29
INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 ) PREFACE Suresh Prabhakar Prabhu Minister for Railways A. K. Gupta General Manager South Western Railway Indian Railways is the lifeline of the naon and catalyst for India's progress and economic development. South Western Railway plays a significant role in the socio-economic development of Karnataka state. The Railway has been operaonal from 1st April 2003 with headquarters at Hubballi in the state of Karnataka. 84% of SWR's jurisdicon cover Karnataka. Southern & South Central Railways join hands with South Western Railway in contribung to improvement of train service and development of Karnataka in the recent past. SWR has achieved visible milestones from the me of its formaon in 2003. Aer its formaon, 345 km of new line, 598 km of GC and 521 km of doubling have been commissioned. 110 numbers of new Express/Passenger trains have been introduced. Apart from this, services of many trains have been extended and frequency of some trains has been increased for the benefit of travelling public. On the freight side, Railway has loaded 44 Million Tonnes during 2016-17. The officers and staff of the Railways are vibrant and dedicated, ready to adopt to changing scenario of the transport sector and to fulfill the expectaons of the people of Karnataka. This booklet is aimed to list out some of the important acvies undertaken in recent past and current projects in the state of Karnataka. We seek your co-operaon in Swachh Bharat Abhiyan to maintain cleaniliness in Rail premises.

Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

  • Upload
    vuthien

  • View
    238

  • Download
    7

Embed Size (px)

Citation preview

Page 1: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

PREFACE

Suresh Prabhakar PrabhuMinister for Railways

A. K. GuptaGeneral Manager

South Western Railway

Indian Railways is the lifeline of the na�on and catalyst for India's progress and economic development. South Western Railway plays a significant role in the socio-economic development of Karnataka state. The Railway has been opera�onal from 1st April 2003 with headquarters at Hubballi in the state of Karnataka. 84% of SWR's jurisdic�on cover Karnataka. Southern & South Central Railways join hands with South Western Railway in contribu�ng to improvement of train service and development of Karnataka in the recent past. SWR has achieved visible milestones from the �me of its forma�on in 2003. A�er its forma�on, 345 km of new line, 598 km of GC and 521 km of doubling have been commissioned. 110 numbers of new Express/Passenger trains have been introduced. Apart from this, services of many trains have been extended and frequency of some trains has been increased for the benefit of travelling public. On the freight side, Railway has loaded 44 Million Tonnes during 2016-17.

The officers and staff of the Railways are vibrant and dedicated, ready to adopt to changing scenario of the transport sector and to fulfill the expecta�ons of the people of Karnataka. This booklet is aimed to list out some of the important ac�vi�es undertaken in recent past and current projects in the state of Karnataka. We seek your co-opera�on in Swachh Bharat Abhiyan to maintain cleaniliness in Rail premises.

Page 2: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

01

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During Last 3 Years (i.e 2014-15,2015-16 &2016-17)

1.0 Infrastructure Developments In Last Three Years

A special thrust is being given to improve infrastructure by enhancing line capacity of Railway network in State of Karnataka. Tremendous progress was achieved in last three years in this aspect.

1.1 Details of Railway Projects Completed for New lines/Doubling:

2014-15 2015-16 2016-17

New Railway line (Kms.)Doubling of exis�ng Railway line (Kms.)

–40

–167

13829

1.2 The following projects have been commissioned during the last 3 years, i.e. 2014-15, 2015-16 and 2016-17:-

1.2.1 Works commissioned in 2014-15:-

During 2014-15, 40 Km of Railway track has been commissioned with double Line in the state of Karnataka

The following sec�ons were commissioned with Doubling of railway track

Highlights of 2014-15 : En�re Doubling of Birur- Nagavangla-Ajjampur -Shivani-Hosadurga sec�on has been commissioned, which was important sub sec�on between Birur & Chikjajur .

Shivani sta�on between Birur and Chikjajur Mandya – Yeliyur Doubling, commissioned

in 2014-15

Se�halli-Maddur & Mandya-Yeliyur [Part of Ramanagaram-Mysuru (93 Kms) -Cost sharing Project with Govt. of Karnataka]Ajjampur-Shivani [Part of Birur-Shivani Doubling – 29 km]Shivani-Hosadurga (10 km)

19

11

10

August 2014

February 2015

February 2015

Length (in km)Month and Year of

CommissioningSec�on

Total 40

Page 3: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

02

During 2015-16, 167 km of doubling Railway track has been laid in the state of Karnataka

• The following sec�ons were commissioned with Doubling of railway track

Highlights of 2015-16 : • Commissioning of 70 km of major por�on of doubling between Guntakal – Raichur resulted in capacity enhancement. · • Commissioning of Doubling between Mysuru and Ramanagaram (Excluding. 1.5 Km) was major land mark. • En�re Doubling project of Hosadurga Road to Chikjajur has been commissioned resul�ng in comple�on of doubling between Birur & Chikjajur, two important junc�on sta�ons on mainline of Bengaluru- Hubballi .This helped in increasing throughput of the sec�on. • Doubling with Electrifica�on between Yesvantpur – Yelahanka and Yelahanka – Channasandra has helped in easing conges�on of Bengaluru area.

Hosadurga & Chikjajur doubling line (28 km) Yeliyur-Naganahalli doubling (28 km)

1.3. Works commissioned in 2015-16 :-

Dedica�on of Yelahanka-Chennasandra doubling with electrifica�on

Length (in km)

Month and Year of CommissioningSec�on

28

28

13

12

16

70

October 2015

October 2015

January 2016

March 2016

January 2016

December 2015

Total 167

Hosadurga-Chikjajur

Yeliyur-Byadarahalli,

Byadarahalli- Pandavapura &

Pandavapura - Srirangapatna-Naganahalli (excl. Cauvery bridges)

[ Part of Ramanagaram-Mysuru (93 Kms)]

Yelahanka-Channasandra

Yesvantpur-Yelahanka

Harlapur-Sompur-Bannikoppa

Guntakal - Raichur Sec�on (excluding Matmari- Mantralayam

sec�on)

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

Page 4: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

03

During 2016-17, 138 km of New Lines and 29 km of doubling have been commissioned in the state of Karnataka.

1.4.2 The following sec�ons of 29 Km were commissioned with Doubling of railway track

1.4.3 Highlights of 2016-17 : • It is a record commissioning of new lines in Karnataka in one year. • Long pending project of Hassan-Shravanabelagola-Nelamangala sta�on was completed providing direct connec�on from Bengaluru/Yesvantpur to Hassan instead of Via Tumakuru/Arsikere.

Kunigal Railway Sta�on Shravanabelagola Sta�on

1.4 Works commissioned in 2016-17 :-

1.4.1 138 Km of New line has been commissioned in the following sec�ons

Joka�e Railway Sta�on pla�orm Tunnel in Hassan-Shravanabelagola Line

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

Length (in km)

Month and Year of Commissioning

Sec�on Sec�ons commissioned

Hassan-Bengaluru via

Shravanabelagola (167 km)*

Munirabad (Ginigera) - Raichur

(165 km) new line *

111

27

March 2017

March 2017

Total

Nelamangala-

Shravanabelagola

Ginigera-Chikkabenakal

138

Sec�on Sec�ons commissioned

Kambarganvi-AlnawarBannikoppa-Bhanapur

Joka�e- Panambur

Hosapete – Hubballi – Londa – Vasco-da-gama

Mangaluru-Panambur

Total

April 2016December 2016

January 2017

Length (in km)

Month and Year of Commissioning

1211

6

29

* [Cost sharing with State Government]

Page 5: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

04

• G inigera-Chikkabenakal New Line (27 km), [part of Munirabad (Ginigera)-Raichur New Line (165 km)] commissioned improving Rail connec�vity in North Karnataka.

Ginigera-Chikkabenakal First Train Chikkabenakal Sta�on building

1.4.4 Transloca�on of Tippu Sultan Armoury:-

Transloca�on of Historic Tippu Sultan Armoury

1.5 Projects/sec�ons Targeted for commissioning in 2017-18

New lines/Doubling in the following sec�ons are targeted in 2017-18

Bagalkot-Kajjidoni (part of Bagalkot-Kudachi New Line-142 km) *

Chikkabenakal-Gangavathi [part of Ginigera – Raichur new line (165 km) ] *

Humnabad-Kalaburagi (Part of Bidar-Kalaburagi New line -104 Km ) *

30

13

72

Target Length(in Km)

Sec�on

NEW LINES

Hotgi- Kudgi-Gadag (284 km)

Yelahanka-Penukonda (121 km)

Hubballi – Chikjajur (190 km)

Arsikere – Tumakuru (96 km)

43

36

37

36

DOUBLING

Total 115

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

* Cost sharing with Government of Karnataka.

In 2017-18, 322 Kms of Track laying has been planned in the state of Karnataka which include 115 km of New Line and 207 km of doubling.

Railway has successfully carried out the extremely sensi�ve and challenging work of “Transloca�on of Tippu Sultan Armoury” (a 225 year old brick and mortar Heritage structure weighing 900 tonnes) by 130 mtr. in Mar. 2017 to facilitate balance 1.7 Km of Bengaluru - Mysuru doubling. Such a work has been executed for the first �me in India and probably in Asia.

Page 6: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

05

Hosapete –Vasco-da-gama Doubling (352 km)

[Shivthan-Londa-Tinaighat

Bhanapur-Koppal

Koppal-Ginigera-Munirabad

Devrayi-Shivthan]

Doubling total

New Line total

Grand Total

55

(15

11

21

8)

207

115

322

Target Length(in Km)

Sec�on

1.6 Quantum jump In Budget Grant for Infrastructure

Gadag-Yalvigi 64058

Cost (In Rs. Crore)Project Length (In Km)

• New line iden�fied under Capital investment programme to be taken up as Joint Venture with State Govt.

Shivamogga-Shikaripura-Ranibennur 170098

Cost (In Rs. Crore)Project Length (In Km)

• Survey for New line:

1.7 New Works Included In Budget 2017-18 • New line sanc�oned :

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

783

1781

2567

31743500

3000

2500

2000

1500

1000

500

0

2014-15 2015-16 2016-17 2017-18

Budget Outlay

in R

s C

rore

Financial Year

Length (Km)Name of project

Badami-Yelburga via Gajendragarh

Alama�-Koppal

Dharmavaram-Ballari

Bidar-Nanded

Swamihalli-Rayadurga

Hassan-Belur-Chikkamagaluru-Sringeri-Shivamogga

Hindupur-Chitradurga

Challakere-Hiriyur-Huliyar-Chikkanayakanahalli-

Turuvekere- Channarayapa�ana

Thalassery-Mysuru

53

125

120

157

45

150

132

200

300

Length (in Km)

• Investment on works has been more than Quadrupled in last three years in the state of Karnataka

• Following bar chart depicts the substan�al pumping of capital to complete on-going works expedi�ously

Page 7: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

2.3 New Railway Electrifica�on Work Sanc�ons in 2017-18 For the first �me in the history of Railways, phenomenal sanc�ons have been received for electrifica�on. As much as 938 Route Km of Railway line in Karnataka has been sanc�oned for electric trac�on in the recent budget.

2.2 Ongoing Railway electrifica�on works

• Survey for Third line:

White field - Bangarpet 3rd line 47

Project Length (In Km)

2.0 Details of Railway Electrifica�on projects commissioned 2.1 Sec�ons commissioned on electric trac�on in last one year

Yelahanka- Dharmavaram, Channasandra-Yelahanka- Lo�egollahalliBengaluru - RamanagaramRamanagaram-YeliyurWadi (Excluding)-ChiksugurChiksugur - GuntakalTalapady - Mangaluru (Part of Charva�ur-Mangaluru)

July 2016

August 2016April 2017

January 2017January 2017

April 2017

Month and Year of Commissioning

Sec�onRoute Km

in Karnataka

211

4656674323

Total 446

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

06

Yeliyur - Mysuru (Part of Mysuru-Bengaluru)Yelhanka - Penukonda 2nd line electrifica�on with doublingBallari - Hosapete electrifica�on along with doublingHosapete - Hubballi - Londa electrifica�on along with doublingLonda - Miraj electrifica�on along with doubling

379392

236180

Route Km within KarnatakaSec�on

Total 638

Bengaluru - Tumakur – Hubballi (With doubling)Gadag – Hotgi (With doubling)Chikjajur – Ballari (Single line)Bengaluru – Omlur (Single line)

560340159152

Cost (in crores)Sec�on Route Km in Karnataka

45625418642

938Total 1211

}

Electrified track in Karnataka has increased nearly by 300 % in last year alone.

Page 8: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

07

3 EXTENSION OF TRAINS AND NEW TRAINS INAUGURATED:3.1 New Trains introduced over last three years

3.2 New Trains introduced in 2014-15: The following pairs of Trains were introduced to cater Karnataka

1. Train No.22695/22696 Yesvantpur -Jaipur Weekly AC Express (Premium)2. Train No.22679/22680 Yesvantpur - Katra Weekly Express (Premium)3. Train No. 22353/22354 Patna-Bengaluru Weekly Express (Premium)4. Train No. 17321/17322 Hubballi - Mumbai Weekly Express5. Train No.16229/16230 Mysuru - Varnasi Bi-weekly Express6. Train No. 16587/16588 Yesvantpur - Bikaner Bi-weekly Express7. Train No. 56921/56922 Hubballi - Belagavi Daily fast Passenger8. Train No. 56282/56281 Bengaluru - Chamarajanagar Daily fast Passenger9. Train No. 56277/56278 Chikmagalur - Yesvantpur Daily fast Passenger10. Train No. 2504/22503 Kamakhya - Baiyyappanahalli Premium Daily Express (LHB Rake)11. Train No. 18111/18112 Tata Nagar - Baiyyappanahalli Weekly Express12. Train No. 76521/76522 Yesvantpur - Nelamangala Daily DEMU passenger13. Train No. 76523/76524 Yesvantpur - Hosur Daily MEMU Passenger (except SUN).14. Train No. 16579/16580 Yesvantpur - Shivamogga Town Bi-weekly Express15. Train No. 56925/56926 Bengaluru - Tumakuru Daily fast passenger16. Train No. 16577/16578 Yesvantpur - Harihar Tri-weekly Express17. Train No. 56665/56666 Byndoor - Kasargod Passenger

Flaging Off Train No. 56925/56926 Bengaluru City - Tumakuru Passenger & Yesvantpur - Hosur Passenger

by Shri D. V. Sadananda Gowda, Honble MR on 01.11.2014

2014-15 2015-16 2016-17

New Trains Introduced (in Nos.) 34 02 28

Frequency Increased/Extended (in pairs) 03 01 06

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

Flagging off Train No.16587/16588 Yesvantpur – Bikaner – Yesvantpur Bi-weekly Express and

Train No. 22695/22696 Jaipur – Yesvantpur – Jaipur Premium Superfast weekly Express

by Shri Anant Kumar, Hon'ble Union Minister on 07.12.2014

Page 9: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

08

In addi�on during 2014-15

• The frequency of 3 pairs of Mail/Express trains was increased from Tri-weekly to Daily and that of 1 Weekly train to Daily. • 6 nos. of Daily Passenger trains and one no. of 6 days a week Passenger train were introduced. • 4 coaches were augmented in Mail/Express trains.•Experimental stoppages for 8 Mail/Express trains were provided at 3 sta�ons.• 40 Special trains were run from Karnataka State to clear extra passenger rush. • 928 Extra coaches were a�ached to clear waitlisted passengers.

3.3 New trains, increase in frequency provided in 2015 – 16

• One pair of biweekly express Train No.11031/32 – Solapur - Vijayapur introduced.• 49 coaches were permanently augmented and 33 coaches were temporarily augmented in various trains. • Experimental stoppages for 10 Mail/Express trains were provided at 5 sta�ons • 20 Special trains were run from Karnataka State to clear extra passenger rush. • 1135 extra coaches were a�ached to clear waitlisted passengers. • Karwar-Madgaon DEMU service extended upto Pernem.

3.4 New Trains introduced in 2016-1714 pairs of new train services were introduced in Karnataka during 2016-17.

1. Train No.22679/80 Yesvantpur – Hassan – Yesvantpur Daily Intercity Express.2. Train No. 16581/16582 KSR Bengaluru – Shivamogga –KSR Bengaluru Tri-Weekly Express.3. Train No. 17022/17021 Vasco da gama – Hyderabad – Vasco da gama Weekly Express.4. Train No. 17420/17419 Vasco da gama –Tirupa� – Vasco da gama Weekly Express5. Train No. 22888/22887 Yesvantpur – Howrah –Yesvantpur Weekly Humsafar Express6. Train No. 66535/66536/66537/66538/66539/66540 KSR Bengaluru – Ramanagaram – K S R Bengaluru MEMU Service7. Train No. 66542/66541 KSR Bengaluru – Whitefield – KSR Bengaluru MEMU Service8. Train No. 66544/66543 KSR Bengaluru – Kuppam – KSR Bengaluru MEMU Service9. Train No. 57478/57477 Kalyandurga – Tirupa� – Kalyandurga Passenger10. Train No. 12503/12504 Bengaluru Can�. -Kamahkya- Bengaluru Can� Weekly Humsafar Express11. Train No. 14715/14716 Sriganganagar- Tiruchchirapalli weekly Humsafar Express(via SWR )12. Train No. 56927/56928 Hubballi – Chikkabenakal Fast passenger 13. Train No. 11076/11075 Bidar-Lokamanya Tilak Terminus Mumbai Weekly Express14. Train No. 11307/11308 Kalaburagi-Hyderabad Intercity Express

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

MEMU services flagged off between KSR Bengaluru and

Ramanagaram on 16th January, 2017.

Inaugura�on of Train services on new rail line between Nelamangala and Shravanabelagola

on 26th March, 2017.

Page 10: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

09

3.5 In addi�on, during 2016-17 • Frequency of service of one train was increased• Five trains were extended• Timings of five pairs of trains were revised to suit passengers • Stoppage provided on experimental basis for 45 trains at different sta�ons• 34 trains over SWR speeded up to reach /leave the sta�on• 4 trains were converted from conven�onal coaches to LHB coaches• 3 Railbus with conven�onal coaches were upgraded to MEMU.

4.0 THROUGHPUT ENHANCEMENT WORK4.1 Traffic facility works commissioned during the last three years • Addi�onal running lines have been commissioned at the following sta�ons of Karnataka

4.2 New Crossing sta�ons have been commissioned in exis�ng Railway Line between the following sta�ons

Sta�on

Tholahunse

Savanur

Nagasamudram

Gubbi

Bageshpura

Habangha�a

Chikkodi Road

Rajanukunte

Banasawadi

Tumakuru

Chikjajur

Jun. 2014

Aug. 2014

Dec. 2014

Mar.2015

Oct. 2015

Feb. 2016

Jun. 2015

May 2015

Mar. 2016

May 2017

Aug. 2016

Month of Commissioning

Sta�on

Koravangala (between Hassan-Bageshpura)

Haliyuru (between Amritapura-Chitradurga)

Nandihalli (between Banniha�-Ranjitpura)

Kudgi (between Mulavad-Basavanabagewadi Road)

Nelamangala (between Chikbanavar-Solur)

Mysuru New Goods Terminal Bye-Pass sta�on between

Belagola and Mysuru New Goods Terminal

Feb. 2015

Aug. 2016

Sep. 2015

Jan. 2017

Jan. 2016

May 2016

Month of Commissioning

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

4.3 In addi�on, many new crossing sta�ons & Intermediate block sta�ons have been commissioned.

4.4 Private Sidings at the following sta�ons have been commissioned

Sta�on / Siding

M/s. Jindal Steel Works Ltd Siding/Nandihalli

M/s. Adani Agri Logis�cs Limited at Malur

M/s. Na�onal Thermal Power Corpora�on at Kudgi

New Freight Loading Terminal at Thokur

August 2015

April 2016

March 2017

April 2017

Month of Commissioning

Page 11: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

10

4.5 Other than the above works, the following capacity enhancement works have been commissioned over last two years.

New Crossing Sta�on at Kudgi with 4 lines for serving upcoming NTPC plant

has been commissioned in January 2016.

New Crossing sta�on at Koravangala between Hassan-Bageshpura sta�on on Hassan-Arsikere sec�on of Mysuu division was commissioned

on 21.02.2015.

(MEMU) Car Shed, BanasawadiMainline Electrical Mul�ple Unit (MEMU)

Shed commissioned at Banasawadi, Bengaluru

Diesel Shed Krishnarajpuram: The capacity of Diesel shed at

Krishnarajpuram was upgraded from 125 to 150 locos

Mysuru New Goods TerminalFreight train examina�on facili�es started at MNGT (Mysore New Goods Terminal), with

Covered shed, crane, service building.

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

Hubballi and Mysuru Workshops have received cer�fica�on of

Integrated Management system (IMS).

Page 12: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

11

5.0 ROAD OVER BRIDGES & ROAD UNDER BRIDGES5.1 Large Number of Road Over Bridges / Road Under Bridges have been provided in Karnataka to facilitate uninterrupted movement of road traffic at level crossing gates. Details of completed works of Road Over bridges /Road under Bridges /Subway in Karnataka

5.2 Out of this, following Road Over Bridges/Road Under Bridges (Accommoda�on Works) were done as part of New Line and Doubling projects.

Road Under Bridge at Bhadravathi

Road Under Bridge between Bengaluru - Nayandahalli sta�ons.

Road Under Bridge at Tumakuru

Road Under Bridge near Srirangapatna

Road Under Bridge at Koppal Road Under Bridge near Chitradurga

5.3 Road Under Bridges

YearNo. of Road Under Bridges/

Subways providedNo. of Road Over Bridges Provided

2014-152015-162016-17

854427

131915

No. of Road Under Bridges/Subways provided

2014-152015-162016-17

31139

Year

13195

No. of Road Over Bridges Provided

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

Page 13: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

12

The Road Over Bridge at Jalahalli in Bengaluru

Road over Bridge between Srirangapatna & Pandavapura

5.5 NEWLY SANCTIONED ROAD OVER BRIDGES/ROAD UNDER BRIDGES IN 2017-18.

Road Over BridgeRoad Under Bridge

Details

0503

Sanc�oned

Total 08

5.6 ELIMINATION OF LEVEL CROSSING GATES: Railway has taken giant leap in elimina�ng unmanned Level Crossings thereby enhancing safety in Train opera�ons. Priority is being given to elimina�on of unmanned LCs situated on main line with higher traffic.

Closure of Level crossings and Manning of Unmanned Level Crossings in Last 3 years

YearClosure of

Manned LCsClosure of

Unmanned LCsManning of

Unmanned LCsTotal

2014-152015-162016-17

192545

554734

15331

75125110

Total 89 136 85 310

5.4 Road Over Bridges

Road Over Bridge at Davangere Road Over Bridge at Belagavi

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

During 2014-17,310 Nos. of Level Crossing gates in Karnataka were eliminated by construc�on of Limited height Subways/Road Over bridge/Road Under Bridge, Diversion.

Railways aims to eliminate all Unmanned Level Crossing gates by 2020

Page 14: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

13

'Customer' is the centre of all our ac�vi�es. Constant efforts are being made to take care of the needs of all segments of passengers and to ensure safe and comfortable travel. During last three financial years, Rs.134 crore has been spent for improving passenger ameni�es at sta�ons over Karnataka. The following addi�onal facili�es were provided for the convenience of the passengers.

Passenger amenity Works completed during 2014-15 & 2015-16

Works completed during 2016-17

Works in progress

Improvement to Sta�on Buildings

2 sta�onsKSR Bengaluru, Krishnarajapuram

10 Sta�ons RanibennurKabakapu�ur Yelahanka BantwalHarihar Subrahmanya RoadHubballiBasavanabagewadi BadamiHolenarsipur

1 Sta�on Davangere

I) Second entry at KSR Bengaluru has been commissioned to decongest the main entry to sta�on and to provide easy access from Northern side of the sta�on. Facili�es provided in new entry are booking counters, concourse area, vehicle parking.

Yelahanka new sta�on building has been constructed. Facili�es like concourse area, booking window, SMR room, Wai�ng halls, VIP longue, Pay & Use toilet, etc. have been provided.

Works like improvement to facade of sta�on building, improvement to circula�ng area/land scapping, provision of Pay & use toilets, provision / renova�on of wai�ng hall, etc. are planned.

II) New sta�on building at Krishnarajapuram. Provided 2nd entry from PF No.4 side Booking window, concourse area, wai�ng halls, parking space facili�es are provided.

At Kabakapu�ur sta�on improvement in the facade of the sta�on building, separate wai�ng hall for gents & ladies, improvement to circula�ng area, extension of PF No.1 have been completed.

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

6. PASSENGER AMENITIES

Page 15: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

14

New Sta�on building at Second entry of KSR Bengaluru Sta�on

New sta�on building at Krishnarajapuram Third entry at Yesvantpur Sta�on

New sta�on building at Chikjajur

Renovated sta�on building at Kabakapu�ur

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

New sta�on building at Holalkere

Adarsh Sta�on: Works have been completed at 30 sta�ons of Karnataka in last three years.

Page 16: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

15

Chikbanavar Byatrayanhalli

MandagereKSR Bengaluru

2016-17

VijayapuraBanasawadi

2014-15

K S R BengaluruYesvantpur

Alma�AlnavarKoppalBadami

BidarBhalki

2015-16

Second Foot over bridge at KSR Bengaluru sta�on from Pla�orm No.1 to 7/8

Commissioning of Foot over bridge at Alnavar, and Alma� Sta�ons

6.1 FOOT OVER BRIDGES- To facilitate passenger movement across pla�orms, Foot Over Bridges are being provided at important sta�ons. The following table depicts year wise commissioning of FOBs at various sta�ons in Karnataka over last three years

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

Foot Over bridge at Yesvantpur Sta�on

Foot over bridge at Chikbanavar sta�on

Foot Over Bridge at Kabakapu�ur

Sta�on

Page 17: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

16

6.2 SUBWAYS:

Mysuru

2016-17

Hubballi

2015-16

New Subway inaugurated at Mysuru Railway Sta�on in March 2016

High level passenger pla�orm at Hoodi sta�on

6.3 Other passenger amenity works

Kuda�ni, Kabakapu�ur, Bidadi, Banaswadi, Indi Road, Ranibennur, Carmelaram, Gauribidanur, Rajanukunte

Provided in 2014-15 & 2015-16

Extension / surface

improvement of pla�orms.

Details

Krishnanarajanagar, Belagola, Mandagere, Holenarsipur, Krishnarajasagara, Hosaagrahara, Akkihebbalu, Mavinakere, Sasalu, Amritapura, Sagaraka�e, Bageshpura, Habbangha�a, Chalgeri, Baiyappanahalli, Mulanur, Devangonthi, Hirehalli & Kyatsandra

Work in progress

Mysuru, Ranibennur, Haveri, Belandur Road, Byatrayanhalli, Kamasamudram, Malleshwaram, Soldevanahalli, Bhairanayakanahalli, Dodbele, Muddalingahalli, Nidvanda, Tarikere, Hulko�, Bengaluru Can�, Udupi

Provided in 2016-17

Extension of Pla�orm No.1 at Udupi Sta�on

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

19 sta�ons16 sta�ons09 sta�ons

Page 18: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

17

20 sta�onsTumakuru, Dodbele, Chikballapur, Byatrayanhalli, Kamasamudram, Naganahalli, Devanahalli, Makalidurga, Nidvanda, Someswara, Alma�, Badami, Alnavar, Harlapur, Jadramakun�, Sompur Road, Bantawala. Banasawadi, Baiyappanahalli, Krishnarajapuram

Provided in 2014-15 & 2015-16

Provision of pla�orm shelters /extension

of pla�orm shelters.

Passenger Amenity Work in progressProvided in 2016-17

69 sta�ons Doddajala, Kuda�ni, Adihalli, Banasandra, Gubbi, Honnavalli Road, Kardi, Oddarahalli, Sulebhavi, Sambre, Desur, Gadiganur, Masarahalli, Tarikere, Malur, Oorgaum, Coromandel, Champion, Hubballi, Alma�, Haveri, Shivamogga Town, Davangere, Ranibennur, Ramanagaram, Yesvantpur, Srirangapatna, Pandavapura, Mandya, Maddur, Daroji, Chikkodi Road, Devarayi, Gunji, Shedbal, Somalapuram, Tavarga�, Vijayanagar, Sagarka�e, Kudachi, Akkihebbalu, Hosaagrahara, Castle Rock, Tinaighat, Mugalolli, Guledgudda Road, Hebsur, Holalkere, Ramagiri, Shivani, Bageshpura, Mavinkere, Habbangha�a, Indi Road, Basavanbagewadi, Channasandra, Rajanukunte, Ballekere, Banavar, Shivapur, Kumsi, Raybag, Toranagallu, Arsikere, Gadag, Ibrahimpur, Amargol, Kyarkoppa, Bidar.

11 sta�ons Dharwad, Londa, Amritapura, Balenahalli, Kodaganur, Mallasandra, Nagavangala, Ni�ur, Sampige Road, Annegeri, Mugad.

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

Page 19: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

18

Extension of Plat Form at Gadiganuru

& Somalapuram Sta�on

Pla�orm Shelter at Shivamogga Sta�on &

Gadag Sta�on

Pla�orm Shelter at Toranagallu & Channapatna

Pla�orm Shelter at Pandavapura & Maddur

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

Page 20: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

19

4 sta�onsArsikere (PF 3)Gadag (PF 1)

Dharwad (PF 1), Ballari (PF 2)

Provided in 2014-15 & 2015-16

Provision of Cement Concrete

Apron

Passenger Amenity Provided in 2016-17

2 sta�onsHubballi (PF 3, 4 & 5)

Bengaluru Can�. (PF 1)

Cement Concrete Apron at Hubballi Sta�on

Provided in 2014-15 & 2015-16

Provision of addi�onal benches.

Passenger Amenity Provided in 2016-17

2879 Nos. benches provided at 10 sta�ons.

Gauribidnur, Coromandel,Malur, Oorgaum, Champion,

Mysuru, Kabakapu�ur, KSR Bengaluru

Gadag, Ibrahimpur

938 Nos. benches provided at 18 sta�ons.

Davangere, Harihar, Ranibennur, Byadgi, Yalvigi, Shivamogga, Bhadravathi, Mysuru, Chamarajapuram,

Nanjangud Town, Chamarajanagar, Champion,

Oorgaum, Coromandel, Carmelaram, Banaswadi, KSR Bengaluru , Bengaluru Can�

Provided in 2014-15 & 2015-16

Construc�on of toilets.

Passenger Amenity Provided in 2016-17

19 sta�onsNavalur, Krishnarajanagar,

Holenarasipura,Kudachi, Raybag, Chitradurga, Coromandel,

Yedamangala, Narimogaru, Challakere, Thalaku, Molakalmuru,

Kundagol, Bommanagudagere, Habbangha�a, Tinaighat,

Ugarkhurd, Kuda�ni, Obalapuram

13 sta�onsSagarjambagaru, Devargudda, Talaguppa, Saunshi, Gudageri, Byatrayanhalli, Devangonthi,

Heelalige, Carmelaram, Champion, Dodbele, Hejjalla, Toranagallu,

04 sta�onsDharwad, Londa,

Kambarganvi, Balenahalli

Provided in 2017-18

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

Page 21: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

PRE-FABRICATED STAINLESS STEEL(SS) TOILETS PROVIDED AT TORNAGALLU STATION–

Facili�es forDivyang

• 04 Nos. of Toilets have been provided for Divyang at Yesvantpur Railway Sta�on.• 01 No. Divyang Toilet has been provided at Badami Railway Sta�on.• 06 Nos. of Divyang Toilet have been provided at KSR Bengaluru Railway Sta�on.

Janani Seva Yojana For providing baby food, hot milk etc for the benefit of mother traveling with infants, this yojana is implemented at catering stalls of important sta�ons.

6.5 Sta�on Re-development • Two sta�ons viz. Bengaluru Cantonment and Yesvantpur have been iden�fied for redevelopment through Public Private Parternership (PPP) Model. • The indica�ve project cost for sta�on redevelopment for these two sta�ons to be taken up for bidding in the first phase is Rs. 80 Cr. & Rs. 100 Cr. for Bengaluru Cantonment & Yesvantpur sta�ons respec�vely.

6.6 Escalators & Li�s Twelve Escalators (Yesvantpur-4, Hubballi-2, Mysuru-2, Bengaluru-1 Mangaluru Central-2 and Udupi 1 ) & Six li�s ( Bengaluru-1, Yesvantpur-3 and Mysuru-2) have been commissioned.

20

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

Ramps provided for “DIVYANG” at Alma�, Badami, Hole Alur Sta�ons

TOILET PROVIDED ATKUDATINI STATION

Page 22: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

21

Escalator at KSR Bengaluru Railway Sta�on

Li� commissioned at Mysuru Sta�on

Li� commissioned at KSR Bengaluru Sta�on

up-down Escalators at Yesvantpur sta�on

6.7 Planning for 2017-18

Mysuru

6 Li�s ( Hosapete-2, Belagavi-2, Yesvantpur-1 and Bengaluru-1)

Escalators

Li�s

Bengaluru-1

6.8 Ticket booking facili�esThe following addi�onal facili�es have been commenced in last 3 years.

No. of sta�ons

Reserva�on facilityUTS cum PRSDefence PRS

India Post PRS

PRSYatri �cket seva Kendras

Jansadharan Ticket Booking Sevaks.PRS centres at Post office

Ticket booking agents ATVMS

Amenity Sta�ons

Chikbanavara, CarmelaramJalahalli, BengaluruN.R. Mohalla, Chintamani, Peenya Industrial Estate, Laxmipuram, Virajpet, SiriguppaKarwarBengaluru- 7, Hubballi-1, Hubballi 3, Bengaluru 3, Mysuru 2, Suratkal 1, Manipal 1 Chintamani & PeenyaTykal, Dodballapur, Chikballapur.

Sl. No

a)b)c)

d)e)f)g)h)i)

Card basedVersa�le

6.9 Other passenger friendly ameni�es LED based name boards at 20 sta�ons and 03 office buildings have been provided. Fluorescent Sta�on Name Boards at important Sta�ons have been commissioned to improve the aesthe�cs of the sta�on buildings.

Electronic Reserva�on Chart Advance Reserva�onAvailability Display System

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

216

18

1023

9020

Page 23: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

22

6.10 GPS based Double-sided Digital Clocks: GPS based Tower Clocks have been provided at Ballari, Belagavi and Dharwad for precise �me. 101 Sta�ons have been provided with GPS based Double-side Digital Clocks.

GPS based Double-sided Digital Clocks

Passenger amenity Provided Sta�ons

63 Staions (Karnataka)Unkal, Amargol, Navalur, Kusugal, Hebsur, Sisvinhalli, Mugad, Kambarganvi, Alnawar, Tavarga�, Nagargalli, Tinaighat, Annigeri, Hulko�, Kanginhal, Harlapur, Sompur Road, Bannikoppa, Ginigera, Hombal, Bhanapur, Munirabad, Gadiganuru, Daroji, Kuda�ni, Obalapuram, Somalapuram, Lachyan, Minchnal, Mulvad, Nimbal, Mugalolli, Wandal, Jumnal, Ibrahimpur(H), Tadval, Kyatankeri Road(H), Mallapur, Balaganur, Lakhmapur, Hole-Alur, Badami , Jadramkunte, Sambre, Sulebhavi, Suldhal, Pachchapur, Gokak Road, Chikkodi Road, Rayabag, Chinchali, Kudachi, Ugarkhurd, Shedbal, Vijaynagar, Desur, Khanapur, Gunji, Devarayi, Kyarakoppa, Hubballi-05 Nos, Belgavi-03 Nos. and Dharwad-03 Nos

3 Sta�ons (Karnataka)Chikaballapur, Bengaluru & Kolar

Works completed during the 2014-15 & 2015-16

6.11 GPS SYNCHRONIZED TOWER CLOCKS: Five important sta�ons were commissioned with GPS Tower Clocks that show �me with higher degree of precision and also enhance the aesthe�cs of the sta�on buildings.

6.12 Public Addressing System: Automa�c Public Address System is provided at various sta�ons to announce the arrival & departure of trains and other informa�on pertaining to passengers at 13 sta�ons in the last three years.

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

GPS Tower Clock at 110 years old Ballari Sta�on

Page 24: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

23

PA System

Passenger amenity Works completed during 2016-17

12 Sta�ons (Karnataka)Bangarpet, Krishnarajpuram, Tarikere, Chikajajur, Yalvigi , Byadgi, Kabakapu�ur, Subrahmanya Road, Chamarajpuram, Krishnarajanagar, Holenarasipura, Kaduru

1 Sta�on (Karnataka)Castlerock

Works completed during the 2014-15 & 2015-16

Passenger Informa�on System: Coach Guidance Boards have been commissioned at Kengeri and Koppal during the Year 2016-17

Coach indica�on boards

Passenger amenity Works completed during 2016-17

2 Sta�ons Koppal, Kengeri

3 Sta�onsKrishnarajpuram,

Bangarpet, Banaswadi

Works completed during the 2014-15 & 2015-16

Coach Guidance Boards at Koppal

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

6.13 Braille signages for the visually challenged passengers have been provided at Bengaluru sta�on under Corporate Social Responsibility ini�a�ve.

Page 25: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

24

7.1 On Board Housekeeping Services (OBHS)In order to improve the cleanliness of long distance Mail/Express trains during the run, OBHS has been implemented . Passenger compartments, coach toilets, doorways and aisles are cleaned by OBHS staff. 46 pairs of trains iden�fied in the jurisdic�on of Karnataka state have been provided with OBHS. SMS based passenger complaint redressal system of cleanmycoach.com has been introduced in important trains. The passengers can get the coaches cleaned by sending a SMS to helpline number . The facility is meant for trains covered under OBHS. 58888

7.1 Mechanized Cleaning of Coaches & sta�ons Railways have adopted Mechanised Cleaning of coaches and Sta�ons.

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

Clean Train Sta�on (CTS) – Hubballi -110 coaches

being cleaned daily

7.2 Bio Toilets in Coaches:Introduced by Indian Railways in a move to improve cleanliness on tracks and at Railway sta�ons

• 1204 Coaches running in Karnataka are provided with 4159 Bio Toilets so far

• 5 Mail/Express trains origina�ng from Karnataka are running with 100 percent Bio Toilet coaches .

• 40 % of coaches of trains origina�ng from Karnataka have been provided with bio toilets

• All trains will be covered by 2019

7.3 Mechanized Washing of linen • Mechanized Laundries of 2 Tonne capacity at

Hubballi and 1.5 Tonne capacity at Mysuru are func�onal• Work is in progress for provision of 10 Tonne laundry

at Bengaluru

7 Swachh Bharat

Page 26: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

25

8 Digital India8.1 Fast & free Wi-Fi provided at 4 sta�ons Under the “Digital India” ini�a�ve, high speed network access has been provided at 4 sta�ons at Bengaluru, Yesvantpur, Mysuru & Hubballi. 210 access points have been installed at these sta�ons to provided high speed Wi-Fi to passengers. Passengers wai�ng for trains can remain connected and con�nue their work.

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

8.2 Planning for the financial year 2017-18 In Karnataka, WIFI will be provided at the following 10 Sta�ons in 2017-18.

Sta�ons

Vijayapura, Ballari, Dharwad, Hospate.Bengaluru Cant, Bangarpet, Kengeri, Krishnarajapuram, Davangere, Shivamogga Town.

8.2 POINT OF SALE (POS) MACHINES To promote cashless economy, Railway is installing Point of Sale (POS) machines for digital transac�ons at the Reserva�on offices, Parcel offices and Booking offices at different loca�ons. 140 POS machines have already been installed in the first phase. Cashless transac�ons can be made through Debit Card, Credit Card, e-wallets, prepaid cards, Mobile Apps like PayTM, Rupay, Bhim, SBI-UPI Apps, Aadhar based digital payment mode etc. at PRS, UTS counters and parcel offices etc.

8.3 DIGIPAY STATIONS In Karnataka, 5 sta�ons i.e. KSR Bengaluru, Bengaluru Cant., Yesvantpur, Krishnarajapuram & Raichur have been declared as DIGIPAY sta�ons wherein digital payment can be made for all services availed.

BENGALURU

Page 27: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

26

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

9.0 Green Ini�a�ves.Railways is earnestly pursuing renewable energy in the interest of greener planet .Some of the ini�a�ves are

9.1 Harnessing Solar energy : • 165KWp solar modules have been provided recently at the following loca�ons • 100 KWp Solar plant installed at South Western Railway Head Quarters - “RAIL SOUDHA” in Hubballi . 25%

of energy requirement of Rail soudha is being met by Solar Energy.

• 45 KWp Solar plant at Hubballi Workshop. • 20 KWp Solar plant at DRM Office, Bengaluru. • Total 165 KWp Green Energy of 2.5 Lakh Units per year, saving Rs. 18.5 Lakhs. /annum approx.

9.2 Solar panels have been provided at 19 Sta�ons and 117 Level Crossing gates .• Four Power Purchase Agreements (PPAs) executed for Roof Top Solar Energy on Developer mode • Total 4.5 MWP solar power is further planned to be generated in 2017-18 .• Annual genera�on through Mission Solar would be ~ 6.75 Million Units that results in Saving of Rs. 1.39

Crores/ annum approx. 9.3 Tree Planta�on: • 3.68 Lakh tree saplings were planted in last 3 years.

• Memorandum was signed with Forest Department in 10 Districts of Karnataka 9.4 Water Harves�ng & Recycling:

• Water Recycling Plants (WRP) are func�onal at Bengaluru and Yesvantpur • New Water Harves�ng Plants planned at Mysuru and at Hubballi. • Rain Water Harves�ng commissioned at 97 sta�ons and Rail Soudha/ SWR Headquaters.

9.5 100% LED fi�ngs • 25 sta�ons of Karnataka have been provided with 100 % LED fi�ngs as a measure of energy conserva�on . • All the sta�ons are planned to be covered with 100 % LED fi�ngs in 2017-18.

Solar Panels installed in Rail Soudha

Shri Manoj Sinha Hon’ble Minister of State for Railways inaugurated Rain Harves�ng Plant atRail Soudha, Hubballi.

Page 28: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

27

10 SECURITY• Closed circuit surveillance system has been installed in major sta�ons of Karnataka • Integrated Security System (ISS) is implemented for enhancing security at Bengaluru, Yesvantpur and Mysuru

Sta�ons. Video Surveillance System commissioned for PRS, Booking offices, Parcel offices & Cloak Rooms at Bengaluru, Ballari, Hosapete, Dharwad, Belagavi, Vijaypur & Hubballi etc.

To enhance security, Video Surveillance System under Nirbhaya Fund will be provided in 31 important sta�ons over SWR at a cost of Rs.15 Cr..

An innova�ve pa�ern of escort has been introduced during the year 2016-17 under the name “Opera�on Night Hawk”, in which a group of minimum 12 RPF personnel escort a par�cular train and create a safe and secured environment to passengers.

10.1 Rescuing of Children In addi�on to providing security to passengers, Security personnel are discharging responsibility of rescuing

children runaway/missing from their homes and found on pla�orms / trains. These children are then being handed over to various NGOs, Police who are therea�er reunited with their parents.

• During the year 2015-16 & 2016-17, RPF has rescued 533 Children and handed over them to NGO's, Parents and Police.

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

RPF Personnel are recovering le� over luggage, electronic gadgets, gold ornaments & cash of passengers and are returning them to the righ�ul owners.

The details of such recovery made are as under: 10.2 Recovery of Le� behind Luggage etc:-

Year Bags (Nos.) Mobiles (Nos.) Laptops (Nos.) Cash in Rs Gold ornaments worth Rs.

201520162017

(Up to April)

213238

183120

161005

2,67,30388,35069,928

1.2 lakhs3 lakhs

1.5 lakhs

Year Total ChildrenRescued

Handed over to NGO’s

Handed overto Parents

Handed over to Police

201520162017

(�ll now)

23030397

14820158

768629

6166

10.3 In 24 cases RPF has apprehended criminals involved in the� of cash, gold, electronic items etc.

Page 29: Minister for Railways General Manager South Western Railway Years... · New Railway line (Kms.) Doubling of exisng Railway line ... Harlapur-Sompur-Bannikoppa ... Tumakur – Hubballi

28

INPUTS BY RAILWAY IN THE STATE OF KARNATAKA During LAST 3 YEARS(i.e 2014-15,2015-16 &2016-17 )

10.4 Drive against Tou�ng.

Year No. of Cases No. of touts Fine Amount (In Rs) Cash seized (In Rs.)

201520162017

(Up to April)

936318

1047418

5,02,100 3,52,0911,37,600

1,21,60794,61027,750

10.5 PROSECUTION UNDER RAILWAY ACT: Railway Protec�on Force are arres�ng and prosecu�ng offenders involved in chain pulling, illegal hawking, nuisance creating, trespassing, foot board travelling etc.

Year No. of persons prosecuted Fine amount realized. (In Rs)

201520162017

(Up to April)

29,97630,64310,040

76,02,338/-86,57,850/-34,16,040/-

****

11. FREIGHT LOADING PERFORMANCE

47

10

No. of Sta�ons

2014-152015-162016-17

Year

New Sta�ons opened for handling Goods traffic in Karnataka.

Railway has consistently increased its loading - an important performance parameter.

Load

ing

in M

illio

n T

on

es