29
MINING INVESTMENT OPPORTUNITIES IN NIGER Mamadou Dikouma Ministry of Mines and Energy

MINING INVESTMENT OPPORTUNITIES IN NIGER Mamadou Dikouma Ministry of Mines and Energy

Embed Size (px)

Citation preview

MINING INVESTMENT OPPORTUNITIES IN NIGER

Mamadou DikoumaMinistry of Mines and Energy

COUNTRY PRESENTATION (1)• West African

country• 1 267 000 sqm land

surface• 2/3 of desert• 15 millions

inhabitants• Capital City :

Niamey

COUNTRY PRESENTATION (2)

• Political transition period• Way back to democracy• Second round of Presidential on

March 12th

• Civilian regime to be in place on April 6th

MINING IN NIGER (1)

• 4th Word Largest Uranium Producer since several decades• 3,4 ktU of output in 2010• Past production 110 KtU (1971)• 3 operating Mines• 1 Under construction (2013)

MINING IN NIGER (2)

MINING IN NIGER (3)

• Over 300 kTU of reserves (1/2 Imou)• Forecast production: 10 KtU by 2015• Advanced project with significant

resources• Over 120 valid licenses, 130 under

process, <300 Open

MINING IN NIGER (4)

MINING IN NIGER (5)

• Forecast production of 10 KtU by 2015• Advanced project with significant

resources scoping study completed• Ongoing exploration programs

MINING IN NIGER (6)

URANIUM DEPOSITS•Northern Niger, West of Air Mountains•Tim Mersoi basin•Pale and Mesozoic formations•Front roll type deposits within arenites

MINING IN NIGER (7)

MINING IN NIGER (8)

MINING IN NIGER (9)

• Front roll type deposits common• Other possibility to explore• Unconformity type• Paleochannel type in Air

Mountains where geophysical survey achieved +concessions

MINING IN NIGER (10)

MINING IN NIGER (11)

MINING IN NIGER (12)

• Djado basin underexplored• East Air, West Tibesti• Paleozoic and Mesozoic

formations with arenites units• Historic works• Radiometric anomalies

MINING IN NIGER (13)

MINING IN NIGER (14)

GOLD•Mined since 2004•2 to 6 tons of gold per year•Several concessions granted•Some application under process•Few available concession

MINING IN NIGER (15)

MINING IN NIGER (16)

MINING IN NIGER (17)

COAL•Mined since 1980•Thermal coal (Lignites to brown coal)•Mine Mouth Power Plant 36 MW•Capacity expansion program•15 millions of reserves, 33 Years

MINING IN NIGER (18)

COAL•Project carrying out feasibility study•Thermal coal (Lignites to brown coal)•Mine Mouth Power Plant 200 MW•50 millions of reserves, 40 Years

MINING IN NIGER (19)

IRON•A lot of occurrences all through the country•1.2 billion of reserves (> 40% Fe)•Several billion resources (> 35 to 55% Fe)

MINING IN NIGER (20)

MINING IN NIGER (21)

Ministry of Mines•Regulation•Licenses granting•“Guichet Unique”•Mining experience•Devoted and qualified crew

MINING IN NIGER (22)

LICENCES GRANTING PROCEDURES•Easy and simple•Quick: 3 months according to mining law•Subject to mining agreement signature

MINING IN NIGER (23)

INCITATIVES CONDITIONS•Mining agreement from exploration through mining stage stabilizing all conditions•Many exemptions, tax holidays•Big scale mines special conditions

MINING IN NIGER (3)

MINING WITH RESPONSABILITY•15% of Government mining income for local development since 2006•Social Mining Program drafting •Companies asked to commit themselves for local development

MINING IN NIGER (3)

NIGER WELCOME NINING INVESTMENT•Good mineral potential•Incitative legal conditions•Experience in mining management

NIGERNIGER

HOPEFULLY YOUR NEXT HOPEFULLY YOUR NEXT MINING DESTINATIONMINING DESTINATION