and CFO is to be obtained fromAPPCB.

  • 8/4/2019 Mines Presentation

    4/15

    MINE OPENING

    Appointment of Agent/Mines Manager.

    Notice of Opening in Form-1.

    STATUTORY BODIES

    Directorate General of Mines Safety (DGMS).

    Indian Bureau of Mines (IBM).Dept. of Mines and Geology, Govt. of AP.

    Dept. of Labour (Central).

    Explosives Dept.

  • 8/4/2019 Mines Presentation

    5/15

    DGMS

    Mines Act 1952

    Mines Rules 1956

    Metalliferrous Mines Regulations 1957

    Mines Vocational Training Rules

    Indian Electricity RulesIBM

    Mineral Concession Rules

    Mines & Minerals (R&D)ActMineral Conservation & Development

    Rules

    Controller General Circulars

  • 8/4/2019 Mines Presentation

    6/15

    MINING OPERATIONS

    DRILLING

    Deep hole Drilling 115 mm dia.

    Pneumatically operated Wagon drill machine.

    Air Compressors (Diesel driven) up to 12

    kg/sq.cm, and 500 cfm.Drilling pattern, square/staggered.

    Rate of drilling is 10 mts/hour

    Cost of Drilling is Rs.130 per mt.

    Production per metre is about 30 MT.

    Secondary Drilling 35 mm dia.

    Jack hammers with portable air compressors.

  • 8/4/2019 Mines Presentation

    7/15

    BLASTING

    Primary BlastingDeep holes -115mm

    Secondary Blasting 35 mm dia

    EXPLOSIVES

    Cap sensitive Slurry Explosives.

    Non cap sensitive- ANFO

    D-Fuse, Detonators-Electrical / Non Electrical

    shock tube. Charging of Drill holes and blasting.

    Blasting Machine/Exploder.

    Vacation of Danger zone-500 mts radius and other

    safety precautions. Blast induced Ground vibrations.

    Explosive Magazines and Explosive van:

    License from Jt.Chief Controller of Explosives.

    Statutory records and returns

  • 8/4/2019 Mines Presentation

    8/15

  • 8/4/2019 Mines Presentation

    9/15

  • 8/4/2019 Mines Presentation

    10/15

    LOADINGLoading the Limestone / waste into Dumpers

    / tippers by Hydraulic Excavators.

    Models and Capacity of the Excavators.

    Capacity Productivity

    PC 200 -One Cu.M 150 MT/hour.

    PC-300 -Two Cu.M 300 MT/hour.

    Excavators are driven by Diesel Engines.Major parts are a) Under carriage b) Super structure&cabin

    c) Boom d) Arm e) Bucket.

    Each operation comprises of a) Digging b) Boom Lifting

    c) Swing for un load d) Unloading e) Swinging for Digging.

    Total Cycle time 1.5 2.0 minutes.Digging height will decide the bench height.

  • 8/4/2019 Mines Presentation

    11/15

    HYDRAULIC EXCAVATOR

  • 8/4/2019 Mines Presentation

    12/15

    TRANSPORTATION

    Transportation of Limestone/ waste is by Dumpers/Tippers.

    Dumpers : BEML/HM Make: Capaity-35/40MT-Engine capacity- 300-400 HP

    Auto Transmission, Bigger tyres 18X25

    Designed for Mines operations.

    HSD Consumption about 20 lts/hour

    Material handling per hour-120 MT with 1.5kms lead. Tippers : TATA/ A.L/AMW/FORCE Make :

    Capacity-17 MT/ 14 Cu.M; Engine 180 HP

    Manual gear shifting. Small tyres-10X20Not designed for Mines; More tyre punctures.

    HSD consumption 2kms/lt.

  • 8/4/2019 Mines Presentation

    13/15

    DUMPER 35 MT

  • 8/4/2019 Mines Presentation

    14/15

  • 8/4/2019 Mines Presentation

    15/15

    THANK YOU