23
- 1 - MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA REGULATION OF THE MINISTER OF ENERGY AND MINERAL RESOURCES REPUBLIC OF INDONESIA NUMBER 08 OF 2016 CONCERNING AMENDMENT TO THE REGULATION OF MINISTER OF ENERGY AND MINERAL RESOURCES NUMBER 33 OF 2014 REGARDING THE QUALITY LEVEL OF SERVICE AND COST RELATED WITH ELECTRICITY DISTRIBUTION COMPANY BY PERUSAHAAN PERSEROAN (LIABILITY COMPANY) PT PERUSAHAAN LISTRIK NEGARA BY THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA, Considering : a. that in order to improve services the supply of electricity to consumers and the ease of doing business as well as in the framework

MINISTER OF ENERGY AND MINERAL RESOURCES OF … file17.07.2016 · NUMBER 08 OF 2016 CONCERNING AMENDMENT TO THE REGULATION OF MINISTER OF ENERGY AND MINERAL RESOURCES NUMBER 33 OF

Embed Size (px)

Citation preview

- 1 -

MINISTER OF ENERGY AND MINERAL RESOURCES

OF REPUBLIC OF INDONESIA

REGULATION OF THE MINISTER OF ENERGY AND MINERAL RESOURCES

REPUBLIC OF INDONESIA

NUMBER 08 OF 2016

CONCERNING

AMENDMENT TO THE REGULATION OF MINISTER OF ENERGY

AND MINERAL RESOURCES NUMBER 33 OF 2014

REGARDING THE QUALITY LEVEL OF SERVICE AND COST RELATED WITH

ELECTRICITY DISTRIBUTION COMPANY BY PERUSAHAAN PERSEROAN

(LIABILITY COMPANY) PT PERUSAHAAN LISTRIK NEGARA

BY THE GRACE OF GOD ALMIGHTY

MINISTER OF ENERGY AND MINERAL RESOURCES OF

REPUBLIC OF INDONESIA,

Considering : a. that in order to improve services the supply

of electricity to consumers and the ease

of doing business as well as in the framework

- 2 -

of the certification of the installation

of the use of electric power low voltage,

necessary to improve the provision of the

quality of services and costs associated

with the distribution of electricity as

stipulated in the Regulation of the Minister

of Energy and Mineral Resources Number 33

of 2014 on level of Service Quality and

Cost Associated With Electricity Distribution

By Perusahaan Perseroan (Liability Company) PT.

Perusahaan Listrik Negara;

b. Based on the considerations as referred to

in paragraph a, it is necessary to stipulate

Regulation of the Minister of Energy and

Mineral Resources of the Amendment to the

Regulation of the Minister of Energy and

Mineral Resources Number 33 of 2014 on the

level of service quality and Cost Associated

With Distribution of Electric Power By

Perusahaan Perseroan (Liability Company) PT

Perusahaan Listrik Negara;

In view of : 1. Law Number 8 of 1999 on Consumer Protection

(State Gazette of the Republic of Indonesia

of 1999 Number 42, Supplement to the State

- 3 -

Gazette of the Republic of Indonesia Number

3821);

2. Law Number 30 of 2009 on Electricity (State

Gazette of the Republic of Indonesia of

2009 Number 133, Supplement to the State

Gazette of the Republic of Indonesia Number

5052);

3. Government Regulation Number 14 of 2012 on

Business Activities of Electricity Supply

(State Gazette of the Republic of Indonesia

of 2012 Number 28, Supplement to the State

Gazette of the Republic of Indonesia Number

5281) as amended by Government Regulation

Number 23 of 2014 (State Gazette of the

Republic of Indonesia Year 2014 Number 75,

State Gazette of the Republic of Indonesia

Number 5530);

4. Presidential Regulation Number 68 of 2015

concerning the Regulation of the Minister

of Energy and Mineral Resources (State Gazette

of the Republic of Indonesia of 2015 Number

132);

5. Presidential Decree Number 121/P of 2014

dated October 27th, 2014;

- 4 -

6. Regulation of Minister of Energy and Mineral

Resources Number 18 of 2010 on the Organization

and Administration of the Ministry of Energy

and Mineral Resources (State Gazette of

the Republic of Indonesia of 2010 Number

552) as twice amended by Regulation of the

Minister of Energy and Mineral Resources

Number30 of 2014 (State Gazette of the

Republic of Indonesia of 2014 Number 1725);

7. Regulation of Minister of Energy and Mineral

Resources Number 33 of 2014 on the level

of service quality and Cost Associated With

Electricity Distribution By Perusahaan

Perseroan (Liability Company) PT Perusahaan

Listrik Negara (State Gazette of the Republic

of Indonesia of 2014 Number 1790);

DECIDED:

Stipulated : REGULATION OF THE MINISTER OF ENERGY AND MINERAL

RESOURCES ON AMENDMENT TO THE REGULATION OF MINISTER

OF ENERGY AND MINERAL RESOURCES NUMBER 33 OF

2014 ON THE LEVEL OF QUALITY OF SERVICE AND COSTS

ASSOCIATED WITH ELECTRICITY DISTRIBUTION OF

PERUSAHAAN PERSEROAN (LIABILITY COMPANY) PT

PERUSAHAAN LISTRIK NEGARA.

- 5 -

Article I

Several provisions in Regulation of the Minister

of Energy and Mineral Resources Number33 of

2014 on the level of service quality and Cost

Associated With Distribution of Electric Power

By Perusahaan Perseroan (Liability Company) PT

Perusahaan Listrik Negara (Official Gazette of

the Republic of Indonesia of 2014 Number 1790),

is amended as following:

1. The provisions of item 9 of Article 1

changed and between number 7 and number 8

is inserted 1 (one) number which is a number

7a, therefore Article 1 shall be read as

follows:

Article 1

1. Consumer is any person or entity who

purchase electricity from Perusahaan

Perseroan (Liability Company) PT Perusahaan

Listrik Negara.

2. Electricity Regular rates is electricity

rates provided by Perusahaan Perseroan

(Liability Company) PT Perusahaan Listrik

- 6 -

Negara which is paid after the use of

electricity by consumers.

3. Prepaid electricity tariffs is prepaid

electricity tariffs provided by Perusahaan

Perseroan (Liability Company) PT Perusahaan

Listrik Negara paid prior to use of

electricity by consumers.

4. The connection fee is a fee paid by

consumers to obtain the connection

power or additional power.

5. Subscriptions Security Electricity is

a Security in the form of cash or

bank Security issued by national banks

on the power consumption and energy

into electricity for consumers.

6. Exposure power is power that is calculated

proportionately and professionally by

limiting instrument or Ability Conductivity

Flow (KHA) a conductor that is used

by power users who are caught at the

time of Controlling Power Consumption

implemented.

7. Connected power is power that is

agreed between Perusahaan Perseroan

(Liability Company) PT Perusahaan Listrik

- 7 -

Negara with Consumers who poured in a

power purchase agreement.

7a. Certification costs Eligible Operation

hereinafter referred to as SLO costs

are costs incurred by the consumer in

the implementation of the certification

of the installation of low-voltage

electric power utilization.

8. Minister is the minister who held

government affairs in the field of

electricity.

9. The Director General is the director

general who has the task of organizing

the formulation and implementation of

policies in the field of development,

exploitation, engineering, working safety,

and the environment in the electricity

sector.

2. Between Article 3 and Article 4, 1 (one)

article, namely Article 3A, which reads as

follows:

Article 3A

(1) The amount of the level of service

quality of power for the new connection

- 8 -

service speed indicator of low voltage

as defined in Article 2 letter h,

implemented within a maximum period

of:

a. 5 (five) working days without

network expansion;

b. 15 (fifteen) working days with

network expansion; and

c. 25 (twenty five) working days

with the addition of a transformer.

(2) Conditions period referred to in

paragraph (1), including the implementation

of the certification of the installation

of low-voltage electrical energy utilization

up to the issuance of Certificate of

Eligible Operations.

(3) Under certain conditions, the provision

period referred to in paragraph (1)

may be excluded.

(4) Certain conditions referred to in paragraph

(3), among others:

a. geographical conditions; and

b. the condition of the existing network.

3. The provisions of paragraph (1) of Article

5 are amended and in between paragraphs

- 9 -

(1) and (2) inserted 3 (three) paragraph

namely paragraph (la), paragraph (lb) and

(lc) as well as paragraph (2) plus 1 (a)

paragraph, namely paragraph (3), so that

Article 5 reads as follows:

Article 5

(1) Perusahaan Persero (Liability Company) PT

Perusahaan Listrik Negara obliged to

provide a reduction in electricity

bills to consumers if the realization

of electric power service quality

levels exceed 10% (ten percent) on the

amount of the quality of services regulated

electricity, for the indicators:

a. long interruption;

b. the amount of interference;

c. speed of service low-voltage power

changes;

d. kWh meter reading error;

e. time error correction account; and/or

f. speed connection service new low

voltage.

- 10 -

(1a) Reduction of electricity bills to

consumers as referred to in paragraph

(1) is provided by:

a. 35% (thirty five percent) of the

Account Fees or Minimum Charges

for consumers on group rates charged

by electric power tariff adjustment

[tariff adjustment); or

b. 20% (twenty percent) of the Account

Fees or Minimum Charges for consumers

on group rates are not subject

to adjustment of electricity tariff

(tariff adjustment).

(1b) For electricity consumers on prepaid

electricity tariffs, reduction in the

bill referred to in paragraph (la)

synchronized with the bill reduction

electricity consumers in the electricity

tariff Connected regular with the same

power.

(1c) Reduction of the bill referred to in

paragraph (la) and (lb) calculated on

electricity bills or purchase prepaid

electricity tokens in the next month.

- 11 -

(2) Perusahaan Persero (Liability Company) PT

Perusahaan Listrik Negara shall periodically

report on the realization of the

quality of services and the implementation

of the reduction of electric power

electricity bill every quarter in

writing to the Director-General no

later than thirty (30) calendar days

after the end of the quarter.

(3) The data source reporting the realization

of the quality of services of electricity

referred to in paragraph (2) using

the measurement and reporting application

Owned Company (Liability Company) PT

Perusahaan Listrik Negara.

4. The provisions of paragraph (1) of Article

7 be amended so that Article 7 shall be

read as follows:

Article 7

(1) Perusahaan Persero (Liability Company) PT

Perusahaan Listrik Negara exempted from

the obligation to provide a reduction

in electricity bills to consumers as

- 12 -

referred to in Article 5 paragraph

(la) in case of force majeure reasons.

(2) Because force majeure as referred to

in paragraph (1) an ability causes

beyond the control of Perusahaan Perseroan

(Liability Company) PT Perusahaan Listrik

Negara include general chaos, riots,

sabotage, riots, violent demonstrations,

strikes, fires, floods, landslides,

earthquakes, due to accidents, natural

disasters, or command authorities.

5. The provisions of paragraph (3) of Article

11 is amended so that Article 11 shall be

read as follows:

Article 11

(1) Consumers with Electricity Rates Regular

imposed Power Security Subscription.

(2) Subscriptions Security electric power

as referred to in paragraph (1) is

set at or worth the expense accounts

of the national average of 1 (one)

month according group rate paid /

delivered no later than 1 (one) month

- 13 -

after the new grafting or change of

power.

(3) Subscriptions Security electric power

as referred to in paragraph (2), may

take the form of bank Securities for:

a. low voltage consumers, namely:

1. group rates for the purposes

of midsize businesses with

the power of 6,600 VA to

200 kVA; and

2. group rates for industrial

purposes is being supplied

with power above 14 kVA up

to 200 kVA.

b. medium voltage consumers; and

c. high voltage consumers.

(4) Electricity Power Security Subscriptions

Management as referred to in paragraph

(1) shall be improved continuously in

the interest of consumers and Limited

Liability Company (Liability Company)

PT Perusahaan Listrik Negara.

(5) Directors of the Company (Liability

Company) PT Perusahaan Listrik Negara

can assign lower Electricity Power Security

- 14 -

Subscription than the provisions as

referred to in paragraph (2) by reason

that could accounted for.

(6) Consumers who terminate the Electricity

Power Purchase Agreement, or switch to

Power Prepaid Rates, Electricity Power

Subscription Security returned to the

consumer after deduction of electricity

bills and all debts to Perusahaan

Perseroan (Liability Company) PT Perusahaan

Listrik Negara which has not been

repaid.

(7) Further provisions on the implementation

of Electricity Power Subscription Security

set by the Board of Directors of

Perusahaan Perseroan (Liability Company)

PT Perusahaan Listrik Negara.

6. Between Chapter IV and Chapter V, 1 (one)

chapter namely Chapter IVA, which shall be

read as follows:

CHAPTER IVA

USAGE INSTALLATION CERTIFICATION COST OF

LOW-VOLTAGE POWER CONSUMER

- 15 -

Article 16A

(1) Installation of low-voltage electric

power utilization required to have a

Certificate of Eligible Operations

prior to the connection of electricity

by Perusahaan Perseroan (Liability

Company) PT Perusahaan Listrik Negara.

(2) To obtain the Certificate of Eligible

operations referred to in paragraph

(1), subject to SLO fee with the amount

as stated in Attachment II which is

an integral part hereto.

Article 16B

(1) SLO fees paid to the following provisions:

a. perform jointly with payment

of the new connection fees;

b. performed jointly with payment

with the electric power addition

cost, as long as there are changes

in power installations; or

c. performed after receiving notification

from Perusahaan Perseroan (Liability

Company) PT Perusahaan Listrik

- 16 -

Negara for recertification of the

Certificate of Eligible Operations

that have expired.

(2) SLO costs referred to in paragraph (1)

may be paid to Perusahaan Perseroan

(Liability Company) PT Perusahaan

Listrik Negara through one (1) door

service.

(3) In addition to through one (1) doors

services payment as referred to in

paragraph (2), SLO fee can be paid

directly to the Low Voltage Technical

Inspection Agency.

Article 16C

Board of Directors of Perusahaan Persero

(Liability Company) PT Perusahaan Listrik

Negara further regulate service provision

of 1 (one) door and ordinances SLO fee

forwarding paid to the Technical Inspection

Agency of Low Voltage.

7. The provisions of Annex I is converted into

as listed in Annex I which is an integral

part hereto.

- 17 -

Article II

(1) The provisions referred to in Article 5

come into effect on January 1, 2017.

(2) This Regulation comes into force on the

date of promulgation.

For public cognizance, this Ministerial Regulation

shall be promulgated in the State Gazette of

the Republic of Indonesia.

Stipulated in Jakarta

On March 15, 2016

MINISTER OF ENERGY AND MINERAL RESOURCES

REPUBLIC OF INDONESIA,

signed.

SUDIRMAN SAID

Promulgated in Jakarta

on March 21, 2016

DIRECTOR GENERAL OF

REGULATION LEGISLATION MINISTRY

- 18 -

OF JUSTICE AND HUMAN RIGHTS OF

THE REPUBLIC OF INDONESIA,

signed.

WIDODO EKATJAHJANA

STATE GAZETTE OF THE REPUBLIC OF INDONESIA OF 2016 NUMBER 417

Copy is in accordance with the original

MINISTRY OF ENERGY AND MINERAL RESOURCES

Chairman of Legal Bureau

[Sealed and signed]

Hufron Asrofi

- 19 -

APPENDIX I

REGULATION OF THE MINISTER OF ENERGY AND

MINERAL RESOURCES REPUBLIC OF INDONESIA

NUMBER 08 OF 2016

CONCERNING

AMENDMENT TO THE REGULATION OF MINISTER OF

ENERGY AND MINERAL RESOURCES NUMBER 33 OF

2014 REGARDING THE QUALITY LEVEL OF

SERVICE AND COST RELATED WITH ELECTRICITY

DISTRIBUTION COMPANY BY PERUSAHAAN PERSEROAN

(LIABILITY COMPANY) PT PERUSAHAAN LISTRIK

NEGARA

SWITCHING FEES

No. Connection group Power In (USD)

1, Connection 1-phase or 3-phase with

power restrictions and low voltage

measurement

a. Connection power up to 450 VA 421,000.00

b. Connected power 900 VA 843,000.00

c. Connected power 1,300 VA 1,218,000.00

d. Connected power 2,200 VA 2,062,000.00

e. Added power to up to 2,200 VA 937.00 / VA

f. Connected power or added power

above 2,200 VA s.d. 100 kVA

969.00 / VA

g. Connected power or added power

class households R-3

969.00 / VA

- 20 -

h. Connected power or added power

above 100 kVA s.d. 200 kVA

775.00 / VA

2. 3-phase connections or add power to

the power restrictions and Medium

Voltage measurement

631.00 / VA

3. 3-phase connections or add power to

the power limitations and measurement

High Voltage

535,00 / VA

4. 1 phase connection with restrictions

on power and low voltage measurements

at the customer premises

No. Connection group Power In (USD)

a. Special rates S-l / TR until 220

VA

60,000.00/

connection

b. To increase the power of the S-

class fare l / TR (without meters)

to 450 VA

Free connection

fee

Note:

Directors of Perusahaan Persero (Liability Company) PT

Perusahaan Listrik Negara may set K factor (multiplier) at

the highest of 1.5 according to local conditions.

MINISTER OF ENERGY AND MINERAL RESOURCES

REPUBLIC OF INDONESIA,

signed.

SUDIRMAN SAID

- 21 -

Copy is in accordance with the original

MINISTRY OF ENERGY AND MINERAL RESOURCES

Head of Legal Bureau

[Sealed and signed]

Hufron Asrofi

- 22 -

APPENDIX II

REGULATION OF THE MINISTER OF ENERGY AND

MINERAL RESOURCES

REPUBLIC OF INDONESIA

NUMBER 08 OF 2016

CONCERNING

AMENDMENT TO THE REGULATION OF MINISTER OF

ENERGY AND MINERAL RESOURCES NUMBER 33 OF

2014 REGARDING THE QUALITY LEVEL OF SERVICE

AND COST RELATED WITH ELECTRICITY DISTRIBUTION

COMPANY BY PERUSAHAAN PERSEROAN (LIABILITY

COMPANY) PT PERUSAHAAN LISTRIK NEGARA

SLO FEES

No. Description Power In

(USD)

1. Connected power until 450 VA 60000.00

2. Connected power 900 VA 70,000.00

3. Connected power 1,300 VA 85.000,00

4. Connected power 2,200 VA 95000.00

5. Connection power of 3,500 VA until 7700 VA 30.00 / VA

6. Connection power of 10,600 VA until 23,000 VA 25.00 / VA

7. Connection power of 33,000 VA until 66,000 VA 20.00 / VA

8. Connection power of 82,500 VA until 197,000 VA 15.00 / VA

- 23 -

MINISTER OF ENERGY AND MINERAL RESOURCES

REPUBLIC OF INDONESIA,

signed.

SUDIRMAN SAID

Copy is in accordance with the original

MINISTRY OF ENERGY AND MINERAL RESOURCES

Head of Legal Bureau

[Sealed and signed]

Hufron Asrofi