MINUTES OF STATE EXPERT APPRAISAL COMMITTEE 117 th MEETING 16 th January 2013 (S.C. Jain) Chairman (Dr Mohini Saxena) Member SEAC (V. Subramanian) Member SEAC (V.R. Khare ) Member SEAC (K.P. Nyati) Member SEAC (R.K. Jain) Member Secretary 1 The meeting conducted on 16 th January 2013 was presided over by Shri S.C. Jain. Following members attended the meeting- 1. Dr Mohini Saxena, Member 2. Prof. V Subramanian, Member 3. Shri V.R. Khare, Member 4. Shri K.P. Nyati and 5. Shri R.K. Jain, Member Secretary The Chairman welcomed all the members of the Committee and thereafter agenda items were taken up for deliberations. Next meeting: It was decided to conduct the next meetings during 1 st and 2 nd February 2013. Following projects were taken up for discussion: Neither the Project proponents nor their representatives of following Projects were present to explain the query which might be raised or to make any commitment which may be desired by the committee during the deliberation. Committee decided to call these proponents in coming meetings as per turn. 1. Case No. 856/2012 - Shri Dharmendra Nagar S/o Shri Chandra Singh Nagar Indore Naka, Ichhawar Road – Sehore, Distt. – Sehore (M.P.) – 466001 01.821 ha. Stone/Boulder Quarry at Kh. No. 401/1, Village- Rafiqganj, Tehsil – Sehore, Distt. – Sehore (M.P.) Capacity: 1800 Cu. M. , ML – 10 Year. 2. Case No. 857/2012- Shri Vaibhav Kumar S/o Shri Bhupendra Arya, 221, Arya Market, Bus Stand- Khargone, Distt. – Khargone (M.P.) – 451001 02.00 ha. Stone/Boulder Quarry at Kh. No.- 221, Village- Devalgaon, Tehsil – Gogawan, Distt.– Khargone (M.P.) Capacity: 5000 Cu. M , ML – 10 Year. 3. Case No. 858/2012- Shri Jagendra Singh, Village – Akauri, Post – Hanumangarh, Teh. – Rampurnaikin, Distt. – Sidhi (M.P.) – 486661 Shri Jagendra Singh Stone Mine at Khasra No. - 287, 291 Village – Karaudia, Teh. – Rampurnaikin, Distt. – Sidhi (M.P.) Lease Area 1.47 ha Capacity: 30,000 Cu. M , ML – 10 Year. 4. Case No. 859/2012 - Shri Sanjeet Singh Keer S/o Shri Narendra Singh Keer, Keer Farms, Opp. Tapti Mills Road, Lalbagh, Burhanpur, Distt. – Burhanpur (M.P.) – 450331 Jainbad Metal Stone Quarry at Khasra No.- 234, 221, 233//2, 233/3, Village – Jainbad, Tehsil - Burhanpur, Distt. – Burhanpur (M.P.) Lease Area 1.52 ha Capacity: 50,000 Cu. M , ML – 10 Year. 5. Case No. 862/2012 - Shri Hanif Qureshi S/o Hajiusman Qureshi, Old Bus Stand – Ganj, Sehore , Distt. – Sehore (M.P.) - 466001 02.00 ha. Stone/Boulder Quarry at Khasra No. - 1013, Town Sehore, Tehsil – Sehore, Distt. – Sehore (M.P.) Capacity: 1800 Cu. M , ML – 10 Year. 6. Case No. 825/2012 Smt.Mahendra Kaur HPA, Shri Kartar Singh, 22, B Mukhrji Nagar – Vidisha, Distt. - Vidisha (M.P.) 464001 Chouravar Black Stone Quarry at Khasra No.- 37, , Village – Chourava, Tehsil – Basouda, Distt. – Vidhisha, (M.P.) Lease Area – 2.0 Ha. Capacity : 5000 Cubic Meter per year, ML – 10 Year. 7. Case No. 829/2012- Shri Saurabh Garg, 85, Vinay Nagar, Sector - 2 Distt. – Gwalior (M.P.)Pratappura Metal Stone Quarry at Khasra No.- 1/1, Village Pratappura, Tehsil – Orcha, Distt. – Tikamgarh, (M.P.) Lease Area – 3.00 Ha. Capacity : Approx 20,000 Cubic Meter per

MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

  • Upload
    donhan

  • View
    221

  • Download
    4

Embed Size (px)

Citation preview

Page 1: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

1

The meeting conducted on 16th January 2013 was presided over by Shri S.C. Jain. Following membersattended the meeting-

1. Dr Mohini Saxena, Member2. Prof. V Subramanian, Member3. Shri V.R. Khare, Member4. Shri K.P. Nyati and5. Shri R.K. Jain, Member Secretary

The Chairman welcomed all the members of the Committee and thereafter agenda items were takenup for deliberations.Next meeting: It was decided to conduct the next meetings during 1st and 2nd February 2013.Following projects were taken up for discussion:

Neither the Project proponents nor their representatives of following Projects were presentto explain the query which might be raised or to make any commitment which may bedesired by the committee during the deliberation. Committee decided to call theseproponents in coming meetings as per turn.

1. Case No. 856/2012 - Shri Dharmendra Nagar S/o Shri Chandra Singh Nagar IndoreNaka, Ichhawar Road – Sehore, Distt. – Sehore (M.P.) – 466001 01.821 ha.Stone/Boulder Quarry at Kh. No. 401/1, Village- Rafiqganj, Tehsil – Sehore, Distt. – Sehore(M.P.) Capacity: 1800 Cu. M. , ML – 10 Year.

2. Case No. 857/2012- Shri Vaibhav Kumar S/o Shri Bhupendra Arya, 221, AryaMarket, Bus Stand- Khargone, Distt. – Khargone (M.P.) – 451001 02.00 ha.Stone/Boulder Quarry at Kh. No.- 221, Village- Devalgaon, Tehsil – Gogawan, Distt.– Khargone(M.P.) Capacity: 5000 Cu. M , ML – 10 Year.

3. Case No. 858/2012- Shri Jagendra Singh, Village – Akauri, Post – Hanumangarh, Teh.– Rampurnaikin, Distt. – Sidhi (M.P.) – 486661 Shri Jagendra Singh Stone Mine at Khasra No.- 287, 291 Village – Karaudia, Teh. – Rampurnaikin, Distt. – Sidhi (M.P.) Lease Area – 1.47 haCapacity: 30,000 Cu. M , ML – 10 Year.

4. Case No. 859/2012 - Shri Sanjeet Singh Keer S/o Shri Narendra Singh Keer, KeerFarms, Opp. Tapti Mills Road, Lalbagh, Burhanpur, Distt. – Burhanpur (M.P.) – 450331Jainbad Metal Stone Quarry at Khasra No.- 234, 221, 233//2, 233/3, Village – Jainbad, Tehsil -Burhanpur, Distt. – Burhanpur (M.P.) Lease Area – 1.52 ha Capacity: 50,000 Cu. M , ML –10 Year.

5. Case No. 862/2012 - Shri Hanif Qureshi S/o Hajiusman Qureshi, Old Bus Stand –Ganj, Sehore , Distt. – Sehore (M.P.) - 466001 02.00 ha. Stone/Boulder Quarry at Khasra No.- 1013, Town Sehore, Tehsil – Sehore, Distt. – Sehore (M.P.) Capacity: 1800 Cu. M , ML – 10Year.

6. Case No. 825/2012 Smt.Mahendra Kaur HPA, Shri Kartar Singh, 22, B MukhrjiNagar – Vidisha, Distt. - Vidisha (M.P.) 464001 Chouravar Black Stone Quarry atKhasra No.- 37, , Village – Chourava, Tehsil – Basouda, Distt. – Vidhisha, (M.P.) Lease Area –2.0 Ha. Capacity : 5000 Cubic Meter per year, ML – 10 Year.

7. Case No. 829/2012- Shri Saurabh Garg, 85, Vinay Nagar, Sector - 2 Distt. – Gwalior(M.P.)Pratappura Metal Stone Quarry at Khasra No.- 1/1, Village Pratappura, Tehsil – Orcha,Distt. – Tikamgarh, (M.P.) Lease Area – 3.00 Ha. Capacity : Approx 20,000 Cubic Meter per

Page 2: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

2

year.( ML dt. 04/102008 to 22/09/2013 )8. Case No. 834/2012 M/s KNR Construction Ltd., KNR House No. 9581, Durga Trally

Wala Gali, New City Colony, Guna (M.P,)- Digod Stone/Boulder Quarry at Khasra No.-89/2/1, Village – Digod, Tehsil – Kolaras, Distt. – Shivpuri, (M.P.) Lease Area – 4.00 Ha.Capacity: 8 Lacs MT/Year.

9. Case No. 870/2012 Shri Lakhan Singh Singh Yadav S/o Shri Mahendra Singh YadavR/o Village – Chandadawani Khas, Tehsil - Orchha Distt. – Tikamgarh (M.P.) 472246 -Stone / Boulder Quarry of Lakhan Singh Singh Yadav S/o Shri Mahendra Singh Yadav at KhasraNo. – 215/3, Village – Chandawani Khas, Tehsil – Orchha, Distt. – Tikamgarh (M.P.) Lease Area– 02.00 ha. Capacity – 40,000 Cu. M. Per Year.

10. Case No. 872/2012 Smt. Uma Mishra, W/o Shri Ashok Mishra, Village – Madwas, Tehsil –Majhouli, Distt. – Sidhi (M.P.) 486601 Stone / Boulder Quarry of Uma Mishra W/o Shri AshokMishra at Khasra No. – 7/2, Village – Rampur, Tehsil - Majhouli, Distt. – Sidhi (M.P.) Lease Area –0.99 ha. Capacity – 12,000 Cu. M. Per Year.

This is a case of mining of Stone / Boulder in an area of 0.99 hectare with production

capacity to the tune of 12000 m3 / Year. The case was forwarded by SEIAA to SEAC for

consideration in the SEAC meeting. It was informed by the PP that lease has already been

granted for a period of 05 years but not yet in operation.

Thus as per the policy of SEIAA the project was considered as category B1 accordingly

PP was informed that EIA study has to be conducted and TOR shall be issued for the same.

PP submitted that he is not capable to carry out EIA presently and thus requested the

committee to hold the case till further review of the policy from SEIAA. Committee

considered the request of PP and decided to defer the case till further submission from the PP

but maximum for period of 01 month after which the case shall be returned to SEIAA for

delisting.

Neither the Project proponents nor their representatives of following Projects were present

to explain the query which might be raised or to make any commitment which may be

desired by the committee during the deliberation. Committee decided to call these

proponents in coming meetings as per turn.

Page 3: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

3

11. Case No. 874/2012 - Shri Vineet Singh Construction Company Pvt. Ltd., MaharanaPratap Colony, Yadunandan Nagar, Near Takshasila School - Bilaspur, Distt. - Bilaspur(C.G) 495223 Geruwar Metal Stone Quarry with Crusher at Khasra No. – 63/1, 63/2, 63/3,63/4, Village – Geruwar, Tehsil- Semaria, Distt. – Rewa (M.P.) Lease Area – 1.214 ha.Capacity – 1,00,000 Cu. M. Per Year.

12. Case No. 893/2012 Shri Firoz Khan S/o Shri Aziz khan, Kayasthakhedi, Tehsil-Saver,Distt. –Indore ( M.P.) Antaraliya Sand Mining at Khasra No. – 223, Village –Antaraliya, Tehsil - Dewas, Distt. – Dewas (M.P.) Lease Area – 2.0 ha. Capacity – 3811.32Cu. M. Per Year.

13. Case No. 891/2012 Smt. Purvi Patel C/o Shri Akash Patel, Perkota, Distt. – Sagar(M.P.) Khejra Bagh Metal Stone Quarry with Crusher at Khasra No. - 07, Village - KhejraBagh, The. – Sagar, Distt. – Sagar (M.P.) Lease Area – 1.0 ha. for production capacity of12,000 cubic meter per year.

14. Case No. 895/2012 Shri Vishram Singh S/o Shri Banshhilal Singh, Village –Amarpura (Mittukhedi), Tehsil – Huzur, Distt. – Bhopal (M.P.) Lease Area - 02.60 Ha.Murum Quarry of Vishram Singh S/o Mr. Banshilal Singh, Village – Amanpura, Tehsil- Huzur,Distt.- Bhopal (M.P.) production capacity of 20,000 cubic meter per year.

15. Case No. 898/2012 Shri Ranchood Chaudhary, S/o Shri Laxmi NarayanChaudhary, Village – Rajoda, Tehsil & Distt. – Dewas (M.P.)- Rajoda Metal Stone Quarrywith Crusher at Khasra No. - 838, Village - Rajoda, Tehsil – Dewas, Distt. – Dewas (M.P.)Lease Area – 3.0 ha. for production capacity of 54,000 cubic meter per year.

16. Case No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1,Bahubalipuram, A. B. Road, Guna (M.P.) – 473001 Lease Area - 0.623 Ha. Stone / BoulderQuarry (New) at Khasra No. - 35, Village – Bajranggrh, Tehsil & Distt.- Guna (M.P.)production capacity of 15,000 cubic meter per year, Period - 10 Year.

17. Case No. 917/2012 Shri Rajeswari Prasad Mishra S/o Shri Rajmani Mishra,1/8/127, Indira Nagar Colony, Rewa, (M.P.) – 486001- Lease Area – 2.00 Ha. Lime StoneQuarry (New) at Kh. No. –256/1,Vill.–Kouadhan, Th.– Huzur, Distt.- Rewa (M.P.) productioncapacity of 15,000 cubic meter per year, Period - 10 Year.

18. Case No. 919/2012 Shri Bhupendra Singh S/o Shri Narendra Singh, 249/ 2A, SaketNagar, Distt. – Bhopal (M.P.)-462024- Lease Area - 4.00 Ha. Stone / Boulder Quarry (New)at Khasra No. – 102,104, Village – Kardai, Tehsil - Huzur Distt.- Bhopal (M.P.) productioncapacity of 10,000 cubic meter per year, Period - 10 Year.

19. Case No. 921/2012 Smt. Sangita Sharma W/o Mr. Murari Sharma, 77, SawanNagar, Lalghati, Bhopal, (M.P.) - 462030 - Lease Area - 2.00 Ha. Stone / Boulder Quarry(Renewal) at Khasra No. – 40, Village – Barkheda Bondaer, Tehsil - Huzur Distt.- Bhopal(M.P.) production capacity of 12,000 cubic meter per year, Renewal of Mining Lease for - 10Year.

20. Case No. 892/2012 Smt. Gurjeet Kaur W/o Shri Satvinder Singh Chawla, AnandNagar – Rajakhedi, Distt. – Sagar (M.P)- Pamakhedi Metal Stone Quarry with StoneCrusher at Khasra No. - 550, Village - Pamakhedi, Tehsil – Sagar, Distt. – Sagar (M.P.) LeaseArea – 1.0 ha. for production capacity of 12,000 cubic meter per year.

21. Case No. 897/2012 Shri Abhishek Rastogi, Authorized Signatory M/s Rajawat StoneIndustries, G-11, Hanuman Nagar, Gole Ka Mandir, Gwalior (M.P.) - Expanssion of

Page 4: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

4

Lakhanpura Metal Stone Quarry at Khasra No. – 12,13, Village - Lakhanpura, Tehsil – Dabra,Distt. – Gwalior (M.P.) Lease Area – 2.320 ha. for production capacity of 1,50,000 cubicmeter per year Existing Capacity: 12,000 TPA.

22. Case No. 900/2012 Shri Sher Singh S/o Shri Tikarm Lodhi, Village – Khirkhiri,Tehsil – Nainpur, Distt. – Mandla (M.P.) - 481776 Lease Area - 1.00 Ha. Stone / BoulderQuarry (New) at Khasra No. – 268, Village – Mohgaon, Tehsil - Nainpur Distt.- Mandla (M.P.)production capacity of 10,000 cubic meter per year, Mining Lease for - 10 Year.

23. Case No. 901/2012 Shri Uday Sachan, Village – Chatua, Tehsil & Distt. – Dindori(M.P.) - Renewal of Jhanki Metal Stone Quarry at Khasra No. – 322, Village - Jhanki, Teh. &,Distt. – Dindori (M.P.) Lease Area – 2.0 ha. for production capacity of 5,000 cubic meter peryear.

24. Case No. 902/2012 Shri Shashank Tiwari S/o Mr. Umakant Tiwari, M/s Jai MaaChandrika Granite, 690, Lokhnathpuram, Ward No. – 37, Chhatarpur (M.P.) 471001 -Lease Area - 4.00 Ha. Stone / Boulder Quarry (New) at Khasra No. – 2276, Village – PrakashBamhori, Tehsil – Gorihar, Distt.- Chhattarpur (M.P.) production capacity of 500 cubic meterper year, Mining Lease for - 10 Year.

25. Case No. 903/2012 Shri Karan Singh S/o Mrs. Shriram Singh, Village & Post –Khedi Khummar, Distt. – Jhajjar (Haryana) 124103 -Lease Area – 3.98 Ha. Stone / BoulderQuarry (New) at Khasra No. – 1367, 1368, 1369, 1370, 1372, 1373, 1374, 139 at Village –Katheri, Teh.–Devsar, Distt.- Singrauli (M.P.) production capacity of 4,50,000 cubic meterper year, Mining Lease for - 10 Year.

26. Case No. 906/2012 Shri Karan Singh S/o Mr. Shriram Singh, Village & Post –Khedi Khummar, Distt. – Jhajjar (Haryana) 124103 - Lease Area – 4.0 Ha. Stone / BoulderQuarry (New) at Khasra No. – 1329, 1330, 1331, 1335 at Village – Katheri, Tehsil – Devsar,Distt.- Singrauli (M.P.) production capacity of 4,50,000 cubic meter per year, Mining Lease for- 10 Year.

27. Case No. 907/2012 Shri Kewal Singh S/o Shri Parwat Singh, Village Kolua Khurd,P. O. – Kolua Khurd Tehsil – Huzur, Distt. – Bhopal (M.P.) 462021- Renewal of MiningLease Area – 2.692 Ha. Mining of Soil (Mud) for Bricks manufacturing of Kewal Singh S/oShri Parwat Singh, at Khasra No. – 12/1, 12/2, 12/3/1, 12/3/2 at Village – Sendora, Tehsil –Raisen, Distt.- Raisen (M.P.) production capacity of 4,50,000 cubic meter per year, MiningLease for - 10 Year.

28. Case No. 908/2012 Shri Jagdish Basantani S/o Mr. Gulabrai Basantani, 72, ShantiNagar Colony, Bairasia Road - Bhopal Distt. – Bhopal (M.P.) 462001 – Lease Area – 4.0Ha. Stone / Boulder Quarry (New) at Khasra No. – 439/1, at Village – Titoria, Tehsil – Ashta,Distt.- Sehore (M.P.) production capacity of 1,00,000 cubic meter per year, Mining Lease for -10 Year.

29. Case No. 909/2012 Shri Ajay Kumar Jain S/o Shri Javaharlal Jain, Tilak Ward,Deori, Distt. – Sagar (M.P.) 470226 - Lease Area – 3.99 Ha. Stone / Boulder Quarry (New) atKhasra No. – 439/1, at Village – Chhevla, Tehsil – Deori, Distt.- Sagar (M.P.) productioncapacity of 10,000 cubic meter per year.

30. Case No. 910/2012 Smt. Rekha Goswami, Propriter M/s Abhishek Stone Crusher,Ward No. – 13, Bhairavganj, Shahpura, Distt. - Dindori (M.P.) -Shahpura Metal StoneQuarry with Crusher at Khasra No. – 790/1, Village - Shahpura,Tehsil – Shahpura, Distt. –Dindori (M.P.) Lease Area – 0.70 ha. for production capacity of 10,,000 cubic meter per

Page 5: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

5

year.31. Case No. 915/2012 Shri Raghuveer Sehariya S/o Shri Halkaiya Sehariya, Ward No.

20, Azad Nagar, Kushmouda, Tehsil – Guna, Distt. – Guna (M.P.) 473001 – Lease Area –2.00 Ha. Stone / Boulder Quarry (New) at Khasra No. – 1009/2, at Village – Bajranggarh,Tehsil & Distt.- Guna (M.P.) production capacity of 6,000 cubic meter per year.

32. Case No. 920/2012 Smt. Sangeeta Sharma W/o Shri Mr. Murari Sharma, 77,Lalghati, Distt. – Bhopal (M.P.) 462030 - Lease Area – 3.670 Ha. Stone / Boulder Quarry(New) at Khasra No. – 37, 38, at Village – Barkheda Bondar, Tehsil – Huzur, Distt.- Bhopal(M.P.) production capacity of 15,000 cubic meter per year, Mining Lease for - 10 Year.

33. Case No. 945/2012 Shri A. Venkat M/s KNR Construction Limited, A-1/18, VinayNagar, Sec. - 4, Gwalior, Distt. – Gwalior (M.P.)– 474009- Lease Area – 4.00 Ha. MurumQuarry (New) at Khasra/Survey No. – 431, Village – Kanjwaha, Tehsil – Khaniyadhana,Distt.- Shivpuri (M.P.) production capacity of 22,000 cubic meter per year, Mining Lease for- 02 Year.- The project is linked with a road project of M.P. Road Development Corporation.

The project pertains to mining of Murum in an area of 4.00 hectare and productioncapacity to the tune of 22000 m3 per year. It was reported by the PP that the murum quarryhas been allotted to them for a period of 02 years. The project falls under category B-2 as perthe policy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by the PP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to the followingconditions:1. PP shall be responsible for any discrepancy (if any) in the submissions made by the PP to

SEAC & SEIAA.2. Water body shall be developed as a ghat with appropriate fencing for safe and smooth use

by the local residents.3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 22000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should take

care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years only.9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. The amount towards EMP shall be deposited with the Collector for further execution of

the activities under EMP12. Road net-work proposed to be used for transportation of materials shall be maintained by

the PP, the point shall be covered in the Gram sabha proceedings and shall be verified bythe MPPCB while issuing consents.

Page 6: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

6

Neither the Project proponents nor their representatives of following Projects were present to explain thequery which might be raised or to make any commitment which may be desired by the committee during thedeliberation. Committee decided to call these proponents in coming meetings as per turn.

34. Case No. 931/2012 Shri Ragvendra Singh Tomar S/o Shri Pratap Singh Tomar, Sector-4, Vinay Nagar,Gwalior (M.P.) - M/s Shri Raghvendra Singh Tomar S/o Shri Pratap Singh Tomar Stone mine and Crusher atVillage- Bamore, Tehsil – Badarwas, Distt. – Shivpuri (M.P.) Lease Area - 2.0 Ha. Capacity – 1,000 Cubic MeterPer Year.

35. Case No. 934/2012 Shri Param Lal Bagri S/o Shri Sarju Prasad Bagari, Village & Tehsil – Pawai, Distt. -Panna (M.P.) – 488446 - Lease Area – 0.88 Ha. Flag Stone Quarry (New) at Khasra No. – 35, Village –Kaimuriya, Tehsil – Pawai, Distt.- Panna (M.P.) production capacity of 10,000 cubic meter per year, Mining Leasefor - 10 Year.

36. Case No. 938/2012 Shri Manish Parwar S/o Shri B.D. Parwar, Propritor M/s Manish ParwarConstruction Company, Nainpur, Ward No.- 4, Beyond Khandeswari Mandir, Mandla, Distt. – Mandla(M.P.) – 481776 - Lease Area 1.89 Ha. Stone / Boulder Quarry (New) at Khasra No. – 355,360,361, Village –Sunjhiri, Tehsil – Keolari, Distt.- Seoni (M.P.) production capacity of 5,000 cubic meter per year, Mining Lease for– 10 Year.

37. Case No. 940/2012 Shri Bhupendra Singh S/o Shri Narendra Singh, 249-2A, Saket Nagar, Bhopal, Distt.– Bhopal (M.P.) – 462024- Lease Area 4.0 Ha. Stone / Boulder Quarry (New) at Khasra No. – 3/2, Village –Chowki, Tehsil – Shyampur, Distt.- Sehore (M.P.) production capacity of 10,000 cubic meter per year, , MiningLease for – 10 Year.

38. Case No. 947/2012 Shri Arun Kumar Gupta, Shahpura Post Office, Shahpura, Tehsil-, Distt. – Dindori(M.P.) - Shahpura Metal Stone Quarry with Crusher at Khasra No. – 807/2, Village – Shahpura, Tehsil – Shahpura,Distt. – Dindori (M.P.) Lease Area 1.0 Ha. Capacity – 5,000 Cubic Meter Per Year.

39. Case No. 954/2012 – Shri Dilip Keshwani S/o Shri Pratap Rai Keshwani Ward No. 6 Tehsil & Dist.-Dindori (M.P)- Sand mne, Area- 3.12 Ha Capa- 5730.19 m3/year at Khasra No. 01 village Rusa Tehsil- and Dist.-Dindorei (M.P)

40. Case No. 955/2012 – Shri Venkat Reddy M/s KNR Constructions Ltd. A-1/18,Vinay Nagar Sector 4 Gwalior (M.P) 474009- Murram Quarry, Area- 4.00 Ha Capa-10000 m3 / year at Survey No. 5, 82 Village Kalipahadi Tehsil- Khaniyadhana, Dist.-Shvipuri (M.P)

The project pertains to mining of Murum in an area of 4.00 hectare and productioncapacity to the tune of 10000 m3 per year. It was reported by the PP that the murum quarryhas been allotted to them for a period of 02 years. The project falls under category B-2 as perthe policy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by the PP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to the followingconditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

Page 7: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

7

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 10000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. The amount towards EMP shall be deposited with the Collector for further execution

of the activities under EMP12. Road net-work proposed to be used for transportation of materials shall be

maintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

Neither the Project proponents nor their representatives of following Projects were present to explain the querywhich might be raised or to make any commitment which may be desired by the committee during thedeliberation. Committee decided to call these proponents in coming meetings as per turn.

41. Case No. 958/2012- Shri Dalpat Singh S/o Shri Naval Singh, Village – Kothia, Tehsil- & Dist.-Dindori(M.P)- Karo Pani Sand Mining Area- 1.28 Ha, Capa- 666 m3 / Year Khsra No. 907 Village Karopani, Tehsil & Dist.-Dindori (M.P)

42. Case No. 960/2012 Smt Yashodabai Goude C/o Shri Manoj Sajwani, Near Hotel Pankaj Palace, BarahiRoad Katni (M.P) – 483501- Stone Quarry with Crusher- Area 1.30Ha Capacity- 10000 m3 / Yaer at Khsra No. 45Village- Chikhli Tehsil- Kundum Dist- Jabalpur (M.P)

43. Case No. 962/2012 – Shri A. Venkat Reddy M/s KNR, Constructions Ltd. A-1/18Vijay Nagar, Sector-4 Gwalior (M.P) 474009 Murrum QuarryAre- 4.0 Ha, Capacity-25000 m3, ML- 2Years at Survey No. 1207 Village Bamorkala Tehsil- Khaniyadhana Diat.Shivpuri (M.P) Captive Mine for widening and reconstruction of Road

The project pertains to mining of Murum in an area of 4.00 hectare and productioncapacity to the tune of 25000 m3 per year. It was reported by the PP that the murum quarryhas been allotted to them for a period of 02 years. The project falls under category B-2 as perthe policy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by the PP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to the followingconditions:

Page 8: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

8

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 25000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. The amount towards EMP shall be deposited with the Collector for further execution

of the activities under EMP12. Road net-work proposed to be used for transportation of materials shall be

maintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

44. Case No. 963/2012 – Shri A. Venkat Reddy M/s KNR, Constructions Ltd. A-1/18Vijay Nagar, Sector-4 Gwalior (M.P) 474009 Murrum QuarryArea- 4.0 Ha, Capacity-15000 m3, ML- 2Years at Survey No. 2947 Village Chamrawa Tehsil- Khaniyadhana Dist.Shivpuri (M.P) Captive Mine for widening and reconstruction of Road

The project pertains to mining of Murum in an area of 4.00 hectare and productioncapacity to the tune of 25000 m3 per year. It was reported by the PP that the murum quarryhas been allotted to them for a period of 02 years. The project falls under category B-2 as perthe policy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by the PP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to the followingconditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 25000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.

Page 9: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

9

8. The validity of the prior EC & the lease shall be for a maximum period of two yearsonly.

9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. The amount towards EMP shall be deposited with the Collector for further execution

of the activities under EMP12. Road net-work proposed to be used for transportation of materials shall be

maintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

45. Case No. 964/2012 – Shri A. Venkat Reddy M/s KNR, Constructions Ltd. A-1/18Vijay Nagar, Sector-4 Gwalior (M.P) 474009 Murrum QuarryArea- 4.0 Ha, Capacity-22000 m3, ML- 2Years at Survey No. 558 Village Bharsula Tehsil- Khaniyadhana Dist.Shivpuri (M.P) -Captive Mine for widening and reconstruction of Road

The project pertains to mining of Murum in an area of 4.00 hectare and productioncapacity to the tune of 22000 m3 per year. It was reported by the PP that the murum quarryhas been allotted to them for a period of 02 years. The project falls under category B-2 as perthe policy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by the PP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to the followingconditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 22000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. The amount towards EMP shall be deposited with the Collector for further execution

of the activities under EMP12. Road net-work proposed to be used for transportation of materials shall be

maintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

Neither the Project proponents nor their representatives of following Projects were present to explain the

Page 10: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

10

query which might be raised or to make any commitment which may be desired by the committee during thedeliberation. Committee decided to call these proponents in coming meetings as per turn.

46. Case No. 968/2012- Shri Jagdish Agarwal C/o Pawan Agarwal 1- F Deshbandhupura oipinnagarItarsi Distt. Hoshangabad (M.P)- Stone mine- Area- 1.0 Ha Capacity- 5000 m3 at Khasra No. 96/2 Village-Koyalbuddhi, Tehsil- Shahapur Distt. Betul (M.P)

47. Case No. 999/2012 M/s V.V. Construction, Shri Radheshamji Agrawal Madan Mohan LahotiAuto Complex Transport Nagar, A.B. Road, Raghogarh, Distt. - Guna (M.P.)- Proposed Sesupura StoneMine ( MLA – 1.00 ha.) at Surve No. 59/1, Village – Sesupura, Tehsil – Bamori, Distt. – Guna (M.P.)

48. Case No. 932/2012 Shri Tej Bahadur Shah S/o Mr. Bharat Shah, Village- Jinwania, The. –Khirkiya, Distt. – Hrda (M.P.) – 461116- Lease Area – 0.90 Ha. Stone / Boulder Quarry ( New) at KhasraNo. – 69/10, 77, at Village – Harraia, Tehsil – Chicholi, Distt.- Betul (M.P.) production capacity of 10,000Cu M , Mining Lease for - 10 Year.

49. Case No. 1008/2012 Shri Omprakash Rai Katni Road, , P.O. Maihar, Distt. Satna – 485771 -Renewal of Mining Lease for – 20 Year, Lease Area – 11.894 Ha. Pahari (No.-1) Limestone and Reject Stoneat Khasra No. – 797 to 801, 810, 811, 621- 625, 1230-1238, 1266, 1276, 1277, 1278, 1279/1, 1279/2, 1280,1264, 1265,1267,1268, 1269, 1270, 1271, 1272, 1273, 1275, 791, 792, 793, -796 at village- Pahari, Tehsil-Maihar, Distt. Satna ( M.P.) Production Capacity of 75,000 MTPA, Case for TOR

50. Case No. 1013/2012 – Shri Omprakash Rai Katni Road, , P.O. Maihar, Distt. Satna – 485771-Renewal of Mining Lease for – 20 Year, Lease Area – 6.543 Ha. Pahari (No.- 3) Limestone Mine along with Crusher at Khasra No. –1167, 1168, 1165, 1166, 786, 787, 788, 789, 783, 784, 785, 818, 819, 820, 780, 808, 815, 816, 817, 805, 806,807, 809, 802, 803, 804, 812,813, 821, 1326/321,1226, 1227, 1228, 1222, 1324/1222, 821/2, 1199, 1214, 1215, 1218, 1228, 1200, 1201, 1196, 1197, 1198, 1216, 1217,1220, 1219, 1213, 1195, 1187, 1188, 1176, 1177, 1178, 1179, 1186, 1180, 1170, 1171, 1172, 1173, 1174, 1175, 1121 ( Total 31.06 Bighaor 6.543 ha. ) at village- Pahari, Tehsil- Maihar, Distt. Satna (M.P.) Proposed Production of Lime Stone and Reject Stone – 1,00,000MTPA, Production Capacity of 30,000 MTPA, Renewal of Mining Lease for – 30Year- Case for TOR

51. Case No. 800/2012 Shri Krishna Kumar Pathak, S/o Shri Laxminarayan Pathak, MIG – 63, NearShailesh Memorial SChool, Makronia, Distt. – Sagar (M.P.) 470004 - Apchand Stone Mine at Khasra No.232, Village – Apchand,Tehsil – Sagar, Distt. – Sagar (M.P.) Lease Area – 0.9 Ha., Proposed Capacity –7000 Cubic Meter Per YearCase was discussed 102nd SEAC Meeting Dt. 11/09/12.

52. Case No. 1019/2012, M/s D.P. Jain & Co. Infrastructure Pvt. Ltd., U/10,Himalaya Accord Appartment, Opp. Law College, Amravati Road, Nagpur (M.S.) -10Temporary Permit for Junapani Murum Quarry at Khasra No. – 435, Village- Junapani,Tehsil – Khalwa, Distt. – Khandwa (M.P.) Lease Area – 2.0 Ha., Lease Period – 02 Year.Proposed Capacity – 30,000 Cubic Meter Per Year.

The project pertains to mining of Murum in an area of 2.00 hectare and productioncapacity to the tune of 30000 m3 per year. It was reported by the PP that the murum quarryhas been allotted to them for a period of 02 years. The project falls under category B-2 as perthe policy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by the PP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to the followingconditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

Page 11: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

11

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 30000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP.

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

53. Case No. 1022/2012, Shri Bhuvan Singh, S/o Sh. Sukliya Singh, Village – DeepakiChouki, P. O. - Borkhad District - Alirajpur (M.P.) - 485771 Lease Area – 2.0 Ha.,Sand Quarry (New) at Khasra / Survey No. – 01, Village - Bijoriya, Tehsil – Alirajpur, Distt.– Alirajpur (M.P.) Lease Period – 02 Year. Proposed Capacity – 20,000 Cubic Meter PerYear.

The project pertains to mining of Sand in an area of 2.00 hectare and production capacityto the tune of 20000 m3 per year. It was reported by the PP that the sand quarry has beenallotted to them for a period of 02 years. The project falls under category B-2 as per thepolicy decided by SEIAA. PP has submitted the information in the prescribed format-1 dulyverified by the DFO and the Tehsildar. EM Scheme has also been submitted by the PP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to the followingconditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.

Page 12: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

12

5. Production shall be to the tune of 20000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP

13. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

54. Case No. 1023/2012 M/s D.P. Jain & Co. Infrastructure Pvt. Ltd., U/10, HimalayaAccord Appartment, Opp. Law College, Amravati Road, Nagpur (M.S.) -10- TemporaryPermit for Piplia to Manasa Road Project Murum Quarry at Khasra No. – 641, Village-Lodkiya, Tehsil – Manasa, Distt. – Neemuch (M.P.) Lease Area – 2.0 Ha., Lease Period –02 Year. Proposed Capacity – 25,000 Cubic Meter Per Year.

The project pertains to mining of Murum in an area of 2.00 hectare and productioncapacity to the tune of 25000 m3 per year. It was reported by the PP that the murum quarryhas been allotted to them for a period of 02 years. The project falls under category B-2 as perthe policy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by the PP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to the followingconditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 25000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.

Page 13: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

13

9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP.

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

55. Case No. 1024/2012 M/s D.P. Jain & Co. Infrastructure Pvt. Ltd., U/10, HimalayaAccord Appartment, Opp. Law College, Amravati Road, Nagpur (M.S.) -10- TemporaryPermit for Piplia to Manasa Road Project Murum Quarry at Khasra No. – 641, Village-Lodkiya, Tehsil – Manasa, Distt. – Neemuch (M.P.) Lease Area – 2.00 Ha. Lease Period – 02Year. Proposed Capacity – 25,000 Cubic Meter Per Year.

The project pertains to mining of Murum in an area of 2.00 hectare and productioncapacity to the tune of 25000 m3 per year. It was reported by the PP that the murum quarryhas been allotted to them for a period of 02 years. The project falls under category B-2 as perthe policy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by the PP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to the followingconditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 25000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.

Page 14: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

14

11. All proposed CSR activities and the budget reserved for the same shall be discussedin the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

56. Case No. 1025/2012 M/s D.P. Jain & Co. Infrastructure Pvt. Ltd., U/10, HimalayaAccord Appartment, Opp. Law College, Amravati Road, Nagpur (M.S.) -10 TemporaryPermit for Datia Bhander Road Project Murum Quarry at Khasra No. – 1146, Village-Kusholi, Tehsil – Datiya, Distt. – Datiya (M.P.) Lease Area – 1.120 Ha., Lease Period – 02Year. Proposed Capacity – 15,000 Cubic Meter Per Year.

The project pertains to mining of Murum in an area of 1.120 hectare and productioncapacity to the tune of 15000 m3 per year. It was reported by the PP that the murum quarryhas been allotted to them for a period of 02 years. The project falls under category B-2 as perthe policy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by the PP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to the followingconditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 30000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP

Page 15: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

15

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

57. Case No. 1026/2012 M/s D.P. Jain & Co. Infrastructure Pvt. Ltd., U/10, HimalayaAccord Appartment, Opp. Law College, Amravati Road, Nagpur (M.S.) -10- TemporaryPermit for Piplia to Manasa Road Project Murum Quarry at Khasra No. – 107/2, Village -Bardiya, Tehsil – Manasa, Distt. – Neemuch (M.P.) Lease Area – 2.620 Ha., Lease Period –02 Year. Proposed Capacity – 25,000 Cubic Meter Per Year.

The project pertains to mining of Murum in an area of 2.620 hectare and productioncapacity to the tune of 25000 m3 per year. It was reported by the PP that the murum quarryhas been allotted to them for a period of 02 years. The project falls under category B-2 as perthe policy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by the PP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to the followingconditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 25000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

Page 16: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

16

58. Case No. 1027/2012 M/s D.P. Jain & Co. Infrastructure Pvt. Ltd., U/10, HimalayaAccord Appartment, Opp. Law College, Amravati Road, Nagpur (M.S.) -10- TemporaryPermit for Piplia to Manasa Road Project Murum Quarry at Khasra No. – 1/4, Village -Gudbheli, Tehsil – Malahargarh, Distt. – Mandsaur (M.P.) Lease Area – 4.00 Ha., LeasePeriod – 02 Year. Proposed Capacity – 20,000 Cubic Meter Per Year.

The project pertains to mining of Murum in an area of 4.00 hectare and productioncapacity to the tune of 20000 m3 per year. It was reported by the PP that the murum quarryhas been allotted to them for a period of 02 years. The project falls under category B-2 as perthe policy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by the PP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to the followingconditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 20000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

59. Case No. 1028/2012 M/s D.P. Jain & Co. Infrastructure Pvt. Ltd., U/10, HimalayaAccord Appartment, Opp. Law College, Amravati Road, Nagpur (M.S.) -10- TemporaryPermit for Barwah Katkut Project Murum Quarry at Khasra No. – 1/4, Village - Khedihat,

Page 17: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

17

Tehsil – Barwah, Distt. – Khargoan (M.P.) Lease Area – 1.943 Ha., Lease Period – 02 Year.Proposed Capacity – 30,000 Cubic Meter Per Year. (DFO Forest – Barwah reported –300 mt.distance forest area)

The project pertains to mining of Murum in an area of 1.943 hectare and productioncapacity to the tune of 30000 m3 per year. It was reported by the PP that the murum quarryhas been allotted to them for a period of 02 years. The project falls under category B-2 as perthe policy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by the PP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to the followingconditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 30000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

60. Case No. 1029/2012 M/s D.P. Jain & Co. Infrastructure Pvt. Ltd., U/10, HimalayaAAccord Appartment, Opp. Law College, Amravati Road, Nagpur (M.S.) -10

Temporary Permit for Piplia to Manasha road Project Murum Quarry at Khasra No.– 01, Village - Bandpiplia, Tehsil – Malahargarh, Distt. – Mandsaur (M.P.) Lease Area –3.40 Ha., Lease Period – 02 Year. Proposed Capacity – 15,000 Cubic Meter Per Year.)

Page 18: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

18

The project pertains to mining of Murum in an area of 3.40 hectare and productioncapacity to the tune of 15000 m3 per year. It was reported by the PP that the murum quarryhas been allotted to them for a period of 02 years. The project falls under category B-2 as perthe policy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by the PP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to the followingconditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 15000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP.

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

61. Case No. 1030/2012 M/s D.P. Jain & Co. Infrastructure Pvt. Ltd., U/10, HimalayaAccord Appartment, Opp. Law College, Amravati Road, Nagpur (M.S.) -10- TemporaryPermit for Piplia to Manasha road Project Metal Stone Quarry at Khasra No. – 931/1,Village - Narayangarh, Tehsil – Malahargarh, Distt. – Mandsaur (M.P.) Lease Area – 4.00Ha., Lease Period – 02 Year. Proposed Capacity – 25,000 Cubic Meter Per Year.)

The project pertains to mining of stone in an area of 4.00 hectare and production capacityto the tune of 25000 m3 per year. It was reported by the PP that the stone quarry has beenallotted to them for a period of 02 years. The project falls under category B-2 as per thepolicy decided by SEIAA. PP has submitted the information in the prescribed format-1 duly

Page 19: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

19

verified by the DFO and the Tehsildar. EM Scheme has also been submitted by the PP.After deliberations on salient features of the project and the EMP suggested by the PP

committee has decided to recommend the case for grant of prior EC subject to the followingconditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 25000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

62. Case No. 1031/2012 M/s D.P. Jain & Co. Infrastructure Pvt. Ltd., U/10, HimalayaAccord Appartment, Opp. Law College, Amravati Road, Nagpur (M.S.) -10- TemporaryPermit for Barwah Katkut Road Project Murum Quarry at Khasra No. – 163, Village -Barzar, Tehsil – Barwah, Distt. – Khargone (M.P.) Lease Area – 2.00 Ha., Lease Period –02 Year. Proposed Capacity – 30,000 Cubic Meter Per Year.)

The project pertains to mining of Murum in an area of 2.00 hectare and productioncapacity to the tune of 30000 m3 per year. It was reported by the PP that the murum quarryhas been allotted to them for a period of 02 years. The project falls under category B-2 as perthe policy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by the PP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to the followingconditions:

Page 20: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

20

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 30000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP, the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

63. Case No. 1032/2012 M/s D.P. Jain & Co. Infrastructure Pvt. Ltd., U/10, HimalayaAccord Appartment, Opp. Law College, Amravati Road, Nagpur (M.S.) -10- TemporaryPermit for Barwah Katkut Road Project Murum Quarry at Khasra No. – 52, Village - Londi,Tehsil – Barwah, Distt. – Khargone (M.P.) Lease Area – 2.00 Ha., Lease Period – 02 Year.Proposed Capacity – 30,000 Cubic Meter Per Year.)

The project pertains to mining of Murum in an area of 2.00 hectare and productioncapacity to the tune of 30000 m3 per year. It was reported by the PP that the murum quarryhas been allotted to them for a period of 02 years. The project falls under category B-2 as perthe policy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by the PP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to the followingconditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

Page 21: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

21

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 30000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

64. Case No. 1033/2012 M/s D.P. Jain & Co. Infrastructure Pvt. Ltd., U/10, HimalayaAccord Appartment, Opp. Law College, Amravati Road, Nagpur (M.S.) -10- TemporaryPermit for Datiya Bhander Road Project Murum Quarry at Khasra No. – 1146, Village -Kusholi, Tehsil – Datiya, Distt. – Datiya (M.P.) Lease Area – 4.00 Ha. Lease Period – 02Year. Proposed Capacity – 30,000 Cubic Meter Per Year.

The project pertains to mining of Murum in an area of 4.00 hectare and productioncapacity to the tune of 30000 m3 per year. It was reported by the PP that the murum quarryhas been allotted to them for a period of 02 years. The project falls under category B-2 as perthe policy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by the PP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to the followingconditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 30000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.

Page 22: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

22

7. The proposed plantation should be carried out along with the mining and PP shouldtake care that these plants attain full growth.

8. The validity of the prior EC & the lease shall be for a maximum period of two yearsonly.

9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP.

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

65. Case No. 1034/2012 M/s D.P. Jain & Co. Infrastructure Pvt. Ltd., U/10, HimalayaAccord Appartment, Opp. Law College, Amravati Road, Nagpur (M.S.) -10- TemporaryPermit for Datiya Bhander Road Project Murum/Boulder Quarry at Khasra No. – 1146,Village - Kusholi, Tehsil – Datiya, Distt. – Datiya (M.P.) Lease Area – 3.00 Ha., LeasePeriod – 02 Year. Proposed Capacity – 20,000/50,000 Cubic Meter Per Year.

The project pertains to mining of Murum & stone in an area of 3.00 hectare and productioncapacity to the tune of 20000 m3 and 50000 m3 per year. It was reported by the PP that thequarry has been allotted to them for a period of 02 years. The project falls under category B-2as per the policy decided by SEIAA. PP has submitted the information in the prescribedformat-1 duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted bythe PP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to the followingconditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of – Murum: 20000 m3/annum and Stone: 50000m3 /

year.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.

Page 23: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

23

8. The validity of the prior EC & the lease shall be for a maximum period of two yearsonly.

9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

66. Case No. 1035/2012 M/s D.P. Jain & Co. Infrastructure Pvt. Ltd., U/10, HimalayaAccord Appartment, Opp. Law College, Amravati Road, Nagpur (M.S.) -10

Temporary Permit for Pipliyato Manasa Road Project Murum Quarry at Khasra No.– 1581, Village - Jharda, Tehsil – Malhargarh, Distt. – Mandsaur (M.P.) Lease Area –3.54 Ha. Lease Period – 02 Year. Proposed Capacity – 20,000 Cubic Meter Per Year.

The project pertains to mining of Murum in an area of 3.54 hectare and productioncapacity to the tune of 20000 m3 per year. It was reported by the PP that the murum quarryhas been allotted to them for a period of 02 years. The project falls under category B-2 asper the policy decided by SEIAA. PP has submitted the information in the prescribedformat-1 duly verified by the DFO and the Tehsildar. EM Scheme has also been submittedby the PP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to thefollowing conditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 20000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.9. Transportation shall not be carried out through forest area.

Page 24: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

24

10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP.

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

67. Case No. 1038/2012 Shri Vinod Kumar Shukla Construction Pvt. Ltd., 18, Second Floor,Metro Plaza, E-5, Arera Colony, Bhopal (M.P.) – 462016- Hasanpur Haweli Ordinary clay quarrycapacity- 30000, MLA- 2.0 Ha, for 2 years, Vill- Hasanpur Haveli, Tehsil & Distt.- Sheopur

Neither the PP nor his representative was present to explain the query which might be raisedor to make any commitment which may be desired by the committee during thedeliberation. Committee decided to call the PP in coming meetings as per turn.

68. Case No. 1039/2012 Shri Kadu Singh, S/o Shri Rumaliya Singh, Vill. & PostAmbari, Distt- Alirajpur, (M.P.) 457887 (M.P)- Sand quarry capacity- 12754 m3/year,MLA- 2.0 Ha, for 2 years, Survey No. 64, Vill- Ambari, Distt Alirajpur- 457887 (M.P)

The project pertains to mining of Sand in an area of 2.0 hectare and production capacityto the tune of 12754 m3/year. It was reported by the PP that the sand quarry has beenallotted to them for a period of 02 years. The project falls under category B-2 as per thepolicy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by thePP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to thefollowing conditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 20000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.

Page 25: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

25

9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP.

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

69. Case No. 1040/2012 Shri Sandeep Kumar, S/o Shri Rajkunwar M/s Concast InfratechLtd. Sehri, Thana Karkota Tehsil- Khargoda Distt. Sonipat (Haryana) 131001- Captive mining ofStone Boulder Quarry of Lease Area – 1.70 Ha.,. Proposed Capacity – Stone Boulder -118000m3/Year for 18 months.for Road project. Khsra no. 321 Vill- Jhanki, Tehsi & Disttl- Dindori. (M.P)

Neither the PP nor his representative was present to explain the query which might be raisedor to make any commitment which may be desired by the committee during thedeliberation. Committee decided to call the PP in coming meetings as per turn.

70. Case No. 1041/2012 Shri Ashish Malviya, Near Sai Temple, Pati, Distt- Barwani (M.P)451661 - Sand Quarry of Lease Area – 2.0 Ha., Lease Period – 02 Year. Proposed Capacity –3000m3/Year for at Khasra No. 489 Village- Pati Distt- Barwani. (M.P)

Neither the PP nor his representative was present to explain the query which might be raisedor to make any commitment which may be desired by the committee during thedeliberation. Committee decided to call the PP in coming meetings as per turn.

71. Case No. 1042/2012 Shri Chander Singh S/o Shri Rai Singh Chouhan Vill-Arthi, Post – Ambari, Tehsil & Distt Alirajpur 457887 (M.P) Sand Quarry of Lease Area– 2.0 Ha., Lease Period – 02 Year. Proposed Capacity –50000 m3/Year for at Survey No.943 Village- Akola, Tehsil & Distt. - Alirajpur. (M.P)

The project pertains to mining of Sand in an area of 2.0 hectare and production capacityto the tune of 50000 m3 per year. It was reported by the PP that the sand quarry has beenallotted to them for a period of 02 years. The project falls under category B-2 as per thepolicy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by thePP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to thefollowing conditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

Page 26: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

26

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 50000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP.

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

72. Case No. 1046/2012 Shri Dildar Singh S/o Shri Bhoot Singh Vill- ChhotiBegalgoan Tehsil- Sondwa Distt- Alirajpur (M.P) Sand Quarry of Lease Area – 1.5 Ha.,Lease Period – 02 Year. Proposed Capacity –30000 m3/Year for at Survey No. 325 Village-Dabdi Tehsil- Sondwa Distt- Alirajpur. (M.P)

The project pertains to mining of Sand in an area of 1.5 hectare and production capacityto the tune of 30000 m3 per year. It was reported by the PP that the sand quarry has beenallotted to them for a period of 02 years. The project falls under category B-2 as per thepolicy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by thePP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to thefollowing conditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.

Page 27: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

27

5. Production shall be to the tune of 30000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP.

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

73. Case No. 1047/2012 Shri Shiv Shakti Construction Company Shri Sanjay SinghChouhan Attorney Holder MIG-27 Bodabagh Colony Housing Board Distt- Rewa (M.P)486001- Metal Stone Quarry of Lease Area – 1.664 Ha.,. Proposed Capacity – StoneBoulder -20000 m3/Year project. Khasra no. 724/1Kha1, 724/1Kha2, 724/1Kha3 Village-Bamhore, Tehsi – Nagod Distt- Satna. (M.P).

The project pertains to mining of Stone in an area of 1.664 hectare and productioncapacity to the tune of 20000 m3 per year. It was reported by the PP that the quarry hasbeen allotted to them for a period of 02 years. The project falls under category B-2 as perthe policy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by thePP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to thefollowing conditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 20000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.

Page 28: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

28

8. The validity of the prior EC & the lease shall be for a maximum period of two yearsonly.

9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP.

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

Neither the Project proponents nor their representatives of following Projects were present to explain thequery which might be raised or to make any commitment which may be desired by the committee during thedeliberation. Committee decided to call these proponents in coming meetings as per turn.

74. Case No. 1043/2012 Shri Arjun Shrama S/o Shri Sanjay Sharma M/s Telecommunications ConsultantIndia Ltd. C-6 Sainik Society Shakti Nagar Jabalpur (M.P) 482001. - Stone Quarry of Lease Area – 2.0 Ha.Lease period 02- years Proposed Capacity – Stone Boulder -50000 m3/Year Khasra no. 85/1 patwari halka No.47/51, Village- Harrai, Tehsil – lkhnadon Distt- Seoni (M.P)

75. Case No. 1045/2012 Shri Arjun Sharma S/o Shri Sanjay Sharma, M/s Telecommunication ConsultantIndia Ltd. , C-6, Sanik Socieety, Shakti Nagar, Jabalpur (M.P.) - 482001 - Stone Quarry of Lease Area – 4.44Ha.,. Proposed Capacity – 1,00,000 m3/Year. Khasra No.- 231& 238, Patwari Halka No. – 42, Village- Nagadhar,Tehsil – Lakhnadon Distt- Seoni (M.P)Lease period - 2 years

76. Case No. 1048/2012 Shri Vinod Kumar Shukla Construction Pvt. Ltd., 18, Second Floor, Metro Plaza,E-5, Arera Colony, Bhopal, Distt. - Bhopal (M.P.) - 462016- Metal Quarry of Lease Area – 4.00 Ha.,. ProposedCapacity – 1,50,000 m3/Year. Khasra No.- 4198, Village - Baroda, Tehsil – Sheopur, Distt- Sheopur (M.P)Leaseperiod - 2 years

77. Case No. 1049/2012 Shri Vinod Kumar Shukla Construction Pvt. Ltd., 18, Second Floor, Metro Plaza,E-5, Arera Colony, Bhopal, Distt. - Bhopal (M.P.) - 462016- Clay Quarry of Lease Area – 1.756 Ha.,. ProposedCapacity – 30,000 m3/Year. Khasra No.- 58, Village - Chaudapur, Tehsil – Sheopur, Distt- Sheopur (M.P)Leaseperiod - 2 years.

`78. Case No. 1050/2012 Shri Surtan Singh S/o Shri Jam Singh, Village – Chhoti

Begalgaon, P.O. – Umariya, Tehsil – Sondwa, Distt. - Alirajpur (M.P.) 457888Sand Quarry of Lease Area – 4.250 Ha.,. Proposed Capacity – 24,000 m3/Year.

Khasra / Survey No. – 456, Village - Chhoti Begalgaon, Tehsil – Sondwa Distt- SheopurAlirajpur (M.P)Lease period - 2 years.

Page 29: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

29

The project pertains to mining of Sand in an area of 4.250 hectare and productioncapacity to the tune of 24000 m3 per year. It was reported by the PP that the sand quarry hasbeen allotted to them for a period of 02 years. The project falls under category B-2 as perthe policy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by thePP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to thefollowing conditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 24000 m3/annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP.

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

79. Case No. 1051/2012 Shri Suresh Kumar (G.M.) M/s Agroh InfrastructureDevelopers Pvt. Ltd., 74, Sanghi Street, Mhow, Indore (M.P.) - 452002 StoneBoulder Quarry of Lease Area – 03.18 Ha.,. Proposed Capacity – 70,000 m3/Year. Khasra308/1, 308/2, , Village - Gudikheda, Tehsil – Khandwa, Distt- Khandwa, (M.P) Leaseperiod - 2 years.

Neither the PP nor his representative was present to explain the query which might be raisedor to make any commitment which may be desired by the committee during thedeliberation. Committee decided to call the PP in coming meetings as per turn.

Page 30: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

30

80. Case No. 1052/2012 Shri Dushrath Singh S/o Shri Amar Singh, Village – Masni,P.O. – Khattali, Tehsil & Distt. - Alirajpur (M.P.) 457887- Sand Quarry of Lease Area –01.00 Ha.,. Proposed Capacity – 5,000 m3/Year. Survey No. – 635, Village - Dudalwat,Tehsil – Alirajpur Distt- Alirajpur (M.P) Lease period - 2 years.

Neither the PP nor his representative was present to explain the query which might be raisedor to make any commitment which may be desired by the committee during thedeliberation. Committee decided to call the PP in coming meetings as per turn.

81. Case No. 1053/2012 M/s Hi-Tech Rock Products & Aggregates Ltd., ECCDivision, C-17, Ground Floor, Vaishali Marg, Vaishali Nagar – Jaipur, Rajasthan –302021 - Stone Boulder Quarry of Lease Area – 4.0 Ha.,. Proposed Capacity – 5,00,000MT/Year. Khasra No. – 78/4/1,, Village Sameli, Tehsil – Rajgarh, Distt- Rajgarh, (M.P)Lease period - 2 years

The project pertains to mining of Stone in an area of 4.0 hectare and production capacityto the tune of 5, 00,000 MT per year. It was reported by the PP that the quarry has beenallotted to them for a period of 02 years. The project falls under category B-2 as per thepolicy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by thePP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to thefollowing conditions:

1) PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2) Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3) Transportation of material shall be done in covered vehicles.4) Curtaining of site shall be done using appropriate media.5) Production shall be to the tune of 5,00,000 MT/annum.6) Sieve or any other sizing device shall not be allowed in the mining lease area.7) The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8) The validity of the prior EC & the lease shall be for a maximum period of two years

only.9) Transportation shall not be carried out through forest area.10) PP shall take CSR activities in the region through the ‘Gram Panchayat’.11) All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12) The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP.

Page 31: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

31

13) Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14) Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

82. Case No. 1062/2012 Mr. Raru S/o Shri Haru, Village - Village – Chhoti Begalgaon,P.O. – Umariya, Tehsil – Sondwa, Distt. - Alirajpur (M.P.) 457888- Sand Quarry ofLease Area – 02.00 Ha.,. Proposed Capacity – 20,000 m3/Year. Khasra / Survey No. – 326,Village - Chhoti Begalgaon, Tehsil – Sondwa Distt- Sheopur Alirajpur (M.P)Lease period -2 years

The project pertains to mining of Sand in an area of 2.0 hectare and production capacityto the tune of 20000 m3 per year. It was reported by the PP that the sand quarry has beenallotted to them for a period of 02 years. The project falls under category B-2 as per thepolicy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by thePP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to thefollowing conditions:

1) PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2) Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3) Transportation of material shall be done in covered vehicles.4) Curtaining of site shall be done using appropriate media.5) Production shall be to the tune of 20000 m3/annum.6) Sieve or any other sizing device shall not be allowed in the mining lease area.7) The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8) The validity of the prior EC & the lease shall be for a maximum period of two years

only.9) Transportation shall not be carried out through forest area.10) PP shall take CSR activities in the region through the ‘Gram Panchayat’.11) All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12) The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP.

13) Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14) Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

Page 32: MINUTES OF STATE EXPERT APPRAISAL MEETING ... No. 916/2012 Smt. Minakshi Jain W/o Shri Vipin Jain, Parijat 1, Bahubalipuram, A. B. Road, Guna (M.P.) 473001 Lease Area - 0.623 Ha. Stone

MINUTES OF STATE EXPERT APPRAISALCOMMITTEE

117th MEETING

16th January 2013

(S.C. Jain)Chairman

(Dr Mohini Saxena)Member SEAC

(V. Subramanian)Member SEAC

(V.R. Khare )Member SEAC

(K.P. Nyati)Member SEAC

(R.K. Jain)Member Secretary

32

83. Case No. 876/2012 Smt. Mohini Awasthi W/o Shri Awasthi R/o Near Suptt. ofPolice Residence, Barapatthar - Seoni, Distt. - Seoni (M.P.) - 480661- M/s RudranshMetal Stone Quarry at Khasra No. – 228/2, Village – Ragadehi, Tehsil – Seoni, Distt. –Seoni (M.P.) Lease Area – 1.0 ha. Capacity – 10,000 Cu. M. Per Year.

The project pertains to mining of Stone in an area of 1.0 hectare and productioncapacity to the tune of 10,000 m3 per year. It was reported by the PP that the quarry hasbeen allotted to them for a period of 02 years. The project falls under category B-2 as perthe policy decided by SEIAA. PP has submitted the information in the prescribed format-1duly verified by the DFO and the Tehsildar. EM Scheme has also been submitted by thePP.

After deliberations on salient features of the project and the EMP suggested by the PPcommittee has decided to recommend the case for grant of prior EC subject to thefollowing conditions:

1. PP shall be responsible for any discrepancy (if any) in the submissions made by thePP to SEAC & SEIAA.

2. Water body shall be developed as a ghat with appropriate fencing for safe andsmooth use by the local residents.

3. Transportation of material shall be done in covered vehicles.4. Curtaining of site shall be done using appropriate media.5. Production shall be to the tune of 10,000m3 /annum.6. Sieve or any other sizing device shall not be allowed in the mining lease area.7. The proposed plantation should be carried out along with the mining and PP should

take care that these plants attain full growth.8. The validity of the prior EC & the lease shall be for a maximum period of two years

only.9. Transportation shall not be carried out through forest area.10. PP shall take CSR activities in the region through the ‘Gram Panchayat’.11. All proposed CSR activities and the budget reserved for the same shall be discussed

in the Gram sabha proceedings which shall be verified by the MPPCB while grantingconsent.

12. The amount towards EMP shall be deposited with the Collector for further executionof the activities under EMP.

13. Proponent has agreed to distribute pressure-cookers to the families in the nearbyvillage the same shall be taken up along with other mining activities.

14. Road net-work proposed to be used for transportation of materials shall bemaintained by the PP; the point shall be covered in the Gram sabha proceedings andshall be verified by the MPPCB while issuing consents.

Meeting ended with thanks to the Chair and the members.