MMUP Sample Questions - PMP + Non EE

Embed Size (px)

DESCRIPTION

MMUP Sample Questions - PMP + Non EE

Citation preview

MMUP Sample Questions

1. If you were awarded a project, you will start work:a. One week before the approval of the authoritiesb. After the approval of the authoritiesc. One day before the approval of the authorities2. Project Scope Management:a. Define scope and control scopeb. Executing scope and verify scopec. Closing process and Create work breakdown structured. All of the abovee. Only A & B3. Scope Management starts with is:a. To identify the client requirementsb. Meet the teamc. Review strategic plan4. Final as built drawings for what purposea. To keep record for later maintenanceb. To give more work to architectc. To be used for further renovation5. Control department work startsa. From the beginning of the projectb. During constructionc. After construction6. Project management is ideally suited excepta. Accountabilityb. Flexibilityc. Innovationd. Speede. Repeatability7. A critical path is the ----------------------in the project management:a. longest b. shortest c. none8. The forward pass review of the project management will indicate the following:a. The earliest start of the taskb. The earliest finish of the taskc. Critical path (longest path)d. Only A & Be. All of the above9. The back pass review of the project will indicate the following:a. The latest start of the task.b. The earliest finish of the task.c. The critical path.d. Only A & Ce. All of the above. 10. Intersecting point for WBS and OBSa. Cost accountb. Intersect matrixc. Project matrixd. None of above11. For operation and designed auto mobile factorya. Mechanical Engineerb. Civil Engineerc. Chemical Engineerd. Petroleum Engineer12. Which of the following discipline is most suitable for doing a natural gas pipeline work?a. Mechanical Engg b. Petroleum Engg c. Chemical Engg d. Civil Engg 13. Gypsum board at residence and industrial building used excepta. Low cost b. Ease of installationc. Recyclability14. Stress defineda. Strain time forceb. Mass divide volumec. Pressure time length d. None of above15. What is the last of estimation for projecta. Estimationb. Assembly schedule16. Which one of the following is suitable in engineering manner? Decision shall be based on reason than situation .a. Quantity Thinking. b. Logical Thinking.c. Interpersonal Skills.d. Honesty. 17. What is QSAS?a. Qatar Sustainability Assessment System18. An activity in a project network can be represented by which of the following?a. Arrow b. Line c. Noded. All of the above 19. Before starting work at site, the major factor has to be checked is?a. Access to site (EFE) b. Storage of Water, tools & equipments c. Safety d. Approval from MMUP / Civil / Defence etc. e. All of the above20. Software programming flowa. Plan, Do, Check, Actb. Plan, Do, Act, Checkc. Plan, Act, Do, Check21. First step of Scope planning starts witha. Budgetingb. Current earning estimationc. Objectives and requirements to satisfy customer 22. In network which point getting more inward flowa. Floatb. Critical pathc. Slackd. Merging point23. What is the least level of WBSa. Deliverableb. Costc. Work packaged. Lowest sub deliverable24. The best place to build an exhibition and convention center (near the Airport? Or in satellite place far from Urban? Etc)25. One situation for cancel project.26. What is the most sensitive period in the project?