MM Purchasing User Manual

Embed Size (px)

Citation preview

  • 8/11/2019 MM Purchasing User Manual

    1/295

    MM COURSE: PURCHASING

    Page | 1

    B S N L

    U SE R M A N U A L : P u r c h a s i n g

    Version:1.0

    01/09/2010

  • 8/11/2019 MM Purchasing User Manual

    2/295

    MM COURSE: PURCHASING

    Page | 2

    Table of Contents

    FLOWCHART ................................................................................................................................................................... 41. Purchase requisition ................................................................................................................................................. 5

    1. MM-ME51N-Create Purchase Requisition for Account Assignment .................................................................... 5

    2. MM-ME51N-Create Purchase Requisition for Asset .......................................................................................... 12

    3. MM-ME51N-Create Purchase Requisition for Non Valuated materials ............................................................. 18

    4. MM-ME51N-Create Purchase Requisition for Stock materials .......................................................................... 23

    5. MM-ME52N-Change Purchase Requisition ........................................................................................................ 306. MM-ME53N-Display Purchase Requisition ........................................................................................................ 37

    7. MM-ME56-To assign source of supply to requisitions ....................................................................................... 41

    8. MM-ZMMF_PR- PR Output ................................................................................................................................ 44

    2. Request for Quotation ............................................................................................................................................. 471. MM-ME41-Create Quotation ............................................................................................................................. 47

    2. MM-ME47-Maintain Quotation ......................................................................................................................... 68

    3. MM-ME48-Display Quotation ............................................................................................................................ 77

    4. MM-ME49-RFQ Comparison .............................................................................................................................. 82

    5. MM-ZMMF_PC-Print Price Comparison Report ................................................................................................. 86

    6. MM-ME9A-Message Output RFQ ....................................................................................................................... 89

    3. Contract/APO .......................................................................................................................................................... 931. MM-ME31K-Create Contract with reference to PR............................................................................................ 93

    2. MM-ME31K-Create Contract with reference to RFQ ....................................................................................... 106

    3. MM-ME32K-Change Contract .......................................................................................................................... 118

    4. MM-ME33K-Display Contract ........................................................................................................................... 125

    5. MM-ME9K-Message Output Contracts ............................................................................................................ 133

    6. MM-ZMMF_APO-Message output APO ........................................................................................................... 137

    4. Purchase Order/Release Order ............................................................................................................................ 1411. MM-ME21N-Create Purchase Order-Account Assignment .............................................................................. 141

    2. MM-ME21N-Create Purchase Order-Assets .................................................................................................... 160

    3. MM-ME21N-Create Purchase Order-Non-Valuated Material .......................................................................... 181

  • 8/11/2019 MM Purchasing User Manual

    3/295

    MM COURSE: PURCHASING

    Page | 3

    4. MM-ME21N-Create Purchase Order-Project Stock .......................................................................................... 199

    5. MM-ME21N-Create Purchase Order-Stock Materials ...................................................................................... 218

    6. MM-ME21N-Create Purchase Order-Subcontracting & Repair ....................................................................... 236

    7. MM-ME21N-ZSTE-Stock Transfer PO External ................................................................................................. 243

    8. MM-ME21N-ZSTI-Stock Transfer PO Internal................................................................................................... 247

    9. MM-ME22N-Change Purchase Order ............................................................................................................... 251

    10. MM-ME23N-Display Purchase Order ........................................................................................................... 256

    11. MM-ZMMP_POTOL-PO Tolerance ............................................................................................................... 259

    12. MM-ME9F-Message Output Purchase Orders ............................................................................................. 262

    13. MM-ZMMP_SPO-Ultimate Consignee Details .............................................................................................. 266

    14. MM-ZMMF_SPO-Ultimate Consignee Details Print ..................................................................................... 271

    15. MM-ZMMP_POAMEND-Purchase Order Amendment ................................................................................ 275

    16. MM-ZMMF_POAMEND-Print Purchase Order Amendment ........................................................................ 279

    5. Approvals .................. ................. .................. ................. .................. ................. .................. ................. .................. 2831. MM-SBWP-PR_APO_PO_RFQ approval process .............................................................................................. 284

    IMORTANT TRANSACTION CODES .......................................................................................................................... 295

  • 8/11/2019 MM Purchasing User Manual

    4/295

    MM COURSE: PURCHASING

    Page | 4

    FLOWCHART

  • 8/11/2019 MM Purchasing User Manual

    5/295

    MM COURSE: PURCHASING

    Page | 5

    1. Purchase requisition

    1. MM-ME51N-Create Purchase Requisition for Account Assignment

    Overview

    Direct requirements from various departments for O&M materials to be directly charged to cost centre.

    Business Process Description Overview A requisition defines the need for a material or service. It is the primary document in the purchasingcycle.

    Purchase Requisition for materials whose cost will be directly charged to cost centre. The document will be used to provide material requirements of non valuated materials from all departments to the purchasing

    department. The purpose of requisitioning should be expense in nature and the material requisitioned willnot be part of inventory at the plant. The requisition authorizes the Purchasing department to purchasematerials in specific quantities within a specified time frame. It is an internal document and is not usedoutside of the company.Note: A Requisition of this nature will be created for codified materials. Incase material code is notavailable; the field may be kept blank. But in that case a proper material text has to be filled along withthe material group so as to help classify the item.

    -Such a requisition will lead to direct consumption at time of purchase, thus purchase will not affectmoving average price of the material as cost will be booked to the cost centre entered in requisition.

  • 8/11/2019 MM Purchasing User Manual

    6/295

    MM COURSE: PURCHASING

    Page | 6

    Input - Required Fields Field Value / Comments Document Type Type of requisition

    Material Code Click on the drop down button to select under any one of the optionsavailable Plant material by description or Material group orMaterial Type or Old material number

    Account Assignment K for Cost Centre

    Plant Plant code requiring material - Click on the drop down button to sele

    Quantity Quantity to be requisitioned ( unit of measurement) will be defaulted

    Valuation PriceEstimate Price per unit Will be defaulted if previous purchaseexists ,can be still changed by user

    Requisitioner Initials of Requisitioner

    Req Tracking Number A reference number for tracking this requisition

    Cost Centre Cost Centre to which cost of purchase will be booked

    Output - Results Comments

    Requisition will be created The requisition is assigned a PR number which is now subject torelease in 2 steps Initiator and Competent Authority.

    Tips and Tricks

    Set up the user defaults for each user to force the system to plug in default data, i.e. Plant, Requisitioner andRequisition Tracking Number.

  • 8/11/2019 MM Purchasing User Manual

    7/295

    MM COURSE: PURCHASING

    Page | 7

    Procedure Steps

    Access transaction by:

    Via Menu Logistics>Materials Management>Purchasing>PurchaseRequisition>Create

    Via Transaction Code ME51N

    On screen Create Purchase Requisition: enter header level information specified in thetable below:

    Transaction

  • 8/11/2019 MM Purchasing User Manual

    8/295

    MM COURSE: PURCHASING

    Page | 8

  • 8/11/2019 MM Purchasing User Manual

    9/295

    MM COURSE: PURCHASING

    Page | 9

    Fields Description R/O/C User Action and Values Comments

    DocumentType

    Defines type of requisition R Please refer the attachedannexure

    HeaderNote

    Header Text O Any comments that are notare generic to all items

    Will not appearin print out

    Required For Required For Item Text O To be entered as text againstthe first Item only

    Only if this textis maintainedagainst item 1will it appear in

    print outProbable

    Vendor List

    Probable Vendor List Item

    Text

    O List of probable vendors

    with complete relevantinformation to be entered astext against the first itemonly

    Only if this text

    is maintainedagainst item 1will it appear in

    print outDelivery Text Delivery Text O Delivery related texts can be

    maintained as text againstthe first item only

    Only if this textis maintainedagainst item 1will it appear in

    print outR = Required, O = Optional, C = Conditional

    On the same screen, in Create Purchase Requisition: Item Overview: enter informationspecified in the table below:

    Cost Centre

    Acct assignment Category

  • 8/11/2019 MM Purchasing User Manual

    10/295

    MM COURSE: PURCHASING

    Page | 10

    Fields Description R/O/C User Action and Values CommentsMaterial Material Code R Material code Click on the

    drop down button to selectunder any oneof the optionsavailable Plantmaterial bydescription orMaterial groupor MaterialType or Old

    material number Account AssignmentA

    Account to book cost R K for Cost Centre

    Short Text Description of material C Will be defaulted if materialcode is selected otherwisehas to be entered manually

    MaterialGroup

    Classification of materials on basis of nature

    C Please refer the attachedannexure

    Plant Plant requiring material basis R Enter plant where material isto be shipped

    ValuationPrice

    Estimated Price per unit C User to enter in the conditionwhen the purchase historyrecord is different from hisestimate.

    In case it is afirst time

    purchase, thenthis field isrequired to befilled.

    Cost Centre Cost Centre R Cost Centre to which costwill be booked

    Storagelocation

    Key for determining storagelocation for a specific plant

    O Can be entered from dropdown list

    Delivery

    date

    Date on which the goods are

    to be delivered. If deliverydate is sooner than thesystem calculated lead time,a warning will be issued

    C This is defaulted as the date

    90 days from present date. Itcan be changed if required.

    PurchasingOrganizatio

    n

    The organization for whichthe procurement needs to bedone

    C Please refer the attached annex

  • 8/11/2019 MM Purchasing User Manual

    11/295

    MM COURSE: PURCHASING

    Page | 11

    PurchasingGroup

    Nature of group preparingrequisition

    CPlease refer the attached

    annexureRequisitioner Indicates for whom the

    material is orderedR Initials of requisitioner

    Req. trackingnumber

    This number can be used tofacilitate the monitoring ofmaterial procurement

    R A reference number fortracking this requisition

    Item Text Item text O Technical specifications ofthe item not covered by theexisting materialdescriptions

    Its a text pageso there is nosystem check onits contents.This will be

    printed in thePR.

    Repeat above for each item in Purchase Requisition.

    Click on the check button to check the document

    System displays a message at the Bottom of the screen.

    Click on the save folder to produce a numbered requisition, or hit Control + S.

  • 8/11/2019 MM Purchasing User Manual

    12/295

  • 8/11/2019 MM Purchasing User Manual

    13/295

    MM COURSE: PURCHASING

    Page | 13

    Input - Required Fields Field Value / Comments Document Type Type of requisition

    Material Code Click on the drop down button to select under any one of theoptions available Plant material by description or Materialgroup or Material Type or Old material number

    Account Assignment A A for Assest

    Plant Plant code requiring material - Click on the drop down button to s

    Quantity Quantity to be requisitioned ( unit of measurement) will bedefaulted

    Valuation Price Estimate Price per unit Will be defaulted if previous purchaseexists ,can be still changed by user

    Requisitioner Initials of Requisitioner

    Req Tracking Number A reference number for tracking this requisition , eg Mech/04/08 where Mech represents Mechanical department, 04for year 2004 and 08 could be a running serial no.

    Internal Order Order in Projects to which cost of purchase will be booked

    Output - Results Comments

    Requisition will be created The requisition is assigned a PR number which is now subject torelease in 2 steps Initiator and Approver. Only after approval therequisition is available for processing at MM Cell.

    Tips and Tricks

    Set up the user defaults for each user to force the system to plug in default data, i.e. Plant, Requisitioner andReq Tracking Number.

  • 8/11/2019 MM Purchasing User Manual

    14/295

    MM COURSE: PURCHASING

    Page | 14

    Procedure Steps

    Access transaction by:

    Via Menu Logistics>Materials Management>Purchasing>PurchaseRequisition>Create

    Via Transaction Code ME51N

    Transaction

  • 8/11/2019 MM Purchasing User Manual

    15/295

    MM COURSE: PURCHASING

    Page | 15

    On screen Create Purchase Requisition: enter header level information specified in the

    table below:

    Fields Description R/O/C User Action and Values CommentsDocument

    TypeDefines type of requisition R Please refer the attached

    annexure

    HeaderNote

    Header Text O Any comments that are notare generic to all items

    Will not appearin print out

    Required For Required For Item Text R To be entered as text againstthe first Item only

    Only if this textis maintainedagainst item 1will it appear in

    print outProbableVendor List

    Probable Vendor List ItemText

    O List of probable vendorswith complete relevantinformation to be entered astext against the first itemonly

    Only if this textis maintainedagainst item 1will it appear in

    print outDelivery Text Delivery Text O Delivery related texts can be

    maintained as text againstthe first item only

    Only if this textis maintainedagainst item 1will it appear in

    print outR = Required, O = Optional, C = Conditional

  • 8/11/2019 MM Purchasing User Manual

    16/295

    MM COURSE: PURCHASING

    Page | 16

    On the same scree n Create Purchase Requisition: Item Overview: enter information

    specified in the table below:

    Fields Description R/O/C User Action and Values Comments

    Material Material Code R Material code Click on thedrop down

    button to selectunder any oneof the optionsavailable Plantmaterial bydescription orMaterial groupor MaterialType or Oldmaterial number

    Account AssignmentA

    Account to book cost R F Internal Order

    Short Text Description of material C Will be defaulted if materialcode is selected otherwisehas to be entered manually

    MaterialGroup

    Classification of materials on basis of nature

    C Please refer the attachedannexure

    Plant Plant requiring material basis R Enter plant where material isto be shipped

    ValuationPrice

    Estimated Price per unit C User to enter in the conditionwhen the purchase historyrecord is different from hisestimate.

    In case it is afirst time

    purchase, thenthis field isrequired to befilled.

    Order Internal Order R Order in Projects to whichcost of purchase will be

    booked

    Storagelocation Key for determining storagelocation for a specific plant O Can be entered from dropdown list

    Deliverydate

    Date on which the goods areto be delivered. If deliverydate is sooner than thesystem calculated lead time,a warning will be issued

    C This is defaulted as the date90 days from present date. Itcan be changed if required.

  • 8/11/2019 MM Purchasing User Manual

    17/295

    MM COURSE: PURCHASING

    Page | 17

    PurchasingOrganization

    Organization for which procurement needs to be

    done

    C Please refer the attached anne

    PurchasingGroup

    Nature of group preparingrequisition

    CPlease refer the attachedannexure

    Requisitioner Indicates for whom thematerial is ordered

    R Initials of requisitioner

    Req. trackingnumber

    This number can be used tofacilitate the monitoring ofmaterial procurement

    R A reference number fortracking this requisition

    Item Text Item text O Technical specifications ofthe item not covered by theexisting materialdescriptions

    Its a text pageso there is nosystem check onits contents.This will be

    printed in thePR.

    Repeat above for each item in Purchase Requisition

    Click on the save folder to produce a numbered requisition, or hit Control + S.

  • 8/11/2019 MM Purchasing User Manual

    18/295

    MM COURSE: PURCHASING

    Page | 18

    3. MM-ME51N-Create Purchase Requisition for Non Valuated materials

    Overview

    Direct requirements from various departments for O&M non valuated materials to be kept in Inventory.

    Business Process Description Overview A requisition defines the need for a material or service. It is the primary document in the purchasingcycle.

    Purchase Requisition for non valuated materials will be used to provide requirements of non valuatedmaterials from all departments to the purchasing department. The purpose of requisitioning should beexpense in nature and the material requisitioned should be part of inventory at the plant. The requisitionauthorizes the Purchasing department to purchase materials in specific quantities within a specified timeframe. It is an internal document and is not used outside of the company.Note :-A Requisition of this nature will be created for codified materials. Incase material code is not available;the field may be kept blank. But in that case a proper material text has to be filled along with the materialgroup so as to help classify the item.

    -Such a requisition will lead to direct consumption at time of purchase thus subsequent tracking ofinventory will only be for the sake of quantity and not value as such items have nil stock value.

    Input - Required Fields Field Value / Comments

    Document Type Type of requisition

    Material Code Click on the drop down button to select under any one of theoptions available Plant material by description or Materialgroup or Material Type or Old material number

    Account Assignment A K for Cost Centre

    Plant Plant code requiring material - Click on the drop down button to s

    Quantity Quantity to be requisitioned ( unit of measurement) will bedefaulted

    Valuation Price Estimate Price per unit Will be defaulted if previous purchaseexists ,can be still changed by user

    Requisitioner Initials of Requisitioner

  • 8/11/2019 MM Purchasing User Manual

    19/295

    MM COURSE: PURCHASING

    Page | 19

    Req Tracking Number A reference number for tracking this requisition

    Cost Centre Cost Centre to which cost of purchase will be booked

    Output - Results Comments Requisition will be created The requisition is assigned a PR number which is now subject to

    release in 2 steps Initiator and Final Approver. Only afterapproval the requisition is available for processing at MM Cell.

    Procedure Steps

    Access transaction by:

    Via Menu Logistics>Materials Management>Purchasing>PurchaseRequisition>Create

    Via Transaction Code ME51N

    Transaction

  • 8/11/2019 MM Purchasing User Manual

    20/295

    MM COURSE: PURCHASING

    Page | 20

    On screen Create Purchase Requisition: enter header level information specified in the

    table below:

    Fields Description R/O/C User Action and Values CommentsDocument

    TypeDefines type of requisition R Please refer the attached

    annexure

    HeaderNote

    Header Text O Any comments that are notare generic to all items

    Will not appearin print out

    Required For Required For Item Text R To be entered as text againstthe first Item only

    Only if this textis maintainedagainst item 1will it appear in

    print outProbableVendor List

    Probable Vendor List ItemText

    O List of probable vendorswith complete relevantinformation to be entered astext against the first itemonly

    Only if this textis maintainedagainst item 1will it appear in

    print out

  • 8/11/2019 MM Purchasing User Manual

    21/295

    MM COURSE: PURCHASING

    Page | 21

    Delivery Text Delivery Text O Delivery related texts can bemaintained as text against

    the first item only

    Only if this textis maintained

    against item 1will it appear in

    print outR = Required, O = Optional, C = Conditional

    On the same screen, in Create Purchase Requisition: Item Overview: enter informationspecified in the table below:

    Fields Description R/O/C User Action and Values Comments

    Material Material Code R Material code Click on thedrop down

    button to selectunder any oneof the optionsavailable Plantmaterial bydescription orMaterial groupor Material

    Type or Oldmaterial number

    Account AssignmentA

    Account to book cost R K for Cost Centre

    Short Text Description of material C Will be defaulted if materialcode is selected otherwisehas to be entered manually

    MaterialGroup

    Classification of materials on basis of nature

    C Please refer the attachedannexure

    Plant Plant requiring material basis R Enter plant where material is

    to be shippedValuation

    PriceEstimated Price per unit C User to enter in the condition

    when the purchase historyrecord is different from hisestimate.

    In case it is afirst time

    purchase, thenthis field isrequired to befilled.

    Cost Centre Cost Centre R Cost Centre to which costwill be booked

  • 8/11/2019 MM Purchasing User Manual

    22/295

    MM COURSE: PURCHASING

    Page | 22

    Storagelocation

    Key for determining storagelocation for a specific plant

    O Can be entered from dropdown list

    Deliverydate

    Date on which the goods areto be delivered. If deliverydate is sooner than thesystem calculated lead time,a warning will be issued

    C It can be changed if required.

    PurchasingOrganization

    Organization for which procurement is needs to bedone

    C Please refer the attachedannexure

    PurchasingGroup

    Nature of group preparingrequisition

    C Please refer the attachedannexure

    Requisitioner Indicates for whom thematerial is ordered R Initials of requisitioner

    Req. trackingnumber

    This number can be used tofacilitate the monitoring ofmaterial procurement

    R A reference number fortracking this requisition

    Item Text Item text O Technical specifications ofthe item not covered by theexisting materialdescriptions

    Its a text pageso there is nosystem check onits contents.

    This will be printed in thePR.

    Repeat above for each item in Purchase Requisition

    Click on the save folder to produce a numbered requisition, or hit Control + S.

  • 8/11/2019 MM Purchasing User Manual

    23/295

    MM COURSE: PURCHASING

    Page | 23

    4. MM-ME51N-Create Purchase Requisition for Stock materials

    Overview

    Direct requirements from various departments for stock materials to be kept in Inventory.

    Business Process Description Overview A requisition defines the need for a material or service. It is the primary document in the purchasingcycle.

    Purchase Requisition for stock materials will be used to provide material requirements from alldepartments to the purchasing department. The purpose of requisitioning should be stocking in nature andthe material requisitioned should be part of valuated inventory at the plant. The requisition authorizes thePurchasing department to purchase materials in specific quantities within a specified time frame. It is aninternal document and is not used outside of the company.Note :-A Requisition of this nature will be created for codified materials only.-Such a requisition is not meant for direct consumption at time of purchase, it is for initiating purchase for

    purpose of inventorying.Any consumption will be subsequent by means of a reservation.

    - Since objective is to stock this material, no account at the time of requisition is to be assigned.

    Input - Required Fields Field Value / Comments

    Document Type Type of requisition

    Material Code Click on the drop down button to select under any one of theoptions available Plant material by description or Materialgroup or Material Type or Old material number

    Plant Plant code requiring material - Click on the drop down button to s

    Quantity Quantity to be requisitioned ( unit of measurement) will bedefaulted

    Valuation Price Estimate Price per unit Will be defaulted if previous purchaseexists ,can be still changed by user

    Requisitioner Initials of Requisitioner

    Req Tracking Number A reference number for tracking this requisition

  • 8/11/2019 MM Purchasing User Manual

    24/295

    MM COURSE: PURCHASING

    Page | 24

    Output - Results Comments Requisition will be created The requisition is assigned a PR number which is now subject to

    release in 2 steps Initiator and Final Approver. Only afterapproval the requisition is available for processing at MM Cell.

    Tips and Tricks

    Set up the user defaults for each user to force the system to plug in default data, i.e. Plant, Requisitioner andReq Tracking Number.

    Procedure Steps

    Access transaction by:

    Via Menu Logistics>Materials Management>Purchasing>PurchaseRequisition>Create

    Via Transaction Code ME51N

    Transaction

  • 8/11/2019 MM Purchasing User Manual

    25/295

    MM COURSE: PURCHASING

    Page | 25

    On screen Create Purchase Requisition: enter header level information specified in the

    table below:

  • 8/11/2019 MM Purchasing User Manual

    26/295

    MM COURSE: PURCHASING

    Page | 26

    Fields Description R/O/C User Action and Values Comments

    DocumentType

    Defines type of requisition R Please refer the attachedannexure

    HeaderNote

    Header Text O Any comments that are notare generic to all items

    Will not appearin print out

    Required For Required For Item Text O To be entered as text against

    the first Item only

    Only if this text

    is maintainedagainst item 1will it appear in

    print outProbableVendor List

    Probable Vendor List ItemText

    O List of probable vendorswith complete relevantinformation to be entered astext against the first itemonly

    Only if this textis maintainedagainst item 1will it appear in

    print outDelivery Text Delivery Text O Delivery related texts can be

    maintained as text againstthe first item only

    Only if this textis maintainedagainst item 1

    will it appear in print out

  • 8/11/2019 MM Purchasing User Manual

    27/295

  • 8/11/2019 MM Purchasing User Manual

    28/295

    MM COURSE: PURCHASING

    Page | 28

    Fields Description R/O/C User Action and Values Comments

    Material Material Code R Material code Click on thedrop down

    button to selectunder any oneof the optionsavailable Plantmaterial bydescription orMaterial groupor MaterialType or Oldmaterial number

    Plant Plant requiring material R Enter plant where material isto be shipped

    Type the plantCode or select

    drop down menu

    ValuationPrice

    Estimated Price per unit C User to enter in the conditionwhen the purchase historyrecord is different from hisestimate.

    In case if it isadopted frommaterial master,then this field isrequired to befilled.

    Storagelocation

    Key for determining storagelocation for a specific plant

    O Can be entered from dropdown list

    Delivery

    date

    Date on which the goods are

    to be delivered. If deliverydate is sooner than thesystem calculated lead time,a warning will be issued

    C It can be changed if required.

    PurchasingOrganization

    Organization for which procurement needs to bedone

    R Please refer the attachedannexure

    PurchasingGroup

    Nature of group preparingrequisition

    C Please refer the attachedannexure

    Requisitioner Indicates for whom thematerial is ordered

    R Initials of requisitioner

    Req. trackingnumber This number can be used tofacilitate the monitoring ofmaterial procurement

    R A reference number fortracking this requisition

  • 8/11/2019 MM Purchasing User Manual

    29/295

    MM COURSE: PURCHASING

    Page | 29

    Item Text Item text O Technical specifications ofthe item not covered by the

    existing materialdescriptions

    Its a text pageso there is no

    system check onits contents.This will be

    printed in thePR.

    R = Required, O = Optional, C = Conditional

    Repeat above for each item in Purchase Requisition

    Use the check button .

    If the system does not generate any error message then Click on the save button or hitControl + S.

    System will generate a number at the bottom of the screen

  • 8/11/2019 MM Purchasing User Manual

    30/295

    MM COURSE: PURCHASING

    Page | 30

    5. MM-ME52N-Change Purchase Requisition

    Overview

    A purchase requisition needs to be changed. A change in quantity and/or required date is the primary triggers forthis transaction.

    Business Process Description Overview Prior to changing or deleting a requisition, the requisitioner needs to know the status of the requisition. Ifthe requisition has been processed into a purchase order, any changes will not be reflected on the

    purchase order. The requisitioned needs to contact the buyer directly. If someone else has deleted therequisition, a new requisition will have to be created, as it is not possible to change a deleted requisition.

    Input - Required Fields Field Value / Comments Purchase requisition number Can be found using Display function or List display functionItem Details Identifies what can be changed or deleted

    Output Results Comments Requisition changed or deleted If Requisition has status Not Edited then changes made will

    reflect in RFQ and Purchase Order.

    Tips and Tricks

    If a requisition has been deleted, you can still use that requisition and create a new one using the canceledrequisition as a reference.

    To save the document, you can click on the save folder.

  • 8/11/2019 MM Purchasing User Manual

    31/295

    MM COURSE: PURCHASING

    Page | 31

    Procedural Steps

    Access transaction by:

    Via Menus Logistics>Materials Management>Purchase>PurchaseRequisition>Change

    Via Transaction Code ME52N

    Transaction

  • 8/11/2019 MM Purchasing User Manual

    32/295

    MM COURSE: PURCHASING

    Page | 32

    On screen Change Purchase Requisition, the last Requisition saved will be displayed as

    default. To enter different number select the icon .System will display anotherwindow to select other document.

    Then delete the document default one and type other PR number and select otherdocument tab.

    System will display other Purchase document.

    Field Name Description R/O/C User Action and Values CommentsRequisition

    NumberRequisition Number R If you dont want to work with

    the defaulted requisition, clickon the Other Requisition

    button on the header bar (It has been shown with anarrow).Enter a uniquerequisition number thatrequires to be changed.

    Requisition can be found usingthe Display orList Displayfunction.

    (Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)

    Click on the Enter button.

  • 8/11/2019 MM Purchasing User Manual

    33/295

    MM COURSE: PURCHASING

    Page | 33

    On the same screen, to delete requisition or item:

    Click on the line of the item to be deleted

  • 8/11/2019 MM Purchasing User Manual

    34/295

    MM COURSE: PURCHASING

    Page | 34

    Click on the Delete (trash can) icon.

    Select Yes on the pop up box to de lete the item

  • 8/11/2019 MM Purchasing User Manual

    35/295

    MM COURSE: PURCHASING

    Page | 35

    The item is now flagged for deletion (see the column labeled D; there will be a

    checkmark).

    On the same screen, to change quantity, price, date required, text etc., enter informationin the fields as specified in the table below:

  • 8/11/2019 MM Purchasing User Manual

    36/295

    MM COURSE: PURCHASING

    Page | 36

    Field Name Description R/O/C User Action and Values CommentsItem

    NumberItem number R Selects the item number that

    needs to be changedVal. Price Price change O Change price if requiredDeliverydate

    Date Change O Change date if required

    Quantity Quantity Change O Change quantity if requiredText Text change O Change or add text if required This holds true

    for all texts Required for,ProbableVendor list andDelivery Text

    (Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)

    Finally use check button

    System displays

    Click on the Save button to save the changes.

  • 8/11/2019 MM Purchasing User Manual

    37/295

    MM COURSE: PURCHASING

    Page | 37

    6. MM-ME53N-Display Purchase Requisition

    Overview

    User needs to view information regarding purchase requisitions, including item information and status ofrequisitions.

    User may not have the authority to change, so they can only look in display mode.

    Business Process Description Overview This BPP demonstrates a function that allows you to view/monitor the status of individual purchaserequisitions.

    Input - Required Fields Field Value / Comments Purchase requisition number Can be found using Display function or List display function

    Output - Results Comments View status of Requisition

    Tips and Tricks

    There are two methods for displaying requisitions - Display and List Display.

    List display is a more comprehensive method of displaying requisitions, and is addressed in BPP MM -ME5A-ListDisplay- Purchase Requisitions

  • 8/11/2019 MM Purchasing User Manual

    38/295

    MM COURSE: PURCHASING

    Page | 38

    Procedural Steps

    Via Menus Logistics>Materials Management>Purchase>PurchaseRequisition>Display

    Via Transaction Code ME53N

    Access transaction by:

    Transaction

  • 8/11/2019 MM Purchasing User Manual

    39/295

    MM COURSE: PURCHASING

    Page | 39

    On screen Display Purchase Requisition, the last Requisition saved will be shown. To

    display other requisition select other purchase requisition icon . Type the respectivePR number and press enter.

    Field Name Description R/O/C User Action and Values CommentsRequisition

    NumberRequisition Number R If you dont want to work with

    the defaulted requisition, clickon the Other Requisition

    button on the header bar (It has been shown with anarrow).Enter a uniquerequisition number thatrequires to be displayed.

    Requisition can be found usingthe Display orList Displayfunction.

    (Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)

  • 8/11/2019 MM Purchasing User Manual

    40/295

    MM COURSE: PURCHASING

    Page | 40

    Click on the Enter button.

    Menu Name

    Description R/O/C User Action and Values Comments

    Details Item Details O Displays every detail from theitem overview screen such asmaterial, qty, material masterdata, plant etc.

    TextOverview

    Text Overview O Displays any text fields in thePurchaser requisition

    Releasestrategy

    Purchase requisition approval O Displays strategy for purchaseapproval

    Status Item history statistics O Displays statistics on status ofPR and also the changes madeto the requisition

    AccountAssignments

    Account assignments foritems

    C Displays the G/L account towhich the items are charged , ifit is an account assigned PR

    Services Service items C This is only possible in the caseservice items

    ValueLimits

    C This is only possible in the caseservice items

    (Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)

  • 8/11/2019 MM Purchasing User Manual

    41/295

    MM COURSE: PURCHASING

    Page | 41

    7. MM-ME56-To assign source of supply to requisitions

    Overview

    To assign source of supply to requisitions

    BUSINESS PROCESS PROCEDURE OVERVIEWWhen you make any contract you need to assign it to a source of supply/vendor to close the transaction orthe requisition processing cycle.

    Input Required Fields Field Values/Comments Purchase requisition number

    Purchasing group

    If the number is known, enter it. If not, search for it.

    Enter the purchasing group.

    Output - Results Displays the screen showing the requisition number and the contract number.

  • 8/11/2019 MM Purchasing User Manual

    42/295

    MM COURSE: PURCHASING

    Page | 42

    Procedural Steps

    Access transaction by:

    Via Menus (a) Logistics Material Management Purchasing Purchase requisition Follow on functions Assign-ME56

    Via Transaction Code ME56

    On screen Assign source of supply to requisitions, enter information in the fields as

    shown in the table below.Press

    Enter the Purchase

  • 8/11/2019 MM Purchasing User Manual

    43/295

    MM COURSE: PURCHASING

    Page | 43

    Field Name Description R/O/C

    User Action and Values Comments

    Purchaserequisition

    Numeric key that uniquelyidentifies the purchaserequisition document.

    O If unknown, conduct a match-code search

    Purchasinggroup

    Purchasing group for therequisition.

    O

    Press

    Screen showing the contract number and the requisition number.

    Click the CHECK BOX and press ASSIGN AUTOMATICALLY tab.

    The following screen shows the output. Click on SAVE button .

  • 8/11/2019 MM Purchasing User Manual

    44/295

    MM COURSE: PURCHASING

    Page | 44

    8. MM-ZMMF_PR- PR Output

    Overview

    A Purchase requisition needs to be printed.

    Business Process Procedure Overview This procedure details how to print a Purchase requisition in R/3.

    Input Required Fields Field Value/Comments Purchase Requisition Number Enter the number of the purchase requisition document which

    needs to be printed.

    Output - Results Comments A successfully printed Request forQuotation

  • 8/11/2019 MM Purchasing User Manual

    45/295

    MM COURSE: PURCHASING

    Page | 45

    Procedural Steps

    Access transaction by:

    Via Transaction Code ZMMF_PR

    On screen Purchase requisition output, enter information in the fields as specified inthe table below:

    Field Name Description R/O/C User Action and Values Comments

    Purchaserequisitionnumber

    Takes the document number. C Enter the required requisitiondocument number.

    Press (Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)

    The output screen shows the document as displayed below.

    Enter the purchase requisition number.

  • 8/11/2019 MM Purchasing User Manual

    46/295

    MM COURSE: PURCHASING

    Page | 46

    Click on PRINT PREVIEW tab .The print preview screen .

    Click on the P RINT tab button.

  • 8/11/2019 MM Purchasing User Manual

    47/295

    MM COURSE: PURCHASING

    Page | 47

    2. Request for Quotation

    1. MM-ME41-Create Quotation

    Overview

    Purchasing determines that a quotation is required from vendors.

    Business Process Procedure Overview SAP provides the capability of creating and issuing single or multiple items Request for Quotes (RFQs).Vendors must have master records created or be categorized as one time vendors The Request for quotation may be created w.r.t a Purchase Requisition incase requirement has come fromuser department else it can be created without any reference also. Both cases have been discussed in thisdocument.

    Input - Required Fields Field Value / Comments RFQ Type Default is Z RFQ for Material Language Default is EN for English RFQ Date Default is creation dateQuotation Deadline Must be prior to required delivery date specifiedPurchasing Org Enter Purchasing Organization identifierPurchasing group Enter Purchasing group number

    Output - Results Comments Saved RFQ Each RFQ per vendor will receive a separate document number.

    Tips and Tricks

    The collective number in the header screen of the RFQ is an important method to link the copies of the RFQ issuedto the different vendors. SAP treats each issuance to a different vendor as a separate RFQ document and thiscollective number can be used to search and provide comparison reporting.

  • 8/11/2019 MM Purchasing User Manual

    48/295

    MM COURSE: PURCHASING

    Page | 48

    Procedural Steps

    CASE 1: CREATION OF RFQ W.R.T PURCHASE REQUISITION

    Via Menu (a) Logistics > Material Management > Purchasing >RFQ/quotation > Request for Quotation> Create

    Via Transaction Code ME41

    Access Transaction by:

  • 8/11/2019 MM Purchasing User Manual

    49/295

    MM COURSE: PURCHASING

    Page | 49

    On screen Create RFQ: Initial Screen, enter information in the fields as specified in the

    table below:

  • 8/11/2019 MM Purchasing User Manual

    50/295

    MM COURSE: PURCHASING

    Page | 50

    Now select the tab Reference to PReq Tab and fill the all required field as mentioned inthe table below.

  • 8/11/2019 MM Purchasing User Manual

    51/295

    MM COURSE: PURCHASING

    Page | 51

    Field Name Description R/O/C User Action and Values Comments

    RFQ Type Default is AN R Please refer the attachedannexure

    Language Default is EN - English R Not to be changedRFQ Date Default is creation date R May be changed if required The RFQ can

    be created forfuture issuance.

    QuotationDeadline

    The due date for vendorquotations

    R Enter the due date in the dateformat assigned in the system

    If the deadlineis stated as adate after therequireddelivery date,the user will begiven an errormessage whenthe deliverydate is entered.

    PurchasingOrg.

    Purchasing Organizationresponsible for RFQ

    R Please refer the attachedannexure

    Referenceto Preq

    Field to allow PurchaseRequisition reference

    R Click on this field

    PurchaseRequisition

    Purchase Requisition field forentry

    R Enter Requisition No. againstwhich RFQ is being floated

    RequisnItem

    Requisition Item number O Enter only if all requisitionitems are not to be taken toRFQ

    Note: On the above table, in column R/O/C; R = required, O = Optional, C = Conditional)

    Note: The Default Data for Items fields will carry these values against all items on the RFQ. Although carried ontothe Item screens, these values may be changed within the transaction. Useful if the majority of the items havecommon data (delivery date, plant, etc.). Enter the appropriate data if desired. (Optional)

    After entering above values press enter to move to next screen - Create RFQ: Header Data.

  • 8/11/2019 MM Purchasing User Manual

    52/295

    MM COURSE: PURCHASING

    Page | 52

    On screen Create RFQ: Header Data, enter information in the fields as specified in thetable below:

  • 8/11/2019 MM Purchasing User Manual

    53/295

    MM COURSE: PURCHASING

    Page | 53

    Field Name

    Description R/O/C User Action and Values Comments

    Coll. No. Collective number R Enter a number to trackvendors of the same RFQ

    This will be a10 digit codeidentifying theBID/ RFQ

    Validitystart

    Validity start O Enter date quotation will start

    Validityend

    Validity end O Enter date quotation will end.

    Applic. By Application date O Enter closing date of BidsBindg.Per.

    Binding period O Enter date period is binding

    TargetValue

    Displays the target value O Enter the target value

    BSNL Number

    BSNL Document number R Enter any alphanumeric value It is a 50 digitalphanumerickey

    After entering above values press enter to move to next screen - Create RFQ: Selection List: Purchase Requisitions

    On screen Create RFQ: Selection List: Purchase Requisitions, enter information in the

    fields as specified in the table below:

  • 8/11/2019 MM Purchasing User Manual

    54/295

    MM COURSE: PURCHASING

    Page | 54

    Field Name Description R/O/C User Action and Values CommentsSloc Storage Location where

    material will be delivered and stored ifordered

    O Enter or select StorageLocation fromtable

    Strictlyoptional.StorageLocation may

    be enteredlater at thetime of P.O.creation orGoodsReceipt.

    Select Requisition line items for processing and click on the button to copy requisition details to

    RFQ. System will take you to the next screen Create RFQ: Item 00001

    On screen Create RFQ: Item 0001 0, enter information in the fields as specified in thetable below:

  • 8/11/2019 MM Purchasing User Manual

    55/295

  • 8/11/2019 MM Purchasing User Manual

    56/295

  • 8/11/2019 MM Purchasing User Manual

    57/295

    MM COURSE: PURCHASING

    Page | 57

    Field Name Description R/O/C User Action and Values CommentsVendor Vendor number R Enter valid vendor number and

    press enterIf vendormaster doesnot exist, usea one-timevendornumber (ifallowed)

    Name Vendor Name C Up to 4 lines available Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.

    Street &House #

    Street address and/or House # C Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.

    Postal Code& City

    Postal code and city / town / vil C Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.

    Country Name of country C Table validated / selection Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.

    Region In some countries, the regionforms part of the address. Themeaning depends on thecountry.

    C Table validated / selection Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.

    Postal Code Zip Code / Postal Code C Onlyrequired ifOne-timevendor.

  • 8/11/2019 MM Purchasing User Manual

    58/295

    MM COURSE: PURCHASING

    Page | 58

    Defaultedfrom vendor

    master.Telephone Telephone # C Only

    required ifOne-timevendor.Defaultedfrom vendormaster.

    Fax Fax # C Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.

    E-mail E-Mail address C Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.

    After entering all vendor details, save the RFQ. This will refresh the Create RFQ: Vendor Address screen to allowcreation of the same RFQ data to a new vendor by following the steps outlined in 1.5 above. The system will displaythe message RFQ Created under the number ___________.

    Return to Main Purchasing Menu. (Select Yellow up Pointing Arrow, Shift F3)

    Refer to Business Process Procedure Display a RFQ - to verify this result.

  • 8/11/2019 MM Purchasing User Manual

    59/295

    MM COURSE: PURCHASING

    Page | 59

    CASE 2: CREATION OF RFQ WITHOUT PURCHASE REQUISITION

    Access Transaction by:

    Via Menu (a) Logistics > Material Management > Purchasing >RFQ/quotation > Request for Quotation> Create

    Via Transaction Code ME41

    On screen Create RFQ: Initial Screen, enter information in the fields as specified in the

    table below:

  • 8/11/2019 MM Purchasing User Manual

    60/295

    MM COURSE: PURCHASING

    Page | 60

    Field Name Description R/O/C User Action and Values CommentsRFQ Type Default is AN' R Please refer the attached

    annexure

    Language Default is EN - English R Not to be changedRFQ Date Default is creation date R May be changed if required The RFQ can

    be created forfuture issuance.

    QuotationDeadline

    The due date for vendorquotations

    R Enter the due date in the dateformat assigned in the system

    If the deadlineis stated as adate after therequireddelivery date,the user will begiven an errormessage whenthe deliverydate is entered.

    PurchasingOrg.

    Purchasing Organizationresponsible for RFQ

    R Please refer the attachedannexure

    Purchasinggroup

    Requisitioning groupIdentifier

    R Please refer the attachedannexure

    If RFQ is beingcreated w.r.tPurchaseRequisitionthen systemwill pick fromRequisition,user need notenter

    ItemCategory

    Key defining how the procurement of a material orservice item is controlled.

    O Enter Item Category if required

    DeliveryDate

    Date on which the goods areto be delivered or the serviceis to be performed.

    O Enter delivery date

    Plant Key for location within thecompany code where goodsare required.

    O Enter Plant

    StorageLocation

    Number of the storagelocation where the material isstored. A plant may containone or more storage locations.

    O Enter Storage Location

    MaterialGroup

    Key that you use to grouptogether several materials orservices with the sameattributes, and to assign themto a particular material group.

    O Please refer the attachedannexure

  • 8/11/2019 MM Purchasing User Manual

    61/295

  • 8/11/2019 MM Purchasing User Manual

    62/295

    MM COURSE: PURCHASING

    Page | 62

    On screen Create RFQ: Header Data, enter information in the fields as specified in the

    table below:

  • 8/11/2019 MM Purchasing User Manual

    63/295

    MM COURSE: PURCHASING

    Page | 63

    Field Name

    Description R/O/C User Action and Values Comments

    Companycode

    Company code R Needs to be entered

    Coll. No. Collective number R Enter a number to trackvendors of the same RFQ

    This will be a10 digit codeidentifying theBID/ RFQ

    Validitystart

    Validity start O Enter date quotation will start

    Validityend

    Validity end O Enter date quotation will end.

    Applic. By Application date O Enter closing date of BidsBindg.Per.

    Binding period O Enter date period is binding

    After entering above values press enter to move to next screen - Create RFQ: Item overview

    On screen Create RFQ: Item Overview, enter information in the fields as specified in thetable below:

  • 8/11/2019 MM Purchasing User Manual

    64/295

    MM COURSE: PURCHASING

    Page | 64

    Field Name Description R/O/C User Action and Values Comments

    Item Number that uniquelyidentifies an item within theRFQ

    R Defaults - Line items aredefined by the system inincrements of 10.

    No UserAction

    I Item Category - determines ifstandard

    purchase or other such as 3 rd paorder, etc.

    O Default is blank - standard purchase

    Typically nouser actionrequired

    Material Material Number R Enter material number All stockmaterial musthave materialnumbers

    RFQQuantity

    Quantity of Materialrequested for quotation

    R Must be numeric

    DeliveryDate

    Date required if ordered R Must be in correct date format

    MaterialGroup

    Group of material which thismaterial belongs

    N/A Please refer the attachedannexure

    Needs to beentered incase of noncodifiedmaterials

    Plant Plant where material isrequired

    R Enter or select Plant fromtable.

    Note: the material master mustexist for that plant.

    Sloc Storage Location wherematerial will

    be delivered and stored ifordered

    O Enter or select StorageLocation fromtable

    Strictlyoptional.StorageLocation may

    be enteredlater at thetime of P.O.creation orGoodsreceipt

  • 8/11/2019 MM Purchasing User Manual

    65/295

    MM COURSE: PURCHASING

    Page | 65

    Now specify the vendors invited to quote by clicking on the Vendor address button or F7 key.

    On screen Create RFQ: Vendor Address, enter information in the fields as specified inthe table below:

  • 8/11/2019 MM Purchasing User Manual

    66/295

    MM COURSE: PURCHASING

    Page | 66

    Field Name Description R/O/C User Action and Values CommentsVendor Vendor number R Enter valid vendor number and

    press enterIf vendormaster doesnot exist, usea one-timevendornumber (ifallowed)

    Name Vendor Name C Up to 4 lines available Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.

    Street &House #

    Street address and/or House # C Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.

    Postal Code& City

    Postal code and city / town / vil C Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.

    Country Name of country C Table validated / selection Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.

    Region In some countries, the regionforms part of the address. Themeaning depends on thecountry.

    C Table validated / selection Onlyrequired ifOne-timevendor.Defaultedfrom vendormaster.

    Postal Code Zip Code / Postal Code C Onlyrequired ifOne-timevendor.

  • 8/11/2019 MM Purchasing User Manual

    67/295

  • 8/11/2019 MM Purchasing User Manual

    68/295

    MM COURSE: PURCHASING

    Page | 68

    2. MM-ME47-Maintain Quotation

    Overview

    Vendor communicates price for material and as a result the RFQ (Request for Quotation) needs to be updated.

    Business Process Procedure Overview In Purchasing, the RFQ and the quotation form a single document. Prices and conditions quoted byvendors areentered in the original RFQ. If you have issued an RFQ to several vendors, you can have the systemdisplay the

    most favorable quotation submitted. You can also store the prices and terms of delivery from certainquotations in an info recordfor future accessing. A quotation is legally binding on the vendor for a certain period. The quotation is thevendors response to a request for quotation issued by a purchasing organization. A quotation consists of items in which thetotal quantityand delivery date of an offered material or service is specified.

    Input Required Fields Field Value/Comments RFQ Enter RFQ No. for which a price or prices need to be entered.

    Output - Results Comments Quotation entered Enter all relevant data received by vendor, price, date available,

    etc.

    Tips and Tricks

    If you are simply entering a price against a RFQ, you can follow these easy steps:

    Choose RFQ/quotation Quotation Maintain .

    (The initial screen for maintaining quotations appears.)

    Enter the number of the RFQ and press ENTER.

    (The RFQ item overview screen appears.)

    You can enter the vendor's price per item on the item detail screen (see steps 4 and 5) or directly on the itemoverview screen.

  • 8/11/2019 MM Purchasing User Manual

    69/295

    MM COURSE: PURCHASING

    Page | 69

    Choose Item ils to enter quotation data on the item detail screen.

    Enter the vendors quotation.

    Save your data.

    Procedural Steps

    Access transaction by:

    Via Menu (a) Logistics > Materials Management > Purchasing >RFQ/quotation > Quotation > Maintain

    Via Transaction Code ME47

    On screen Maintain Quotation: Initial Screen, enter information in the fields asspecified in the table below:

    Field Name Description R/O/C User Action and Values CommentsRFQ RFQ Number R Enter RFQ Number for

    which price entries are to bemade.

    Search help can be used to locatethe appropriatevalue.

    (Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)

  • 8/11/2019 MM Purchasing User Manual

    70/295

    MM COURSE: PURCHASING

    Page | 70

    Press the Enter key, or click on the green Enter icon to proceed.

    View the screen Maintain Quotation: Header Data by clicking on the Header data icon in the toolbar.

  • 8/11/2019 MM Purchasing User Manual

    71/295

    MM COURSE: PURCHASING

    Page | 71

    Enter information in the fields as specified in the table below. Some fields will not beavailable for input, as they are reference fields only.

    Field Name Description R/O/C User Action and Values CommentsAdministrativeFields :Qout. Dead. Quotation deadline R Supplied from initial screenValidity start Validity start O Enter date quotation will startValidity end Validity end O Enter date quotation will end.Applic. By Application date O Enter closing date of Bids

    Bindg. Per. Binding period O Enter date period is bindingTerms ofPayment &Delivery:Payment terms Key for defining

    payment termscomposed of cashdiscount percentagesand payment periods.

    O Enter appropriate value ifnecessary.

    (F4) search help can be used to locate theappropriate value.

    ReferenceData:Quotation Date Date quotation

    submittedO Enter date if desired.

    (Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)

  • 8/11/2019 MM Purchasing User Manual

    72/295

    MM COURSE: PURCHASING

    Page | 72

    Once all necessary header data has been maintained, the user can then enter the price

    information in one of two fashions:

  • 8/11/2019 MM Purchasing User Manual

    73/295

    MM COURSE: PURCHASING

    Page | 73

    Enter the price in the Net Price field on the Maintain Quotation: Item Overview

    screen. This price should be the basic price exclusive of discounts/surcharges.

    To enter more detailed information in addition to the net price, select the line item and

    click on the Item conditions icon.

    Here various conditions as per vendor quotation will be maintained.

    Drop down on the open field of Condition type and choose the type of condition to be levied for this

    basic price. Please note that basic price is referred to as Gross price in this screen since Net will becalculated after taking into account all conditions.

    Examples could be Discount (start with -), Surcharge (start with +), Freight charges, Inspection charges etc. Mostconditions are either in % or per unit or Absolute value basis.

  • 8/11/2019 MM Purchasing User Manual

    74/295

    MM COURSE: PURCHASING

    Page | 74

    1.6.3.2 If CST/LST or Excise duty is applicable, the same has to be entered via the tax code. To choose this code, goback to Item overview screen. Select the material item line and go to Item Details screen. Enter the tax code

    here. If a purchase order is created by referencing an RFQ, this code facilitates the determination of the taxamount when the invoice is entered in the system. The tax code has to be entered for each item in theQuotation.

  • 8/11/2019 MM Purchasing User Manual

    75/295

    MM COURSE: PURCHASING

    Page | 75

    Header Conditions There may be some conditions that are applicable on the total amount of the Quotation. Theseheader conditions can be maintained at header level so that item wise repetition is not required. To enter theseconditions, goto Item overview screen and Choose Header Conditions. The value of these conditions will beapportioned to individual items.

  • 8/11/2019 MM Purchasing User Manual

    76/295

    MM COURSE: PURCHASING

    Page | 76

    Click on the green Back arrow to return to the Overview screen once data has been

    maintained.There is a field for quotation comments that will segregate quotations as per their status, Comments such as NotResponded, Regret case, Technically Unqualified, Commercially Unqualified, Techno-commercially Accepted,Unsuccessful bid, Lowest Technocomm. Accepted are available to choose from. These comments are to be enteredin the Item details screen under Quotation comments.

    Once all quotation information has been successfully entered, save the data by clickingon the Save button, or press the < Ctrl + S> keys. A message will be displayed that the datahas been saved.

  • 8/11/2019 MM Purchasing User Manual

    77/295

    MM COURSE: PURCHASING

    Page | 77

    3. MM-ME48-Display Quotation

    Overview

    The need arises to display a quotation already maintained for an RFQ (Request for Quotation) in the system.

    Business Process Description Overview This BPP will discuss the procedure to display a quotation in the R/3 system.

    Input - Required Fields Field Value / Comments RFQ number RFQ number for which you want to display quotation information.

    Output - Results Comments Quotation is displayed. Display Only format.

    Tips and Tricks

    By consistently using the collective number field on RFQs, the search for the required RFQ number is muchsimpler.

    Changes can not be made in this mode. If changes are required, transaction ME47can be used to maintainquotation data. See BPP MM-ME47-Maintain Quotation.doc for reference.

  • 8/11/2019 MM Purchasing User Manual

    78/295

    MM COURSE: PURCHASING

    Page | 78

    Procedural Steps

    Access transaction by:

    Via Menu Logistics > Materials Management > Purchasing > RFQ/Quotation >Quotation > Display

    Via Transaction Code ME48

    On the Display Quotation: Initial Screen screen, enter information in the fields as

    specified in the table below:

    Field Name Description R/O/C User Action and Values CommentsRFQ RFQ number R Enter RFQ number (typically a

    non-intelligent systemgenerated number).

    Matchcode (F4)search functions can

    be used to find anappropriate RFQ inthe system.

    (Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)

    Press the Enter key or click on the green Enter icon.

    On the Display Quotation: Item Overview screen the following data will be returned indisplay-only format:

  • 8/11/2019 MM Purchasing User Manual

    79/295

    MM COURSE: PURCHASING

    Page | 79

    Field Name DescriptionItem Number Item within RFQMaterial Material master numberShort Text Description of the material or service to be procuredRFQ quantity The quantity of material requiredOuN Order UnitDelivery Date Date that the material will be duePrice The price that the vendor has quoted for this item

    Material Group Material group that the item most closely belongs toPlant Plant numberStorage Location Storage location numberD Deletion indicatorR Rejection indicator specifying that the vendor is to receive a rejection letter in

    respect of his quotation.Texts Text associated with a line item. An icon will appear in the text field if text has

    been entered. Simply click on the icon to view the associated text

  • 8/11/2019 MM Purchasing User Manual

    80/295

    MM COURSE: PURCHASING

    Page | 80

    More detailed information can be viewed by clicking on any one of the following toolbaricons.

    Button Name Information ReturnedHeader details (F6) Administrative field values and Reference data.Vendor address (F7) Vendor name, address, search terms, communication data, etc.Partners (Ctrl-Shift-F5) Partner Schema (if applicable)Messages (Shift-F1) Printing informationItem details (F2) Line item specific data (select line on RFQ and click on icon)

    Example: In the event that the header data needs to be displayed, use the menu path Header Details, or click on theDisplay Header icon. On the Display Quotation: Header Data screen the following data will be returned in display only forma t:

  • 8/11/2019 MM Purchasing User Manual

    81/295

    MM COURSE: PURCHASING

    Page | 81

    Field Name DescriptionRFQ RFQ numberRFQ Type Type of RFQVendor Vendor numberCompany Code Company codePurchasing Group Purchasing group codePurchasing Organization Purchasing organization numberRFQ date Date of RFQ creation.Validity start Start of the period in which the RFQ may be submittedValidity end End of the period in which the RFQ may be submittedPayment terms Terms stipulated by vendor

    Collective number Number used to collectively group RFQs Quot. dead. Date by which the vendor is to submit the quotationApplic. by Date by which the bidder is to express an interest in submitting a bid.Bindg. per. Date for which the quotation is valid and bindingTarget val Target value of the contract.Quotation date Date quote submitted by vendor

    To r etur n , cli ck on the green Back button , the yel low Exit button or press the < Shift + F3 >keys.

  • 8/11/2019 MM Purchasing User Manual

    82/295

    MM COURSE: PURCHASING

    Page | 82

    4. MM-ME49-RFQ Comparison

    Overview

    The need arises to make a price based comparison of the different quotations sent by vendors to select the mostsuitable vendor.

    BUSINESS PROCESS PROCEDURE OVERVIEWThis BPP will discuss the procedure to compare different quotations to select the most suitable vendor forthe material.

    Input Required Fields Field Values/Comments Purchasing Organization Enter the number of the purchasing organization under which the

    procurement will be done.Collective RFQ number Enter the Collective RFQ number for the quotations to be

    compared.

    Output - Results A comparative analysis of the different quotations.

    Procedural Steps

    Access transaction by:

    Via Menu

    Via Transaction Code

    Logistics>Materialmanagement>Purchasing>RFQ/Quotation>Quotation>ME49Price Comparison

    ME49

  • 8/11/2019 MM Purchasing User Manual

    83/295

    MM COURSE: PURCHASING

    Page | 83

    On screen Price Comparison List,enter information in the fields as specified in the below table:

    Field Name Description R/O/C User Action and Values CommentsPurchasingOrganizationCollectiveRFQnumber

    MeanValueQuotation

    MinimumValueQuotation

    Includediscounts

    Purchasing Organizationnumber

    Collective RFQ number forthe quotations to becompared

    Select this indicator if the

    basis for comparison is to

    be the average price from

    all quotations.

    Select this indicator if the

    R

    R

    O

    Enter Purchasing Organizationnumber

    Enter the collective RFQnumber

    Click on

    Match code (F4)

    Enter the PurchasingOrganization and the

  • 8/11/2019 MM Purchasing User Manual

    84/295

    MM COURSE: PURCHASING

    Page | 84

    Includedeliverycosts

    Determineeffective

    price

    basis for comparison is to

    be the lowest price from allquotations.

    Specifies whether the

    percentage discount

    granted on the purchase

    price in accordance with

    the terms of payment is to

    be taken into account in

    determining the price.

    Select the field if the

    delivery osts are to be

    taken into account in

    calculating the price.

    Select the field if the

    effective price is to be

    computed.

    O

    O

    O

    O

    Tick the check box.

    Tick the check box.

    Tick the check box.

    Tick the check box.

    (Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)

    Comparati ve analysis of the dif ferent quotations displayin g the ranki ng of the diff erent quotations.

  • 8/11/2019 MM Purchasing User Manual

    85/295

    MM COURSE: PURCHASING

    Page | 85

    Now the user can select the most suitable quotation and r eject the others (in th e above case rank2 and r ank3).

    Double cli ck on the pri ce of the quotati on to be rejected and tick the check box.

    Click on SAVE button .

    Repeat the same process for other quotations /items to be rejected.

    Double click on therice to be re ected.

    Check the REJECTION

    Click on the

    SAVE button

  • 8/11/2019 MM Purchasing User Manual

    86/295

    MM COURSE: PURCHASING

    Page | 86

    5. MM-ZMMF_PC-Print Price Comparison Report

    Overview

    Once we have maintained the quotation received from vendor in the system then we will compare them

    Prerequisite:

    1. Quotations to be compared should be maintained in the system

    Business Process:

    1. Print or Price Comparison ReportSr. No. Activity T Code Remarks1 Price Comparison Report ZMMF_PC

    Procedural Steps:

    In the Screen Driver Programme for Price Comparison Smart form(MM014) enter the following Data:

    Field Name Description R/O/C User Action and Values Comments

    PurchasingOrganization Enter Purchasing Organization R Enter Purchasing Organization

    Quotation No.

    Enter Quotation Number O Enter Quotation Number

    CollectiveRFQ

    Enter Collective RFQ number R Enter Collective RFQ number

    Vendor Enter Vendor Code O Enter Vendor CodeMaterial Enter Material Number O Enter Material Number

  • 8/11/2019 MM Purchasing User Manual

    87/295

    MM COURSE: PURCHASING

    Page | 87

    After entering the Selection Parameter, press Execute button

    Enter Printer

    Click here for Print Preview

    lick here for Print

  • 8/11/2019 MM Purchasing User Manual

    88/295

    MM COURSE: PURCHASING

    Page | 88

  • 8/11/2019 MM Purchasing User Manual

    89/295

    MM COURSE: PURCHASING

    Page | 89

    6. MM-ME9A-Message Output RFQ

    Overview

    A Request for Quotation needs to be printed

    Business Process Procedure Overview This procedure details how to print a Request for Quotation created in R/3

    Input Required Fields Field Value/Comments Message Data Details the type of message to print.

    Output - Results Comments A successfully printed Request forQuotation

    Tips and Tricks

    The more search parameters that are entered the more efficient the search and the less unnecessary information that isdisplayed.

  • 8/11/2019 MM Purchasing User Manual

    90/295

    MM COURSE: PURCHASING

    Page | 90

    Procedural Steps

    Access transaction by:Via Menu Logistics>Materials Management>Purchasing

    >RFQ/Quotation>Request forQuotation>Messages>Print/Transmit

    Via Transaction Code ME9A

    On screen Message Output, enter information in the fields as specified in the tablebelow:

  • 8/11/2019 MM Purchasing User Manual

    91/295

    MM COURSE: PURCHASING

    Page | 91

    Field Name Description R/O/C User Action and Values Comment

    sPurch.Doc. DataDocument

    NumberPO Number O Choose from drop down menu

    Vendor Vendor # O Choose from drop down menuPurchasingOrganization

    Purchasing Organization # O Please refer the attached annexure

    PurchasingGroup

    Purchasing Group # O Please refer the attached annexure

    DocumentType

    Identifier allowingdifferentiation between thevarious kinds of purchasingdocument in the SAP system

    O Please refer the attached annexure

    DocumentDate

    Date on which the purchasingdocument was created.

    O Enter Document date or choosefrom drop down menu

    MessageDataApplication Subdivides the usage of a

    condition for the use indifferent application areas

    R EA defaults for RFQ

    Messagetype

    Specifies the kind of output O Choose from drop down menu

    Processingstatus

    Indicates the status-1 indicates the process wassuccessful.2 indicates an error0 indicates the process hasnot yet started

    C Default is 0

    Creationdate

    Date the message is create O Enter date or choose the dropdown menu

    Timecreated

    Displays the time the messagewas created

    C Defaults to time started

    (Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)

    Click on the Execute button.

  • 8/11/2019 MM Purchasing User Manual

    92/295

    MM COURSE: PURCHASING

    Page | 92

    On screen Message Output select the appropriate Request for Quotation and perform

    the following:

    Select the check box and

    Click on and/ or

  • 8/11/2019 MM Purchasing User Manual

    93/295

    MM COURSE: PURCHASING

    Page | 93

    3. Contract/APO

    1. MM-ME31K-Create Contract with reference to PR

    Overview

    Business needs should be defined through a requisition. If the requisition needs to be converted into a contract,then it can either be created w.r.t the requisition or a quotation maintained for a particular vendor.

    Here we will find how to create contract with reference to PR

    Business Process Description Overview

    A contract establishes a long-term agreement with a vendor to supply a material or service. Contractsmay either be value contracts or quantity contracts. Value contracts have a ceiling that is a monetaryamount that should not be exceeded. A quantity contact specifies a ceiling of goods or services that the

    vendor will provide to us.

    This procedure outlines the steps involved in creating a standard quantity or value contract in R/3 forstock material. Contracts do not specify delivery dates; this is determined when release orders areissued against the contract.

    Input - Required Fields Field Value / Comments

    Purchase requisition Select from drop down list

  • 8/11/2019 MM Purchasing User Manual

    94/295

  • 8/11/2019 MM Purchasing User Manual

    95/295

    MM COURSE: PURCHASING

    Page | 95

    Procedural Steps

    Access Create Contract by;

    Via Menu (a) Logistics>Materials Management>Purchasing>Outlineagreement>Contract >Create

    Via Transaction Code ME31K

    In the Create Contract: Initial Screen, Select the Reference to the PReq

    Click on Reference to PReq

  • 8/11/2019 MM Purchasing User Manual

    96/295

    MM COURSE: PURCHASING

    Page | 96

    Enter the Proper PReq number .

    Field Name Description R/O/C User Action and Values CommentsVendor Vendor for which the contract

    is forC Vendor number known or via

    searchIf notmentioned inPreq

    Agreementtype

    Specify what kind of outlineagreement

    R Please refer the attachedannexure ZAED, ZANB,ZAPO, ZARC, ZASR.

    Picked fromPreq.

    AgreementDate

    Date of the contract R Defaults todays date into thisfield

    Agreement Agreement number C Leave blank, if the system isconfigured to assign numbersinternally or enter desirednumber

    This numberwill bedeterminedinternally

    Purch. Organization for which the con R Please refer the attached annexur Picked from

    Enter the Proper PReq

  • 8/11/2019 MM Purchasing User Manual

    97/295

    MM COURSE: PURCHASING

    Page | 97

    Organization

    is valid PReq

    Press

    Enter the vendor

  • 8/11/2019 MM Purchasing User Manual

    98/295

    MM COURSE: PURCHASING

    Page | 98

    On the Create Contract: Header Data screen, enter information as specified in the fields

    in the table below:

    Field Name Description R/O/C User Action and Values CommentsAgreementdate

    Date the agreement wascreated

    R Supplied from initial screen Grayed out

    Validitystart

    Beginning date of contract period.

    R Defaults todays date into thefield. Change if necessary

    Validityend

    Date that the contract expires. R Enter the date until the contractwill be valid

    Paymentterms

    Terms stipulated by vendor O Defaults from vendor master.Change if necessary

    Target val Target value of the contract. R Required for value contractsExch. rate Exchange rate of the currency O Change if necessary

    Enter the validity end date

    Enter target value

    Enter BSNL APO

  • 8/11/2019 MM Purchasing User Manual

    99/295

    MM COURSE: PURCHASING

    Page | 99

    Ex. Rate fx. Fixing of exchange rate.Indicates the purchase order

    currency and the exchangerate cannot be changed duringinvoice verification.

    O

    Incoterms Freight terms stipulated byvendor

    O Defaults from vendor master.Change if necessary

    BSNL APOnumber

    BSNL Number R Required for value

    Press

    On screen Create Contract: Overview: Reference Document Items, enter information in

    the fields as specified in the table below:

    1. Enter the storage location3. Click on Adopt2. Select the line item

  • 8/11/2019 MM Purchasing User Manual

    100/295

    MM COURSE: PURCHASING

    Page | 100

    Field Name Description R/O/C User Action and Values Comments

    Sloc Storage Location wherematerial will

    be delivered and stored ifordered

    O Enter or select StorageLocation fromtable

    Strictlyoptional.StorageLocation may

    be enteredlater at thetime of P.O.creation orGoodsReceipt.

    Select line items of reference document and click on the button to copy details to Contract. System will

    take you to the next screen Create Contract: Item 000010

  • 8/11/2019 MM Purchasing User Manual

    101/295

    MM COURSE: PURCHASING

    Page | 101

    On the Create Contract: Item 0001 0 screen, enter information as specified in the fields

    in the table below:

    1.Enter the Net orderprice

    2.Press OK

  • 8/11/2019 MM Purchasing User Manual

    102/295

    MM COURSE: PURCHASING

    Page | 102

    Field Name Description R/O/C User Action and Values Comments

    A Account AssignmentCategory. Key to determinewho will be paying for theconsumable material orservice.

    O Will default from originalscreen if information has beenentered.

    Short Text Description of the material orservice to be procured

    C Defaults from material master.Enter a text for material notmaintained in the materialmaster (ex. Non stockmaterials)

    Targ. qty. The quantity for which thecontract is valid

    O forWK R forMK

    Enter the number of pieces oramount of service for thecontract.

    Oun Order Unit C Defaults from material master. Net OrderPrice

    Basic price to be entered R Required when Preq is used asreference document

    Tax code Tax Code O Will be defaulted fromreference document, ifavailable

    Can be enteredfroED,CST,LSTcapture

    Tracking No.

    Will be defaulted fromreference document

    O Can be changed if required

    Press

  • 8/11/2019 MM Purchasing User Manual

    103/295

    MM COURSE: PURCHASING

    Page | 103

    Upon entering all of this information, the user have the option to use the radio buttons /

    icons on the menu bar to update or view more information that pertains to the contract.

    1. Enter the continue

    2. Click on vendor address

  • 8/11/2019 MM Purchasing User Manual

    104/295

  • 8/11/2019 MM Purchasing User Manual

    105/295

    MM COURSE: PURCHASING

    Page | 105

    Press icon , contract will be created and contract number will be displayed

    APO number will beenerated

  • 8/11/2019 MM Purchasing User Manual

    106/295

    MM COURSE: PURCHASING

    Page | 106

    2. MM-ME31K-Create Contract with reference to RFQ

    Overview

    Business needs should be defined through a requisition. If the requisition needs to be converted into a contract,then it can either be created w.r.t the requisition or a quotation maintained for a particular vendor.

    Here we will find how to create contract with reference to RFQ

    Business Process Description Overview

    A contract establishes a long-term agreement with a vendor to supply a material or service. Contractsmay either be value contracts or quantity contracts. Value contracts have a ceiling that is a monetaryamount that should not be exceeded. A quantity contact specifies a ceiling of goods or services that thevendor will provide to us.

    This procedure outlines the steps involved in creating a standard quantity or value contract in R/3 forstock material. Contracts do not specify delivery dates; this is determined when release orders areissued against the contract.

    Input - Required Fields Field Value / Comments

    Request for quotation Select from drop down list

    Output - Results Comments Contract document Document Created.

  • 8/11/2019 MM Purchasing User Manual

    107/295

    MM COURSE: PURCHASING

    Page | 107

    Tips and Tricks

    By providing as much input information as possible when creating contracts, the user can save time by minimizingthe inputs at the time of the order release.

    By selecting the RFQ all data will gate copied over to the screen.

  • 8/11/2019 MM Purchasing User Manual

    108/295

    MM COURSE: PURCHASING

    Page | 108

    Procedural Steps

    Access Create Contract by;

    Via Menu (a) Logistics>Materials Management>Purchasing>Outlineagreement>Contract >Create

    Via Transaction Code ME31K

    In the Create Contract: Initial Screen, Select the Reference to the RFQ

    Click on Reference to RFQ

  • 8/11/2019 MM Purchasing User Manual

    109/295

    MM COURSE: PURCHASING

    Page | 109

    Enter the Proper RFQ number .

    Field Name Description R/O/C User Action and Values CommentsVendor Vendor for which the contract

    is forC Vendor number known or via

    searchIf notmentioned inRFQ

    Agreementtype

    Specify what kind of outlineagreement

    R Please refer the attachedannexure ZAED, ZANB,ZAPO, ZARC, ZASR.

    Picked fromRFQ

    AgreementDate

    Date of the contract R Defaults todays date into thisfield

    Agreement Agreement number C Leave blank, if the system isconfigured to assign numbersinternally or enter desirednumber

    This numberwill bedeterminedinternally

    Purch. Organization for which the con R Please refer the attached annexur Picked from

    Enter the Proper RFQ

  • 8/11/2019 MM Purchasing User Manual

    110/295

  • 8/11/2019 MM Purchasing User Manual

    111/295

    MM COURSE: PURCHASING

    Page | 111

    Field Name Description R/O/C User Action and Values Comments

    Agreementdate

    Date the agreement wascreated

    R Supplied from initial screen Grayed out

    Validitystart

    Beginning date of contract period.

    R Defaults todays date into thefield. Change if necessary

    Validityend

    Date that the contract expires. R Enter the date until the contractwill be valid

    Paymentterms

    Terms stipulated by vendor O Defaults from vendor master.Change if necessary

    Target val Target value of the contract. R Required for value contractsExch. rate Exchange rate of the currency O Change if necessaryEx. Rate fx. Fixing of exchange rate.

    Indicates the purchase ordercurrency and the exchangerate cannot be changed duringinvoice verification.

    O

    Incoterms Freight terms stipulated byvendor

    O Defaults from vendor master.Change if necessary

    BSNL APOnumber

    BSNL Number R Required for value

    Press

  • 8/11/2019 MM Purchasing User Manual

    112/295

    MM COURSE: PURCHASING

    Page | 112

    On screen Create Contract: Overview: Reference Document Items, enter information in

    the fields as specified in the table below:

    Field Name Description R/O/C User Action and Values CommentsSloc Storage Location where

    material will be delivered and stored ifordered

    O Enter or select StorageLocation fromtable

    Strictlyoptional.StorageLocation may

    be enteredlater at thetime of P.O.creation orGoodsReceipt.

    1. Enter the storage location3. Click on Adopt2. Select the line item

  • 8/11/2019 MM Purchasing User Manual

    113/295

  • 8/11/2019 MM Purchasing User Manual

    114/295

    MM COURSE: PURCHASING

    Page | 114

    Field Name Description R/O/C User Action and Values Comments

    A Account AssignmentCategory. Key to determinewho will be paying for theconsumable material orservice.

    O Will default from originalscreen if information has beenentered.

    Short Text Description of the material orservice to be procured

    C Defaults from material master.Enter a text for material notmaintained in the materialmaster (ex. Non stockmaterials)

    Targ. qty. The quantity for which thecontract is valid

    O forWK R forMK

    Enter the number of pieces oramount of service for thecontract.

    Oun Order Unit C Defaults from material master. Net OrderPrice

    Basic price to be entered R Required when Preq is used asreference document

    Tax code Tax Code O Will be defaulted fromreference document, ifavailable

    Can be enteredfroED,CST,LSTcapture

    Tracking No.

    Will be defaulted fromreference document

    O Can be changed if req