25
MISSION: To supply nuclear fuel cycle and related products and services.

MISSION: To supply nuclear fuel cycle and related products and services

Embed Size (px)

Citation preview

Page 1: MISSION: To supply nuclear fuel cycle and related products and services

MISSION: To supply nuclear fuel

cycle and related products and

services.

MISSION: To supply nuclear fuel

cycle and related products and

services.

Page 2: MISSION: To supply nuclear fuel cycle and related products and services

Area: 8 511 695 km2

Population: 186,800,000 inhabitants

Gross Domestic Product : US$1,067 x 109

Electric Power Generation: 419,3 TWh

Electric Power Consumption: 390 TWh

Nuclear Plants: 2 (636 MW + 1245 MW)

Total nuclear generation: 13,8 TWh

% of total generation: 3,3%

Sources: Brazilian Energy Balance EPE - 2007

-

GENERAL INFORMATION 2006

GUIANA FRANCESASURINAME

GUIANAVENEZUELA

COLÔMBIA

PERU

EQUADOR

BOLÍVIA

PARAGUAI

ARGENTINA

URUGUAI

CHILE

BRASIL

Page 3: MISSION: To supply nuclear fuel cycle and related products and services

Ministry of Scienceand Technology

Ministry ofMines and Energy

Comissão Nacionalde Energia Nuclear

IndústriasNucleares

do Brasil S.A .

EletronuclearS.A.

Centrais ElétricasBrasileiras S.A .

Ministry ofDefense

CTMSP

NavyCommand

NuclebrásEquipamentosPesados S.A

Organization of the Brazilian Nuclear Sector

Page 4: MISSION: To supply nuclear fuel cycle and related products and services

DEMANDA E PRODUÇÃO DE URÂNIO

CONSUMO INTERNO

(t U3O8/ano)ANO USINAS DEMANDA PRODUÇÃO

2008 Angra I e II 420 400

2010 Angra I e II 420 800

2014 Angra I, II e III 690 2.000

2020 Angras + 4 N 1.510 2.300

2030 Angras + 6 N 2.170 2.300 AI demanda de 150 t U3O8/ano AII e AIII demanda individual de 270 t U3O8/ano Novas usinas nucleares com demanda individual de 230 t U3O8/ano Caetité ampliando produção para 800 t U3O8/ano em 2010 Itataia produção inicial de 1.200, ampliando para 1.500 t U3O8 /ano

Page 5: MISSION: To supply nuclear fuel cycle and related products and services

INB MISION

To ensure the supply of

nuclear fuel for electric power

generation in Brazil.

Mining

Conversion

Enrichment

UF6 to UO2 Conversion

Pellets

Fuel Assemblies

Page 6: MISSION: To supply nuclear fuel cycle and related products and services

MINING GEOLOGICAL URANIUM RESERVES

Deposits

Tons of U3O8

Measurements / Indicated Inferred Total

Caetité / Lagoa Real

94.000 6.700 100.770

Santa Quitéria

91.200 51.300 142.500

Others 39.500 26.600 66.100

TOTAL 224.700 84.670 309.370*

PROGNOSTICATED: Pitinga (AM): 150.000PROGNOSTICATED: Pitinga (AM): 150.000Rio Cristalino (PA): 150.000Rio Cristalino (PA): 150.000

SPECULATIVE: 500.000

Espinharas

Caetité / Lagoa Real

Santa Quitéria

Poços de Caldas

Amorinópolis

Figueira

Campos Belos /Rio Preto

Quadrilátero Ferrífero

Pitinga

Rio Cristalino

* Result from prospecting on only 25 % of the national territory.

Page 7: MISSION: To supply nuclear fuel cycle and related products and services

INB’s Mining andIndustrial Units

Brasília

INB Resende

INB Caetité

INB Santa Quitéria

Facility - Caetité MineCapacity - 400 t/yU3O8

Status - in operation

Facility - Caetité MineCapacity - 400 t/yU3O8

Status - in operation

Facility - Rod Fabrication/AssemblingCapacity - 240 t/yr

Status - in operation

Facility Capacity StatusUO2 powder 160 t/y in operationUO2 pellet 120 t/y in operationEnrichment plant under implementation

Facility - Santa QuitériaCapacity - 1.600 t/y U3O8

Status - in process

Facility - Santa QuitériaCapacity - 1.600 t/y U3O8

Status - in process

Page 8: MISSION: To supply nuclear fuel cycle and related products and services

CALDAS - INICIO DA CAVA DA MINA CALDAS

Page 9: MISSION: To supply nuclear fuel cycle and related products and services

AÇÕES EM CURSO EM CALDAS – URA

1. Reembalagem da Torta II

2. Programa de Recuperação de Áreas Degradadas – PRAD

3. Cava da Mina

4. Córrego do Cercado

5. Remodelagem da canal de drenagem do BF 8N;

6. Córrego da Consulta

7. Remoção da borra de enxofre do local atual para a Cava da Mina;

8. Reforma e aquisição de equipamentos para os laboratórios

CALDAS

Page 10: MISSION: To supply nuclear fuel cycle and related products and services

CALDAS

Page 11: MISSION: To supply nuclear fuel cycle and related products and services

BOTA FORA 8 CALDAS

Page 12: MISSION: To supply nuclear fuel cycle and related products and services

CALDAS

Page 13: MISSION: To supply nuclear fuel cycle and related products and services

CALDAS

Page 14: MISSION: To supply nuclear fuel cycle and related products and services

1122

1 - Bacias de Estocagem de Efluentes 2 - Pátio de Britagem3 - Pátios de Lixiviação 4 - Bacias de Estocagem do Licor5 - Tratamento Químico, Insumos 6 - Administração e Utilidades

1 - Bacias de Estocagem de Efluentes 2 - Pátio de Britagem3 - Pátios de Lixiviação 4 - Bacias de Estocagem do Licor5 - Tratamento Químico, Insumos 6 - Administração e Utilidades

3344

55

66

INB CAETITÉProdução de Urânio

INB CAETITÉProdução de Urânio

Page 15: MISSION: To supply nuclear fuel cycle and related products and services

PRODUÇÃO DE CONCENTRADO DE URÂNIOAmpliação para 800 t/ano

Planejamento 2008

Programa de produção (toneladas de U3O8 / ano)

Ano 2008 2009 2010 2011 2012 2013Cachoeira (AN13) - Lavra céu aberto 400 400 500 200 0 0Engenho (AN09) 0 0 0 0 300 300Quebradas (AN08) - Lavra céu aberto 0 0 0 0 100 100Cachoeira (AN13) - Lavra subterrânea 0 0 0 400 400 400Capacidade anual em U3O8 (em t) 400 400 500 600 800 800

Page 16: MISSION: To supply nuclear fuel cycle and related products and services

UNIDADE DE CAETITÉ

Page 17: MISSION: To supply nuclear fuel cycle and related products and services

UNIDADE DE CAETITÉ

Page 18: MISSION: To supply nuclear fuel cycle and related products and services

LAVRA A CÉU ABERTO CAVA DO CORPO I E III

INB CAETITÉ

Page 19: MISSION: To supply nuclear fuel cycle and related products and services

MINERAÇÃO A CÉU ABERTO E SUBTERRÂNEAPlanta de Tratamento

Pilha de Estéril

Mineração Céu Aberto

Lavra

Desenvolvimento

Galerias de Exploração Reservas Futuras

Nível de Transporte

Subnível 2

Subnível 1

Rampa -15%

Poço de ventilação

Exaustor

Subnível 3

Subnível 4

INB CAETITÉ

Page 20: MISSION: To supply nuclear fuel cycle and related products and services

PROJETO CONTEMPLANDO LAVRA DOS CORPOS ATÉ COTA 600

INB CAETITÉ

Page 21: MISSION: To supply nuclear fuel cycle and related products and services

MINERAÇÃO E BENEFICIAMENTO

DE URÂNIO

PROJETO SANTA QUITÉRIA

Itataia

Reservas: 142.500 t de urânio Localização: Município de Santa Quitéria (CE), a 250 km de Fortaleza

Page 22: MISSION: To supply nuclear fuel cycle and related products and services

Reserva total de minério: 80 milhões t

Teores médios: 11% em P2O5 0,1% em U3O8

Reservas de Fosfato: 9 milhões t P2O5

Reservas de Urânio: 80 mil t U3O8

Reservas de Mármore: 300 milhões m3

Produção de Fosfato 240.000 t/ano P2O5

Produção de Urânio: 1.500 t/ano U3O8

PROJETO SANTA QUITÉRIA

Caracterização da jazida

Page 23: MISSION: To supply nuclear fuel cycle and related products and services

LavraCéu aberto

BeneficiamentoMineral

PlantaFosfórico

PurificaçãoFosfórico

Concentrado800 MTA

MAP270 MTA

Enxofre

Planta Sulfúrico

Planta Urânio

H2SO4710 MTA

U3O81,5 MTA

Fluxograma simplificado

Planta MAP

Planta Bicálcico

Bicálcico240 MTA

(Fertilizantes)

(Ração animal)

(Geração de Energia)

P2O5240 MTA

PROJETO SANTA QUITÉRIA

Page 24: MISSION: To supply nuclear fuel cycle and related products and services

LavraCéu aberto

Beneficiamento

Mineral

PlantaFosfórico

Purificação Fosfórico

Planta Sulfúrico

Planta Urânio

Licenciamento Ambiental

Planta MAP

Planta Bicálcico

IBAMA/CNENSEMACE

PROJETO SANTA QUITÉRIA

Page 25: MISSION: To supply nuclear fuel cycle and related products and services

PROJETO SANTA QUITÉRIA

Cronograma