Upload
rukometlas
View
268
Download
3
Embed Size (px)
Citation preview
8/11/2019 MM Purchasing User Manual
1/295
MM COURSE: PURCHASING
Page | 1
B S N L
U SE R M A N U A L : P u r c h a s i n g
Version:1.0
01/09/2010
8/11/2019 MM Purchasing User Manual
2/295
MM COURSE: PURCHASING
Page | 2
Table of Contents
FLOWCHART ................................................................................................................................................................... 41. Purchase requisition ................................................................................................................................................. 5
1. MM-ME51N-Create Purchase Requisition for Account Assignment .................................................................... 5
2. MM-ME51N-Create Purchase Requisition for Asset .......................................................................................... 12
3. MM-ME51N-Create Purchase Requisition for Non Valuated materials ............................................................. 18
4. MM-ME51N-Create Purchase Requisition for Stock materials .......................................................................... 23
5. MM-ME52N-Change Purchase Requisition ........................................................................................................ 306. MM-ME53N-Display Purchase Requisition ........................................................................................................ 37
7. MM-ME56-To assign source of supply to requisitions ....................................................................................... 41
8. MM-ZMMF_PR- PR Output ................................................................................................................................ 44
2. Request for Quotation ............................................................................................................................................. 471. MM-ME41-Create Quotation ............................................................................................................................. 47
2. MM-ME47-Maintain Quotation ......................................................................................................................... 68
3. MM-ME48-Display Quotation ............................................................................................................................ 77
4. MM-ME49-RFQ Comparison .............................................................................................................................. 82
5. MM-ZMMF_PC-Print Price Comparison Report ................................................................................................. 86
6. MM-ME9A-Message Output RFQ ....................................................................................................................... 89
3. Contract/APO .......................................................................................................................................................... 931. MM-ME31K-Create Contract with reference to PR............................................................................................ 93
2. MM-ME31K-Create Contract with reference to RFQ ....................................................................................... 106
3. MM-ME32K-Change Contract .......................................................................................................................... 118
4. MM-ME33K-Display Contract ........................................................................................................................... 125
5. MM-ME9K-Message Output Contracts ............................................................................................................ 133
6. MM-ZMMF_APO-Message output APO ........................................................................................................... 137
4. Purchase Order/Release Order ............................................................................................................................ 1411. MM-ME21N-Create Purchase Order-Account Assignment .............................................................................. 141
2. MM-ME21N-Create Purchase Order-Assets .................................................................................................... 160
3. MM-ME21N-Create Purchase Order-Non-Valuated Material .......................................................................... 181
8/11/2019 MM Purchasing User Manual
3/295
MM COURSE: PURCHASING
Page | 3
4. MM-ME21N-Create Purchase Order-Project Stock .......................................................................................... 199
5. MM-ME21N-Create Purchase Order-Stock Materials ...................................................................................... 218
6. MM-ME21N-Create Purchase Order-Subcontracting & Repair ....................................................................... 236
7. MM-ME21N-ZSTE-Stock Transfer PO External ................................................................................................. 243
8. MM-ME21N-ZSTI-Stock Transfer PO Internal................................................................................................... 247
9. MM-ME22N-Change Purchase Order ............................................................................................................... 251
10. MM-ME23N-Display Purchase Order ........................................................................................................... 256
11. MM-ZMMP_POTOL-PO Tolerance ............................................................................................................... 259
12. MM-ME9F-Message Output Purchase Orders ............................................................................................. 262
13. MM-ZMMP_SPO-Ultimate Consignee Details .............................................................................................. 266
14. MM-ZMMF_SPO-Ultimate Consignee Details Print ..................................................................................... 271
15. MM-ZMMP_POAMEND-Purchase Order Amendment ................................................................................ 275
16. MM-ZMMF_POAMEND-Print Purchase Order Amendment ........................................................................ 279
5. Approvals .................. ................. .................. ................. .................. ................. .................. ................. .................. 2831. MM-SBWP-PR_APO_PO_RFQ approval process .............................................................................................. 284
IMORTANT TRANSACTION CODES .......................................................................................................................... 295
8/11/2019 MM Purchasing User Manual
4/295
MM COURSE: PURCHASING
Page | 4
FLOWCHART
8/11/2019 MM Purchasing User Manual
5/295
MM COURSE: PURCHASING
Page | 5
1. Purchase requisition
1. MM-ME51N-Create Purchase Requisition for Account Assignment
Overview
Direct requirements from various departments for O&M materials to be directly charged to cost centre.
Business Process Description Overview A requisition defines the need for a material or service. It is the primary document in the purchasingcycle.
Purchase Requisition for materials whose cost will be directly charged to cost centre. The document will be used to provide material requirements of non valuated materials from all departments to the purchasing
department. The purpose of requisitioning should be expense in nature and the material requisitioned willnot be part of inventory at the plant. The requisition authorizes the Purchasing department to purchasematerials in specific quantities within a specified time frame. It is an internal document and is not usedoutside of the company.Note: A Requisition of this nature will be created for codified materials. Incase material code is notavailable; the field may be kept blank. But in that case a proper material text has to be filled along withthe material group so as to help classify the item.
-Such a requisition will lead to direct consumption at time of purchase, thus purchase will not affectmoving average price of the material as cost will be booked to the cost centre entered in requisition.
8/11/2019 MM Purchasing User Manual
6/295
MM COURSE: PURCHASING
Page | 6
Input - Required Fields Field Value / Comments Document Type Type of requisition
Material Code Click on the drop down button to select under any one of the optionsavailable Plant material by description or Material group orMaterial Type or Old material number
Account Assignment K for Cost Centre
Plant Plant code requiring material - Click on the drop down button to sele
Quantity Quantity to be requisitioned ( unit of measurement) will be defaulted
Valuation PriceEstimate Price per unit Will be defaulted if previous purchaseexists ,can be still changed by user
Requisitioner Initials of Requisitioner
Req Tracking Number A reference number for tracking this requisition
Cost Centre Cost Centre to which cost of purchase will be booked
Output - Results Comments
Requisition will be created The requisition is assigned a PR number which is now subject torelease in 2 steps Initiator and Competent Authority.
Tips and Tricks
Set up the user defaults for each user to force the system to plug in default data, i.e. Plant, Requisitioner andRequisition Tracking Number.
8/11/2019 MM Purchasing User Manual
7/295
MM COURSE: PURCHASING
Page | 7
Procedure Steps
Access transaction by:
Via Menu Logistics>Materials Management>Purchasing>PurchaseRequisition>Create
Via Transaction Code ME51N
On screen Create Purchase Requisition: enter header level information specified in thetable below:
Transaction
8/11/2019 MM Purchasing User Manual
8/295
MM COURSE: PURCHASING
Page | 8
8/11/2019 MM Purchasing User Manual
9/295
MM COURSE: PURCHASING
Page | 9
Fields Description R/O/C User Action and Values Comments
DocumentType
Defines type of requisition R Please refer the attachedannexure
HeaderNote
Header Text O Any comments that are notare generic to all items
Will not appearin print out
Required For Required For Item Text O To be entered as text againstthe first Item only
Only if this textis maintainedagainst item 1will it appear in
print outProbable
Vendor List
Probable Vendor List Item
Text
O List of probable vendors
with complete relevantinformation to be entered astext against the first itemonly
Only if this text
is maintainedagainst item 1will it appear in
print outDelivery Text Delivery Text O Delivery related texts can be
maintained as text againstthe first item only
Only if this textis maintainedagainst item 1will it appear in
print outR = Required, O = Optional, C = Conditional
On the same screen, in Create Purchase Requisition: Item Overview: enter informationspecified in the table below:
Cost Centre
Acct assignment Category
8/11/2019 MM Purchasing User Manual
10/295
MM COURSE: PURCHASING
Page | 10
Fields Description R/O/C User Action and Values CommentsMaterial Material Code R Material code Click on the
drop down button to selectunder any oneof the optionsavailable Plantmaterial bydescription orMaterial groupor MaterialType or Old
material number Account AssignmentA
Account to book cost R K for Cost Centre
Short Text Description of material C Will be defaulted if materialcode is selected otherwisehas to be entered manually
MaterialGroup
Classification of materials on basis of nature
C Please refer the attachedannexure
Plant Plant requiring material basis R Enter plant where material isto be shipped
ValuationPrice
Estimated Price per unit C User to enter in the conditionwhen the purchase historyrecord is different from hisestimate.
In case it is afirst time
purchase, thenthis field isrequired to befilled.
Cost Centre Cost Centre R Cost Centre to which costwill be booked
Storagelocation
Key for determining storagelocation for a specific plant
O Can be entered from dropdown list
Delivery
date
Date on which the goods are
to be delivered. If deliverydate is sooner than thesystem calculated lead time,a warning will be issued
C This is defaulted as the date
90 days from present date. Itcan be changed if required.
PurchasingOrganizatio
n
The organization for whichthe procurement needs to bedone
C Please refer the attached annex
8/11/2019 MM Purchasing User Manual
11/295
MM COURSE: PURCHASING
Page | 11
PurchasingGroup
Nature of group preparingrequisition
CPlease refer the attached
annexureRequisitioner Indicates for whom the
material is orderedR Initials of requisitioner
Req. trackingnumber
This number can be used tofacilitate the monitoring ofmaterial procurement
R A reference number fortracking this requisition
Item Text Item text O Technical specifications ofthe item not covered by theexisting materialdescriptions
Its a text pageso there is nosystem check onits contents.This will be
printed in thePR.
Repeat above for each item in Purchase Requisition.
Click on the check button to check the document
System displays a message at the Bottom of the screen.
Click on the save folder to produce a numbered requisition, or hit Control + S.
8/11/2019 MM Purchasing User Manual
12/295
8/11/2019 MM Purchasing User Manual
13/295
MM COURSE: PURCHASING
Page | 13
Input - Required Fields Field Value / Comments Document Type Type of requisition
Material Code Click on the drop down button to select under any one of theoptions available Plant material by description or Materialgroup or Material Type or Old material number
Account Assignment A A for Assest
Plant Plant code requiring material - Click on the drop down button to s
Quantity Quantity to be requisitioned ( unit of measurement) will bedefaulted
Valuation Price Estimate Price per unit Will be defaulted if previous purchaseexists ,can be still changed by user
Requisitioner Initials of Requisitioner
Req Tracking Number A reference number for tracking this requisition , eg Mech/04/08 where Mech represents Mechanical department, 04for year 2004 and 08 could be a running serial no.
Internal Order Order in Projects to which cost of purchase will be booked
Output - Results Comments
Requisition will be created The requisition is assigned a PR number which is now subject torelease in 2 steps Initiator and Approver. Only after approval therequisition is available for processing at MM Cell.
Tips and Tricks
Set up the user defaults for each user to force the system to plug in default data, i.e. Plant, Requisitioner andReq Tracking Number.
8/11/2019 MM Purchasing User Manual
14/295
MM COURSE: PURCHASING
Page | 14
Procedure Steps
Access transaction by:
Via Menu Logistics>Materials Management>Purchasing>PurchaseRequisition>Create
Via Transaction Code ME51N
Transaction
8/11/2019 MM Purchasing User Manual
15/295
MM COURSE: PURCHASING
Page | 15
On screen Create Purchase Requisition: enter header level information specified in the
table below:
Fields Description R/O/C User Action and Values CommentsDocument
TypeDefines type of requisition R Please refer the attached
annexure
HeaderNote
Header Text O Any comments that are notare generic to all items
Will not appearin print out
Required For Required For Item Text R To be entered as text againstthe first Item only
Only if this textis maintainedagainst item 1will it appear in
print outProbableVendor List
Probable Vendor List ItemText
O List of probable vendorswith complete relevantinformation to be entered astext against the first itemonly
Only if this textis maintainedagainst item 1will it appear in
print outDelivery Text Delivery Text O Delivery related texts can be
maintained as text againstthe first item only
Only if this textis maintainedagainst item 1will it appear in
print outR = Required, O = Optional, C = Conditional
8/11/2019 MM Purchasing User Manual
16/295
MM COURSE: PURCHASING
Page | 16
On the same scree n Create Purchase Requisition: Item Overview: enter information
specified in the table below:
Fields Description R/O/C User Action and Values Comments
Material Material Code R Material code Click on thedrop down
button to selectunder any oneof the optionsavailable Plantmaterial bydescription orMaterial groupor MaterialType or Oldmaterial number
Account AssignmentA
Account to book cost R F Internal Order
Short Text Description of material C Will be defaulted if materialcode is selected otherwisehas to be entered manually
MaterialGroup
Classification of materials on basis of nature
C Please refer the attachedannexure
Plant Plant requiring material basis R Enter plant where material isto be shipped
ValuationPrice
Estimated Price per unit C User to enter in the conditionwhen the purchase historyrecord is different from hisestimate.
In case it is afirst time
purchase, thenthis field isrequired to befilled.
Order Internal Order R Order in Projects to whichcost of purchase will be
booked
Storagelocation Key for determining storagelocation for a specific plant O Can be entered from dropdown list
Deliverydate
Date on which the goods areto be delivered. If deliverydate is sooner than thesystem calculated lead time,a warning will be issued
C This is defaulted as the date90 days from present date. Itcan be changed if required.
8/11/2019 MM Purchasing User Manual
17/295
MM COURSE: PURCHASING
Page | 17
PurchasingOrganization
Organization for which procurement needs to be
done
C Please refer the attached anne
PurchasingGroup
Nature of group preparingrequisition
CPlease refer the attachedannexure
Requisitioner Indicates for whom thematerial is ordered
R Initials of requisitioner
Req. trackingnumber
This number can be used tofacilitate the monitoring ofmaterial procurement
R A reference number fortracking this requisition
Item Text Item text O Technical specifications ofthe item not covered by theexisting materialdescriptions
Its a text pageso there is nosystem check onits contents.This will be
printed in thePR.
Repeat above for each item in Purchase Requisition
Click on the save folder to produce a numbered requisition, or hit Control + S.
8/11/2019 MM Purchasing User Manual
18/295
MM COURSE: PURCHASING
Page | 18
3. MM-ME51N-Create Purchase Requisition for Non Valuated materials
Overview
Direct requirements from various departments for O&M non valuated materials to be kept in Inventory.
Business Process Description Overview A requisition defines the need for a material or service. It is the primary document in the purchasingcycle.
Purchase Requisition for non valuated materials will be used to provide requirements of non valuatedmaterials from all departments to the purchasing department. The purpose of requisitioning should beexpense in nature and the material requisitioned should be part of inventory at the plant. The requisitionauthorizes the Purchasing department to purchase materials in specific quantities within a specified timeframe. It is an internal document and is not used outside of the company.Note :-A Requisition of this nature will be created for codified materials. Incase material code is not available;the field may be kept blank. But in that case a proper material text has to be filled along with the materialgroup so as to help classify the item.
-Such a requisition will lead to direct consumption at time of purchase thus subsequent tracking ofinventory will only be for the sake of quantity and not value as such items have nil stock value.
Input - Required Fields Field Value / Comments
Document Type Type of requisition
Material Code Click on the drop down button to select under any one of theoptions available Plant material by description or Materialgroup or Material Type or Old material number
Account Assignment A K for Cost Centre
Plant Plant code requiring material - Click on the drop down button to s
Quantity Quantity to be requisitioned ( unit of measurement) will bedefaulted
Valuation Price Estimate Price per unit Will be defaulted if previous purchaseexists ,can be still changed by user
Requisitioner Initials of Requisitioner
8/11/2019 MM Purchasing User Manual
19/295
MM COURSE: PURCHASING
Page | 19
Req Tracking Number A reference number for tracking this requisition
Cost Centre Cost Centre to which cost of purchase will be booked
Output - Results Comments Requisition will be created The requisition is assigned a PR number which is now subject to
release in 2 steps Initiator and Final Approver. Only afterapproval the requisition is available for processing at MM Cell.
Procedure Steps
Access transaction by:
Via Menu Logistics>Materials Management>Purchasing>PurchaseRequisition>Create
Via Transaction Code ME51N
Transaction
8/11/2019 MM Purchasing User Manual
20/295
MM COURSE: PURCHASING
Page | 20
On screen Create Purchase Requisition: enter header level information specified in the
table below:
Fields Description R/O/C User Action and Values CommentsDocument
TypeDefines type of requisition R Please refer the attached
annexure
HeaderNote
Header Text O Any comments that are notare generic to all items
Will not appearin print out
Required For Required For Item Text R To be entered as text againstthe first Item only
Only if this textis maintainedagainst item 1will it appear in
print outProbableVendor List
Probable Vendor List ItemText
O List of probable vendorswith complete relevantinformation to be entered astext against the first itemonly
Only if this textis maintainedagainst item 1will it appear in
print out
8/11/2019 MM Purchasing User Manual
21/295
MM COURSE: PURCHASING
Page | 21
Delivery Text Delivery Text O Delivery related texts can bemaintained as text against
the first item only
Only if this textis maintained
against item 1will it appear in
print outR = Required, O = Optional, C = Conditional
On the same screen, in Create Purchase Requisition: Item Overview: enter informationspecified in the table below:
Fields Description R/O/C User Action and Values Comments
Material Material Code R Material code Click on thedrop down
button to selectunder any oneof the optionsavailable Plantmaterial bydescription orMaterial groupor Material
Type or Oldmaterial number
Account AssignmentA
Account to book cost R K for Cost Centre
Short Text Description of material C Will be defaulted if materialcode is selected otherwisehas to be entered manually
MaterialGroup
Classification of materials on basis of nature
C Please refer the attachedannexure
Plant Plant requiring material basis R Enter plant where material is
to be shippedValuation
PriceEstimated Price per unit C User to enter in the condition
when the purchase historyrecord is different from hisestimate.
In case it is afirst time
purchase, thenthis field isrequired to befilled.
Cost Centre Cost Centre R Cost Centre to which costwill be booked
8/11/2019 MM Purchasing User Manual
22/295
MM COURSE: PURCHASING
Page | 22
Storagelocation
Key for determining storagelocation for a specific plant
O Can be entered from dropdown list
Deliverydate
Date on which the goods areto be delivered. If deliverydate is sooner than thesystem calculated lead time,a warning will be issued
C It can be changed if required.
PurchasingOrganization
Organization for which procurement is needs to bedone
C Please refer the attachedannexure
PurchasingGroup
Nature of group preparingrequisition
C Please refer the attachedannexure
Requisitioner Indicates for whom thematerial is ordered R Initials of requisitioner
Req. trackingnumber
This number can be used tofacilitate the monitoring ofmaterial procurement
R A reference number fortracking this requisition
Item Text Item text O Technical specifications ofthe item not covered by theexisting materialdescriptions
Its a text pageso there is nosystem check onits contents.
This will be printed in thePR.
Repeat above for each item in Purchase Requisition
Click on the save folder to produce a numbered requisition, or hit Control + S.
8/11/2019 MM Purchasing User Manual
23/295
MM COURSE: PURCHASING
Page | 23
4. MM-ME51N-Create Purchase Requisition for Stock materials
Overview
Direct requirements from various departments for stock materials to be kept in Inventory.
Business Process Description Overview A requisition defines the need for a material or service. It is the primary document in the purchasingcycle.
Purchase Requisition for stock materials will be used to provide material requirements from alldepartments to the purchasing department. The purpose of requisitioning should be stocking in nature andthe material requisitioned should be part of valuated inventory at the plant. The requisition authorizes thePurchasing department to purchase materials in specific quantities within a specified time frame. It is aninternal document and is not used outside of the company.Note :-A Requisition of this nature will be created for codified materials only.-Such a requisition is not meant for direct consumption at time of purchase, it is for initiating purchase for
purpose of inventorying.Any consumption will be subsequent by means of a reservation.
- Since objective is to stock this material, no account at the time of requisition is to be assigned.
Input - Required Fields Field Value / Comments
Document Type Type of requisition
Material Code Click on the drop down button to select under any one of theoptions available Plant material by description or Materialgroup or Material Type or Old material number
Plant Plant code requiring material - Click on the drop down button to s
Quantity Quantity to be requisitioned ( unit of measurement) will bedefaulted
Valuation Price Estimate Price per unit Will be defaulted if previous purchaseexists ,can be still changed by user
Requisitioner Initials of Requisitioner
Req Tracking Number A reference number for tracking this requisition
8/11/2019 MM Purchasing User Manual
24/295
MM COURSE: PURCHASING
Page | 24
Output - Results Comments Requisition will be created The requisition is assigned a PR number which is now subject to
release in 2 steps Initiator and Final Approver. Only afterapproval the requisition is available for processing at MM Cell.
Tips and Tricks
Set up the user defaults for each user to force the system to plug in default data, i.e. Plant, Requisitioner andReq Tracking Number.
Procedure Steps
Access transaction by:
Via Menu Logistics>Materials Management>Purchasing>PurchaseRequisition>Create
Via Transaction Code ME51N
Transaction
8/11/2019 MM Purchasing User Manual
25/295
MM COURSE: PURCHASING
Page | 25
On screen Create Purchase Requisition: enter header level information specified in the
table below:
8/11/2019 MM Purchasing User Manual
26/295
MM COURSE: PURCHASING
Page | 26
Fields Description R/O/C User Action and Values Comments
DocumentType
Defines type of requisition R Please refer the attachedannexure
HeaderNote
Header Text O Any comments that are notare generic to all items
Will not appearin print out
Required For Required For Item Text O To be entered as text against
the first Item only
Only if this text
is maintainedagainst item 1will it appear in
print outProbableVendor List
Probable Vendor List ItemText
O List of probable vendorswith complete relevantinformation to be entered astext against the first itemonly
Only if this textis maintainedagainst item 1will it appear in
print outDelivery Text Delivery Text O Delivery related texts can be
maintained as text againstthe first item only
Only if this textis maintainedagainst item 1
will it appear in print out
8/11/2019 MM Purchasing User Manual
27/295
8/11/2019 MM Purchasing User Manual
28/295
MM COURSE: PURCHASING
Page | 28
Fields Description R/O/C User Action and Values Comments
Material Material Code R Material code Click on thedrop down
button to selectunder any oneof the optionsavailable Plantmaterial bydescription orMaterial groupor MaterialType or Oldmaterial number
Plant Plant requiring material R Enter plant where material isto be shipped
Type the plantCode or select
drop down menu
ValuationPrice
Estimated Price per unit C User to enter in the conditionwhen the purchase historyrecord is different from hisestimate.
In case if it isadopted frommaterial master,then this field isrequired to befilled.
Storagelocation
Key for determining storagelocation for a specific plant
O Can be entered from dropdown list
Delivery
date
Date on which the goods are
to be delivered. If deliverydate is sooner than thesystem calculated lead time,a warning will be issued
C It can be changed if required.
PurchasingOrganization
Organization for which procurement needs to bedone
R Please refer the attachedannexure
PurchasingGroup
Nature of group preparingrequisition
C Please refer the attachedannexure
Requisitioner Indicates for whom thematerial is ordered
R Initials of requisitioner
Req. trackingnumber This number can be used tofacilitate the monitoring ofmaterial procurement
R A reference number fortracking this requisition
8/11/2019 MM Purchasing User Manual
29/295
MM COURSE: PURCHASING
Page | 29
Item Text Item text O Technical specifications ofthe item not covered by the
existing materialdescriptions
Its a text pageso there is no
system check onits contents.This will be
printed in thePR.
R = Required, O = Optional, C = Conditional
Repeat above for each item in Purchase Requisition
Use the check button .
If the system does not generate any error message then Click on the save button or hitControl + S.
System will generate a number at the bottom of the screen
8/11/2019 MM Purchasing User Manual
30/295
MM COURSE: PURCHASING
Page | 30
5. MM-ME52N-Change Purchase Requisition
Overview
A purchase requisition needs to be changed. A change in quantity and/or required date is the primary triggers forthis transaction.
Business Process Description Overview Prior to changing or deleting a requisition, the requisitioner needs to know the status of the requisition. Ifthe requisition has been processed into a purchase order, any changes will not be reflected on the
purchase order. The requisitioned needs to contact the buyer directly. If someone else has deleted therequisition, a new requisition will have to be created, as it is not possible to change a deleted requisition.
Input - Required Fields Field Value / Comments Purchase requisition number Can be found using Display function or List display functionItem Details Identifies what can be changed or deleted
Output Results Comments Requisition changed or deleted If Requisition has status Not Edited then changes made will
reflect in RFQ and Purchase Order.
Tips and Tricks
If a requisition has been deleted, you can still use that requisition and create a new one using the canceledrequisition as a reference.
To save the document, you can click on the save folder.
8/11/2019 MM Purchasing User Manual
31/295
MM COURSE: PURCHASING
Page | 31
Procedural Steps
Access transaction by:
Via Menus Logistics>Materials Management>Purchase>PurchaseRequisition>Change
Via Transaction Code ME52N
Transaction
8/11/2019 MM Purchasing User Manual
32/295
MM COURSE: PURCHASING
Page | 32
On screen Change Purchase Requisition, the last Requisition saved will be displayed as
default. To enter different number select the icon .System will display anotherwindow to select other document.
Then delete the document default one and type other PR number and select otherdocument tab.
System will display other Purchase document.
Field Name Description R/O/C User Action and Values CommentsRequisition
NumberRequisition Number R If you dont want to work with
the defaulted requisition, clickon the Other Requisition
button on the header bar (It has been shown with anarrow).Enter a uniquerequisition number thatrequires to be changed.
Requisition can be found usingthe Display orList Displayfunction.
(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)
Click on the Enter button.
8/11/2019 MM Purchasing User Manual
33/295
MM COURSE: PURCHASING
Page | 33
On the same screen, to delete requisition or item:
Click on the line of the item to be deleted
8/11/2019 MM Purchasing User Manual
34/295
MM COURSE: PURCHASING
Page | 34
Click on the Delete (trash can) icon.
Select Yes on the pop up box to de lete the item
8/11/2019 MM Purchasing User Manual
35/295
MM COURSE: PURCHASING
Page | 35
The item is now flagged for deletion (see the column labeled D; there will be a
checkmark).
On the same screen, to change quantity, price, date required, text etc., enter informationin the fields as specified in the table below:
8/11/2019 MM Purchasing User Manual
36/295
MM COURSE: PURCHASING
Page | 36
Field Name Description R/O/C User Action and Values CommentsItem
NumberItem number R Selects the item number that
needs to be changedVal. Price Price change O Change price if requiredDeliverydate
Date Change O Change date if required
Quantity Quantity Change O Change quantity if requiredText Text change O Change or add text if required This holds true
for all texts Required for,ProbableVendor list andDelivery Text
(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)
Finally use check button
System displays
Click on the Save button to save the changes.
8/11/2019 MM Purchasing User Manual
37/295
MM COURSE: PURCHASING
Page | 37
6. MM-ME53N-Display Purchase Requisition
Overview
User needs to view information regarding purchase requisitions, including item information and status ofrequisitions.
User may not have the authority to change, so they can only look in display mode.
Business Process Description Overview This BPP demonstrates a function that allows you to view/monitor the status of individual purchaserequisitions.
Input - Required Fields Field Value / Comments Purchase requisition number Can be found using Display function or List display function
Output - Results Comments View status of Requisition
Tips and Tricks
There are two methods for displaying requisitions - Display and List Display.
List display is a more comprehensive method of displaying requisitions, and is addressed in BPP MM -ME5A-ListDisplay- Purchase Requisitions
8/11/2019 MM Purchasing User Manual
38/295
MM COURSE: PURCHASING
Page | 38
Procedural Steps
Via Menus Logistics>Materials Management>Purchase>PurchaseRequisition>Display
Via Transaction Code ME53N
Access transaction by:
Transaction
8/11/2019 MM Purchasing User Manual
39/295
MM COURSE: PURCHASING
Page | 39
On screen Display Purchase Requisition, the last Requisition saved will be shown. To
display other requisition select other purchase requisition icon . Type the respectivePR number and press enter.
Field Name Description R/O/C User Action and Values CommentsRequisition
NumberRequisition Number R If you dont want to work with
the defaulted requisition, clickon the Other Requisition
button on the header bar (It has been shown with anarrow).Enter a uniquerequisition number thatrequires to be displayed.
Requisition can be found usingthe Display orList Displayfunction.
(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)
8/11/2019 MM Purchasing User Manual
40/295
MM COURSE: PURCHASING
Page | 40
Click on the Enter button.
Menu Name
Description R/O/C User Action and Values Comments
Details Item Details O Displays every detail from theitem overview screen such asmaterial, qty, material masterdata, plant etc.
TextOverview
Text Overview O Displays any text fields in thePurchaser requisition
Releasestrategy
Purchase requisition approval O Displays strategy for purchaseapproval
Status Item history statistics O Displays statistics on status ofPR and also the changes madeto the requisition
AccountAssignments
Account assignments foritems
C Displays the G/L account towhich the items are charged , ifit is an account assigned PR
Services Service items C This is only possible in the caseservice items
ValueLimits
C This is only possible in the caseservice items
(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)
8/11/2019 MM Purchasing User Manual
41/295
MM COURSE: PURCHASING
Page | 41
7. MM-ME56-To assign source of supply to requisitions
Overview
To assign source of supply to requisitions
BUSINESS PROCESS PROCEDURE OVERVIEWWhen you make any contract you need to assign it to a source of supply/vendor to close the transaction orthe requisition processing cycle.
Input Required Fields Field Values/Comments Purchase requisition number
Purchasing group
If the number is known, enter it. If not, search for it.
Enter the purchasing group.
Output - Results Displays the screen showing the requisition number and the contract number.
8/11/2019 MM Purchasing User Manual
42/295
MM COURSE: PURCHASING
Page | 42
Procedural Steps
Access transaction by:
Via Menus (a) Logistics Material Management Purchasing Purchase requisition Follow on functions Assign-ME56
Via Transaction Code ME56
On screen Assign source of supply to requisitions, enter information in the fields as
shown in the table below.Press
Enter the Purchase
8/11/2019 MM Purchasing User Manual
43/295
MM COURSE: PURCHASING
Page | 43
Field Name Description R/O/C
User Action and Values Comments
Purchaserequisition
Numeric key that uniquelyidentifies the purchaserequisition document.
O If unknown, conduct a match-code search
Purchasinggroup
Purchasing group for therequisition.
O
Press
Screen showing the contract number and the requisition number.
Click the CHECK BOX and press ASSIGN AUTOMATICALLY tab.
The following screen shows the output. Click on SAVE button .
8/11/2019 MM Purchasing User Manual
44/295
MM COURSE: PURCHASING
Page | 44
8. MM-ZMMF_PR- PR Output
Overview
A Purchase requisition needs to be printed.
Business Process Procedure Overview This procedure details how to print a Purchase requisition in R/3.
Input Required Fields Field Value/Comments Purchase Requisition Number Enter the number of the purchase requisition document which
needs to be printed.
Output - Results Comments A successfully printed Request forQuotation
8/11/2019 MM Purchasing User Manual
45/295
MM COURSE: PURCHASING
Page | 45
Procedural Steps
Access transaction by:
Via Transaction Code ZMMF_PR
On screen Purchase requisition output, enter information in the fields as specified inthe table below:
Field Name Description R/O/C User Action and Values Comments
Purchaserequisitionnumber
Takes the document number. C Enter the required requisitiondocument number.
Press (Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)
The output screen shows the document as displayed below.
Enter the purchase requisition number.
8/11/2019 MM Purchasing User Manual
46/295
MM COURSE: PURCHASING
Page | 46
Click on PRINT PREVIEW tab .The print preview screen .
Click on the P RINT tab button.
8/11/2019 MM Purchasing User Manual
47/295
MM COURSE: PURCHASING
Page | 47
2. Request for Quotation
1. MM-ME41-Create Quotation
Overview
Purchasing determines that a quotation is required from vendors.
Business Process Procedure Overview SAP provides the capability of creating and issuing single or multiple items Request for Quotes (RFQs).Vendors must have master records created or be categorized as one time vendors The Request for quotation may be created w.r.t a Purchase Requisition incase requirement has come fromuser department else it can be created without any reference also. Both cases have been discussed in thisdocument.
Input - Required Fields Field Value / Comments RFQ Type Default is Z RFQ for Material Language Default is EN for English RFQ Date Default is creation dateQuotation Deadline Must be prior to required delivery date specifiedPurchasing Org Enter Purchasing Organization identifierPurchasing group Enter Purchasing group number
Output - Results Comments Saved RFQ Each RFQ per vendor will receive a separate document number.
Tips and Tricks
The collective number in the header screen of the RFQ is an important method to link the copies of the RFQ issuedto the different vendors. SAP treats each issuance to a different vendor as a separate RFQ document and thiscollective number can be used to search and provide comparison reporting.
8/11/2019 MM Purchasing User Manual
48/295
MM COURSE: PURCHASING
Page | 48
Procedural Steps
CASE 1: CREATION OF RFQ W.R.T PURCHASE REQUISITION
Via Menu (a) Logistics > Material Management > Purchasing >RFQ/quotation > Request for Quotation> Create
Via Transaction Code ME41
Access Transaction by:
8/11/2019 MM Purchasing User Manual
49/295
MM COURSE: PURCHASING
Page | 49
On screen Create RFQ: Initial Screen, enter information in the fields as specified in the
table below:
8/11/2019 MM Purchasing User Manual
50/295
MM COURSE: PURCHASING
Page | 50
Now select the tab Reference to PReq Tab and fill the all required field as mentioned inthe table below.
8/11/2019 MM Purchasing User Manual
51/295
MM COURSE: PURCHASING
Page | 51
Field Name Description R/O/C User Action and Values Comments
RFQ Type Default is AN R Please refer the attachedannexure
Language Default is EN - English R Not to be changedRFQ Date Default is creation date R May be changed if required The RFQ can
be created forfuture issuance.
QuotationDeadline
The due date for vendorquotations
R Enter the due date in the dateformat assigned in the system
If the deadlineis stated as adate after therequireddelivery date,the user will begiven an errormessage whenthe deliverydate is entered.
PurchasingOrg.
Purchasing Organizationresponsible for RFQ
R Please refer the attachedannexure
Referenceto Preq
Field to allow PurchaseRequisition reference
R Click on this field
PurchaseRequisition
Purchase Requisition field forentry
R Enter Requisition No. againstwhich RFQ is being floated
RequisnItem
Requisition Item number O Enter only if all requisitionitems are not to be taken toRFQ
Note: On the above table, in column R/O/C; R = required, O = Optional, C = Conditional)
Note: The Default Data for Items fields will carry these values against all items on the RFQ. Although carried ontothe Item screens, these values may be changed within the transaction. Useful if the majority of the items havecommon data (delivery date, plant, etc.). Enter the appropriate data if desired. (Optional)
After entering above values press enter to move to next screen - Create RFQ: Header Data.
8/11/2019 MM Purchasing User Manual
52/295
MM COURSE: PURCHASING
Page | 52
On screen Create RFQ: Header Data, enter information in the fields as specified in thetable below:
8/11/2019 MM Purchasing User Manual
53/295
MM COURSE: PURCHASING
Page | 53
Field Name
Description R/O/C User Action and Values Comments
Coll. No. Collective number R Enter a number to trackvendors of the same RFQ
This will be a10 digit codeidentifying theBID/ RFQ
Validitystart
Validity start O Enter date quotation will start
Validityend
Validity end O Enter date quotation will end.
Applic. By Application date O Enter closing date of BidsBindg.Per.
Binding period O Enter date period is binding
TargetValue
Displays the target value O Enter the target value
BSNL Number
BSNL Document number R Enter any alphanumeric value It is a 50 digitalphanumerickey
After entering above values press enter to move to next screen - Create RFQ: Selection List: Purchase Requisitions
On screen Create RFQ: Selection List: Purchase Requisitions, enter information in the
fields as specified in the table below:
8/11/2019 MM Purchasing User Manual
54/295
MM COURSE: PURCHASING
Page | 54
Field Name Description R/O/C User Action and Values CommentsSloc Storage Location where
material will be delivered and stored ifordered
O Enter or select StorageLocation fromtable
Strictlyoptional.StorageLocation may
be enteredlater at thetime of P.O.creation orGoodsReceipt.
Select Requisition line items for processing and click on the button to copy requisition details to
RFQ. System will take you to the next screen Create RFQ: Item 00001
On screen Create RFQ: Item 0001 0, enter information in the fields as specified in thetable below:
8/11/2019 MM Purchasing User Manual
55/295
8/11/2019 MM Purchasing User Manual
56/295
8/11/2019 MM Purchasing User Manual
57/295
MM COURSE: PURCHASING
Page | 57
Field Name Description R/O/C User Action and Values CommentsVendor Vendor number R Enter valid vendor number and
press enterIf vendormaster doesnot exist, usea one-timevendornumber (ifallowed)
Name Vendor Name C Up to 4 lines available Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.
Street &House #
Street address and/or House # C Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.
Postal Code& City
Postal code and city / town / vil C Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.
Country Name of country C Table validated / selection Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.
Region In some countries, the regionforms part of the address. Themeaning depends on thecountry.
C Table validated / selection Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.
Postal Code Zip Code / Postal Code C Onlyrequired ifOne-timevendor.
8/11/2019 MM Purchasing User Manual
58/295
MM COURSE: PURCHASING
Page | 58
Defaultedfrom vendor
master.Telephone Telephone # C Only
required ifOne-timevendor.Defaultedfrom vendormaster.
Fax Fax # C Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.
E-mail E-Mail address C Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.
After entering all vendor details, save the RFQ. This will refresh the Create RFQ: Vendor Address screen to allowcreation of the same RFQ data to a new vendor by following the steps outlined in 1.5 above. The system will displaythe message RFQ Created under the number ___________.
Return to Main Purchasing Menu. (Select Yellow up Pointing Arrow, Shift F3)
Refer to Business Process Procedure Display a RFQ - to verify this result.
8/11/2019 MM Purchasing User Manual
59/295
MM COURSE: PURCHASING
Page | 59
CASE 2: CREATION OF RFQ WITHOUT PURCHASE REQUISITION
Access Transaction by:
Via Menu (a) Logistics > Material Management > Purchasing >RFQ/quotation > Request for Quotation> Create
Via Transaction Code ME41
On screen Create RFQ: Initial Screen, enter information in the fields as specified in the
table below:
8/11/2019 MM Purchasing User Manual
60/295
MM COURSE: PURCHASING
Page | 60
Field Name Description R/O/C User Action and Values CommentsRFQ Type Default is AN' R Please refer the attached
annexure
Language Default is EN - English R Not to be changedRFQ Date Default is creation date R May be changed if required The RFQ can
be created forfuture issuance.
QuotationDeadline
The due date for vendorquotations
R Enter the due date in the dateformat assigned in the system
If the deadlineis stated as adate after therequireddelivery date,the user will begiven an errormessage whenthe deliverydate is entered.
PurchasingOrg.
Purchasing Organizationresponsible for RFQ
R Please refer the attachedannexure
Purchasinggroup
Requisitioning groupIdentifier
R Please refer the attachedannexure
If RFQ is beingcreated w.r.tPurchaseRequisitionthen systemwill pick fromRequisition,user need notenter
ItemCategory
Key defining how the procurement of a material orservice item is controlled.
O Enter Item Category if required
DeliveryDate
Date on which the goods areto be delivered or the serviceis to be performed.
O Enter delivery date
Plant Key for location within thecompany code where goodsare required.
O Enter Plant
StorageLocation
Number of the storagelocation where the material isstored. A plant may containone or more storage locations.
O Enter Storage Location
MaterialGroup
Key that you use to grouptogether several materials orservices with the sameattributes, and to assign themto a particular material group.
O Please refer the attachedannexure
8/11/2019 MM Purchasing User Manual
61/295
8/11/2019 MM Purchasing User Manual
62/295
MM COURSE: PURCHASING
Page | 62
On screen Create RFQ: Header Data, enter information in the fields as specified in the
table below:
8/11/2019 MM Purchasing User Manual
63/295
MM COURSE: PURCHASING
Page | 63
Field Name
Description R/O/C User Action and Values Comments
Companycode
Company code R Needs to be entered
Coll. No. Collective number R Enter a number to trackvendors of the same RFQ
This will be a10 digit codeidentifying theBID/ RFQ
Validitystart
Validity start O Enter date quotation will start
Validityend
Validity end O Enter date quotation will end.
Applic. By Application date O Enter closing date of BidsBindg.Per.
Binding period O Enter date period is binding
After entering above values press enter to move to next screen - Create RFQ: Item overview
On screen Create RFQ: Item Overview, enter information in the fields as specified in thetable below:
8/11/2019 MM Purchasing User Manual
64/295
MM COURSE: PURCHASING
Page | 64
Field Name Description R/O/C User Action and Values Comments
Item Number that uniquelyidentifies an item within theRFQ
R Defaults - Line items aredefined by the system inincrements of 10.
No UserAction
I Item Category - determines ifstandard
purchase or other such as 3 rd paorder, etc.
O Default is blank - standard purchase
Typically nouser actionrequired
Material Material Number R Enter material number All stockmaterial musthave materialnumbers
RFQQuantity
Quantity of Materialrequested for quotation
R Must be numeric
DeliveryDate
Date required if ordered R Must be in correct date format
MaterialGroup
Group of material which thismaterial belongs
N/A Please refer the attachedannexure
Needs to beentered incase of noncodifiedmaterials
Plant Plant where material isrequired
R Enter or select Plant fromtable.
Note: the material master mustexist for that plant.
Sloc Storage Location wherematerial will
be delivered and stored ifordered
O Enter or select StorageLocation fromtable
Strictlyoptional.StorageLocation may
be enteredlater at thetime of P.O.creation orGoodsreceipt
8/11/2019 MM Purchasing User Manual
65/295
MM COURSE: PURCHASING
Page | 65
Now specify the vendors invited to quote by clicking on the Vendor address button or F7 key.
On screen Create RFQ: Vendor Address, enter information in the fields as specified inthe table below:
8/11/2019 MM Purchasing User Manual
66/295
MM COURSE: PURCHASING
Page | 66
Field Name Description R/O/C User Action and Values CommentsVendor Vendor number R Enter valid vendor number and
press enterIf vendormaster doesnot exist, usea one-timevendornumber (ifallowed)
Name Vendor Name C Up to 4 lines available Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.
Street &House #
Street address and/or House # C Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.
Postal Code& City
Postal code and city / town / vil C Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.
Country Name of country C Table validated / selection Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.
Region In some countries, the regionforms part of the address. Themeaning depends on thecountry.
C Table validated / selection Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.
Postal Code Zip Code / Postal Code C Onlyrequired ifOne-timevendor.
8/11/2019 MM Purchasing User Manual
67/295
8/11/2019 MM Purchasing User Manual
68/295
MM COURSE: PURCHASING
Page | 68
2. MM-ME47-Maintain Quotation
Overview
Vendor communicates price for material and as a result the RFQ (Request for Quotation) needs to be updated.
Business Process Procedure Overview In Purchasing, the RFQ and the quotation form a single document. Prices and conditions quoted byvendors areentered in the original RFQ. If you have issued an RFQ to several vendors, you can have the systemdisplay the
most favorable quotation submitted. You can also store the prices and terms of delivery from certainquotations in an info recordfor future accessing. A quotation is legally binding on the vendor for a certain period. The quotation is thevendors response to a request for quotation issued by a purchasing organization. A quotation consists of items in which thetotal quantityand delivery date of an offered material or service is specified.
Input Required Fields Field Value/Comments RFQ Enter RFQ No. for which a price or prices need to be entered.
Output - Results Comments Quotation entered Enter all relevant data received by vendor, price, date available,
etc.
Tips and Tricks
If you are simply entering a price against a RFQ, you can follow these easy steps:
Choose RFQ/quotation Quotation Maintain .
(The initial screen for maintaining quotations appears.)
Enter the number of the RFQ and press ENTER.
(The RFQ item overview screen appears.)
You can enter the vendor's price per item on the item detail screen (see steps 4 and 5) or directly on the itemoverview screen.
8/11/2019 MM Purchasing User Manual
69/295
MM COURSE: PURCHASING
Page | 69
Choose Item ils to enter quotation data on the item detail screen.
Enter the vendors quotation.
Save your data.
Procedural Steps
Access transaction by:
Via Menu (a) Logistics > Materials Management > Purchasing >RFQ/quotation > Quotation > Maintain
Via Transaction Code ME47
On screen Maintain Quotation: Initial Screen, enter information in the fields asspecified in the table below:
Field Name Description R/O/C User Action and Values CommentsRFQ RFQ Number R Enter RFQ Number for
which price entries are to bemade.
Search help can be used to locatethe appropriatevalue.
(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)
8/11/2019 MM Purchasing User Manual
70/295
MM COURSE: PURCHASING
Page | 70
Press the Enter key, or click on the green Enter icon to proceed.
View the screen Maintain Quotation: Header Data by clicking on the Header data icon in the toolbar.
8/11/2019 MM Purchasing User Manual
71/295
MM COURSE: PURCHASING
Page | 71
Enter information in the fields as specified in the table below. Some fields will not beavailable for input, as they are reference fields only.
Field Name Description R/O/C User Action and Values CommentsAdministrativeFields :Qout. Dead. Quotation deadline R Supplied from initial screenValidity start Validity start O Enter date quotation will startValidity end Validity end O Enter date quotation will end.Applic. By Application date O Enter closing date of Bids
Bindg. Per. Binding period O Enter date period is bindingTerms ofPayment &Delivery:Payment terms Key for defining
payment termscomposed of cashdiscount percentagesand payment periods.
O Enter appropriate value ifnecessary.
(F4) search help can be used to locate theappropriate value.
ReferenceData:Quotation Date Date quotation
submittedO Enter date if desired.
(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)
8/11/2019 MM Purchasing User Manual
72/295
MM COURSE: PURCHASING
Page | 72
Once all necessary header data has been maintained, the user can then enter the price
information in one of two fashions:
8/11/2019 MM Purchasing User Manual
73/295
MM COURSE: PURCHASING
Page | 73
Enter the price in the Net Price field on the Maintain Quotation: Item Overview
screen. This price should be the basic price exclusive of discounts/surcharges.
To enter more detailed information in addition to the net price, select the line item and
click on the Item conditions icon.
Here various conditions as per vendor quotation will be maintained.
Drop down on the open field of Condition type and choose the type of condition to be levied for this
basic price. Please note that basic price is referred to as Gross price in this screen since Net will becalculated after taking into account all conditions.
Examples could be Discount (start with -), Surcharge (start with +), Freight charges, Inspection charges etc. Mostconditions are either in % or per unit or Absolute value basis.
8/11/2019 MM Purchasing User Manual
74/295
MM COURSE: PURCHASING
Page | 74
1.6.3.2 If CST/LST or Excise duty is applicable, the same has to be entered via the tax code. To choose this code, goback to Item overview screen. Select the material item line and go to Item Details screen. Enter the tax code
here. If a purchase order is created by referencing an RFQ, this code facilitates the determination of the taxamount when the invoice is entered in the system. The tax code has to be entered for each item in theQuotation.
8/11/2019 MM Purchasing User Manual
75/295
MM COURSE: PURCHASING
Page | 75
Header Conditions There may be some conditions that are applicable on the total amount of the Quotation. Theseheader conditions can be maintained at header level so that item wise repetition is not required. To enter theseconditions, goto Item overview screen and Choose Header Conditions. The value of these conditions will beapportioned to individual items.
8/11/2019 MM Purchasing User Manual
76/295
MM COURSE: PURCHASING
Page | 76
Click on the green Back arrow to return to the Overview screen once data has been
maintained.There is a field for quotation comments that will segregate quotations as per their status, Comments such as NotResponded, Regret case, Technically Unqualified, Commercially Unqualified, Techno-commercially Accepted,Unsuccessful bid, Lowest Technocomm. Accepted are available to choose from. These comments are to be enteredin the Item details screen under Quotation comments.
Once all quotation information has been successfully entered, save the data by clickingon the Save button, or press the < Ctrl + S> keys. A message will be displayed that the datahas been saved.
8/11/2019 MM Purchasing User Manual
77/295
MM COURSE: PURCHASING
Page | 77
3. MM-ME48-Display Quotation
Overview
The need arises to display a quotation already maintained for an RFQ (Request for Quotation) in the system.
Business Process Description Overview This BPP will discuss the procedure to display a quotation in the R/3 system.
Input - Required Fields Field Value / Comments RFQ number RFQ number for which you want to display quotation information.
Output - Results Comments Quotation is displayed. Display Only format.
Tips and Tricks
By consistently using the collective number field on RFQs, the search for the required RFQ number is muchsimpler.
Changes can not be made in this mode. If changes are required, transaction ME47can be used to maintainquotation data. See BPP MM-ME47-Maintain Quotation.doc for reference.
8/11/2019 MM Purchasing User Manual
78/295
MM COURSE: PURCHASING
Page | 78
Procedural Steps
Access transaction by:
Via Menu Logistics > Materials Management > Purchasing > RFQ/Quotation >Quotation > Display
Via Transaction Code ME48
On the Display Quotation: Initial Screen screen, enter information in the fields as
specified in the table below:
Field Name Description R/O/C User Action and Values CommentsRFQ RFQ number R Enter RFQ number (typically a
non-intelligent systemgenerated number).
Matchcode (F4)search functions can
be used to find anappropriate RFQ inthe system.
(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)
Press the Enter key or click on the green Enter icon.
On the Display Quotation: Item Overview screen the following data will be returned indisplay-only format:
8/11/2019 MM Purchasing User Manual
79/295
MM COURSE: PURCHASING
Page | 79
Field Name DescriptionItem Number Item within RFQMaterial Material master numberShort Text Description of the material or service to be procuredRFQ quantity The quantity of material requiredOuN Order UnitDelivery Date Date that the material will be duePrice The price that the vendor has quoted for this item
Material Group Material group that the item most closely belongs toPlant Plant numberStorage Location Storage location numberD Deletion indicatorR Rejection indicator specifying that the vendor is to receive a rejection letter in
respect of his quotation.Texts Text associated with a line item. An icon will appear in the text field if text has
been entered. Simply click on the icon to view the associated text
8/11/2019 MM Purchasing User Manual
80/295
MM COURSE: PURCHASING
Page | 80
More detailed information can be viewed by clicking on any one of the following toolbaricons.
Button Name Information ReturnedHeader details (F6) Administrative field values and Reference data.Vendor address (F7) Vendor name, address, search terms, communication data, etc.Partners (Ctrl-Shift-F5) Partner Schema (if applicable)Messages (Shift-F1) Printing informationItem details (F2) Line item specific data (select line on RFQ and click on icon)
Example: In the event that the header data needs to be displayed, use the menu path Header Details, or click on theDisplay Header icon. On the Display Quotation: Header Data screen the following data will be returned in display only forma t:
8/11/2019 MM Purchasing User Manual
81/295
MM COURSE: PURCHASING
Page | 81
Field Name DescriptionRFQ RFQ numberRFQ Type Type of RFQVendor Vendor numberCompany Code Company codePurchasing Group Purchasing group codePurchasing Organization Purchasing organization numberRFQ date Date of RFQ creation.Validity start Start of the period in which the RFQ may be submittedValidity end End of the period in which the RFQ may be submittedPayment terms Terms stipulated by vendor
Collective number Number used to collectively group RFQs Quot. dead. Date by which the vendor is to submit the quotationApplic. by Date by which the bidder is to express an interest in submitting a bid.Bindg. per. Date for which the quotation is valid and bindingTarget val Target value of the contract.Quotation date Date quote submitted by vendor
To r etur n , cli ck on the green Back button , the yel low Exit button or press the < Shift + F3 >keys.
8/11/2019 MM Purchasing User Manual
82/295
MM COURSE: PURCHASING
Page | 82
4. MM-ME49-RFQ Comparison
Overview
The need arises to make a price based comparison of the different quotations sent by vendors to select the mostsuitable vendor.
BUSINESS PROCESS PROCEDURE OVERVIEWThis BPP will discuss the procedure to compare different quotations to select the most suitable vendor forthe material.
Input Required Fields Field Values/Comments Purchasing Organization Enter the number of the purchasing organization under which the
procurement will be done.Collective RFQ number Enter the Collective RFQ number for the quotations to be
compared.
Output - Results A comparative analysis of the different quotations.
Procedural Steps
Access transaction by:
Via Menu
Via Transaction Code
Logistics>Materialmanagement>Purchasing>RFQ/Quotation>Quotation>ME49Price Comparison
ME49
8/11/2019 MM Purchasing User Manual
83/295
MM COURSE: PURCHASING
Page | 83
On screen Price Comparison List,enter information in the fields as specified in the below table:
Field Name Description R/O/C User Action and Values CommentsPurchasingOrganizationCollectiveRFQnumber
MeanValueQuotation
MinimumValueQuotation
Includediscounts
Purchasing Organizationnumber
Collective RFQ number forthe quotations to becompared
Select this indicator if the
basis for comparison is to
be the average price from
all quotations.
Select this indicator if the
R
R
O
Enter Purchasing Organizationnumber
Enter the collective RFQnumber
Click on
Match code (F4)
Enter the PurchasingOrganization and the
8/11/2019 MM Purchasing User Manual
84/295
MM COURSE: PURCHASING
Page | 84
Includedeliverycosts
Determineeffective
price
basis for comparison is to
be the lowest price from allquotations.
Specifies whether the
percentage discount
granted on the purchase
price in accordance with
the terms of payment is to
be taken into account in
determining the price.
Select the field if the
delivery osts are to be
taken into account in
calculating the price.
Select the field if the
effective price is to be
computed.
O
O
O
O
Tick the check box.
Tick the check box.
Tick the check box.
Tick the check box.
(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)
Comparati ve analysis of the dif ferent quotations displayin g the ranki ng of the diff erent quotations.
8/11/2019 MM Purchasing User Manual
85/295
MM COURSE: PURCHASING
Page | 85
Now the user can select the most suitable quotation and r eject the others (in th e above case rank2 and r ank3).
Double cli ck on the pri ce of the quotati on to be rejected and tick the check box.
Click on SAVE button .
Repeat the same process for other quotations /items to be rejected.
Double click on therice to be re ected.
Check the REJECTION
Click on the
SAVE button
8/11/2019 MM Purchasing User Manual
86/295
MM COURSE: PURCHASING
Page | 86
5. MM-ZMMF_PC-Print Price Comparison Report
Overview
Once we have maintained the quotation received from vendor in the system then we will compare them
Prerequisite:
1. Quotations to be compared should be maintained in the system
Business Process:
1. Print or Price Comparison ReportSr. No. Activity T Code Remarks1 Price Comparison Report ZMMF_PC
Procedural Steps:
In the Screen Driver Programme for Price Comparison Smart form(MM014) enter the following Data:
Field Name Description R/O/C User Action and Values Comments
PurchasingOrganization Enter Purchasing Organization R Enter Purchasing Organization
Quotation No.
Enter Quotation Number O Enter Quotation Number
CollectiveRFQ
Enter Collective RFQ number R Enter Collective RFQ number
Vendor Enter Vendor Code O Enter Vendor CodeMaterial Enter Material Number O Enter Material Number
8/11/2019 MM Purchasing User Manual
87/295
MM COURSE: PURCHASING
Page | 87
After entering the Selection Parameter, press Execute button
Enter Printer
Click here for Print Preview
lick here for Print
8/11/2019 MM Purchasing User Manual
88/295
MM COURSE: PURCHASING
Page | 88
8/11/2019 MM Purchasing User Manual
89/295
MM COURSE: PURCHASING
Page | 89
6. MM-ME9A-Message Output RFQ
Overview
A Request for Quotation needs to be printed
Business Process Procedure Overview This procedure details how to print a Request for Quotation created in R/3
Input Required Fields Field Value/Comments Message Data Details the type of message to print.
Output - Results Comments A successfully printed Request forQuotation
Tips and Tricks
The more search parameters that are entered the more efficient the search and the less unnecessary information that isdisplayed.
8/11/2019 MM Purchasing User Manual
90/295
MM COURSE: PURCHASING
Page | 90
Procedural Steps
Access transaction by:Via Menu Logistics>Materials Management>Purchasing
>RFQ/Quotation>Request forQuotation>Messages>Print/Transmit
Via Transaction Code ME9A
On screen Message Output, enter information in the fields as specified in the tablebelow:
8/11/2019 MM Purchasing User Manual
91/295
MM COURSE: PURCHASING
Page | 91
Field Name Description R/O/C User Action and Values Comment
sPurch.Doc. DataDocument
NumberPO Number O Choose from drop down menu
Vendor Vendor # O Choose from drop down menuPurchasingOrganization
Purchasing Organization # O Please refer the attached annexure
PurchasingGroup
Purchasing Group # O Please refer the attached annexure
DocumentType
Identifier allowingdifferentiation between thevarious kinds of purchasingdocument in the SAP system
O Please refer the attached annexure
DocumentDate
Date on which the purchasingdocument was created.
O Enter Document date or choosefrom drop down menu
MessageDataApplication Subdivides the usage of a
condition for the use indifferent application areas
R EA defaults for RFQ
Messagetype
Specifies the kind of output O Choose from drop down menu
Processingstatus
Indicates the status-1 indicates the process wassuccessful.2 indicates an error0 indicates the process hasnot yet started
C Default is 0
Creationdate
Date the message is create O Enter date or choose the dropdown menu
Timecreated
Displays the time the messagewas created
C Defaults to time started
(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)
Click on the Execute button.
8/11/2019 MM Purchasing User Manual
92/295
MM COURSE: PURCHASING
Page | 92
On screen Message Output select the appropriate Request for Quotation and perform
the following:
Select the check box and
Click on and/ or
8/11/2019 MM Purchasing User Manual
93/295
MM COURSE: PURCHASING
Page | 93
3. Contract/APO
1. MM-ME31K-Create Contract with reference to PR
Overview
Business needs should be defined through a requisition. If the requisition needs to be converted into a contract,then it can either be created w.r.t the requisition or a quotation maintained for a particular vendor.
Here we will find how to create contract with reference to PR
Business Process Description Overview
A contract establishes a long-term agreement with a vendor to supply a material or service. Contractsmay either be value contracts or quantity contracts. Value contracts have a ceiling that is a monetaryamount that should not be exceeded. A quantity contact specifies a ceiling of goods or services that the
vendor will provide to us.
This procedure outlines the steps involved in creating a standard quantity or value contract in R/3 forstock material. Contracts do not specify delivery dates; this is determined when release orders areissued against the contract.
Input - Required Fields Field Value / Comments
Purchase requisition Select from drop down list
8/11/2019 MM Purchasing User Manual
94/295
8/11/2019 MM Purchasing User Manual
95/295
MM COURSE: PURCHASING
Page | 95
Procedural Steps
Access Create Contract by;
Via Menu (a) Logistics>Materials Management>Purchasing>Outlineagreement>Contract >Create
Via Transaction Code ME31K
In the Create Contract: Initial Screen, Select the Reference to the PReq
Click on Reference to PReq
8/11/2019 MM Purchasing User Manual
96/295
MM COURSE: PURCHASING
Page | 96
Enter the Proper PReq number .
Field Name Description R/O/C User Action and Values CommentsVendor Vendor for which the contract
is forC Vendor number known or via
searchIf notmentioned inPreq
Agreementtype
Specify what kind of outlineagreement
R Please refer the attachedannexure ZAED, ZANB,ZAPO, ZARC, ZASR.
Picked fromPreq.
AgreementDate
Date of the contract R Defaults todays date into thisfield
Agreement Agreement number C Leave blank, if the system isconfigured to assign numbersinternally or enter desirednumber
This numberwill bedeterminedinternally
Purch. Organization for which the con R Please refer the attached annexur Picked from
Enter the Proper PReq
8/11/2019 MM Purchasing User Manual
97/295
MM COURSE: PURCHASING
Page | 97
Organization
is valid PReq
Press
Enter the vendor
8/11/2019 MM Purchasing User Manual
98/295
MM COURSE: PURCHASING
Page | 98
On the Create Contract: Header Data screen, enter information as specified in the fields
in the table below:
Field Name Description R/O/C User Action and Values CommentsAgreementdate
Date the agreement wascreated
R Supplied from initial screen Grayed out
Validitystart
Beginning date of contract period.
R Defaults todays date into thefield. Change if necessary
Validityend
Date that the contract expires. R Enter the date until the contractwill be valid
Paymentterms
Terms stipulated by vendor O Defaults from vendor master.Change if necessary
Target val Target value of the contract. R Required for value contractsExch. rate Exchange rate of the currency O Change if necessary
Enter the validity end date
Enter target value
Enter BSNL APO
8/11/2019 MM Purchasing User Manual
99/295
MM COURSE: PURCHASING
Page | 99
Ex. Rate fx. Fixing of exchange rate.Indicates the purchase order
currency and the exchangerate cannot be changed duringinvoice verification.
O
Incoterms Freight terms stipulated byvendor
O Defaults from vendor master.Change if necessary
BSNL APOnumber
BSNL Number R Required for value
Press
On screen Create Contract: Overview: Reference Document Items, enter information in
the fields as specified in the table below:
1. Enter the storage location3. Click on Adopt2. Select the line item
8/11/2019 MM Purchasing User Manual
100/295
MM COURSE: PURCHASING
Page | 100
Field Name Description R/O/C User Action and Values Comments
Sloc Storage Location wherematerial will
be delivered and stored ifordered
O Enter or select StorageLocation fromtable
Strictlyoptional.StorageLocation may
be enteredlater at thetime of P.O.creation orGoodsReceipt.
Select line items of reference document and click on the button to copy details to Contract. System will
take you to the next screen Create Contract: Item 000010
8/11/2019 MM Purchasing User Manual
101/295
MM COURSE: PURCHASING
Page | 101
On the Create Contract: Item 0001 0 screen, enter information as specified in the fields
in the table below:
1.Enter the Net orderprice
2.Press OK
8/11/2019 MM Purchasing User Manual
102/295
MM COURSE: PURCHASING
Page | 102
Field Name Description R/O/C User Action and Values Comments
A Account AssignmentCategory. Key to determinewho will be paying for theconsumable material orservice.
O Will default from originalscreen if information has beenentered.
Short Text Description of the material orservice to be procured
C Defaults from material master.Enter a text for material notmaintained in the materialmaster (ex. Non stockmaterials)
Targ. qty. The quantity for which thecontract is valid
O forWK R forMK
Enter the number of pieces oramount of service for thecontract.
Oun Order Unit C Defaults from material master. Net OrderPrice
Basic price to be entered R Required when Preq is used asreference document
Tax code Tax Code O Will be defaulted fromreference document, ifavailable
Can be enteredfroED,CST,LSTcapture
Tracking No.
Will be defaulted fromreference document
O Can be changed if required
Press
8/11/2019 MM Purchasing User Manual
103/295
MM COURSE: PURCHASING
Page | 103
Upon entering all of this information, the user have the option to use the radio buttons /
icons on the menu bar to update or view more information that pertains to the contract.
1. Enter the continue
2. Click on vendor address
8/11/2019 MM Purchasing User Manual
104/295
8/11/2019 MM Purchasing User Manual
105/295
MM COURSE: PURCHASING
Page | 105
Press icon , contract will be created and contract number will be displayed
APO number will beenerated
8/11/2019 MM Purchasing User Manual
106/295
MM COURSE: PURCHASING
Page | 106
2. MM-ME31K-Create Contract with reference to RFQ
Overview
Business needs should be defined through a requisition. If the requisition needs to be converted into a contract,then it can either be created w.r.t the requisition or a quotation maintained for a particular vendor.
Here we will find how to create contract with reference to RFQ
Business Process Description Overview
A contract establishes a long-term agreement with a vendor to supply a material or service. Contractsmay either be value contracts or quantity contracts. Value contracts have a ceiling that is a monetaryamount that should not be exceeded. A quantity contact specifies a ceiling of goods or services that thevendor will provide to us.
This procedure outlines the steps involved in creating a standard quantity or value contract in R/3 forstock material. Contracts do not specify delivery dates; this is determined when release orders areissued against the contract.
Input - Required Fields Field Value / Comments
Request for quotation Select from drop down list
Output - Results Comments Contract document Document Created.
8/11/2019 MM Purchasing User Manual
107/295
MM COURSE: PURCHASING
Page | 107
Tips and Tricks
By providing as much input information as possible when creating contracts, the user can save time by minimizingthe inputs at the time of the order release.
By selecting the RFQ all data will gate copied over to the screen.
8/11/2019 MM Purchasing User Manual
108/295
MM COURSE: PURCHASING
Page | 108
Procedural Steps
Access Create Contract by;
Via Menu (a) Logistics>Materials Management>Purchasing>Outlineagreement>Contract >Create
Via Transaction Code ME31K
In the Create Contract: Initial Screen, Select the Reference to the RFQ
Click on Reference to RFQ
8/11/2019 MM Purchasing User Manual
109/295
MM COURSE: PURCHASING
Page | 109
Enter the Proper RFQ number .
Field Name Description R/O/C User Action and Values CommentsVendor Vendor for which the contract
is forC Vendor number known or via
searchIf notmentioned inRFQ
Agreementtype
Specify what kind of outlineagreement
R Please refer the attachedannexure ZAED, ZANB,ZAPO, ZARC, ZASR.
Picked fromRFQ
AgreementDate
Date of the contract R Defaults todays date into thisfield
Agreement Agreement number C Leave blank, if the system isconfigured to assign numbersinternally or enter desirednumber
This numberwill bedeterminedinternally
Purch. Organization for which the con R Please refer the attached annexur Picked from
Enter the Proper RFQ
8/11/2019 MM Purchasing User Manual
110/295
8/11/2019 MM Purchasing User Manual
111/295
MM COURSE: PURCHASING
Page | 111
Field Name Description R/O/C User Action and Values Comments
Agreementdate
Date the agreement wascreated
R Supplied from initial screen Grayed out
Validitystart
Beginning date of contract period.
R Defaults todays date into thefield. Change if necessary
Validityend
Date that the contract expires. R Enter the date until the contractwill be valid
Paymentterms
Terms stipulated by vendor O Defaults from vendor master.Change if necessary
Target val Target value of the contract. R Required for value contractsExch. rate Exchange rate of the currency O Change if necessaryEx. Rate fx. Fixing of exchange rate.
Indicates the purchase ordercurrency and the exchangerate cannot be changed duringinvoice verification.
O
Incoterms Freight terms stipulated byvendor
O Defaults from vendor master.Change if necessary
BSNL APOnumber
BSNL Number R Required for value
Press
8/11/2019 MM Purchasing User Manual
112/295
MM COURSE: PURCHASING
Page | 112
On screen Create Contract: Overview: Reference Document Items, enter information in
the fields as specified in the table below:
Field Name Description R/O/C User Action and Values CommentsSloc Storage Location where
material will be delivered and stored ifordered
O Enter or select StorageLocation fromtable
Strictlyoptional.StorageLocation may
be enteredlater at thetime of P.O.creation orGoodsReceipt.
1. Enter the storage location3. Click on Adopt2. Select the line item
8/11/2019 MM Purchasing User Manual
113/295
8/11/2019 MM Purchasing User Manual
114/295
MM COURSE: PURCHASING
Page | 114
Field Name Description R/O/C User Action and Values Comments
A Account AssignmentCategory. Key to determinewho will be paying for theconsumable material orservice.
O Will default from originalscreen if information has beenentered.
Short Text Description of the material orservice to be procured
C Defaults from material master.Enter a text for material notmaintained in the materialmaster (ex. Non stockmaterials)
Targ. qty. The quantity for which thecontract is valid
O forWK R forMK
Enter the number of pieces oramount of service for thecontract.
Oun Order Unit C Defaults from material master. Net OrderPrice
Basic price to be entered R Required when Preq is used asreference document
Tax code Tax Code O Will be defaulted fromreference document, ifavailable
Can be enteredfroED,CST,LSTcapture
Tracking No.
Will be defaulted fromreference document
O Can be changed if req