32
Smarter Thinking. © MIRA Ltd 2013 Smarter Thinking. © MIRA Ltd 2013 MIRA Corporate Overview Dr G Davis CCTO November 7, 2013

MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Smarter Thinking. © MIRA Ltd 2013

MIRA Corporate Overview

Dr G Davis

CCTO

November 7, 2013

Page 2: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

MIRA is a long established world leading vehicle engineering consultancy

November 7, 2013 We Deliver Smarter Thinking. 2

Page 3: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

MIRA has a well established offering as an engineering service provider

November 7, 2013 We Deliver Smarter Thinking. 3

World-class vehicle engineering consultancy

Test Engineering Services

Technology Park 67 years of experience UK Government Support

Transport Sector

600+ dedicated staff Strong growth

Page 4: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

MIRA serves an increasing multi-industry global client base

November 7, 2013 We Deliver Smarter Thinking. 4

Automotive Defence Aerospace Rail

Page 5: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

MIRA has world class capabilities across 9 business segments

November 7, 2013 We Deliver Smarter Thinking. 5

Vehicle Engineering Test Engineering Certification & Homologation

Controls & xEV Intelligent Mobility Future Transport Technologies

Unmanned Ground Vehicles Functional Safety Technology Park

Page 6: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Our strategic goals

November 7, 2013 We Deliver Smarter Thinking. 6

“One day every journey in the world will be positively influenced by us.”

Growing services in automotive and defence vehicle engineering Expanding in key international markets Developing the Technology Park at MIRA as a world-class location focused on the transport sector

Smarter Thinking.

Page 7: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

MIRA remains transport technology focused

November 7, 2013 We Deliver Smarter Thinking. 7

“MIRA provide innovative solutions to address the key challenges faced by the transport industry.”

Increased intelligence in vehicles

Improving safety

Reducing congestion

Lowering CO2 emissions

MIRA hosts Europe’s only independent capability for developing and validating Intelligent Transportation Systems (ITS) technologies

Page 8: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

With advanced tools & techniques

November 7, 2013 We Deliver Smarter Thinking. 8

Page 9: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

And over 35 major facilities

November 7, 2013 We Deliver Smarter Thinking. 9

Page 10: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

A diverse global customer base

Our services range from individual product tests, to turn-key, multi-vehicle design, development and build programmes for:

Vehicle manufacturers System & component manufacturers Defence vehicle manufacturers Military equipment suppliers Rail rolling stock builders Aerospace manufacturers & suppliers Government bodies Research & academic institutes

November 7, 2013 We Deliver Smarter Thinking. 10

Page 11: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

And a growing global footprint

Several sales and engineering facilities around the world - Providing comprehensive range of services to global client base

November 7, 2013 We Deliver Smarter Thinking. 11

Page 12: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Recent success and performance

2012 was another year of solid growth

- New customer relationships established

- Key investment in core facilities

November 7, 2013 We Deliver Smarter Thinking. 12

25

30

35

40

45

50

2007 2008 2009 2010 2011 201225

30

35

40

45

50

2007 2008 2009 2010 2011 2012

Order Intake (£m) Income (£m)

*Compound Annual Growth Rate (CAGR)

50% growth in business since the establishment of new executive team

Page 13: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Investing in the future

Page 14: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Our vision

“To create a world class centre of excellence in transport technology and an outstanding working environment.”

1.75 million sq.ft. of R&D space

UK Enterprise Zone status

Strong UK inward investment opportunity

Premier location in the heart of the UK automotive sector

2000 new jobs over the next 10 years

November 7, 2013 We Deliver Smarter Thinking. 14

Page 15: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Why choose a career at MIRA

A long established transport orientated engineering and test consultancy, with history, heritage and global brand recognition

Entering an exciting period of growth and business change

We are looking for high calibre engineers and project managers who want to work in a fast paced environment on advanced transport technologies with an increasingly global client base

November 7, 2013 We Deliver Smarter Thinking. 15

Page 16: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Case studies

November 7, 2013 We Deliver Smarter Thinking. 16

Page 17: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Case Study Concept Suspension Design and Development

Approach:

12 month pre-programme approval concept study and design

Target Setting & benchmarking responsibilities

Integration with customer programme team and potential suppliers

20+ heads

17

Results and benefits

MIRA’s expertise of global requirements and real world usage profiles of vehicle types assists greatly in engineering design optimisation

Situation and objective:

Concept design of suspension and chassis systems for new prestige 4WD vehicle

CAD and CAE analysis and integration of vehicle attribute teams (R & H)

Current project

Page 18: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Case Study Foundation Brake Development Programmes

Approach:

Integrated team placed within OEM engineering HQ

Supplier and component management

Prototype build definition for brake development programme

Development test responsibilities and Final Engineering Sign Off

Launch Support

18

Results and benefits:

Vehicles have currently passed FE Sign off

MIRA expertise in braking and in particular brake refinement have eased programme through NVH issues

Situation and objective:

European OEM mainstream programme on coupe and convertible, SOP 2013

MIRA team responsibility for taking brake design from PS to SOP+90 days

Page 19: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Case Study Turnkey EMC Engineering Provider for Ford Motor Company

Approach:

On-site team manage test planning

Test & engineering conducted at MIRA

Simulation led approach ensures best platform architecture

In-vehicle field distributions (EMC threats and Rad Haz)

Optimum harness, ECU and antenna location.

19

Results and benefits:

• Test programme ensures Corporate and Legislative requirements are satisfied

• MIRA expertise delivers problem resolution. Zero failure approach

• Audio Evaluation / Audio improvements ensure customer satisfaction

Situation and objective:

Ford has outsourced all EMC engineering, test and validation to MIRA since 1996

MIRA is a full service EMC provider to the Ford Motor Company

Page 20: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Case Study Limo Green: Jaguar XJ REEV (Range Extended Electric Vehicle)

Approach:

MIRA responsibility included

Hybrid Control Systems and Powertrain integration

Prototype build and technology demonstration

November 7, 2013 We Deliver Smarter Thinking. 20

Results and benefits:

Successfully developed and built a series of high quality advanced prototype demonstrators

Helped shape JLR’s on-going hybrid strategy

Situation and objective:

MIRA requested to develop premium Series Hybrid with challenging performance, targets

- Vmax 180 km/h; 0-100 km/h 7.9s

- Range 1000 km (EV 50 km); <120g/km CO2

Page 21: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Case Study Functional safety concept development for a major premium OEM

Approach:

Item definition

Hazard analysis and risk assessment

Specification of the functional safety concept

Cascading of safety requirements to suppliers

Monitoring of supplier progress against these requirements on behalf of the OEM

November 7, 2013 We Deliver Smarter Thinking. 21

Situation and objective:

OEM introducing a novel concept to an existing drive-by-wire control system

MIRA asked to develop the functional safety concept on behalf of the OEM

Need to create and cascade functional safety requirements to the suppliers including impact analysis on existing systems

Results and benefits:

ISO 26262-compliant activities with minimal change to OEM and supplier processes

MIRA’s safety requirements integrated into customer requirements management system

Documentation generated for OEM’s safety case

Page 22: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Case Study Unmanned Improvised Explosive Device (IED) Detection System

Approach:

12 month engineering development and delivery programme

System is based on MIRA’s MACE technology

50+ heads

Full support including all upgrades

Results and benefits:

Used extensively for rapid and safe route proving

The equipment has been cited in reports as the most capable equipment of it’s kind

Situation and objective:

Design and supply of a comprehensive unmanned capability

Integrated in to a Land Rover Defender

In service with the British Army since 2011

November 7, 2013 We Deliver Smarter Thinking. 22

Page 23: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Further details on MIRA’s activities

November 7, 2013 We Deliver Smarter Thinking. 23

Page 24: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Vehicle Engineering

November 7, 2013 We Deliver Smarter Thinking.

Steering Durability Brake development

NVH Chassis design HVAC / Thermal

Ride and handling Driver training Body design

Page 25: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Test Engineering

November 7, 2013 We Deliver Smarter Thinking.

Calibration Components EMC

Environmental Safety Development Electrical

Test facility development Certification & Homologation Aerodynamics

Page 26: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Certification and Homologation

November 7, 2013 We Deliver Smarter Thinking.

Programme management Crash structures Type approval

Certification Homologation services Market region legislation

CE marking Radio approvals Noise analysis

Page 27: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Controls and xEV

November 7, 2013 We Deliver Smarter Thinking.

EMC products Hybrid powertrain solutions Intelligent transportation systems

HVAC systems Electronic chassis control systems Battery management systems

Optimisation of xEV Modelling of xEV System & vehicle validation

Page 28: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Intelligent Mobility

November 7, 2013 We Deliver Smarter Thinking.

Proving ground management Co-operative vehicles Cloud based traffic simulation

Autonomous systems Eco driving solutions Connected vehicles

Advanced Driver Assist Systems Intelligent safety systems Cityscape living laboratory

Page 29: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Future Transport Technology's

November 7, 2013 We Deliver Smarter Thinking.

Low carbon vehicles Alternative fuels Battery management systems

Human tech interface Low carbon technologies Future safety requirements

New vehicle architecture Lightweight design Sustainable energies

Page 30: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Unmanned Ground Vehicles

November 7, 2013 We Deliver Smarter Thinking.

Pathfinder MACE3 Guardsman MACE2

MACE3 Sherpa ‘Hop-in, hop-out’ Command & control systems

Intelligent self navigation Modular based technologies Cutting-edge UGV research

Page 31: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Technology Park

November 7, 2013 We Deliver Smarter Thinking.

Master plan Enterprise Zone Midlands location

Centre for innovation Apprenticeship schemes Independent experts

Government backing Unique offering of one location Client facilities

Page 32: MIRA Corporate Overview - Ordem dos Engenheiros · MIRA hosts Europe’s only independent capability for developing and . ... Hazard analysis and risk assessment Specification of

Smarter Thinking. © MIRA Ltd 2013

Contact Details

November 7, 2013 We Deliver Smarter Thinking. 32

MIRA Ltd Watling Street, Nuneaton, Warwickshire, CV10 0TU, UK T: +44 (0)24 7635 5000 F: +44 (0)24 7635 8000 www.mira.co.uk

Dr. Geoff Davis BEng (Hons), MSc (Eng), PhD Chief Commercial and Technical Officer

Direct T: +44 (0) 24 7635 5418 M: +44 (0) 7787 505190 E: [email protected]