Date' 1;'" f-ebruary 2020 MINUTES OF PRE-BID MEETING Procurement OF SUPPLIERS FOR 1-8MARKAZ PROJECT (FDOC) Tenders 1) Supply of Architectural Owner Furnished Materials for 1-8Markaz Project Islamabad a. Package 4(a): Supply of Concrete Blocks b. Package 4(b): Supply of Aluminum Glass Doors c. Package 4(c): Supply of Windows & Ventilators d. Package 4(d): Supply of Aluminum Composite Panel Cladding e. Package 4(e): Supply of Ceramic & Porcelain Tiles f. Package 4(f): Supply of Granite 2) Supply of HVAC, Electrical, Plumbing and Fire Fighting Owner Furnished Materials for 1-8Markaz Project Islamabad a. Package 4(1):Supply of Light Fixtures b. Package 4(m): Supply of Switch Gears c. Package 4(n): Supply of Diesel Generator d. Package 4(0): Supply of CCTV System EMPLOYER'S REPRESENTATION: Engr. Umair Ishaq (GM Engineering and P&C) Engr. Khurram Iqbal (Project Manager - PRIMACO) Engr Amir Naveed ( Manager Engineering Electrical - PRIMACO) Ain Uz Zia Qusain Pasha (Manager Contracts) Syed Salman Tahir (Manager Procurement) Engr. Waleed Khan (Assistant Manager Contracts) 1. On behalf of PRIMACO, GM (Engineering and P & C) initiated the meeting while highlighting location background of the project, introduction to various Tenders and their scope, and the intent of the Employer to execute project. After detailed introduction, the bidders were requested to raise their queries, if any, for further clarifications by Employer's team. Following are the queries and responses raised during the meeting. 1 I

MINUTESOFPRE-BIDMEETING Procurement OFSUPPLIERS FOR1 ...primaco.com.pk/download.php?filename=20-02-17... · 2. Client will have the right and call for the certificate from the original

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MINUTESOFPRE-BIDMEETING Procurement OFSUPPLIERS FOR1 ...primaco.com.pk/download.php?filename=20-02-17... · 2. Client will have the right and call for the certificate from the original

Date' 1;'" f-ebruary 2020

MINUTES OF PRE-BID MEETING

Procurement OF SUPPLIERS FOR 1-8MARKAZ PROJECT (FDOC)

Tenders

1) Supply of Architectural Owner Furnished Materials for 1-8Markaz Project Islamabada. Package 4(a): Supply of Concrete Blocksb. Package 4(b): Supply of Aluminum Glass Doorsc. Package 4(c): Supply of Windows & Ventilatorsd. Package 4(d): Supply of Aluminum Composite Panel Claddinge. Package 4(e): Supply of Ceramic & Porcelain Tilesf. Package 4(f): Supply of Granite

2) Supply of HVAC, Electrical, Plumbing and Fire Fighting Owner Furnished Materials for 1-8Markaz Project Islamabada. Package 4(1):Supply of Light Fixturesb. Package 4(m): Supply of Switch Gearsc. Package 4(n): Supply of Diesel Generatord. Package 4(0): Supply of CCTV System

EMPLOYER'S REPRESENTATION:

••••••

Engr. Umair Ishaq (GM Engineering and P&C)Engr. Khurram Iqbal (Project Manager - PRIMACO)Engr Amir Naveed ( Manager Engineering Electrical - PRIMACO)Ain Uz Zia Qusain Pasha (Manager Contracts)Syed Salman Tahir (Manager Procurement)Engr. Waleed Khan (Assistant Manager Contracts)

1. On behalf of PRIMACO, GM (Engineering and P & C) initiated the meeting while highlighting location backgroundof the project, introduction to various Tenders and their scope, and the intent of the Employer to execute project. Afterdetailed introduction, the bidders were requested to raise their queries, if any, for further clarifications by Employer's team.Following are the queries and responses raised during the meeting.

1 I

Page 2: MINUTESOFPRE-BIDMEETING Procurement OFSUPPLIERS FOR1 ...primaco.com.pk/download.php?filename=20-02-17... · 2. Client will have the right and call for the certificate from the original

-No. CLARIFICATION {QUERY RESPONSE1. What percentage of Service sales tax will be All taxes and duties will charged as per Government

charged by the Employer? regulations, in case of sales tax on services, 5% of contractamount will be deducted from successful bidder.

2. What are the criteria to check equivalency of the Equivalent materials will be accepted for all these OFMmaterials? contracts with following criteria;

1. Equivalent brand to Manufacturer list will beacceptable after scrutiny by Design Consultant in light ofproject specifications.2. Client will have the right and call for the certificatefrom the original manufacturer for items/material supplied bythe contractor for the project.3. Local Representative must have at least 5 yeardealership of proposed brand and must be authorized tosupply the material on this project.4. Previous performance with employer shall beconsidered as qualification/disqualification criteria forevaluation of this procurement.

3. Are the UL (Underwriters Laboratories) The Employer / purchaser will ascertain that all suppliedCertification mandatory for these materials? materials (where applicable) are certified {listed under UL-

Certifications to ensure that product meets specific definedrequirements and standards of safety.

4. What will be the origin of Diesel Generator? Can Origin of the material will be as per RFP document.local manufacturers execute the coupling Moreover, local coupling will not be allowed.procedure? And if it would be acceptable to theEmployer?

5. Who will carry out the site acceptance test, Site Acceptance Test will be carried out by the supplier onsupplier or the contractor? load bank as directed by the Emplover.

6. What is guarantee period for Diesel Generator? 12 months guarantee period is required from the date of

- acceptance of commissioning.7. Is Joint venture allowed? Joint Ventures will not be permitted in these contracts.8. Does the bidder will be required to get Factory Factory Acceptance Tests (FAT) will be provided by supplier

Acceptance Test from the manufacturer? Ldul~ notarized by the country of origin before shipment from_

2 I

Page 3: MINUTESOFPRE-BIDMEETING Procurement OFSUPPLIERS FOR1 ...primaco.com.pk/download.php?filename=20-02-17... · 2. Client will have the right and call for the certificate from the original

the count~ of oriain.9. What will be the scenario if lowest submitted bid is Contractor will be asked to submit additional amount of

significantly above or below of engineer estimate? Performance Guarantee if his bid is above and below 15% ofEngineers Estimate.

2. The meeting was concluded on thanks giving notes.

NOTES:

1. Timelines will be strictly followed in line with RFP.2. The financial impact in line with scope of RFP and Pre-bid Meeting must be incorporated accordingly.