[INSERT PLANNING SCHEME NAME] PLANNING SCHEME
SCHEDULE [NUMBER] TO CLAUSE 42.02 VEGETATION PROTECTION OVERLAY
Shown on the planning scheme map as VPO[number].
NAME OF SCHEDULE
1.0 Statement of nature and significance of vegetation to be protected
Clause 42.02 requires a schedule to contain a statement of the nature and significance of the vegetation to be protected.See 42.02-1 for relevant provisions.
2.0 Vegetation protection objectives to be achieved
Clause 42.02 requires a schedule to contain the vegetation protection objective to be achieved.Insert a maximum of 5 objectivesSee 42.02-1 for relevant provisions.
3.0 Permit requirement
Where no requirements are specified insert “None specified.”orWhere permit requirements are specified insert specific permit requirements such as “A permit is not required to [insert specific requirement/s: remove, destroy or lop any vegetation]”.See 42.02-2 for relevant provisions.
4.0 Application requirements
Where no requirements are specified insert “None specified.”orWhere application requirements are specified insert “The following application requirements apply to an application for a permit under Clause 42.02, in addition to those specified elsewhere in the scheme and must accompany an application, as appropriate, to the satisfaction of the responsible authority: [insert application requirements].”
5.0 Decision guidelines
Where no requirements are specified insert “None specified.”orWhere decision guidelines are specified insert “The following decision guidelines apply to an application for a permit under Clause 42.02, in addition to those specified in Clause 42.02 and elsewhere in the scheme which must be considered, as appropriate, by the responsible authority: [insert decision guidelines]”See 42.02-5 for relevant provisions.
OVERLAYS - CLAUSE 42.02 - SCHEDULE [NUMBER] PAGE 1 OF 1
30/07/2018
30/07/2018
30/07/2018
30/07/2018
30/07/2018
30/07/2018