Agenda• Background• Organization• Schedule• Training• Communication• Issues• Actions
Background• 16.83x project• UNP competition – We won entrance to
first phase!• The OSMV vehicle description• Mission: To validate the on-orbit
performance of a Diverging Cusped-field Hall Thruster (DCHT) through various Air Force relevant SSA, ORS, and ISR mission scenarios
Why an MIT Satellite Team
• Our seniors are graduating• The competition is graded based on
distribution of participants across all year groups and several majors
• It’s a really good idea• It will be a lot of fun!
Current Status• 16.832 vehicle
– FlatSat operational test to be completed soon
– Engineering model tested in vibe, thermal vacuum, and communication range
– Software to be completed
• UNP vehicle (The MST vehicle)– System concept review completed– System requirements review 4/16/2009– Preliminary design review 8/2009
Organization
Roles•Ace programmers•Machinists•Electronic board designers•CAD/ORCAD wizards•Communications equipment designer•Master solderer•HAM radio operator•Documentation expert/librarian skills
Schedule (1)• Overall schedule
– Summer UROPs– Systems Requirements Review 4/16/2009– SHOT I June 2009– Preliminary Design Review 8/2009– SHOT II June 2010– Critical Design Review 8/2010– Competition for flight opportunity January
2011
Schedule (2)• Spring activities16.832
– Bench Review 5/7/2009
• Summer activities• Plans for fall 2009 and beyond• New projects (?)
Training• Expert area telecons• 16.832 mentors• Joe Robinson and John Richmond• Professor Miller, Colonel Keesee,
Professor Lozano, Alvar Saenz-Otero• Space Mission Analysis and Design
(SMAD) by Wertz and Larson• Classes in fall 2009 (16.681) and spring
2010 (16.83x)
Communication• Email list• Website• Fileshare
Issues• Most of current team is graduating in
June• Lots to do over the summer• Non-US citizens won’t have access to
some materials
Actions• Summer UROP applicants need to
submit proposals by 4/16/2009• Participate in the SRR on 4/16 at 5:00
pm• Attend the 16.832 Bench Review on 5/7
2:00 – 6:00 pm• Spread the word• Build and launch some spacecraft• Have fun!
Questions• [email protected]• 33-218c• [email protected] • SMAD