Republic of the Philippines METROPOLITAN NAGA WATER DISTRICT
40 J. Miranda Avenue, Naga City
QUALITY MANAGEMENT
SYSTEM
OF ONE CORE PROCESS
ISO 9001:2015
2016 ·-
WHEREAS, upon thorough deliberation the Honorable Members of the Board of Directors find the QMS Manual aforesaid to be complete in form and in substance;
MANUAL
TABLE OF CONTENTS
I. Introduction …………………………………………………………….…… 1
II. Mandate of MNWD ………………………………………………….……… 3
III. Vision ………………………………………………………………….……… 4
IV. Mission ………………………………………………………………….……… 4
V. Values ………………………………………………………………….……… 4
VI. Quality Policy ………………………………………………………….……… 5
VII. MNWD Organizational Structure ………………………………….……… 6
1. Office of the General Manager ………………………………….……… 6
2. Commercial Services Department ………………………………….……… 6
2.1 Customer Services Division ………………………….…….....6
2.2 Customer Accounts Division ………………………….……… 6
3. Engineering and Environmental Department ………………….……… 7
3.1 Environment and Water Resources Division ………….……… 7
3.2 Planning, Design and Construction Division ………….……… 7
4. Production Department ………………………………………….……… 7
4.1 Water Production & Electro-Mechanical Division ….……… 7
4.2 Water Quality Division ………………………………….……… 7
5. Pipelines and Appurtenances Maintenance Department ………….……… 7
5.1 Water Distribution and Restoration Division……………….……... 7
5.2 Pipeline Leakage Control and Non-Revenue
Water Management Division …………………………….…… 7
6. Administrative Services Department …………………………….…… 8
6.1 Administrative, General Services, Materials and …………….…… 8
Supply Management Division…………………………….…… 8
6.2 Human Resource Division…………………………………….…… 8
7. Finance Department …………………………………………….…… 8
7.1 Accounting Division …………………………………….…… 8
7.2 Treasury and Budget Division ……………………………….… 8
VIII. General Business Process Map……………………………………………....…….10
IX. QMS Organizational Structure ………………………………………………..…..14
X. Scope of QMS ………………………………………………………………..…..18
XI. Business Process Map of Scope …………………………………….…..….19
XII. Internal / External Issues ……………………………………………..……..20
XIII. Stakeholders / Customers and their Requirements ……………………………26
XIV. Description of Different Divisions involved in QMS Scope ....……...………….33
1. Office of the General Manager ……………………………………………33
2. Administrative Services Department
2.1 Administrative / General Services, Materials and Supply
Management Division……………………………………………………34
2.2 Human Resource Division ……………………………………………34
3. Production Department
3.1Water Quality Division ………………………………………...........…….36
4. Engineering and Environmental Department
4.1 Environment and Water Resources Division ……………………………36
4.2 Planning, Design and Construction Division ……………………………37
5. Finance Department ……………………………………………………………37
5.1 Accounting Division ……………………………………………………38
5.2 Treasury and Budget Division ………………………………….39
XV. Management Process Description ……………………………………………40
XVI. Core Process Description ……………………………………………………42
XVII. Support Process Description ……………………………………………………58
XVIII. Quality Objectives of Different Divisions ……………………………………84
XIX. Detailed Processes and Procedures ……………………………………………99
XX. Control of Documented Information …………………………………………..106
XXI. ANNEXES
1. Office Performance Commitment and Review Form (OPCR)
2. Division Performance Commitment and Review Form (DPCR)
MNWD Quality Management System Manual 2016
I. INTRODUCTION
The need for government agencies to improve quality in their operations and
service delivery has never been more urgent in the light of the Duterte Administration’s
thrust to ensure that “real change” is the actual direction of the government. During the
inaugural speech of the President, government agencies were directed to improve the
delivery of services through process streamlining and rationalizing documentary
requirements for ease of transaction of the citizens. There was also an urgent call to
improve the citizens’ faith and trust in the government’s capacity to make the Filipino’s
life better, safer and healthier.
This clear and compelling direction of the Administration further strengthens the
need for government agencies to comply with Executive Order (EO) No. 605 (Document
No.1), Institutionalizing the Structure, Mechanisms, and Standards to Implement the
Government Quality Management Program, Amending for the Purpose Administrative
Order No. 161, s. 2006, which was issued to effect improvement in public sector
performance by ensuring the consistency of products and services through quality
processes. Effective management and good governance are essential elements of quality
that can be achieved through the implementation of an effective Quality Management
System (QMS). Aligning an organization’s planning, service, and support operations to
ISO 9001 International Standards is one reliable approach in establishing a QMS. This
methodology provides a clear perspective of the quality system requirements and the
areas of control to assure the consistency in the quality of services and continuous
process improvement that will generate approaches to improve customer/citizen
satisfaction.
The Metropolitan Naga Water District (MNWD), in compliance with E.O No.
605, shall strive to deliver its vision, mission and values to be a dynamic water district
contributing to the improvement of the living standards of the people and providing fast
and technologically suitable water services through a well-organized team advocating
nature protection and water resources conservation imbued with integrity and
professionalism. As such, the MNWD will undertake the establishment of a QMS
certifiable to the ISO 9001:2015 standard.
1
MNWD Quality Management System Manual 2016
The ISO 9001:2015 shall provide a globally recognized standard that would
transform MNWD’s current management system to a certifiable QMS.
The MNWD-QMS is in compliance with the Inter-Agency Task Force on the
Harmonization of National Government Performance Monitoring, Information and
Reporting Systems Memorandum Circular No. 2016-1 (Document No.2) setting the
Performance Targets for CY 2016. The MNWD is classified as a Category A Water
District under the Revised Local Water District Manual on Categorization and Re-
categorization or LWD-MACRO (Document No.3), hence, it is required to establish an
ISO aligned documentation of its QMS for one core process as evidenced by this QMS
Manual.
The MNWD-QMS will define the interrelated/interacting elements that allow the
organization to establish its policy and objectives related to quality and to achieve those
objectives.
The MNWD-QMS shall ensure operational and cost reduction benefits through
the delivery of mandated functions with the establishment of a system for control of non-
conforming services and performance of an internal quality audit. Documents and records
management is better controlled with the strict implementation of established procedures.
Enhanced knowledge and understanding of basic processes and procedures of the
different operating and support units of the MNWD will result to improved staff
discipline and capability. The commitment of management to provide necessary
resources such as competent human resources, good working environment and well-
maintained infrastructure will result to a more transparent and improved management
system, thereby, maintaining the trust and confidence of customers and the general
public. Eventually, this proposed undertaking of Management will translate to cost
reduction and/or savings as a result of efficient and contented workforce.
2
MNWD Quality Management System Manual 2016
II. MANDATE OF MNWD
Pursuant to Section 5 and 6 of Presidential Decree (PD) No. 198, otherwise
known and referred to as the "Provincial Water Utilities Act of 1973", Local Water
Districts may be formed for the purpose of (a) acquiring, installing, improving,
maintaining and operating water supply and distribution systems for domestic, industrial,
municipal and agricultural uses for residents and lands within the boundaries of such
districts, (b) providing, maintaining and operating wastewater collection, treatment and
disposal facilities, and (c) conducting such other functions and operations incidental to
water resource development, utilization and disposal within such districts, as are
necessary or incidental to said purpose.
“An organization full of dynamism working for the improvement of the living
standards of the people through fast and technologically suitable water services
characterized by the basic values of team work, integrity and professionalism advocating
nature protection and water resources conservation” shall serve as the MNWD’s guiding
principle.
In pursuit of the above stated mandate, the MNWD Vision, Mission, Values and
Quality Policy are hereunder enumerated.
3
MNWD Quality Management System Manual 2016
VII. MNWD ORGANIZATIONAL STRUCTURE
The MNWD Organizational Structure (Figure 1) is premised on the basic
definition of management as the art and science of getting things done through the efforts
of people. It is the continuous interplay of the elements, functions, principles and
practices of management. The notion that: “Human Resource is the most important
element of management”, was given due consideration in the structuring of the MNWD
as an organization.
Policy formulation and overall direction is vested on the Board of Directors while
overall management control and supervision is exercised by the General Manager, duly
assisted by the following line departments and functional divisions, to wit:
1. OFFICE OF THE GENERAL MANAGER
1.1. Management Information Systems
1.1.1. Computer maintenance and User support
1.2. Management Support Services
1.2.1. Public Relations and Information
1.2.2. Documentation and Recording
2. COMMERCIAL SERVICES DEPARTMENT
2.1. CUSTOMER SERVICES DIVISION
Management and Supervision Billing Services, Customer Accounts
2.1.1. Billing Section
– Individual service connection data
2.1.2. Customer Services Section
– Customer Frontline Services
2.2 CUSTOMER ACCOUNTS DIVISION
2.2.1 Meter Reading Section
– Meter reading and bill distribution
2.2.2 Investigation Section
– Service connections field verification
6
MNWD Quality Management System Manual 2016
2.2.3 Collection/Disconnection Section
3. ENGINEERING AND ENVIRONMENTAL DEPARTMENT
3.1 ENVIRONMENT AND WATER RESOURCES DIVISION
3.1.1 Watershed Section
3.1.1.1 Rehabilitation, protection and maintenance of Anayan-
Rumangrap, Kalinisan-Nabuntulan and Naga River Watershed
3.1.2 Wastewater Section
3.1.2.1 Septage collection, treatment and disposal
3.2 PLANNING, DESIGN AND CONSTRUCTION DIVISION
3.2.1 Planning and Design Section
3.2.1.1 Cost Estimates and Drafting
3.2.2 Construction Section
3.2.2.1 Project Monitoring and Supervision
4. PRODUCTION DEPARTMENT
4.1 WATER PRODUCTION & ELECTRO-MECHANICAL DIVISION
4.1.1 Water Production Section
4.1.2 Electro-Mechanical Section
4.2 WATER QUALITY DIVISION
4.2.1 Quality Control/ Assurance Section
4.2.2 Laboratory Testing & Analysis Section
5. PIPELINES AND APPURTENANCES MAINTENANCE DEPARTMENT
5.1WATER DISTRIBUTION AND RESTORATION DIVISION
5.1.1 Water Distribution Section
5.1.2 Restoration Section
5.2 PIPELINE LEACKAGE CONTROL AND NON-REVENUE WATER
MANAGEMENT DIVISION
5.2.1 Pipelines and Leakage Control Section
5.2.2 Non-Revenue Water Management Section
7
MNWD Quality Management System Manual 2016
6. ADMINISTRATIVE SERVICES DEPARTMENT
6.1 ADMINISTRATIVE, GENERAL SERVICES, MATERIALS AND
SUPPLY MANAGEMENT DIVISION
6.1.1 Admin. / General Service Section
6.1.2 Materials and Supply Management Section
6.2 HUMAN RESOURSE DIVISION
6.2.1 Manpower, Planning, Recruitment, Training, &Development Section
6.2.2 Personnel Welfare Section
7. FINANCE DEPARTMENT
7.1 ACCOUNTING DIVISON
7.1.1General Accounting Section
7.1.1.1 Bookkeeping, processing and record keeping
7.1.2 Payroll Subsidiary Section
7.1.2.1 Preparation of payroll of salaries and other benefits
7.2 TREASURY AND BUDGET DIVISION
7.2.1 Treasury Section
7.2.1.1 Collection and Disbursement transactions of the District
8
MNWD Quality Management System Manual 2016
VIII. GENERAL BUSINESS PROCESS MAP
In adherence to the principles of Results – Based and Strategic Performance –
Based operation of core functions of the Metropolitan Naga Water District (MNWD), the
Quality Management System is prepared to serve as a blueprint of work distribution
based on the Agency – Organizational Performance Indicator Framework (OPIF Figure
2) to the Working Units down to Individual Performers within the MNWD hierarchy.
Likewise, major MNWD plans, programs and projects are in consonance with the
five (5) key result areas, namely: (1) Poverty Reduction and Empowerment of the poor
& vulnerable (2) Rapid Inclusive and Sustained Economic Growth (3) integrity of the
Environment and Climate Change, Adaptation and mitigation (4) Transparency,
Accountability and Participatory Government and (5) Just and Lasting peace and the Rule
of Law. Under Executive Order (EO) No. 43, Series of 2011, dated May13, 2011 and the
Logical Framework (Figure 3) as contained in the MNWD Strategic Performance
Management System (SPMS) Manual (Document No.4).
The General Business Process Map focusing on the three (3) major core processes
of the MNWD and the Support Services including management processes is hereto
attached as Figure 4.
10
MNWD Quality Management System Manual 2016
IX. QMS ORGANIZATIONAL STRUCTURE
The QMS Organization (Figure 5) per MNWD Memorandum No. OGM 2016-12-
040 (Document No.5) dated December 2016 is a manifestation of a dynamic organization
through the combination of the conventional, matrix type/project management style
(“Ringiseido”) organization. The Core team is so organized to focus on the organization’s
objectives, rather than the hierarchy of authority. This type of a combined organization is
termed as "Halo-Halo" or Filipino style of management.
The vision, mission and quality policy will be the guiding principles for the
attainment of MNWD’s quality objectives.
The roles and responsibilities of the key players for the establishment,
implementation and monitoring of the MNWD-QMS are as follows:
Roles and Responsibilities of Top Management
• Leads the establishment, implementation, and monitoring of the QMS
• Ensures effectiveness of the QMS through risk-based thinking
• Establishes and communicates the quality policy;
• Ensures that the quality objectives are established;
• Communicates the importance of meeting customer requirements;
•Determines and provides necessary resources and ensures that they are adequately
available; and,
• Conducts Management Review meetings.
Roles and Responsibilities of QMS LEADER/HEAD
•Oversees the establishment, documentation, and effective implementation of the
QMS
• Promotes risk-based thinking in overseeing the effectiveness of the QMS
• Acts as liaison with external parties on matters related to the QMS
• Ensures that procedures for Internal Quality Audit (IQA), Management Review,
and Corrective Actions are established and implemented
14
MNWD Quality Management System Manual 2016
• Reports QMS performance to Top Management for review and continual
improvement
Roles and Responsibilities of the Quality Workplace Team
• Ensures that the environment for the operation of processes needed to achieve
conformity to service requirements is managed
• Ensures consistent implementation of 5S programs, as applicable
• Monitors and assesses workplace cleanliness, orderliness, and safety
Roles and Responsibilities of the Training & Advocacy Team
•Provides administrative support in terms of training and advocacy for the
successful implementation and sustenance of the QMS
• Plans and coordinates effective deployment and efficient use of resources in line
with training and advocacy activities
• Plans and coordinates echoing/cascading sessions on QMS-related training
Roles and Responsibilities of the Internal Quality Audit Team
• Determines conformance of the QMS to the requirements of ISO 9001:2015,
based on planned arrangements
• Determines successful implementation of the QMS
• Provides inputs during management review on the results of the IQA
• Monitors the implementation of corrective and preventive actions for any
nonconformities raised during the audits
Roles and Responsibilities of the ISO-QMS Secretariat/Documentation Team
•Provides administrative support for successful QMS implementation until
attainment of ISO 9001:2015 certification
•Facilitates the delivery of specific outputs in line with the QMS
• Plans and coordinates effective deployment and efficient use of human,
financial, and other physical resources for the QMS
15
MNWD Quality Management System Manual 2016
• Ensures that the requirements for maintaining and retaining documented
information are established and implemented
Roles and Responsibilities of the Employees
•Active involvement and participation in all ISO-QMS related activities
• Sincere commitment in working together with the ISO Core Team towards
continual improvement of the management systems.
16
X. SCOPE OF QMS
The scope of the MNWD quality management system is limited to the core
process on water resource development focusing on planning, design and construction
including watershed management and water quality analysis (Figure 6). The management
processes involved within the scope shall include policy implementation, supervision and
control, strategic planning and development and QMS monitoring and evaluation. Policy
implementation is based on board resolutions adopted, memoranda and office orders
issued by management. Supervision and control is defined as the authority and powers
vested in the General Manager by the Board of Directors. Strategic planning and
development shall be developed based on the needs and targets of the MNWD as
cascaded by the Local Water Utilities Administration (LWUA). Continual improvement
of the quality management system shall be monitored and evaluated for possible revision
and adoption.
Processes to support the water resources development, watershed management
and water quality core processes shall include: the Human Resource Division (HRD),
Information Technology (IT), Accounting, Treasury and Budget Division and
Administrative, General Services and Supply Management Division.
18
MNWD Quality Management System Manual 2016
MNWD Quality Management System Manual 2016
As deduced from the identification of stakeholders, customers and their
requirements together with internal and external issues categorized into political,
economic, social, technology, legal and environmental concerns relative to the scope of
the QMS, the SWOT Analysis Matrix is hereunder presented:
32
MNWD Quality Management System Manual 2016
XIV. DESCRIPTION OF DIFFERENT DIVISIONS INVOLVED IN QMS SCOPE
OFFICE OF THE GENERAL MANAGER
The General Manager is vested with full supervision and control of the line
Departments of the MNWD, namely: Engineering and Environment Department;
Pipelines and Appurtenances Maintenance Department; Production Department;
Administrative Services Department; Finance Department and Commercial Services
Department (Organizational Structure hereto attached as Figure 1).
The Office of the General Manager (OGM) is responsible for all areas and
oversees all of the District’s staff support functions and manages daily operations as well
as the implementation of formulated policies by the Board of Directors and Management.
It focuses on the entire District which has the full coordination over all line departments
and has to communicate with all operating units to make sure that the District performs
well. The OGM has three (3) primary sections: (1) Information & Communications
Technology Section, (2) Public Relations and External Affairs Section (PREAS) and (3)
Internal Audit Section.
The Information & Communications Technology Section develops software and
provides technical support in repairing computer software and hardware to ensure that the
District’s information, database and system are properly secured. It also addresses the
public’s / customer’s complaints and queries through the help of the Communication
Center that provides 24/7 service.
The second section of the Office of the General Manager is Public Relations and
External Affairs Section (PREAS) where the core function is information dissemination
to the general public via public service announcement through the different media outlets.
The Internal Audit helps the district accomplish its objectives by properly
evaluating and reviewing the District’s financial records, procurement process and other
33
MNWD Quality Management System Manual 2016
District’s operations. Its general function is to ensure and promote the effective
performance of accountability in conformance with the internal policies of the District
and other provisions issued by the government.
ADMINISTRATIVE/GENERAL SERVICES AND MATERIALS SUPPLY
MANAGEMENT DIVISION
The Administrative/General Services and Materials Supply Management Division
(A/GSMSMD) under the Administrative Services Department is mandated to provide
administrative support such as procurement services, materials management including
building, vehicles and equipment maintenance and repairs, security and other
administrative and logistical concerns necessary for the implementation of water
resources development, watershed management and water quality analysis.
The scope of procurement services includes canvass of goods and services on the
Competitive Public Bidding and preparation of purchase orders.
The materials and supply management is in-charge of receiving, issuing,
managing of goods and services including inventory and safekeeping. The Division shall
ensure that products and services acquired through external providers are within the
standards and specifications and adequate warranties on workmanship and that buffer
stocks are given due consideration.
HUMAN RESOURCE DIVISION
The four key functions of Human Resource Management are: Recruitment and
Selection; Learning and Development; Performance Management System; and Rewards
and Recognition necessary for the implementation of water resources development,
watershed management and water quality analysis.
34
MNWD Quality Management System Manual 2016
The Human Resource Division (HRD) under the Administrative Services
Department commits to create, encourage, and maintain an environment that supports,
develops and sustains the well-being of MNWD employees, clients and broader
community. Any organization cannot build a good team of working professionals
without good human resources in consonance with our value statement and quality
policy. The HRD is composed of two sections, namely; Manpower Planning,
Recruitment, Training and Development Section; and the Personnel Welfare Section.
The Manpower Planning, Recruitment, Training and Development Section is
responsible for the recruitment, selection and placement of personnel, as well as the
learning and development aspect of human resource. Among its basic functions are
publication of vacant positions; initial screening of applicants; issuance of appointment,
assumption of duties and position description form; deployment and orientation of office
policies, rules and regulations to all employees. This section also maintains the 201/120
Files of all regular and casual employees. Other responsibilities of this section also
include: submission of reports to other government agencies, like the Department of
Budget and Management and the Civil Service Commission.
Human resource processes which involve leave administration, monetization of
accrued leave credits; certification of services rendered for payroll preparation; and other
personnel welfare and benefits are the main functions of the Personnel Welfare Section.
This section is basically responsible for the monitoring of leave balances, punctuality and
attendance of employees. This section ensures that all employees submit their Statement
of Assets, Liabilities and Networth (SALN) to the Office of the Ombudsman and Civil
Service Commission.
Through the Infirmary and Breastfeeding Area employees and customers are
provided with immediate medical attention by qualified staff; likewise, a comfortable
space is provided to breastfeeding mothers.
35
MNWD Quality Management System Manual 2016
WATER QUALITY DIVISION
The Water Quality Division (WQD) is mainly tasked to ensure safe and potable
water for all. It is composed of two (2) sections namely, Water Quality and Assurance
Section and Laboratory Testing and Analysis Section.
The Water Quality and Assurance Section is tasked to monitor sampling points
for chlorine residual at strategic locations within the MNWD water distribution system
including the collecting of water samples for laboratory testing.
The Laboratory Testing and Analysis Section on the other hand, provides analysis
and interpretation of water samples gathered for potability assurance. The MNWD
Laboratory Testing and Analysis Section is accredited by the Department of Health
(DOH) to conduct Physical and Chemical Analysis. The section accepts water quality
testing for external client such as: water refilling stations, private wells and institutions,
other water districts, and government agencies and other entities requesting for the said
services.
ENVIRONMENT AND WATER RESOURCES DIVISION
The Environment and Water Resources Division (EWRD) under the Engineering
and Environment Department (EED) shall ensure the development and protection of the
well-field area of the water sources of the MNWD to guarantee the provision of
continual, safe, adequate and affordable potable water through the maintenance of
watersheds, environmental protection and wastewater management. One of the primary
task of the EWRD is the conceptualization of the Integrated Watershed Management Plan
(IWMP). The EWRD is composed of two sections: The Watershed Management Section
and the Wastewater Management Section.
36
MNWD Quality Management System Manual 2016
The Watershed Management Section is in-charge of the overall implementation of
programs and projects aligned with the IWMP. It is mandated to ensure the effective
implementation of the watershed rehabilitation, conservation, maintenance and
protection. It also focuses on the institutional development, particularly in the
organization of the Conservation Farming Communities (CFCs), including the relocated
park settlers, to improve their quality of life and lessen, if not totally eliminate their
dependence on watershed resources for their daily sustenance.
The EWRD shall ensure that continuous coordination and linkages with partner
agencies and other institutions are sustained and expanded for purposes of technical
support and livelihood opportunities for the CFCs.
On the other hand, the Wastewater Management Section is in-charge of septage
collection, treatment and disposal. The section is still in its organizational stage pending
completion of the Septage Treatment Facility.
PLANNING DESIGN AND CONSTRUCTION DIVISION
The Planning Design and Construction Division (PDCD) is responsible for the
conceptualization, preparation of documentary requirements, program of works, cost
estimates and other related activities including the implementation of various
infrastructure , transmission, distribution and lateral lines relative to water resources
development for MNWD.
Monitoring and evaluation of the status of project implementation being
undertaken by administration or their external constructors or service providers including
submission of regular reports for the Management and the Board of Directors are
likewise the regular output of the division. The division ensures that project
implementation is within the standards, specifications and post-project requirements such
as: water quality analysis, warranties and workmanship are accordingly complied with.
37
MNWD Quality Management System Manual 2016
FINANCE DEPARTMENT
The Finance Department (FD) is composed of two divisions, the Accounting
Division and the Treasury and Budget Division. Each division has two sections
performing different functions mandated to the department including functions necessary
for the implementation of water resources development, watershed management and
water quality analysis.
The first division is the Accounting Division. The two sections that comprise this
division are that Accounting Section and the Payroll and Subsidiary Section.
ACCOUNTING DIVISION
The Accounting Section provides the systematic recording of all financial
transactions of the district, in accordance with the authoritative pronouncements, such as
issuances of the COA, DBM and the Philippine Government Accounting System. It also
provides guidance to other units of the MNWD on the implementation of relevant
accounting policies and procedures.
It maintains adequate records of all financial transactions of the district. It records
all the financial transactions to the books of account, verifies the appropriateness of the
transaction and maintains subsidiary accounts for analysis and reconciliation. It accounts
for the acquisition, disposal and changes in the assets of the District. It is responsible for
the preparation and submission of periodic financial statements.
The Payroll and Subsidiary Section is responsible for the preparation of payroll
and other benefits due to the employees.
38
MNWD Quality Management System Manual 2016
The section is in charge of the preparation of monthly remittances of the
employees’ premiums and loan amortizations due to other National Government
Agencies such as the Government Service and Insurance System (GSIS), Home
Development Mutual Fund, the Philippine Health Insurance Corporation and the Bureau
of Internal Revenue (BIR).
The second division of the Finance Department is the Treasury and Budget
Division. The two sections that comprise the division are the Treasury Section and the
Budget Section.
TREASURY AND BUDGET DIVISION
The Treasury Section is responsible for the collections of cash and cash
equivalent from all sources and said collections shall be deposited intact daily to the
authorized government depository bank.
It maintains records for the daily collection and deposits as well as disbursement
transactions of the MNWD. It is responsible for the payment of the MNWD’s liabilities.
The Budget Section is responsible for the financial plan of the water district for
the given period of time embodying the statement of income and estimated expenditures
for the implementation of the agency program and activities in pursuit of its mandates,
goals and objectives.
It is in charge of the MNWD’s proper utilization of resources and close
monitoring by providing proper guidance as to how the MNWD could maximize its
resources and would not result to overspending.
Lastly, the section is also accountable for the proper classification and monitoring
of the charges or expenses and balances of the budget.
39
MNWD Quality Management System Manual 2016
XV. MANAGEMENT PROCESSES DESCRIPTION
As shown in Table 7, the Management Processes under the Leadership of the
General Manager involves:
1. Policy implementation of various policies, directives, office orders and other
regulations.
2. Supervision and control to ensure that all employees contribute to the effectiveness of
the QMS and achieve its intended objectives in conformance with the needs of the
MNWD.
3. Strategic planning and development to ensure that the MNWD promotes process
approach, applies risk-based thinking and ensure availability of resources focused in
enhancing customer satisfaction
.
4. Monitoring and Evaluation to ensure that all employees are well informed of the
importance of an effective QMS and avoid non-conformities, promotes improvement
thus timely self-monitoring and internal audit system in compliance with regulatory
and legal requirements with the end in view of customer satisfaction.
The General Manager, Division Managers, QMS Core Team,
Secretariat/Documentation Team together with the existing Performance Management
Team (PMT) and Water Safety Plan (WSP) Team are jointly responsible for all phases of
the MNWD Quality Management System.
Management review shall be conducted following every internal quality audit
addressing necessary improvement for non-conformities.
40
XVI. CORE PROCESSES DESCRIPTION
This chapter describes the process involved in Production Well Development
(Figure 7) including its requirements for the issuance of Water Permit from the National
Water Resources Board (NWRB) (Figure 8) and the Environment and Natural Resources
and Environmental Compliance Certificate (ECC) (Figure 9) from the Department of
Environment and Natural Resources–Environmental Management Bureau (DENR-EMB),
Refer to Figure 8 and 9.The process involved in the development of spring sources
(Figure10) including its requirements are likewise presented in flow process diagram and
narrative descriptions.
Watershed rehabilitation and development plays a vital role in the sustainability
of water resources development, Figure 11; shows the various stages and processes
involved in this particular phase of the core process.
Another important phase in water resource development is the construction or
project implementation of various infrastructure and related structures for water supply
and other capital expenditure of the MNWD, as shown in Figure 12. Upon completion of
any water supply project, water quality analysis needs to be conducted prior to its turn-
over to the end-user Division(s). Process flow chart and description on bacteriological,
physical and chemical analysis is hereto attached as Figure 13.
42
MNWD Quality Management System Manual 2016
MNWD Quality Management System Manual 2016
WATER RESOURCE DEVELOPMENT- WELL
The work procedures involved in well development starts with project
Identification. Project Identification may be the result of the following: (1) 10-year
projected water demand; (2) From the monthly pressure survey conducted by the Pipeline
Leakage Control and Non-Revenue Water Management Division (PLC&NRWMD) on
several observation points distributed within the MNWD coverage area showing low
water pressure in the entire water supply system; (3) Requests for additional water
services. This additional water supply requirement could be addressed through the
development of additional water source, in this case, construction of production well.
Engineering Survey will be the next activity wherein, site identification would be
the first step. In this step, consideration on the well to well minimum distance of one (1)
kilometer is considered and the strategic location to which it would effectively address
the needed additional water supply on a specific area. Upon completion of site
identification, site negotiation and acquisition will be the next activity prior to drilling of
the said exploratory production well. The contract to sell with right of entry will be
drafted and subsequently finalized. One of the important stipulations in the said contract
to sell is; should the volume of the potable water fail to meet the standard requirements,
MNWD reserves the right to look for another area and restore all damages to the property
caused by the aforesaid activities at no cost to the MNWD.
Once the conditional Site /Lot acquisition is finalized, survey and data gathering
will follow taking into account the distance of the aforesaid site to the interconnection
point of the existing transmission line, elevation of the site, possible discharge area for
flushing activities, road right of way or access to the site, identification of all the adjacent
and existing well and its final well design. After all the needed data are gathered,
preparation of preliminary design will be done, from the preliminary well design, site
development and building plans, then preparation of the program of works with the
corresponding specifications will follow. The application for water permit will be filed
44
MNWD Quality Management System Manual 2016
with the National Water Resource Board (NWRB) and the corresponding Permit to Drill
in accordance with the hereunder flowchart, to wit:
45
MNWD Quality Management System Manual 2016
The Initial Environmental Examination (IEE) shall be prepared for the issuance of
Environmental Compliance Certificate (ECC) by the Department of Environment and
Natural Resources- Environmental Management Board (DENR-EMB) in accordance with
the flowchart hereunder, to wit:
46
MNWD Quality Management System Manual 2016
After the preliminary design and plans are completed, it is submitted to the
Division Manager and General Manager for approval and finalization of the Plans,
Design, Program of Works and Specifications. Finalized copies of all requirements are
submitted to the Division Manager, General Manager and to the Board of Directors for
approval and issuance of the corresponding Board Resolution.
After the approval of the Board, preparation of request for construction together
with the Permit to Drill, Environmental Compliance Certificate (ECC) and Building
Permit are filed with the concerned agencies. Bidding process will be the next activity
and project implementation. During the implementation, well drilling activities will be
conducted, bore holing, installation of casing, well development, constant discharge test,
pumping test within 72 hours, water quality test shall be conducted by the licensed Water
Quality Laboratory and by the MNWD Water Quality Division. Thereafter, well capacity
shall be determined.
47
MNWD Quality Management System Manual 2016
WATER RESOURCE DEVELOPMENT- SPRING
The need for additional water supply can be determined through the following: (1)
The 10-year projected water demand requirements; (2) Monthly pressure survey results
conducted by the Pipeline Leakage Control (PLC) and Non-Revenue Water Division
(NRWD) on several observation points distributed on the entire coverage area wherein
low water pressure in the system can be identified; (3) The requirements for additional
water supply as a result of the various requests for additional water connections.
Springs as potential water sources can be utilized if there are no other interested
parties or water users in the area. Should there be other water users such as; hydro power,
irrigation or industrial users, necessary documents and agreements will have to be
secured. If spring is available, site identification will be conducted and the engineering
survey, site negotiation and acquisition will follow as one of the important activity for the
water source development process. Survey and data gathering shall be conducted monthly
for at least one (1) year through discharge measurement and sampling for water quality
test. These are being done to ensure the reliability of the spring as to its capacity and
quality.
Based on the data gathered, preliminary intake box design, the corresponding
program of works, specifications and other details are prepared. Requirements for the
water rights, building permit and Environmental Compliance Certificate (ECC)
applications are likewise prepared.
After all the preliminary plans and designs are completed, it will be submitted to
the Division Manager and General Manager for approval. Then the finalization of the
preliminary plans, design, program of works and specification will follow. Finalized
copies of all the requirements are submitted to the Division Manager, General Manager
and to the Board of Directors for approval and issuance of the corresponding board
resolution.
49
MNWD Quality Management System Manual 2016
Application for water permits to the National Water Resource Board (NWRB),
Environmental Compliance Certificate (ECC) to the Department of Environment and
Natural Resources- Environmental Management Board (DENR-EMB) and building
permit from the concerned Local Government Units (LGU) are then filed. Request for
construction are prepared as one of the requirements prior to the bidding process.
After the bidding process, the project implementation will commence, and water
quality analysis is conducted after the project completion including the discharge
measurement to determine the actual water capacity.
50
WATERSHED REHABILITATION AND DEVELOPMENT
The preparatory works on watershed development and rehabilitation comprises all
the necessary activity in the initial assessment procedure. The said activity shall be
conducted by the detailed personnel to determine the area for rehabilitation, estimated
time allocation, necessary works, materials and budget allocation. The requisition of
materials shall be prepared by the detailed personnel consequently upon the assessment
and submit to the supervisor and Division Manager to facilitate approval. The
establishment of the watershed nursery including the entire operation and maintenance,
moreover, the Watershed Plantation, Maintenance and Forest Protection shall be
conducted by the delegated field personnel under the supervision of the assigned field
supervisor.
The watershed evaluation will be conducted by the Watershed Rehabilitation and
Development Project Management Staff (PMS) every end of the period to assess the
overall project implementation. The PMS should conduct vegetation assessment and
timber stand inventory to determine the extent of the project implementation and status of
the watershed. The result of the watershed assessment will outline recommendations and
define priority areas for enrichment planting, enhanced forest protection and maintenance
works.
Likewise, the PMS facilitates Information Education Campaigns,
Assembly/Convention/Forum and Tree planting Orientation as part of the implementation
of Public Awareness Program coupled with the Watershed Rehabilitation and
Development Project.
The Monthly Accomplishment Report, Monthly Progress Report, Livelihood
Implementation Status Report are prepared and submitted by the assigned field
supervisor and PMS every end of the reporting period.
52
MNWD Quality Management System Manual 2016
MNWD Quality Management System Manual 2016
CONSTRUCTION SECTION
After all documents are approved and the procurement process is completed,
project implementation shall commence. The construction section follows a procedure in
which monitoring activities and reporting are carried out by the field personnel, project
in-charge and section head as enumerated hereunder:
I. Daily Project Monitoring – a daily logbook accomplished by the field
personnel that record the manpower, project activities, weather, physical
accomplishment, and other related information concurred by the contractors
representative.
II. Weekly Status Report – every Monday the construction section conducts a
meeting to check and consolidate all the daily logbooks of each project. Moreso,
project schedules for the week are planned. Problems encountered during the
week are likewise discussed in order to avoid delays. This report is submitted to
the General Manager as it is discussed during the Board of Directors meeting.
III. Monthly Accomplishment Report – refers to the summary of project
accomplishment reports included in the Capital Expenditures (CAPEX) of the
current year and to be submitted to the finance division and Office of the General
Manager.
At any point in time during project implementation, request for payment or
change order may arise. Each request has its own process to follow and required
documents must be submitted and approved, to wit:
54
MNWD Quality Management System Manual 2016
A. Billing
1. The contractor shall submit request for billing coupled with statement of work
accomplished & Physical Accomplishment subject for verification and checking
by the project in-charge.
2. The billing documents are presented to the BOD by the General Manager.
3. Upon approval by the Board of Directors, the billing documents are forwarded to
the Finance Division.
The required documents are the following:
a) Letter request for partial billing
b) Statement of Work Accomplished (SWA) c) Physical Accomplishment d) Contract of Agreement (for first payment) e) Previous payment (SWA) f) Board Resolution approving the request for payment g) Revised Bill of Qualities (if there’s any) h) Surety Bond i) Certificate of completion For final Billing j) Certificate of final completion & Acceptance
B.C Change Order/Variation Orders
1. Request letter from contractor or order from the engineer. 2. Verify, check and measure the changes in actual site condition against the plan. 3. Prepare and submit revised BOQ to the Division Manager-A 4. Prepare request for change/variation order with its supporting documents to be
submitted to the OGM. 5. The GM will recommend for the approval of the request for change/variation
order. Hereunder are the supporting documents necessary for the approval of the said request:
a) Letter request from the contractor b) Survey data c) Revised BOQ d) Photograph (if needed) e) Change order request and justification f) Other documents needed to justify relative change variation order
55
MNWD Quality Management System Manual 2016
IV. Certificate of Completion – Upon submission of the project evaluation committee report, the division shall prepare the certificate of completion as pre- requisite for the final completion and acceptance certificate.
V. Certificate of Final Completion and Acceptance – Shall be issued upon all
of the documents have been checked and verified as well as the quantity & quality of the completed activities in accordance w/ the contracted work items and all works are completed in accordance with plans and specification.
56
MNWD Quality Management System Manual 2016
LABORATORY TESTING AND ANALYSIS PROCESS
The Laboratory Testing and Analysis Center is a duly accredited testing center of
the Department of Health (DOH). As shown in Figure 13, clients must fill-out laboratory
requests for Bacteriological, Physical, and Chemical Analysis. In order for the request to
be processed, clients must pay certain fees for requested test(s) at the cashier. After
paying, the laboratory personnel check the official receipt and release sterile bottle/s to
clients (for bacteriological test only). Clients collect water samples for bacteriological test
in the bottle provided and submit the sample to the laboratory for processing, which can
only be submitted on Mondays and Tuesdays. The laboratory personnel check laboratory
requests and all necessary data to be tested. The Medical Technologist will conduct
testing of samples submitted. After two (2) days, samples with no reaction passed the
test, however, samples with reactions needs confirmatory period of another two (2) days.
All results are encoded and printed. Once the results are signed by the concerned
personnel, the results will be released to the clients.
58
MNWD Quality Management System Manual 2016
XVII. SUPPORT PROCESSES DESCRIPTION
This chapter describes the various processes involved in support to the core
process identified within the scope of water resources development.
Support processes under Human Resource Development include: Recruitment
Selection and Placement (Figure 14.1, 14.2, and 14.3), Performance Management (Figure
15.1, 15.2) Learning and Development and Personnel Welfare, Rewards and Recognition
(Figure 16).
Management Information Services include: Office Automation, Hardware,
Software Maintenance (Figure 17), Electronic Back-up (Figure 18), Documents Storage
(Figure 19) and Retrieved (Figure 20).
Budgeting and Disbursement Processes are presented in (Figure 21).
Administrative, General Services & Supply Management Division support
processes include: Material Service Request/Trip ticket Flow chart (Figure 22);
Procedural Process Diagram for Procurement Services (Figure 23) and Property and
Supply Management (Figure 24).
59
MNWD Quality Management System Manual 2016
Recruitment, Selection & Placement
The Recruitment, Selection & Placement strictly adheres to the principles of
merit, fitness and equality. The selection of employees shall be based on their relative
qualifications and competence to perform the duties and responsibilities of the position.
There shall be no discrimination in the selection of employees on account of gender, civil
status, disability, religion, ethnicity or political affiliation.
The updated list of vacant positions will be endorsed by the General Manager for
publication. The HRD facilitates the publication of the vacancies as well as the initial
screening of applicants to be included in the Selection Line-Up for evaluation of the
Personnel Selection Board (PSB). The PSB conducts assessment of competencies and
qualifications of candidates. The list of qualified applicants will be posted and submitted
to the General Manager. The GM will endorse to the HRD the list of newly
hired/promoted applicants for issuance of Appointment. The HRD will process all
necessary documents attached to the Appointment for submission to the Civil Service
Commission Field Office.
63
MNWD Quality Management System Manual 2016
Learning & Development
This process ensures that the public is served by a well-trained professional
workforce. The HRD ensures that all employees have equitable access to learning
opportunities for individual development. It also provides training to employees
according to the requirements of MNWD. The employees get the opportunity to sharpen
their existing skills or develop specialized skills which in turn, will help to take up some
new roles.
The Manpower Planning, Recruitment, Training and Development Section
facilitates or conducts training and/or workshops in partnership with other accredited
government or private training institutions. Likewise, the HRD shall recommend to the
General Manager external trainings and/or workshops to be attended by officers and
employees relevant or aligned with the development goal of their department. The
Personnel Development Committee partners with the HRD in the learning and
development aspect of the human resource. Their main objective is to prepare its officers
and employees for future bigger responsibilities required to achieve department goals.
Performance Management
The Human Resource Division leads in driving the performance management
process. It is an interactive process where the Human Resource Division provides
sufficient resources for the development of capacities of all employees. This process
encourages employees to work according to their potential and give suggestions that can
help them to bring about improvement in it.
The General Manager sets the direction through the development of the Office
Performance and Commitment Review (OPCR). Every division should cascade an
approved unit work plan to its employees. A monthly accomplishment report will be
submitted by all employees that will be the basis for the monitoring and coaching
67
MNWD Quality Management System Manual 2016
activities of division managers and supervisors. The division managers will be
responsible for the individual performances of their staff. They may recommend further
learning and development interventions to achieve the goals of the unit. The Performance
Management Team will be responsible for the review and evaluation of the division and
individual ratings. Likewise, the PMT shall recommend to the PRAISE Committee all
employees eligible for awards. The annual training plan prepared by the HRD should be
aligned with the learning and development interventions discussed by the Division
Managers with their Staff.
Personnel Welfare
The Human Resource Division is responsible for processing employee benefit
claims, leave administration, medical services, and employee rewards and recognition.
This ensures the accurate process of employee welfare, benefits and compensation.
The PRAISE Committee is the leading light of the rewards and recognition
process. This committee publishes list of rewards and recognition programs for approval
of the General Manager. They receive the list of nominations for recognition. The list of
nominated employees will be consolidated by the HRD. The PRAISE Committee shall
review, deliberate and validate the consolidated list of nominees prepared by the HRD.
This committee shall be responsible for the announcement of the awards.
68
MNWD Quality Management System Manual 2016
Software Development
Preliminary analysis
The objective of phase 1 is to conduct a preliminary analysis, propose alternative
solutions, describe costs and benefits and submit a preliminary plan with
recommendations.
Conduct the preliminary analysis: in this step, the software development team
need to find out the organization's objectives and the nature and scope of the problem
under study. Even if a problem refers only to a small segment of the organization itself,
we need to find out what the objectives of the organization itself are. Then we need to see
how the problem being studied fits in with them.
Propose alternative solutions: In digging into the organization's objectives and
specific problems, the team may have already covered some solutions. Alternate
proposals may come from interviewing employees, clients, suppliers, and/or consultants.
We can also study what competitors are doing. With this data, we will have three choices:
leave the system as is, improve it, or develop a new system. Describe the costs and
benefits.
Systems analysis, requirements definition
Defines project goals into defined functions and operation of the intended
application. It is the process of gathering and interpreting facts, diagnosing problems and
recommending improvements to the system. Analyzes end-user information needs and
also removes any inconsistencies and incompleteness in these requirements.
72
MNWD Quality Management System Manual 2016
A series of steps followed by the developer are:
1. Collection of Facts: End user requirements are obtained through documentation, client
interviews, observation and questionnaires,
2. Scrutiny of the existing system: Identify pros and cons of the current system in-place,
so as to carry forward the pros and avoid the cons in the new system.
3. Analysis of the proposed system: Solutions to the shortcomings in step two are found
and any specific user proposals are used to prepare the specifications.
• Systems design: Describes desired features and operations in detail, including
screen layouts, business rules, process diagrams, pseudo code and other
documentation.
• Development: Coding of functions into computer language.
• Integration and testing: Brings all the pieces together into a special testing
environment, then checks for errors, bugs and interoperability.
• Acceptance, installation, deployment: The final stage of initial development,
where the software is put into production and runs the actual business.
• Maintenance: The system is assessed to ensure it does not become obsolete. This
is also where changes are made to initial software. It involves continuous
evaluation of the system in terms of its performance.
• Evaluation: This is where the system that was developed, as well as the entire
process, is evaluated. Some of the questions that need to be answered include:
• Does the newly implemented system meet the initial business requirements
and objectives?
• Is the system reliable and fault-tolerant?
• Does the system function according to the approved functional requirements?
In addition to evaluating the software that was released, it is important to assess the
effectiveness of the development process. If there are any aspects of the entire
73
MNWD Quality Management System Manual 2016
process, or certain stages, that management is not satisfied with, this is the time to
improve. Evaluation and assessment are difficult issues. However, the company
must reflect on the process and address weaknesses.
• Disposal: In this phase, plans are developed for discarding system information,
hardware and software in making the transition to a new system. The purpose here
is to properly move, archive, discard or destroy information, hardware and
software that is being replaced, in a manner that prevents any possibility of
unauthorized disclosure of sensitive data. The disposal activities ensure proper
migration to a new system. Particular emphasis is given to proper preservation and
archival of data processed by the previous system. All of this should be done in
accordance with the organization's security requirements.
74
MNWD Quality Management System Manual 2016
Operations and maintenance
The deployment of the system includes changes and enhancements before the
decommissioning or sunset of the system. Maintaining the system is an important aspect
of System Development Life Cycle. As key personnel change positions in the
organization, new changes will be implemented. There are two approaches to system
development; there is the traditional approach (structured) and object oriented.
Information Engineering includes the traditional system approach, which is also called
the structured analysis and design technique. The object oriented approach views the
information system as a collection of objects that are integrated with each other to make a
full and complete information system.
Evaluation
The final phase of the System Development Life Cycle is to measure the
effectiveness of the system and evaluate potential enhancements.
75
MNWD Quality Management System Manual 2016
ACCOUNTING, TREASURY AND BUDGET DIVISION
PROCESS DESCRIPTION
Disbursement Based on Deliveries and Construction
The process begins with the approved project proposal coming from the
Engineering and Environment Department. This project proposal is supported with the
corresponding approved program of works, pre-purchase request or request for
construction services. These documents are reviewed as to its mathematical computation
and availability of funds. Subsequently, these documents are forwarded to the Technical
Working Group of the Bids and Awards committee for further processing. The request
shall be presented to the Board of Directors for information and approval. Upon approval
of the Board of Directors, the purchase request or the construction services request, as the
case maybe, shall be prepared by the procurement section. The procurement section will
undertake the succeeding processes, in accordance with Republic Act (R.A) 9184,
Philippine Government Procurement Act.
When the procurement process is completed, a purchase order or a contract of
agreement shall be prepared. The purchase order or contract of agreement together with
its complete supporting documents shall be forwarded to the Budget section for the
preparation of the Budget Utilization Slip. The Budget Utilization slip is an
acknowledgement that the claims/charges against the budget is necessary, lawful and that
the budget is available, by the requesting unit and by the head of the budget section.
These documents are forwarded back to the procurement section for the issuance
of the Purchase Order or the contract of agreement to the supplier/contractor.
Upon the completion of the contract and/or delivery, a Certificate of Completion
and Final acceptance and/ or the Inspection and Acceptance Report shall be prepared and
the whole set of documents shall be forwarded to the accounting section for the
processing of Disbursement Voucher.
In the preparation of the disbursement voucher, the completeness of the
documents are verified and examined as to the legality of the transactions. This shall be
77
MNWD Quality Management System Manual 2016
forwarded to the Office of the General Manager for approval. The approved
Disbursement Voucher shall be forwarded to the treasury section for the check
preparation and subsequent disbursement.
78
MNWD Quality Management System Manual 2016
PROCESS DESCRIPTION
Payroll Preparation
The Payroll and Subsidiary section generally prepares three (3) sets of payroll,
namely payroll for the regular (permanent) employees, payroll for casual employees and
payroll for contract of service workers. Payroll for regular (permanent) and casual
employees are prepared once a month whereas payroll for the contract of service workers
are prepared twice a month with a cutoff date of every 15th and 30th/31st day of the month.
In the preparation of payroll for permanent and casual employees the following
are considered, to wit:
1. Summary of leave without pay
2. Summary of Representation and Transportation Allowances
3. GSIS, HDMF, PHIC, Provident Fund Premiums
4. Withholding Tax on Employees Compensation
5. Employees’ Loan Amortizations
Upon determination of the above cited factors, the person in charge prepares a
draft of the payroll. From there, the persons in charge of the remittances of the various
withholdings will review and check the respective deductions. Subsequently, a final copy
of the payroll shall be printed and submitted to concerned signatories.
Consequently, since the payroll is through Automated Teller Machine (ATM), an
Authority to Debit Account (ADA) is prepared, wherein the amount due to each of the
employees are encoded in the payroll system of the depository bank, that is, in the case of
regular and casual employees, the Land Bank of the Philippines (LBP).
81
MNWD Quality Management System Manual 2016
Afterwards, the payroll together with the ADA shall be forwarded to the Budget
Section for the preparation of the Budget Utilization Slip and submission of said
documents to the concerned signatories.
Then, those documents shall be presented to the Accounting Section for the
preparation of the Disbursement Voucher (DV).
After the Disbursement, has been duly approved, it shall be forwarded to the
Treasury Section for the preparation of check and its subsequent release.
The preparation of payroll for contract of service workers commences from the
moment the payroll and subsidiary section receives the summary of attendance of
contract of service workers from the Human Resource Division.
The Summary of Attendance of Contract of Service Workers is reviewed and
checked before proceeding with the payroll preparation. Then, the respective hours
worked of the contract of service workers are encoded in the payroll. Just like the case of
regular and casual employees, allowable deductions specifically Home Development
Mutual Fund (HDMF) premiums and loan amortizations are considered. A draft payroll
shall be printed for further checking and review.
Subsequently, a final payroll shall be printed and submitted to the concerned
signatories,
Consequently, since the payroll is through Automated Teller Machine (ATM), an
Authority to Debit Account (ADA) is prepared, wherein the amount due to each of the
contract of service workers are encoded in the payroll system of the depository bank, that
is, in the case of contract of service workers, the Development Bank of the Philippines
(DBP).
82
MNWD Quality Management System Manual 2016
Afterwards, the payroll together with the ADA shall be forwarded to the Budget
Section for the preparation of the Budget Utilization Slip and submission of said
documents to the concerned signatories.
Then, those documents shall be presented to the Accounting Section for the
preparation of the Disbursement Voucher (DV).
After the Disbursement, has been duly approved, it shall be forwarded to the
Treasury Section for the preparation of check and its subsequent release.
Aside from the aforementioned payroll, the payroll and subsidiary section is also
responsible for the preparation of overtime payroll, night shift differential payroll, payroll
for monetization of accrued leave credits and other payroll of benefits accruing to the
employees.
83
MNWD Quality Management System Manual 2016
DESCRIPTION MSR/TRIP TICKETS
• Monitors condition of property for repair or replacement.
• Preserves the property in good condition at all time.
• Transports office personnel to respective destination.
84
MNWD Quality Management System Manual 2016
DESCRIPTION FOR PURCHASE ORDER (SVP)
• Posts Purchase Request (ABC = P 50,000.00 above)
• Prepares Canvass/Price Quotation Request (ABC less than P 50,000.00
• Prepares Abstract of Quotation
• Prepares Notice to Proceed/Purchase Order/Contract Agreement
DESCRIPTION FOR PURCHASE ORDER (PUBLIC BIDDING)
• Posts Purchase Request
• Prepares Summary of Abstract
• Prepares Notice of Award
• Prepares Notice to Proceed/Purchase Order/Contract Agreement
85
MNWD Quality Management System Manual 2016
DESCRIPTION FOR DELIVERIES
• Delivery of materials, equipment and supplies
• Inspects deliveries
• Receives deliveries
• Prepares Inspection and Acceptance Report (IAR)
• Posts stock items
86
MNWD Quality Management System Manual 2016
XVIII. QUALITY OBJECTIVES OF DIFFERENT DIVISIONS
This chapter describes the inter-relationships of the processes involved as input to
the site identification for the planning, design and construction of infrastructures and
other water related facilities for water resources development, watershed management
and water analysis to the identified quality objectives by the different divisions in the
Business Process and the Office/Division Performance Commitment and Review
(OPCR/DPCR) Forms hereto attached as Annex 1 and Annex 2.
The functional objectives established in the office performance commitment and
review (OPCR) form is cascaded to the respective division performance commitment and
review DPCR form to the level of individual performance commitment and review
(IPCR).
The MNWD quality objectives are cascaded by LWUA as its regulatory agency
consistent with the quality policy, measured in terms of quantity and timeliness,
monitored monthly and evaluated on a semestral basis by the Performance Management
Team (PMT) in conformance with the enchantment of water facility service management,
water distribution management, support to operations and general administrative support
service.
Processes for support services are interconnected to the core process within the
scope as described in Figure24 below.
87
MNWD Quality Management System Manual 2016
XIX. DETAILED PROCESSES AND PROCEDURES
The overall context of the Inter – Relationships of the MNWD’s product, services
and the environment is well illustrated in Figure 2: Organizational Performance Indicator
Framework (OPIF). Water comes from the watershed and extracted using water
extracting equipment, facilities and structures, thereafter, transmitted through a
conveyance of pipelines and appurtenances to respective consumers and prior to the
release of waste water to the receiving environment treatment should be effected.
The Major Final Outputs of the MNWD as cascaded by its regulatory agency, the
Local Water Utilities Administration (LWUA), are as follows;
1. Water Facility Service Management
1.1. Access to potable water (Quantity):
Percentage of barangays with access to potable water against the
total number of barangays within the MNWD service coverage.
1.2. Reliability of service (Quality):
Percentage of household connections receiving 24 / 7 supply of
water.
1.3. Adequacy (Timeliness):
Source capacity of MNWD to meet demands for 24 / 7 supply of
water.
2. Water Distribution Service Management
2.1. Non – Revenue Water (Quantity):
Percentage of unbilled water to water production
2.2. Potability (Quality):
Average deviation from PNSDW chlorine residual requirements
2.3. Adequacy / Reliability of Service (Timeliness):
Average response time to restore service when there are
interruptions.
102
MNWD Quality Management System Manual 2016
3. Support to Operation
3.1. Staff Productivity Index:
Category A Staff Productivity index. The Staff Productivity index
shall be one (1) position for every One Hundred Twenty (120) service
connections for Category A, shall be strictly observed in the determination
of the total number of positions in an LWD.
3.2. Reasonableness / Affordability of water rates:
Reasonableness / Affordability of water rates to consumers with
access connections. Water rates for the 1st 10 CuM must not exceed 5% of
the average income of LIG.
3.3. Customer Satisfaction:
100% of Customer related complaints acted upon within an
average of 3 days.
4. General Administration and Support Services (GASS)
4.1. Financial viability and sustainability
4.1.1. Collection Efficiency: 90%
4.1.2. Operating ratio: 85%
4.1.3. Current ratio: 8.5:1
4.2. Compliance with COA reporting requirements:
Reporting requirements in accordance with content and period of
submission (Submission of five (5) financial reports, i.e. Balance Sheet,
Statement of Cash Flows, Statement of Government Equity, Notes to
Financial Statement)
4.3. Compliance with LWUA reporting requirements
Reporting requirements in accordance to content and period of
submission:
103
MNWD Quality Management System Manual 2016
4.3.1. Monthly Data Sheets, Balance Sheet, Income Statement, Cash
Flow Statement
4.3.2. Bacteriological report
4.3.3. Chlorine residual report
4.3.4. Physical/Chemical report
4.3.5. Annual report
4.3.6. Approved WD budget with Annual Procurement Plan (APP)
To address the above stated Major Final Outputs, the General Business Process
Map of the Management Processes, Core Processes pursuant to the provisions of
Presidential Decree (PD 198) otherwise known as the Provincial Water Utilities Act of
1973 and Support Processes of MNWD is illustrated in Figure 4. However, the scope of
this QMS is limited to the following Management Processes, Core Processes and Support
Services, as shown in Figure 6, to wit:
1. Management Processes
1.1. Policy Implementation through the issuance of Board Resolutions from
the Board of Directors, Memoranda and other Office Orders coming from
the General Manager.
1.2. The Overall Direction, Supervision and Control is exercised by the
General Manager. All powers, privileges and duties are performed by and
through the Board of Directors. Any executive, administrative or
ministerial power is delegated and re – delegated by the Board of
Directors to Officers designated for such purpose and to be executed by
respective officials headed by the General Manager.
1.3. Determination of needs by the customers and employees, as internal and
external clients, is prioritized for target setting, planning and development.
1.4. Quality Management Systems’ requirement is a management process
involving monitoring and evaluation of procedures, work instructions and
document control for continual improvement and development.
104
MNWD Quality Management System Manual 2016
2. Core Process – Water Resources Development
2.1. Planning, Design and Construction Division
105
MNWD Quality Management System Manual 2016
3. Support Processes
3.1. Human Resource Division
3.2. Management Information System
3.3. Accounting and Treasury and Budget Division
3.4. Administrative / General Services, Materials and Supply Management
3.5. Pipeline, Leakage Control and Non – Revenue Management Division
3.5.1 Pressure Survey Data
108
Republic of the Philippines METROPOLITAN NAGA WATER DISTRICT
40 J. Miranda Avenue, Naga City ANNEX "1"
OFFICE PERFORMANCE COMMITMENT AND REVIEW FORM
I, CESAR H. FEDERIZON, General Manager A of Metropolitan Naga Water District, commits to deliver and agree to be rated on the attainment of the following targets in accordance with the indicated measures for the period January to December 2016.
CESAR H. FEDERIZON Date:
APPROVED BY:
CESAR H. FEDERIZON General Manager A
Date:
MFO / PAP
Success Indicators
1st Sem
2nd Sem
Alloted Budget
Division Accountable
Rating Remarks
Q E T A
A. Water Facility Service Management 2016 Budget:
PI 1 (Quantity) Access to potable water 86% or 75 of 87 barangays with access to potable water against the total number of barangays within the coverage of the LWD on December 31, 2016
75 Barangays
75 Barangays
PDCD; WPEMD and
PLC&NRWD
90% of 1,800 additional new household connections. 810
810
WDRD, WPEMD, CSD and CAD
PI 2 (Quality) Reliability of service 90% of household connections receiving 24/7 supply of water
90%
90%
WDRD; PLC&NRWMD; and WPEMD
PI 3 (Timeliness) Adequacy Source capacity of LWD to meet demands for 24/7 supply of water 1.75:1 1.75:1 EWRD and WPEMD
5 - Outstanding
4 - Very Satisfactory
3 - Satisfactory
2 - Unsatisfactory
1 - Poor
MFO / PAP
Success Indicators
1st Sem
2nd Sem
Alloted Budget
Division Accountable Rating
Remarks Q E T A
B. Water Distribution Service Management 2016 Budget:
PI 1 (Quantity) Non-Revenue Water (NRW) 20% of water production are non-revenue 20% 20% PLC&NRWMD
PI 2 (Quality) Potability Average deviation from PNSDW (chlorine residual requirements) from January 1 to December 31 (0.3ppm chlorine residual)
To attain at least 0.3ppm chlorine
residual
To attain at least 0.3ppm chlorine
residual
WQD
PI 3 (Timeliness) Adequacy/Reliability of service 100% of request for repair attended within the average response time to restore service when there are interruptions based on the MNWD Citizen's Charter
minor repair: 12 hrs
minor repair: 12 hrs
PLC&NRWMD
major repair: 48 hrs
major repair: 48 hrs
Support to Operation 2016 Budget: PI 1 (Quantity) Staff Productivity Index Category A Staff Productivity Index. The Staff
Productivity Index shall be one (1) position for every One Hundred Twenty (120) service connections for Categories A, shall be strictly observed in the determination of the total number of positions in LWD
1:120
1:120
HRD
PI 2 (Quality) Affordability Reasonableness/Affordability of water rates to consumers with service connections. Water rate for the 1st 10 cu.m. must not exceed 5% of the average income of LIG.
P 125 < P 390
P 125 < P 390
CSD and CAD
PI 3 (Timeliness) Customer Satisfaction Percentage
100% of Customer related complaints acted upon within an average of 3 days
100% of Customer related complaints
acted upon within an average of 3 days
100% of Customer related complaints
acted upon within an average of 3 days
CSD, CAD, PLC&NRWMD and
WDRD
PI 3 (Timeliness) General Services Tranport Services 100% of Office Personnel, Materials
and Equipment transported to
respective destination within one (1) hour upon receipt of trip
tickets
100% of Office Personnel, Materials
and Equipment transported to
respective destination within one (1) hour upon receipt of trip
tickets
A/GSM&SMD
Procurement Services 100% of PQR, AQ and P.O. prepared, signed
and served within three (3) days upon receipt
100% of PQR, AQ and P.O. prepared, signed
and served within three (3) days upon receipt
MFO / PAP
Success Indicators
1st Sem
2nd Sem
Alloted Budget
Division Accountable Rating
Remarks Q E T A
Property and Supply 100% of request materials issued
released to requesting office within one (1) hour upon request.
100% of request materials issued
released to requesting office within one (1) hour upon request.
Leave Administration 100% of procedures involving leave administration is in accordance with the Omnibus Rules on Leave as prescribed by the Civil Service
100% of procedures involving leave
administration is in accordance with the
Omnibus Rules on Leave as prescribed by
the Civil Service
100% of procedures involving leave
administration is in accordance with the
Omnibus Rules on Leave as prescribed by
the Civil Service
HRD
General Administration and Support Services (GASS) 2016 Budget: PI 1 Financial Viability and
Sustainability 90% of collection efficiency Collection Ratio: 90% Collection Ratio: 90% CSD and CAD
85% operating ratio Operating Ratio: 0.85 Operating Ratio: 0.85
AD and T&BD Current ratio: 8.5:1 Current Ratio: 8.5:1 Current Ratio: 8.5:1
PI 2 Compliance with COA reporting requirements
A. Compliance with Commission on Audit (COA)
reporting requirements in accordance with content
and period of submission (Submission of five (5)
financial reports, i.e. Balance Sheet, Statement of
Income and Expenses, Statement of Cash Flows,
Statement of Government Equity, Notes to
Financial Statement)
March 31, 2016
AD and T&BD
Report on Ageing of Cash Advance December 1, 2016 Compliance with LWUA reporting requirements
B. Compliance with Local Water Utilities Administration (LWUA) reporting requirements in accordance to content and period of submission:
ALL DIVISIONS, OGM and BOD
* Monthly Data Sheets, Balance Sheet, Income Statement, Cash Flow Statement 6 reports every end of
the following months 6 reports every end of the following months
* Bacteriological Report 6 reports every 1st week of the following
month
6 reports every 1st week of the following
month
* Chlorine residual report 6 reports every 1st week of the following
month
6 reports every 1st week of the following
month
MFO / PAP
Success Indicators
1st Sem
2nd Sem
Alloted Budget
Division Accountable Rating
Remarks Q E T A
* Physical/chemical report -
1 report last quarter of the year
* Annual report Submitted: March 24, 2016
* Approved WD budget with Annual Pocurement Plan (APP)
Feb. 2017
ALL DIVISIONS
Republic of the Philippines METROPOLITAN NAGA WATER DISTRICT
40 J. Miranda Avenue, Naga City
DIVISION PERFORMANCE COMMITMENT AND REVIEW (DPCR) PLANNING, DESIGN AND CONSTRUCTION DIVISION & ENVIRONMENT AND WATER RESOURCES DIVISION
January to June 2016
ANNEX "2"
I, VIRGILIO B. LUANSING I, Acting Division Manager A of Planning, Design and Construction Division & Officer-In-Charge of Environment and Water Resources Division, commits to deliver and agree to be rated on the attainment of the following targets in accordance with the indicated measures for the period January 1 to June 30, 2016.
VIRGILIO B. LUANSING I Acting Division Manager - A. PDCD & OIC-EWRD
Date: July 11 , 2016
MFO / PAP
Success Indicators
Individual Accountable Rating
Standard on when to receive 5,4,3,2,1 Remarks
5 4 3 2 1 VBL GVE MBM NAM VDR RSB BPM ARM JLR SAA FLC RAC VCS ASE RSP SOM HCL PBP PSSL
A. MFO 1: WATER FACILITY SERVICE MANAGEMENT 1. (Quantity) Access to potable water a. Preparation of
Program of Works 100% of Program of Works (POW) assigned, prepared fifteen (15) days upon receipt of request.
.
. 100% of POW
prepared on or before 8 days upon
request
100% of POW prepared 10 days
upon request
100% of POW prepared 15 days
upon request
100% of POW prepared 20 days
upon request
100% of POW prepared 25 days
or beyond the date of request
b. Preparation of Plans and Drawings
100% of Plans and drawings, prepared fifteen (15) days upon receipt of request.
. .
. 100% of Plans &
Drawings prepared on or before 8 days
upon request
100% of Plans & Drawings prepared
10 days upon request
100% of Plans & Drawings prepared
15 days upon request
100% of Plans & Drawings prepared
20 days upon request
100% of Plans & Drawings
prepared 25 days or beyond the
date of request
5 - Outstanding
4 - Very Satisfactory
3 - Satisfactory
2 - Unsatisfactory
1 - Poor
APPROVED BY:
CESAR H. FEDERIZON General Manager A
Date:
MFO / PAP
Success Indicators
Individual Accountable Rating
Standard on when to receive 5,4,3,2,1 Remarks
5 4 3 2 1 VBL GVE MBM NAM VDR RSB BPM ARM JLR SAA FLC RAC VCS ASE RSP SOM HCL PBP PSSL
c. Preparation of Cost Estimates
100% of Cost Estimates, prepared ten (10) days upon receipt of request.
.
. 100% of Cost
Estimates prepared on or before 5 days
upon request
100% of Cost Estimates prepared 6 days upon request
100% of Cost Estimates prepared
10 days upon request
100% of Cost Estimates prepared
13 days upon request
100% of Cost Estimates
prepared 15 days or beyond the
date of request
d. Preparation and submission of Project Tender Documents
100% of Project Tender Documents submitted to Bids and Awards Committee (BAC) ten days (10) days before the publication.
.
. 100% of Project
Tender Documents submitted to BAC 13
days before the publication.
100% of Project Tender Documents
submitted to BAC 11 days before the
publication.
100% of Project Tender Documents
submitted to BAC 10 days before the
publication.
100% of Project Tender Documents submitted to BAC 8
days before the publication.
100% of Project Tender
Documents submitted to BAC 5 days before the
publication.
e. Conduct Project monitoring and submission of Status
100% of Assign Project, Monitored and Status Report, prepared and submitted within two (2) working days before the Board Meeting
.
. .
. 100% of Assigned
Project, Monitored and Status Report
prepared and submitted within 2
working days before Board Meeting
- - - 100% of Assigned Project,
Monitored and Status Report
prepared andsubmitted
during the before Board Meeting.
100% of monitoring activity of Assigned Projects conducted and accomplishment report submitted within three (3) working days upon request.
.
.
. 100% of monitoring
activity Assigned Projects conducted
and accomplishment report prepared and submitted 1 working
day upon request.
100% of monitoring activity Assigned
Projects conducted and accomplishment report prepared and submitted 2 working days upon request.
100% of monitoring activity Assigned
Projects conducted and accomplishment report prepared and submitted 3 working days upon request.
100% of monitoring activity Assigned
Projects conducted and
accomplishment report prepared and submitted 4
working days upon request.
100% of monitoring
activity Assigned Projects
conducted and accomplishment report prepared and submitted 5
working days upon request.
f. Project implementation
100% of Draft of certificate of completion prepared and submitted to Division Manager within 3 days upon project completion.
.
. 100% of Draft of
certificate of completion
prepared and submitted to
Division Manager 1 day upon project
completion.
100% of Draft of certificate of completion
prepared and submitted to
Division Manager 2 days upon project
completion.
100% of Draft of certificate of completion
prepared and submitted to
Division Manager 3 days upon project
completion.
100% of Draft of certificate of completion
prepared and submitted to
Division Manager 4 days upon project
completion.
100% of Draft of certificate of completion
prepared and submitted to
Division Manager 5 days upon
project
g. Preparation and submission of Project Proposal
100% of Project Proposal prepared and submitted sixty (60) days upon request.
.
. 100% of Project
Proposal prepared and submitted 30
days upon request.
100% of Project Proposal prepared and submitted 45 days upon request.
100% of Project Proposal prepared and submitted (60) days upon request.
100% of Project Proposal prepared and submitted 75
days upon request.
100% of Project Proposal prepared
and submitted 90 days
upon request.
2. (Timeliness) a. Conduct Watershed
Plantation 100% of watershed plantation conducted and submitted Monthly Accomplishment Report every 10th day ensuing month.
.
. 100% of watershed
plantation conducted and
submitted Monthly Accomplihment
Report on the 5th day of ensuing
month.
100% of watershed plantation
conducted and submitted Monthly
Accomplihment Report on the 7th
day of ensuing month.
100% of watershed plantation
conducted and submitted Monthly
Accomplihment Report on the 10th
day of ensuing month.
100% of watershed plantation
conducted and submitted Monthly
Accomplihment Report on the 13th
day of ensuing month.
100% of watershed plantation
conducted and submitted Monthly
Accomplihment Report on the
15th day of ensuing month.
MFO / PAP
Success Indicators
Individual Accountable Rating
Standard on when to receive 5,4,3,2,1 Remarks
5 4 3 2 1 VBL GVE MBM NAM VDR RSB BPM ARM JLR SAA FLC RAC VCS ASE RSP SOM HCL PBP PSSL
b. Conduct Watershed maintenance
100% of watershed maintenance conducted and submitted Monthly Accomplishment Report every 10th day ensuing month.
.
. 100% of watershed
maintenance conducted and
submitted Monthly Accomplishment Report on the 5th
day of ensuing month.
100% of watershed maintenance
conducted and submitted Monthly Accomplishment Report on the 7th
day of ensuing month.
100% of watershed maintenance
conducted and submitted Monthly Accomplishment
Report on the 10th day of ensuing
month.
100% of watershed maintenance
conducted and submitted Monthly Accomplishment
Report on the 13th day of ensuing
month.
100% of watershed
maintenance conducted and
submitted Monthly
Accomplishment Report on the
15th day of ensuing month.
c. Conduct Educational and Promotional Campaign
100% of Educational and Promotional Campaign conducted and submitted Report 10 days after the activity.
.
. .
.
.
.
. 100% of Educational
and Promotional Campaign
conducted and submitted Report 5
days after the activity.
100% of Educational and Promotional
Campaign conducted and
submitted Report 7 days after the
activity.
100% of Educational and Promotional
Campaign conducted and
submitted Report 10 days after the
activity.
100% of Educational and
Promotional Campaign
conducted and submitted Report 13 days after the
activity.
100% of Educational and
Promotional Campaign
conducted and submitted Report 15 days after the
activity.
d. Implemetation of Livelihood Projects
e. Conduct Patrol Works
100% of Livelihood Projects implemented and submitted Monthly Report every 10th day of ensuing month. 100% of Patrol Works conducted and submitted Monthly Accomplishment Report every 10th day of ensuing month.
.
.
.
.
.
. 100% of Livelihood
Projects implemented and
submitted Monthly Report on or before 5th day of ensuing
month.
100% of Patrol
Works conducted and submitted
Monthly Accomplishment Report on the 5th
day of ensuing month.
100% of Livelihood Projects
implemented and submitted Monthly Report on the 7th
day of ensuing month.
100% of Patrol
Works conducted and submitted
Monthly Accomplishment Report on the 7th
day of ensuing month.
100% of Livelihood Projects
implemented and submitted Monthly Report on the 10th
day of ensuing month.
100% of Patrol
Works conducted and submitted
Monthly Accomplishment
Report on the 10th day of ensuing
month.
100% of Livelihood Projects
implemented and submitted Monthly Report on the 13th
day of ensuing month.
100% of Patrol
Works conducted and submitted
Monthly Accomplishment
Report on the 13th day of ensuing
month.
100% of Livelihood Projects
implemented and submitted
Monthly Report on the 15th day of
ensuing month. 100% of Patrol
Works conducted and submitted
Monthly Accomplishment
Report on the 15th day of
ensuing month.
f. Conduct Inventory On Seedlings/Trees
100% of Seedling Inventory conducted and submitted Monthly Seedling Inventory Report every 10th day of ensuing month.
.
. 100% of Seedling
Inventory conducted and submitted
Monthly Seedling Inventory Report on
the 5th day of ensuing month.
100% of Seedling Inventory conducted
and submitted Monthly Seedling
Inventory Report on the 7th day of
ensuing month.
100% of Seedling Inventory conducted
and submitted Monthly Seedling
Inventory Report on the 10th day of ensuing month.
100% of Seedling Inventory
conducted and submitted Monthly Seedling Inventory Report on the 13th
day of ensuing month.
100% of Seedling Inventory
conducted and submitted
Monthly Seedling Inventory Report
on the 15th day of ensuing month.
MFO / PAP
Success Indicators
Individual Accountable Rating
Standard on when to receive 5,4,3,2,1 Remarks
5 4 3 2 1 VBL GVE MBM NAM VDR RSB BPM ARM JLR SAA FLC RAC VCS ASE RSP SOM HCL PBP PSSL
g. Submission of Watershed Development Project (WDP) Monthly Progress Report.
100% of Watershed Development Project (WDP) Monthly Progress Report prepared and submitted on the 15th day
.
.
.
.
.
. 100% of Watershed
Development Project Monthly Progress Report
prepared and
100% of Watershed Development
Project Monthly Progress Report
prepared and
100% of Watershed Development
Project Monthly Progress Report
prepared and
100% of Watershed Development
Project Monthly Progress Report
prepared and
100% of Watershed
Development Project Monthly Progress Report
of ensuing month. submitted on or submitted on the submitted on the submitted on the prepared and
before 8th day of 10th day of ensuing 15th day of ensuing 20th day of ensuing submitted on the
ensuing month. month. month. month. 25th day of
ensuing month.
i. Conduct Research and Development
100% of draft Development Plan/Proposal prepared sixty 60 days upon request. . .
100% of draft development plan/proposal
prepared before 60 days upon request.
_ 100% of draft development plan/proposal
prepared 60 days upon request.
_ 100% of draft development plan/proposal
prepared beyond 60 days upon
request.
100% of data gathering conducted and submitted accomplishment report five (5) days upon request.
.
. 100% of data
gathering conducted and submitted
accomplishment report within 3 days
upon request.
100% of data gathering conducted
and submitted accomplishment
report 4 days upon request.
100% of data gathering conducted
and submitted accomplishment
report 5 days upon request.
100% of data gathering
conducted and submitted
accomplishment report 6 days upon
request.
100% of data gathering
conducted and submitted
accomplishment report 7 days upon request.
j. Conduct Water Resources Assessment
100% of Water sampling activity conducted and submitted water samples to the MNWD Laboratory five (5) days upon request.
.
. 100% of Water
sampling activity conducted and
submitted water samples to the
MNWD Laboratory on or before 3 days
upon request.
100% of Water sampling activity conducted and
submitted water samples to the
MNWD Laboratory 4 days upon request.
100% of Water sampling activity conducted and
submitted water samples to the
MNWD Laboratory 5 days upon request.
100% of Water sampling activity conducted and
submitted water samples to the
MNWD Laboratory 6 days upon
request.
100% of Water sampling activity conducted and
submitted water samples to the
MNWD Laboratory
beyond 7 days upon request.
B. Support to Operations (STO) 1. Application of NWRB
Permits 100% of Application of National Water Resources Board (NWRB) permits prepared and submitted for issuance of water permit nine (9) days upon request
*No request for application of NWRB Permit recieved.
. 100% of Application
of NWRB permits prepared and submitted for
issuance of water permit on or before
5 days upon request.
100% of Application of NWRB permits
prepared and submitted for
issuance of water permit 7 days upon
request.
100% of Application of NWRB permits
prepared and submitted for
issuance of water permit 9 days upon
request.
100% of Application of NWRB permits
prepared and submitted for
issuance of water permit 11 days upon request.
100% of Application of NWRB permits prepared and submitted for
issuance of water permit 13 days or beyond the date
of request.
MFO / PAP
Success Indicators
Individual Accountable Rating
Standard on when to receive 5,4,3,2,1 Remarks
5 4 3 2 1 VBL GVE MBM NAM VDR RSB BPM ARM JLR SAA FLC RAC VCS ASE RSP SOM HCL PBP PSSL
2. Application of Various Permits to other Government Agencies
100% of Application of various permits prepared and submitted the necessary documents to the other government agencies Fifteen (15) days upon request.
. .
.
. 100% of Application
of various permits prepared and submitted the
necessary documents to other
government agencies 8 days upon request
100% of Application of various permits
prepared and submitted the
necessary documents to other
government agencies 10 days
upon request
100% of Application of various permits
prepared and submitted the
necessary documents to other
government agencies 15 days
upon request
100% of Application of various permits
prepared and submitted the
necessary documents to other
government agencies 20 days
upon request
100% of Application of
various permits prepared and submitted the
necessary documents to
other government agencies 25 days
or beyond the date of request
3. Evaluation and Submission of Subdivision Requirements
100% of Subdivision requirements evaluated and submitted to the Office of the General Manager (OGM) fifteen (15) days upon receipt of the completed requirements from the developer.
. 100% of Subdivision
requirements evaluated and
submitted to the OGM on or before 8 days upon receipt of
the completed requirements from
the developer
100% of Subdivision requirements
evaluated and submitted to the OGM 8 to 14 days
upon receipt of the completed
requirements from the developer
100% of Subdivision requirements
evaluated and submitted to the
OGM 15 days upon receipt of the
completed requirements from
the developer
100% of Subdivision requirements
evaluated and submitted to the
OGM 16 to 19 days upon receipt of the
completed requirements from
the developer
100% of Subdivision
requirements evaluated and
submitted to the OGM 20 days and beyond the date of receipt of the
completed requirements
from the developer
4. Hydraulic Analysis/ Simulation
100% of Hydraulic design report prepared and submitted five (5) days upon request
. 100% of Hydraulic
design report prepared and
submitted on or before 3 days upon
request.
100% of Hydraulic design report prepared and
submitted 4 days upon request.
100% of Hydraulic design report prepared and
submitted 5 days upon request.
100% of Hydraulic design report prepared and
submitted 6 days upon request.
100% of Hydraulic design report prepared and
submitted 7 days or beyond the
date of request.
5. Preparation of MIG's payroll
100% of MIGs payroll prepared two (2) working days after the cut-off time.
. 100% of MIGs
payroll prepared and submitted 1 working day after the cut-off
time.
-
100% of MIGs payroll prepared and submitted 2 working
days after the cut- off time.
-
100% of MIGs payroll prepared and submitted beyond 2 days
after the cuff-off time.
MFO / PAP
Success Indicators
Individual Accountable Rating
Standard on when to receive 5,4,3,2,1 Remarks
5 4 3 2 1 VBL GVE MBM NAM VDR RSB BPM ARM JLR SAA FLC RAC VCS ASE RSP SOM HCL PBP PSSL
6. Preparation of documents for Technical and Management Support Services (Memoranda,Brief, Minutes of meetings and other compositions)
100% of Documents for Technical and management support services prepared and submitted three (3) days upon receipt of the assignment order
.
. 100% of Documents
for Technical and management
support services prepared and
submitted documents 1 day
upon receipt of the assignment order
100% of Documents for Technical and
management support services
prepared and submitted
documents 2 days upon receipt of the assignment order
100% of Documents for Technical and
management support services
prepared and submitted
documents 3 days upon receipt of the assignment order
100% of Documents for Technical and management
support services prepared and
submitted documents 4 days
upon receipt of the assignment order
100% of Documents for Technical and management
support services prepared and
submitted documents 5 days
upon receipt of the assignment
order
7. Performs clerical
works
100% of draft minutes prepared five (5) days after the conduct of the meeting. 100% of clerical works performed within two (2) hours upon request
.
. . .
.
100% of draft minutes prepared within 2 days after
the meeting.
100% clerical works performed less than 2 hrs. upon request.
100% of draft minutes prepared
within 3-4 days after the meeting.
-
100% of draft minutes prepared 5
days after the meeting.
100% clerical works performed 2 hrs.
upon request.
100% of draft minutes prepared
within 6-7 days after the meeting.
-
100% of draft minutes prepared
beyond 7 days after the meeting.
100% clerical works performed more than 4 hrs.
upon request.
8. Preparation and Submision of RCS / PPR / PJOR
100% of RCS/PPR/PJOR prepared and submitted to the procurement officer fourteen (14) days before procurement schedule indicated in the PPMP
.
. 100% of
RCS/PPR/PJOR prepared and
submitted to the procurement officer
20 days before procurement
schedule indicated in the PPMP
- 100% of RCS/PPR/PJOR prepared and
submitted to the procurement officer
14 days before procurement
schedule indicated in the PPMP
- 100% of RCS/PPR/PJOR prepared and
submitted to the procurement
officer 7 days or beyond before procurement
schedule indicated in the
PPMP
9. Preparation of Draft Communications
100% of draft communications prepared and submitted to ADMA 3 days upon request.
. . . . . . 100% of draft
communications prepared and
submitted to ADMA 1 day upon request.
100% of draft communications
prepared and submitted to ADMA 2 days upon request.
100% of draft communications
prepared and submitted to ADMA 3 days upon request.
100% of draft communications
prepared and submitted to ADMA
4 days upon request.
100% of draft communications
prepared and submitted to ADMA 5 days upon request.
100% of Communications acted upon and final reply submitted to GM within one (1) day upon receipt of the draft.
. 100% of
Communications acted upon and final reply submitted to
GM within 1 day upon receipt of the
draft.
-
-
-
100% of Communications acted upon and
final reply submitted to GM
beyond a day upon receipt of
draft.
MFO / PAP
Success Indicators
Individual Accountable Rating
Standard on when to receive 5,4,3,2,1 Remarks
5 4 3 2 1 VBL GVE MBM NAM VDR RSB BPM ARM JLR SAA FLC RAC VCS ASE RSP SOM HCL PBP PSSL
10 Preparation of Summary of Annual Water Charges Payment
100% of Annual water charges of MNWD water sources payable to NWRB prepared three (3) days upon request
. 100% of Annual
water charges of MNWD water
sources payable to NWRB prepared 1 day upon request.
100% of Annual water charges of
MNWD water sources payable to NWRB prepared 2
days upon request.
100% of Annual water charges of
MNWD water sources payable to NWRB prepared 3
days upon request.
100% of Annual water charges of
MNWD water sources payable to NWRB prepared 4
days upon request.
100% of Annual water charges of
MNWD water sources payable
to NWRB prepared 5 days upon request.
11 Conduct Engineering/Market Survey
100% of Engineering/market survey data report prepared and submitted fifteen (15) days upon completion of the survey works.
. . . 100% of
Engineering/ market survey date report
prepared and submitted on or
before 8 days upon completion of the
surveyworks
100% of Engineering/ market survey date report
prepared and submitted 10 days
upon completion of the surveyworks
100% of Engineering/ market survey date report
prepared and submitted 15 days
upon completion of the surveyworks
100% of Engineering/
market survey date report prepared
and submitted 20 days upon
completion of the surveyworks
100% of Engineering/
market survey date report
prepared and submitted 25 days
or beyond the date of completion
of the surveyworks
12 Lot Titling 100% of lot documents prepared and facilitated the registration and transfer in the name of MNWD from different agencies *No request for Lot Titling, registration and transfer recieved.
. 100% of lot
documents prepared and facilitated the
registration and transfer in the name
of MNWD from different agencies
- - - Less than 100% of lot documents prepared and facilitated the
registration and transfer in the
name of MNWD from different
agencies
13 Application for Drilling Permit
100% prepared and submitted documents to NWRB and line agencies needed in the issuance of Drilling permit fifteen (15) days upon request
. Drilling permit
prepared and submitted
documents needed in the issuance of
NWRB and line agencies on or
before 7 days upon request
Drilling permit prepared and
submitted documents needed in the issuance of
NWRB and line agencies 8 to 14
days upon request
Drilling permit prepared and
submitted documents needed
in the issuance of NWRB and line
agencies 15 days upon request
Drilling permit prepared and
submitted documents needed in the issuance of
NWRB and line agencies 16 to 19
days upon request
Drilling permit prepared and
submitted documents
needed in the issuance of NWRB and line agencies
20 days or beyond the date of
request
14. Well Drilling Monitoring
100% of Well drilling monitored and status report prepared on the 2nd day of ensuing week.
.
. 100% of Well drilling
monitored and status report
prepared on the 1st day of ensuing week.
- 100% of Well drilling monitored and status report
prepared on the 2nd day of ensuing week.
- 100% of Well drilling monitored and status report prepared beyond
the 2nd day of ensuing week.
General Administration and Support Services (GASS)
MFO / PAP
Success Indicators
Individual Accountable Rating
Standard on when to receive 5,4,3,2,1 Remarks
5 4 3 2 1 VBL GVE MBM NAM VDR RSB BPM ARM JLR SAA FLC RAC VCS ASE RSP SOM HCL PBP PSSL
1. Preparation of Project Procurement Management Plan (PPMP)
100% of Project Procurement Management Plan (PPMP) prepared and submitted to the ADMA Ten (10) days upon request.
. 100% of PPMP
prepared and submitted to
Division Manager 5 days upon request.
100% of PPMP prepared and submitted to
Division Manager 6-9 days upon request.
100% of PPMP prepared and submitted to
Division Manager 10 days upon request.
100% of PPMP prepared and submitted to
Division Manager 11-14 days upon
request.
100% of PPMP prepared and submitted to
Division Manager 15 days or beyond
the date of request.
2. Preparation and Submission of Monthly Reports
100% or 6/6 of Monthly Reports prepared and submitted every 1st week of ensuing month.
. 100% report
prepared and submitted within
4th day of ensuing month.
100% report prepared and
submitted within 5th day of ensuing
month.
100% report prepared and
submitted on the 7th day of ensuing
month.
100% report prepared and
submitted within 9th day of ensuing
month.
100% report prepared and
submitted within 10th day or beyond of
ensuing month.
3. Liquidation of Cash Advance
100% of Cash Advance Liquidated within the prescribed period
. . . . . . . . . . . . . . . . . . 100% of cash
liquidated within the prescribed period
-
-
-
100% of cash liquidated beyond
the prescribed period
4. Preparation of Monthly Accomplishment Report (MAR)
100% of MAR prepared three (3) working days of the ensuing month.
. . . . . . . . . . . . . . . . . . 100% of MAR
prepared 1 working day of the ensuing
month.
100% of MAR prepared 2 working days of the ensuing
month.
100% of MAR prepared 3 working days of the ensuing
month.
100% of MAR prepared 4 working days of the ensuing
month.
100% of MAR prepared beyond 4 working days of
the ensuing month.
5. Preparation and submission of Division Target for July to December 2016
100% of Division Target for July to December 2016 prepared and submitted to the PMT secretariat on June 15, 2016.
. . 100% of Division
Target for the period July to December
2016 prepared and submitted to the
PMT secretariat on or before June 8,
2016.
100% of Division Target for the period
July to December 2016 prepared and submitted to the
PMT secretariat on June 9-14, 2016.
100% of Division Target for the period
July to December 2016 prepared and submitted to the
PMT secretariat on June 15, 2016.
100% of Division Target for the period July to
December 2016 prepared and
submitted to the PMT secretariat on June 16-19, 2016.
100% of Division Target for the period July to
December 2016 prepared and
submitted to the PMT secretariat beyond June 19,
2016.
6. Submision of IPCR Rating
100% submision of IPCR Rating for July to December 2015 on the 13th day of January 2016.
. . . . . . . . . . . . . . 100% IPCR (Rating)
submitted on or before the 7th day
of January 2016.
100% IPCR (Rating) submitted on the 9th day of January
2016.
100% IPCR (Rating) submitted on the
13th day of January 2016.
100% IPCR (Rating) submitted on the
18th day of January 2016.
100% IPCR (Rating)
submitted beyond the 20th day of January 2016.
MFO / PAP
Success Indicators
Individual Accountable Rating
Standard on when to receive 5,4,3,2,1 Remarks
5 4 3 2 1 VBL GVE MBM NAM VDR RSB BPM ARM JLR SAA FLC RAC VCS ASE RSP SOM HCL PBP PSSL
100% of DPCR Rating for July to December 2015 submitted to OGM on January 15, 2016.
. . 100% DPCR Rating
for July to December 2015 submitted to
the OGM on or before the 8th day
of January 2016.
100%DPCR Rating for July to December
2015 submitted to the OGM on the 9th day of January 2016.
100% DPCR Rating for July to December
2015 submitted to the OGM on the
15th day of January 2016.
100% DPCR Rating for July to
December 2015 submitted to the OGM on the 19th
day of January 2016.
100% DPCR Rating for July to
December 2015 submitted to the OGM on the 20th
day of January 2016.
M F
Success Indicators Individual Accountable Rating
Standard on when to receive 5,4,3,2,1 Remarks
5 4 3 2 1 VBL GVE MBM NAM VDR RSB BPM ARM JLR SAA FLC RAC VCS ASE RSP SOM HCL PBP PSSL
7. Submission of Statement of Assets, Liabilities and Networth (SALN)
Submit SALN to HRD on March 30, 2016
. . . . . . . . .
. Submitted SALN to
HRD before March 30, 2016
-
Submited SALN to HRD on March 30,
2016
-
Submitted SALN to HRD beyond the prescribed
date.
8. Coaching of all unit staff
100% of staff coached for program implementation strategy or development and corresponding report seven (7) working days of
. 100% of staff
coached for program implementation
strategy or development and
100% of staff coached for program
implementation strategy or
development and
100% of staff coached for program
implementation strategy or
development and
100% of staff coached for
program implementation
strategy or
100% of staff coached for
program implementation
strategy or
the ensuing month. corresponding corresponding corresponding development and development and report prepared report prepared 6 report prepared 7 corresponding corresponding within 5 working working days of the working days of the report prepared 8 report prepared
days of the ensuing ensuing month. ensuing month. working days of the beyond 8 working month. ensuing month. days of the
ensuing month.
Total Overall Rating Final Average Rating
MFO / PAP
Success Indicators
Individual Accountable Rating
Standard on when to receive 5,4,3,2,1 Remarks
5 4 3 2 1 VBL GVE MBM NAM VDR RSB BPM ARM JLR SAA FLC RAC VCS ASE RSP SOM HCL PBP PSSL
Rater's Comments and Reccomendation for Development Purposes of Rewards/Promotion:
PERFORMANCE MANAGEMENT TEAM (PMT)
VIRGILIO B. LUANSING I Chairman
Acting Division Manager A, PDCD & OIC, EWRD
RICARDO B. FELIX III Member
Division Manager A, HRD
CRISTINA S. TADURAN Member
IRMO-C, HRD
VICENTE ANICETO D. RUBIO Member
SWUM/DO, EWRD
EMMA A. CUYO Member
Division Manager A, AD / OIC - TBD
RONALD P. SARMIENTO Member
U/CSA A, WPEMD, MNWDEU President
Name and signature of ratee: Position: Date:
Final Rating By: Position: Date:
Republic of the Philippines METROPOLITAN NAGA WATER DISTRICT
40 J. Miranda Avenue, Naga City
DIVISION PERFORMANCE COMMITMENT AND REVIEW (DPCR) WATER PRODUCTION AND ELECTRO-MECHANICAL DIVISION
BREAKDOWN PER PUMP OPERATOR AND CARETAKER
I, ENGR. RENATO R. DELA CRUZ, Division Manager A of Water Production and Electro-Mechanical Division, commit to deliver and agree to be rated on the attainment of the following targets in accordance with the indicated measures for the period JANUARY 1, 2016 to JUNE 30, 2016.
ENGR. RENATO R. DELA CRUZ
Ratee Date: July 8, 2016
MFO's/STO's/PAP's Success Indicator
Individual Accountable
Standard on when to receive 5,4,3,2,1 Actual Accomplishment Rating
Alloted
MFO 1: WATER FACILITY SERVICE MANAGEMENT A. ADEQUACY/RELIABILITY OF SERVICE
CFA EMM VGB WPA EEE ASY AFC FZC EAS MDV DVA RIB VEM ABN DML MBB AGP ASB PPE LAF RPF JBP ANR DSB JCB LLD AVG MSR ATS DPC RBR DRB 5 4 3 2 1 Budget
1. Adequacy of Water Supply • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
8.3 million cu.m of Water Production Supply
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 8,877,435 cu.m of Water Production Supply
5.00 8.5 million cu.m
8.4 million cu.m
8.3 million cu.m
8.2 million cu.m
8.1 million cu.m
SUPPORT TO OPERATION (STO) • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
BACK
A. Operation of Production Sources
90 Reports on Daily Operation of Deepwell Pumps conducted
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 107 (Average) Daily Operation of Deepwell Pumps w/ 1 error
117; w/ no error
103; w/ 1 error 90; w/ 2 error 58; w/ 3 error 45; w/ 4 error
B. Chlorine Consumption 6 Reports on Daily Chlorine • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 6 Monthly Reports on Chlorine
BACK
6; submitted 1 6; submitted 2 6; submitted 3 6; submitted 4 6; submitted Monitoring Consumption Monitoring
submitted 3 working days of the ensuing month
Consumption Monitoring submitted 2 working days of the ensuing month
BACK
working day working days working days working days beyond 4 working days
C. Generator Set Operation and 6 Reports on Daily Generator Sets • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 6 Monthly Reports on Generator 6; submitted 1 6; submitted 2 6; submitted 3 6; submitted 4 6; submitted Diesel Fuel Consumption Monitoring
Operation and Diesel Fuel Consumption Monitoring submitted 3 working days of the ensuing month
Sets Operation and Diesel Fuel Consumption Monitoring submitted 2 working days of the ensuing month
BACK
working day working days working days working days beyond 4 working days
D. Water Level Monitoring 6 Reports on Spring Sources Water • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 6 Monthly Reports on Spring Sources 6; submitted 1 6; submitted 2 6; submitted 3 6; submitted 4 6; submitted Level Monitoring submitted 3 working days of the ensuing month
Water Level Monitoring submitted 1 working day of the ensuing month
working day working days working days working days beyond 4 working days
E. Water Production Monitoring 6 Reports on Daily Water • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 6 Monthly Reports on Daily Water
BACK
6; submitted 1 6; submitted 2 6; submitted 3 6; submitted 4 6; submitted Production submitted submitted 3 working day of the ensuing month
Production submitted 1 working day of the ensuing month
working day working days working days working days beyond 4 working days
GENERAL ADMINISTRATION AND SUPPORT SERVICES (GASS) • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
BACK
A. Submission of Monthly Accomplishment Reports
100% of Monthly Accomplishment Report submitted 5 working days of the ensuing month
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 100% of Monthly Accomplishment Report submitted 4 working days of the ensuing month
100%; 3 working days
100%; 4 working days
100%; 5 working days
100%; 6 working days
100%; beyond 6 working days
B. Submission of Statement of Submitted SALN to HRD on the • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Submitted SALN to HRD on or before
BACK
submitted on - - - submitted Assets, Liabilities and Networth 30th day of March (SALN)
the 30th day of March
BACK
or before the 30th day of
March
beyond the 30th day of
March
C. Individual Performance Commitment and Review (IPCR) Rating
100% of IPCR for July to December 2015 submitted on the 15th day of January 2016 to HRD and PDCD
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 100% of IPCR Rating for July to December 2015 submitted on the 12th day of January 2016 to HRD and PD
100%; submitted on
the 10th day of January 2016
100%; submitted on
the 11-14th day of January
100%; submitted on
the 15th day of January 2016
100%; submitted on
the 16-25th day of January
100%; submitted
beyond the 25th day of
5 - Outstanding 4 - Very Satisfactory 3 - Satisfactory 2 - Unsatisfactory 1 - Poor
APPROVED BY:
CESAR H. FEDERIZON General Manager A
Date:
MFO's/STO's/PAP's Success Indicator Individual Accountable Actual Accomplishment Rating
Standard on when to receive 5,4,3,2,1 Alloted Budget CFA EMM VGB WPA EEE ASY AFC FZC EAS MDV DVA RIB VEM ABN DML MBB AGP ASB PPE LAF RPF JBP ANR DSB JCB LLD AVG MSR ATS DPC RBR DRB 5 4 3 2 1
D. Liquidation of Cash Advance Liquidated 100% Cash Advance within the prescribed period
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Liquidated 100% Cash Advance 21 days upon return
BACK
100%; within the prescribed
period
- - - 100%; beyond the prescribed
period
TOTAL RATING FINAL AVERAGE RATING
5.00 5.00
Rater's Comments and Recommendation for Development Purposes of Rewards/Promotion:
The above rating has been discussed with me by my Division Chief. Name and signature of Ratee: ENGR. RENATO R. DELA CRUZ Final Rating by: CESAR H. FEDERIZON Position: Division Manager A Position: General Manager A Date: July 8, 2016 Date:
RICARDO B. FELIX III CRISTINA S. TADURAN Member Member
DMA - HRD IRMO-C, HRD
PERFORMANCE MANAGEMENT TEAM (PMT)
ENGR. VIRGILIO B. LUANSING I PMT Chairperson
ADMA - PDCD & OIC, EWRD
VICENTE ANICETO D. RUBIO Member
SWUM/DO, EWRD
EMMA A. CUYO Member
DMA - AD & OIC - TBD
RONALD P. SARMIENTO Member
MNWDEU President
Division Performance Commitment and Review (DPCR) Administrative Department
I, JEREMIAS P. ABAN, JR. Division Manager A of Administrative Department, commit to deliver and agree to be rated on the attainment of the following targets in accordance with the indicated measures for the period of January to July, 2016.
JEREMIAS P. ABAN, JR.
Division Manager A, Administrative Department
MFO/PAP's
Success Indicator
Standards on when to receive 5,4, 3, 2, 1 Budget Alloted
JLS
JB
ML
LA
JC
BB
IGP
AA
FA
JF
JOF
SE
EGC
RR
SB
LB
JE
DRIVERS
Ratings 5 4 3 2 1
A. SUPPORT TO OPERATION I - GENERAL SERVICES A. PREPARATION OF LORRY SALES REPORT (LSR)
100% of Lorry Sales Report (LSR) prepared & reviewed within 5 days of ensuing month
•
•
•
100% Prepared & reviewed LSR w/in 3 days of ensuing month
100% Prepared & reviewed LSR w/in 4 days of ensuing month
100% Prepared & reviewed LSR w/in 5 days of ensuing month
100% Prepared and reviewed LSR w/in 6 days of ensuing month
Prepared & reviewed LSR beyond 4 days of ensuing month
B. APPROVAL OF MAINTENANCE SERVICE REQUEST REPORT(MSR)
100% of Maintenance Service Request (MSR) prepared & reviewed within 1 day
•
•
•
100% prepared MSR w/in 2 hrs
100% prepared MSR w/in 1/2 day
100% prepared MSR w/in 1 day
100% prepared MSR w/in 1 1/2 day
Prepared MSR w/in 1 1/2 days and beyond
C. REQUISTION AND ISSUE VOCHER (WORKING FUND)
100% of Requistion and Issue Voucher acted and signed 5 mins upon receipt of request
•
•
100% Accomplished w/in 3 mins
100% Accomplished w/in 4 mins
100% Accomplished w/in 5 mins
100% Accomplished w/in 6 mins
100% Accomplished beyond 6 mins
5- Outstanding 4- Very Satisfactory 3- Satisfactory 2- Unsatisfactory 1- Poor
APPROVED BY: CESAR H. FEDERIZON
General Manager
MFO/PAP's
Success Indicator
Standards on when to receive 5,4, 3, 2, 1 Budget Alloted
JLS
JB
ML
LA
JC
BB
IGP
AA
FA
JF
JOF
SE
EGC
RR
SB
LB
JE
DRIVERS
Ratings 5 4 3 2 1
D. WATER REFILLING STATION ACTIVITIES
100% Sales report prepared and accomplished every 5th day of ensuing month
•
•
•
100% accomplished
every 3rd day of ensuing month
100% accomplished
every 4th day of ensuing month
100% accomplished
every 5th day of ensuing month
100% accomplished
every 6th day of ensuing month
100% accomplished
beyond 6th day of ensuing month
II - DRIVING SERVICES A. TRIP TICKETS PREPARATION
100% of Trip tickets accomplished, acted and signed 15 minutes upon receipt of request
•
•
•
•
100% accomplished 7 mins upon receipt
100% accomplished 10 mins upon receipt w
100% accomplished 15 mins upon receipt
100% Accomplished 20 mins upon receipt
Accomplished beyond 20 mins
B. APPROVAL OF REPORT OF WASTE MATERIAL
100% of Report of Waste reviewed within 1 hour upon receipt of request
•
•
100% Reviewed within 30 mins
100% Reviewed within 45 mins
100% Reviewed within 1 hour
100% Reviewed within 1 hour & 30 mins
100% Reviewed beyond 1 hr & 30 mins
C. TRANSPORT OFFICE PERSONNEL, MATERIALS AND EQUIPMENT
100% of Office personnel, materials and equipment transported to respective destination upon receipt of trip tickets within 15 mins subject to the availability of service vehicle with no negative feedback
•
•
100% accomplished w/in 7 mins
100% accomplished w/in 10 mins
100% acccomplished w/in 15 mins
100% Accomplished w/in 20 mins
Accomplished beyond 20 mins
D. EXTENDED SERVICES 100% of Water delivered to respective desitnation within 2 days from receipt of trip tickets
•
•
100% accomplished in 1 day
100% accomplished in 1 1/2 day
100% acccomplished 2 days
100% Accomplished in 2 1/2 days
Accomplished beyond 2 1/2 days
III - MAINTENANCE
MFO/PAP's
Success Indicator
Standards on when to receive 5,4, 3, 2, 1 Budget Alloted
JLS
JB
ML
LA
JC
BB
IGP
AA
FA
JF
JOF
SE
EGC
RR
SB
LB
JE
DRIVERS
Ratings 5 4 3 2 1
A. MOTORPOOL ACTIVITIES 100% of Major & minor equipment, vehicles, motorcycles repaired 60 days upon request
•
•
•
100% Major repaired w/in 30 days
100% Major repaired w/in 45days
100% Major repaired w/in 60 days
100% Major repaired 90 days
Major repaired beyond 90 days
B. RENEWAL OF LTO REGISTRATION
100% Vehicles renewed & registered before the expiration date 7working days
•
•
100% Renewed & registered 3 days before expiration date
100% Renewed & registered 5 days before expiration date
100% Renewed & registered 7 days before expiration date
100% Renewed & registered 9 days after expiration date
Renewed & registered beyond 9 days after expiration date
C. RENEWAL FOR EMISSION TESTING CERTIFICATE
100% of Vehicles renewed for emission testing 7 working days
•
•
100% Renewed for emission w/in 3 days
100% Renewed for emission w/in 5 days
100% Renewed for emission w/in 7 days
100% Renewed for emission 8 to 12 days
Renewed for emission beyond 12 days
D. RENEWAL FOR GSIS PREMIUMS
100% of Vehicles renewed for GSIS insurance premiums 7 working days
•
•
100% Renewed for GSIS ins prem w/in 3 days
100% Renewed for GSIS ins prem w/in 5 days
100% Renewed for GSIS ins prem w/in 7 days
100% Renewed for GSIS ins prem 8 to 12 days
Renewed for GSIS ins prem beyond 12 days
E. PREPARATION OF PPR AND PJOR
100% of Pre-purchase Requisition (PPR) and Pre-Job Order Requisition (PJOR) prepared for service units 2 working days
•
•
100% Prepared&signed PPR & PJOR w/in 1 day
100% Prepared&signed PPR & PJOR w/in 1 and 1/2 day
100% Prepared&signed PPR & PJOR w/in 2 days
100% Prepared&signed PPR & PJOR w/in 2 and 1/2 days
Prepared&signed PPR & PJOR beyond 2 and 1/2 days
MFO/PAP's
Success Indicator
Standards on when to receive 5,4, 3, 2, 1 Budget Alloted
JLS
JB
ML
LA
JC
BB
IGP
AA
FA
JF
JOF
SE
EGC
RR
SB
LB
JE
DRIVERS
Ratings 5 4 3 2 1
F. PREPARATION OF GAS CONSUMPTION REPORT
100% monitored Gasoline Consumption of Office vehicles and equipments every 5 th day of ensuing month
•
•
•
100% Accomplished within 3rd days of ensuing month
100% Accomplished within 4th days of ensuing month
100% Accomplished within 5th days of ensuing month
100% Accomplished within 6th days of ensuing month
Accomplished beyond 6th days of ensuing month
G.. GROUND AND BUILDING ACTIVITIES
100% Building maintenance report prepared every 5th day of ensuing month
•
•
•
100% Accomplished within 3rd days of ensuing month
100% Accomplished within 4th days of ensuing month
100% Accomplished within 5th days of ensuing month
100% Accomplished within 6th days of ensuing month
Accomplished beyond 6th days of ensuing month
100% Electrical installation acted upon within 1 hour upon request
•
•
100% Accomplished within 30 mins acted upon request
100% Accomplished within 45 mins acted upon request
100% Accomplished within 1 hr acted upon request
100% Accomplished within 30 mins acted upon request
100% Accomplished within 30 mins acted upon request
100% Major and minor repairs of the building/office premises acted upon within 1 hour upon request
•
•
100% Accomplished within 30 mins acted upon request
100% Accomplished within 45mins acted upon request
100% Accomplished within 1 hour acted upon request
100% Accomplished within 1 hour and 30 mins acted upon request
Accomplished beyond 1 hour and 30 mins acted upon request
H. HOUSEKEEPING 100% maintained cleanliness of ground and office building within 1 day
•
•
•
100% accomplished in 30 mins
100% accomplished in 45 mins
100% accomplished in 1 day
100% Accomplished in 1 & 1/2 day
Accomplished beyond 1 1/2 day
IV- PROCUREMENT SERVICES
MFO/PAP's
Success Indicator
Standards on when to receive 5,4, 3, 2, 1 Budget Alloted
JLS
JB
ML
LA
JC
BB
IGP
AA
FA
JF
JOF
SE
EGC
RR
SB
LB
JE
DRIVERS
Ratings 5 4 3 2 1
A. PREPARATION OF ABSTRACT QUOTATION (PR) and ABSTRACT QUOTATION (PJOR)
100% AQ PR & PJOR prepared & signed 2 working days after canvass
•
•
100% Prepared & signed w/in 1day
100% Prepared & signed w/in 1 and 1/2 day
100% Prepared & signed w/in 2days
100% Prepared & signed w/in 2 and 1/2days
Prepared & signedAQ beyond 2 and 1/2 days
B. PREPARATION OF PRICE QUOTATION REQUEST
100% 0f PQR prepared, distributed/served & signed to the prospective supplier 2 working days
•
•
•
100% accomplished of PQR w/in 1 day
100% accomplished of PQR w/in 1 and 1/2 day
100% accomplished of PQR w/in 2days
100% accomplished of PQR w/in 2 and 1/2 days
Accomplished of PQR beyond 2 1/2 days
C. PREPARATION OF PRICE INQUIRY
100% of price inquiry prepared&served 2 working days upon receipt of request
•
•
100% Prepared&served Price Inquiry Request w/in 1 day
100% Prepared&served Price Inquiry Request w/in 1 and 1/2 day
100%Prepared&s erved Price Inquiry Request w/in 2 days
100% Prepared&served Price Inquiry Request w/in 2 and 1/2 days
Prepared &served Price Inquiry Request beyond 2 1/2 days
D. PREPARATION OF PURCHASE ORDER
100% of Purchase order prepared,signed & served 2 working days upon receipt of Abstract Quotation w/ no error
•
•
•
100% Prepared,signed& served PO w/in 1 day
100% Prepared,signed& served PO w/in 1 and 1/2 day
100% Prepared,signed& served PO w/in 2 days
100% Prepared,signed& served PO w/in 2 and 1/2 days
Prepared,signed& served PO beyond 2 1/2 days
V- PROPERTY AND SUPPLIES A.REVIEW OF PJOR, JOB ORDER, PPR, PR
100% of PJOR, Job Order, PPR & PR reviewed & signed 15 mins upon receipt of the documents
•
•
100% Reviewed w/in 7 mins upon receipt
100% Reviewed w/in 10 mins upon receipt
100% Reviewed w/in 15 mins upon receipt
100% Reviewed w/in 20 mins upon receipt
100% Reviewed beyond 20 mins upon receipt
MFO/PAP's
Success Indicator
Standards on when to receive 5,4, 3, 2, 1 Budget Alloted
JLS
JB
ML
LA
JC
BB
IGP
AA
FA
JF
JOF
SE
EGC
RR
SB
LB
JE
DRIVERS
Ratings 5 4 3 2 1
B. PREPARATION OF INSPECTION AND ACCEPTANCE REPORT
100% of Inspection and acceptance report prepared & reviewed 1 day upon completion of deliveries
•
•
•
100% accomplished w/in 30 mins upon completion of deliveries
100%accomplishe d w/in 45 mins upon completion of deliveries
100% accomplished w/in 1 day upon completion of deliveries
100% Accomplished w/in 1 & 1/2 day upon completion of deliveries
Accomplished beyond 1 1/2 days upon completion of deliveries
C. RECEIPT AND ISSUANCE OF MIS, RIS & RMS OF SUPPLIES, TOOLS, MATERIALS & FITTINGS
100% of MIS, RIS, & RMS issued, inspected and reviewed upon 2 hours upon receipt of request
•
•
•
•
100% accomplished w/in 1 hour upon receipt of request
100% accomplished w/in 1 1/2 hour upon receipt of request
100% accomplished w/in 2 hours upon receipt of request
100% Accomplished w/in 2 1/2 hours upon receipt of request
Accomplished beyond 2 1/2 hours upon receipt of request
VI- CALIBRATION A. REVIEW OF WATER AND FLOW METER CALIBRATION & REPAIR REPORT
100% of Water and Flow Meters calibrated & repaired reviewed within 5 days of ensuing month
•
•
100% reviewed within the 3rd day
100% reviewed within the 4th day
100% reviewed within the 5th day
100% reviewed within the 6th day
Reviewed beyond the 6th day
DIVISION TOTAL RATING DIVISION TOTAL AVERAGE RATING
• •
PERFORMANCE MANAGEMENT TEAM (PMT)
VIRGILIO B. LUANSING I
Chairperson
Acting Division Manager A, PDCD & OIC, EWRD
EMMA A. CUYO RICARDO B. FELIX III CHRISTINA S. TADURAN VICENTE ANICETO D. RUBIO RONALD P. SARMIENTO
Member Member Member Member Member
DMA, A, AD & OIC, TBD DMA, HRD IRMO-C. HRD SWUM/DO, EWRD U/CSA A, WPEMD & MNWDEU I
Republic of the Philippines METROPOLITAN NAGA WATER DISTRICT
No. 40 J. Miranda Avenue, Naga City
DIVISION PERFORMANCE COMMITMENT AND REVIEW (DPCR) Human Resource Division
I, RICARDO B. FELIX III, Division Manager A, commit to deliver and agree to be rated on the attainment of the following targets in accordance with the indicated measures for the period January to June 2016.
RICARDO B. FELIX III Division Manager A
PAP's SUCCESS INDICATOR ACCOMPLISHMENT
(JAN-JUNE)
INDIVIDUAL ACCOUNTABLE
AVERAGE RATING
Standards on when to receive 5,4, 3, 2, 1 Alloted Budget RBF CST NPS SPN JALB MGD CGRR AVF 5 4 3 2 1
SUPPORT TO OPERATIONS 1. Planning and Budgeting a. Submission of Project Procurement Management Plan (PPMP).
Submitted PPMP to OGM within fifteen (15) days upon receipt of the approved annual budget with at least two (2) negative feedbacks.
Submitted PPMP to OGM on 1/27/2016 (within 7 wd from receipt) with no negative feedback.
•
•
-
-
-
-
-
-
•
•
E=with PPMP; Q=no neg. feedback; T=7 days
Q=1 neg. feedback; T=8- 13 days
Q=2-5 neg. feedbacks; T=14 16 days
E=less than 100%; Q=5-10 neg. feedbacks; T=17-25 days
Q=6 & more neg. feedbacks; T=more than 26 days
b. Monitoring of Division's Annual Budget
100% of PPR/PJOR reviewed as to correctness & completeness in three (3) working days after receipt with at least 2 negative feedbacks.
100% of PPR/PJOR reviewed in an average of 1 wd after receipt & 1 negative feedback.
•
•
-
-
-
-
-
•
•
•
E=100% ; Q=no negative feedback; T=upon receipt
Q=1 neg. feedback; T=2nd wd
Q=2-5 neg. feedbacks; T=3rd-5th wd
E=less than 100%; Q=6-9 neg. feedbacks; T=6th-15th wd
Q=10 & more neg. feedbacks; T=16th wd & beyond
Five (5) Summary of office supplies expense reviewed in three (3) working days upon receipt.
Reviewed five (5) reports in an average of 1 wd upon receipt.
•
•
-
-
-
-
-
-
•
•
E=6 reports ; T=1st wd of ensuing month
T=2nd-3rd wd
T=4th-5th wd
E=less than 6; Q=6-9 neg. feedbacks; T=6th-15th wd
Q=10 & more neg. feedbacks; T=16th wd & beyond
5- Outstanding 4- Very Satisfactory 3- Satisfactory 2- Unsatisfactory 1- Poor
APPROVED BY:
CESAR H. FEDERIZON General Manager A
Date:
PAP's SUCCESS INDICATOR ACCOMPLISHMENT
(JAN-JUNE)
INDIVIDUAL ACCOUNTABLE AVERAGE RATING
Standards on when to receive 5,4, 3, 2, 1 Alloted Budget RBF CST NPS SPN JALB MGD CGRR AVF 5 4 3 2 1
Five (5) Summary of Budget Utilization Slip (BUS) for accounts/expenses charged to HRD are checked/reviewed every 10th wd of ensuing month.
Reviewed five (5) Reports in an average of 1.6 days & no revisions.
•
•
-
-
-
-
-
-
•
•
E=6 reports ; Q=no negative feedback; T=5th wd of ensuing mo.
Q=1 neg. feedback; T=6th- 8th wd
Q=2-5 neg. feedbacks; T=9th-10th wd
E=less than 6; Q=6-9 neg. feedbacks; T=10th-25th wd
Q=10 & more neg. feedbacks; T=26th wd & beyond
1. Public Assistance and Complaint Desk a. Duty as Officer of the Day b. Assistance to requests of clients. c. Client queries acted upon
100% of Duty as PACD Officer of the day complied with.
100% of Duty as PACD Officer of the day complied with.
•
•
•
E= 100% of schedule complied; Q=no negative feedback
Q=1 negative feedback
Q=2-5 negative feedbacks
E= less than 100%; Q=6-10 negative feedbacks
Q=11 negative feedbacks
100% of requests for assistance acted upon within 30 minutes and clients are made to sign in the monitoring logsheet.
100% of requests for assistance acted upon within 100 minutes & clients are made to sign in the monitoring logsheet.
•
•
•
E=100%; T=15 mins.
T=16-25 mins
T=26-30 mins
E=less than 100%; T=31-50 mins.
T=51 mins
100% of queries acted upon within 30 minutes and clients are made to sign in the monitoring logsheet.
100% of queries acted upon within 100 minutes & clients are made to sign in the monitoring logsheet.
•
•
•
E=100%; T=15 mins.
T=16-25 mins
T=26-30 mins
E=less than 100%; T=31-50 mins.
T=51 mins
3. Performance Management System 2. Submission of DPCR and IPCR
DPCR for July-Dec. 2016 submitted on June 15, 2016 with at least 2 revisions.
DPCR for July-Dec. 2016 submitted on June 15, 2016 with no revision.
•
•
-
-
-
-
-
-
•
•
E=with DPCR; Q=no revision; T=June 7
Q=1 revision; T=June 8-14
Q=2-5 revisions; T=June15
Q=6-9revisions; T=June 16-25
Q=10 & more revisions; T=beyond June 26
100% of staff submitted IPCR for the period July-Dec. 2016 on June 15, 2016.
100% of HRD staff submitted IPCR on 6/15/2016.
•
•
•
•
•
•
•
•
•
•
E=100%; T=June 7
T=June 8-14
T=June 15
E=less than 100%; T=July 16 25
T=beyond June 26
Submit IPCR Ratings of all staff on Jan. 15, 2016 for July-Dec. 2015 evaluation .
All staff submitted IPCR Ratings on 1/8/2016.
•
•
•
•
•
•
•
•
•
•
E=100% of Staff; T=Jan. 8
T=Jan. 9-14
T=Jan. 15-17
E=less than 100%; T=Jan. 18 28
T=Jan. 29
PAP's SUCCESS INDICATOR ACCOMPLISHMENT
(JAN-JUNE)
INDIVIDUAL ACCOUNTABLE AVERAGE RATING
Standards on when to receive 5,4, 3, 2, 1 Alloted Budget RBF CST NPS SPN JALB MGD CGRR AVF 5 4 3 2 1
Submit my DPCR Ratings on Jan. 15, 2016 for July-Dec. 2015 evaluation with at least 2 revisions.
Submitted my Individual DPCR on 1/8/2016 with no revision.
•
-
-
-
-
-
-
-
•
•
E=with DPCR Ratings; Q=no revision; T=Jan. 8
Q=1 revision; T=Jan. 8-14
Q=2-5 revision; T=Jan.15
E=no DPCR; Q=6-9 revisions; T=Jan. 16-25
Q=10 & revisions; T=Jan. 26 & beyond
4. Check/review Staff's Monthly Accomplishment Report (MAR)
100% of HRD staff submitted MAR on the 5th working day of ensuing month.
100% of staff submitted M AR in an average of 1-2 working days.
•
•
•
•
•
•
•
•
•
•
E= all HRD styaff with AR; T=1st wd
T=2nd-4th wd
T=5th wd
E=not all HRD staff submitted AR; T=6th-15th wd
T=beyond 16th
wd
Six (6) MAR of staff reviewed by section heads as to correctness & completeness of proofs/evidence in three (3) working days with at least 2 negative feedbacks.
Checked six (6) MAR of upon receipt with no negative feedback.
•
•
•
•
E=6 ARs ; Q=no negative feedback; T=upon receipt
Q=1 neg. feedback; T=2nd wd
Q=2-5 neg. feedbacks; T=3rd-5th wd
E=less than 6 ARs; Q=6-9 neg. feedbacks; T=6th-15th wd
Q=10 & more neg. feedbacks; T=16th wd & beyond
5. Submission of Division's semi- annual accomplishment report. - Powerpoint Presentation
Division's Accomplishment Report with documentation submitted to the OGM every 15th cd of Jan. or on date as required by Agency Head.
Unit's 6-month AR in Powerpoint format submitted on 1/8/2016.
•
-
-
-
-
-
-
•
•
•
E=with AR; T=Jan. 8
T=Jan. 9-14
T=Jan. 15-17
E=no AR; T=Jan. 18-25
T=beyond Jan. 26
GENERAL ADMINISTRATIVE AND SUPPORT(GAS)
1. Internal Processes a. Review of staffing pattern, organizational structure (OS) and related schedules.
Review 100% of Staffing pattern, OS and other related schedules as may be assigned by the Agency Head in connection with the proposed systems in three (3) wd with at least 2 negative feedbacks.
Reviewed/submitted staffing pattern, and related schedules & reports upon receipt with no negative feedbacks.
•
•
-
-
-
-
-
-
•
•
E=100%; Q=no revisions; T=upon request of HOA
Q=1 revision; T=1 wd after request of HOA
Q=2-5 revisions; T=3 wd after request
E=less than 100%; Q=6-9 revisions; T=4- 10 wd after request
Q=10 & more revisions; T=11 wd & beyond
b. Certification of documents such as, Application for Leave (Form 6), Compensatory Time-Off (CTO) & Monetization of Leave Credits.
100% of CS form 6 or Application for Leave certified in three (3) wd from receipt of each application with at least 2 negative feedbacks.
100% of these documents certified upon receiptwith no negative feedbacks.
•
-
-
-
-
-
•
-
•
•
E=100%; Q=no neg. feedback; T=1 wd
Q=1 neg. feedback; T=2 wd
Q=2-5 neg. feedback; T=3 wd
E=less than 100%; Q=6-9 neg. feedback; T=4-10 wd
Q=10 & more neg. feedback; T=11 wd & beyond
100% of Application for Overtime Service Authorization certified in three (3) wd from receipt of each application with at least 2 negative feedbacks.
100% of these documents certified upon receiptwith no negative feedbacks.
•
•
•
•
E=100%; Q=no neg. feedback; T=1 wd
Q=1 neg. feedback; T=2 wd
Q=2-5 neg. feedback; T=3 wd
E=less than 100%; Q=6-9 neg. feedback; T=4-10 wd
Q=10 & more neg. feedback; T=11 wd & beyond
PAP's SUCCESS INDICATOR ACCOMPLISHMENT
(JAN-JUNE)
INDIVIDUAL ACCOUNTABLE AVERAGE RATING
Standards on when to receive 5,4, 3, 2, 1 Alloted Budget RBF CST NPS SPN JALB MGD CGRR AVF 5 4 3 2 1
100% of Application for CTO certified in three (3) wd from receipt of each application with at least 2 negative feedbacks.
100% of these documents certified upon receiptwith no negative feedbacks.
•
•
•
•
•
E=100%; Q=no neg. feedback; T=1 wd
Q=1 neg. feedback; T=2 wd
Q=2-5 neg. feedback; T=3 wd
E=less than 100%; Q=6-9 neg. feedback; T=4-10 wd
Q=10 & more neg. feedback; T=11 wd & beyond
c. Certification/review of Summary of Monetization.
100% of Summary of Monetization signed & forwarded to OGM in three (3) wd after receipt with at least 2 negative feedbacks.
100% of Summary of Monetization signed & forwarded to OGM upon receipt with no negative feedback.
•
-
•
-
-
-
•
-
•
•
E=100%; Q=no neg. feedback; T=upon receipt
Q=1 neg. feedback; T=2 wd
Q=2-5 neg. feedbacks; T=3- 5 wd
E=less than 100%; Q=6-9 neg. feedbacks; T=6-15 wd
Q=10 & more neg. feedbacks; T=more than 16 wd
d. Certification of request for bond coverage and/or cancellation of bond for accountable officials and employees.
100% of request for bond and/or cancellation of bond coverage certified/signed in three (3) wd after receipt with at least 2 negative feedbacks.
100% of request for renewal of bond coverage signed upon receipt with no negative feedbacks.
•
-
•
-
-
-
-
•
•
•
E=100%; Q=no neg. feedback; T=upon receipt
Q=1 neg. feedback; T=2 wd
Q=2-5 neg. feedbacks; T=3- 5 wd
E=less than 100%; Q=6-9 neg. feedbacks; T=6-15 wd
Q=10 & more neg. feedbacks; T=more than 16 wd
100% of application for bond coverage of newly appointed accountable employees certified/signed in three (3) wd after receipt with at least 2 negative feedbacks.
100% of requests for new bond coverage signed upon receipt with no negative feedbacks.
•
-
•
-
-
-
-
•
•
•
E=100%; Q=no neg. feedback; T=upon receipt
Q=1 neg. feedback; T=2 wd
Q=2-5 neg. feedbacks; T=3- 5 wd
E=less than 100%; Q=6-9 neg. feedbacks; T=6-15 wd
Q=10 & more neg. feedbacks; T=more than 16 wd
e. Issuance of certifications
100% of requests certified and issued in three (3) wd from receipt with at least 2 negative feedbacks.
100% of a total of 202 requests certified upon receipt with no negative feedbacks.
•
-
-
-
-
-
•
-
•
•
E=100%; Q=no neg. feedback; T=upon receipt
Q=1 neg. feedback; T=2 wd
Q=2-5 neg. feedbacks; T=3- 5 wd
E=less than 100%; Q=6-9 neg. feedbacks; T=6-15 wd
Q=10 & more neg. feedbacks; T=more than 16 wd
f. Printing of DTRs of Regular, Casual and CSWs.
100% of of DTRs printed: Regular & Casual every 20th of the ensuing month; CSWs every every 1st wd after payroll cut-off with at least two (2) revisions.
100% of of DTRs printed: Regular & Casual before due date ; CSWs every every 1st wd after payroll cut-off.
-
-
-
-
-
-
•
•
•
•
E=100%; Q=no revision; T=1 wd
-
-
E=less than 100%; Q=with revision; T=more than 1 wd
-
g. Printing of CSW IDs
100% of CSW IDs printed in three (3) wd after receipt of five (5) requests with no revision.
100% of 120 IDs printed & issued.
-
-
-
-
-
-
-
•
•
•
E=100%; Q=no revision; T=1 wd
T=2 wd
T=3 wd
E=less than 100%; Q=with revision; T=6-9 wd
T=10 wd
PAP's SUCCESS INDICATOR ACCOMPLISHMENT
(JAN-JUNE)
INDIVIDUAL ACCOUNTABLE AVERAGE RATING
Standards on when to receive 5,4, 3, 2, 1 Alloted Budget RBF CST NPS SPN JALB MGD CGRR AVF 5 4 3 2 1
g. Certification of summary of Attendance of HRD Contract of Service Workers (CSW).
100% of Summary of Attendance of CSW certified as to services rendered forwarded to Divisions upon receipt with at least 2 negative feedbacks.
100% of Summary of Attendance of CSW certified as to services rendered forwarded to Divisions upon receipt with no negative feedbacks.
•
-
•
-
-
-
-
•
•
•
E=100%f; Q=no neg. feedback; T= upon receipt
Q=1 neg. feedback
Q=2-5 neg. feedbacks
E=less than 100%; Q=6-9 neg. feedbacks; T=more than 1 day
-
2. Internal Resource Management a. Review of Service Records
100% of service records reviewed in three (3) working days after receipt with at least 2 negative feedbacks.
100% of service records reviewed upon receipt with no negative feedback.
•
-
•
-
-
-
-
-
•
•
E=100%; Q=no neg. feedbacks; T=upon receipt
Q=1 neg. feedback; T=2nd day
Q=2-5 neg. feedbcaks; T=3rd-5th day
E=less than 100%; Q=6-9 neg. feedbacks; T=6th-15th day
Q=10 & more neg. feedbacks; T=beyond 16th day
b. Communications
100% of drafts of Communications reviewed and forwarded to GM within 2 hours upon receipt.
100% of drafts of Communications reviewed and forwarded to GM within 1 hour upon receipt.
•
•
-
-
-
-
-
-
•
•
E=100%; T=one (1) hr
T=1 hr & 15 mins to 1 hr & 45 mins
T=2 hrs to 2 hrs & 30 mins
E=less than 100%; T=3-4 hrs
T=more than 4 hrs
c. Submit reports to other agencies (DBM & CSC)
Six (6) sets of Plantilla of Personnel certified & reviewed as to correctness for submission to DBM on the 15th working day of February with 2 negative feedbacks.
Reviewed/submitted 6 sets of POP to DBM on 2/2/2016 with no neg. feedbacks
•
•
-
-
-
•
-
-
•
•
E=100%; Q=no neg. feedback; T= Feb. 7
Q=1 neg. feedback; T=Feb. 8-13
Q=2-5 neg. feedbacks; T=Feb. 14-16
E=less than 100%; Q=6-9 neg. feedbacks; T=Feb. 17-25
Q=10 & more neg. feedbacks; T=Feb. 26 & beyond
Six (6) monthly Report on Appointment Issued (RAI) certified & reviewed as to correctness for submission to CSC Field Office on 15th day of the following month with 2 negative feedbacks.
Checked six (6) RAI in an average of 1 day with no negative feedbacks.
•
•
-
-
-
•
-
-
•
•
E=100%; Q=no neg. feedback; T= 7th wd
Q=1 neg. feedback; T=8th- 13th
Q=2-5 neg. feedbacks; T=14th-16th
E=less than 100%; Q=6-9 neg. feedbacks; T=7th-25th
Q=10 & more neg. feedbacks; T=26th wd & beyond
Six (6) monthly Report on Separation certified & reviewed as to correctness for submission to CSC Field Office every 15th day of following month with 2 negative feedbacks.
Checked six (6) Monthly Separation in an average of 1 day with no negative feedbacks.
•
•
-
-
-
•
-
-
•
•
E=100%; Q=no neg. feedback; T= 7th wd
Q=1 neg. feedback; T=8th- 13th
Q=2-5 neg. feedbacks; T=14th-16th
E=less than 100%; Q=6-9 neg. feedbacks; T=7th-25th
Q=10 & more neg. feedbacks; T=26th wd & beyond
One (1) reports on Accession certified & reviewed as to correctness for submission to CSC Field Office every 15th day of following quarter with 2 negative feedbacks.
Checked upon receipt of report (submitted to CSC FO on 4/11/2016) with no negative feedbacks.
•
•
-
-
-
•
-
-
•
•
E=100%; Q=no neg. feedback; T= 7th wd
Q=1 neg. feedback; T=8th- 13th
Q=2-5 neg. feedbacks; T=14th-16th
E=less than 100%; Q=6-9 neg. feedbacks; T=7th-25th
Q=10 & more neg. feedbacks; T=26th wd & beyond
Two (2) sets of Agency's Quarterly Accomplishment Report (AQAR) certified & reviewed as to correctness for submission to CSC Field Office every 5th cd of following quarter with at least 2 negative feedbacks.
2 reports submitted to CSC on Jan. 5, 2016 (Oct.-Dec. 2015) & Apr. 4, 2016 (Jan.-Mar. 2016) with no negative feedbacks.
•
•
-
•
-
-
-
-
•
•
E=100%; Q=no neg. feedback; T= 1st wd
Q=1 neg. feedback; T=2nd-4th
Q=2-5 neg. feedbacks; T=5th-7th
E=less than 100%; Q=6-9 neg. feedbacks; T=8th-15th
Q=10 & more neg. feedbacks; T=16th cd & beyond
PAP's SUCCESS INDICATOR ACCOMPLISHMENT
(JAN-JUNE)
INDIVIDUAL ACCOUNTABLE AVERAGE RATING
Standards on when to receive 5,4, 3, 2, 1 Alloted Budget RBF CST NPS SPN JALB MGD CGRR AVF 5 4 3 2 1
d. Other HRD Internal Reports
Six 6 Monthly reports on Punctuality & Attendance reviewed as to correctness and completeness within three (3) working days upon receipt with at least 2 negative feedback.
100% of monthly reports reviewed as to correctness and completeness upon receipt with no negative feedback.
•
-
•
•
-
•
•
E=6; Q=no neg. feedbacks; T=upon receipt
Q=1 neg. feedback; T=2nd day
Q=2-5 neg. feedbcaks; T=3rd-5th day
E=less than 6; Q=6-9 neg. feedbacks; T=6th-15th day
Q=10 & more neg. feedbacks; T=beyond 16th day
Six (6) monthly Summary of LWOP reviewed as to correctness and completeness within three (3) working days upon receipt with at least 2 negative feedback.
100% of monthly reports reviewed as to correctness and completeness upon receipt with no negative feedback.
•
•
•
•
•
E=6; Q=no neg. feedbacks; T=upon receipt
Q=1 neg. feedback; T=2nd day
Q=2-5 neg. feedbcaks; T=3rd-5th day
E=less than 6; Q=6-9 neg. feedbacks; T=6th-15th day
Q=10 & more neg. feedbacks; T=beyond 16th day
Six (6) monthly Summary of Pass Slip reviewed as to correctness and completeness within three (3) working days upon receipt with at least 2 negative feedback.
100% of monthly reports reviewed as to correctness and completeness upon receipt with no negative feedback.
•
•
•
•
•
E=6; Q=no neg. feedbacks; T=upon receipt
Q=1 neg. feedback; T=2nd day
Q=2-5 neg. feedbcaks; T=3rd-5th day
E=less than 6; Q=6-9 neg. feedbacks; T=6th-15th day
Q=10 & more neg. feedbacks; T=beyond 16th day
Six (6) monthly reports on Summary of Leave Balance reviewed as to correctness and completeness within three (3) working days upon receipt with at least 2 negative feedback.
100% of monthly reports reviewed as to correctness and completeness upon receipt with no negative feedback.
•
•
•
•
•
E=6; Q=no neg. feedbacks; T=upon receipt
Q=1 neg. feedback; T=2nd day
Q=2-5 neg. feedbcaks; T=3rd-5th day
E=less than 6; Q=6-9 neg. feedbacks; T=6th-15th day
Q=10 & more neg. feedbacks; T=beyond 16th day
100% of all other reports of Personnel Welfare Section reviewed as to correctness and completeness within three (3) working days upon receipt with at least 2 negative feedback.
100% of all other reports of Personnel Welfare Section reviewed as to correctness and completeness upon receipt with no negative feedback.
•
-
•
-
•
-
•
-
•
•
E=100%; Q=no neg. feedbacks; T=upon receipt
Q=1 neg. feedback; T=2nd day
Q=2-5 neg. feedbcaks; T=3rd-5th day
E=less than 100%; Q=6-9 neg. feedbacks; T=6th-15th day
Q=10 & more neg. feedbacks; T=beyond 16th day
100% of other internal HRD reports noted/signed in three (3) working days upon receipt.
100% of other internal HRD reports noted/signed upon receipt.
•
•
•
•
E=100%; T= upon receipt
T=2nd day
T=3rd day
E=less than 100%; T=4th- 10th
T=beyond 11th day
100% of HRD forms/documents reviewed in three (3) working days upon receipt.
100% of HRD forms/documents reviewed upon receipt.
•
•
•
•
E=100%; T= upon receipt
T=2nd day
T=3rd day
E=less than 100%; T=4th- 10th
T=beyond 11th day
3. Learning & Growth – Human Capital
PAP's SUCCESS INDICATOR ACCOMPLISHMENT
(JAN-JUNE)
INDIVIDUAL ACCOUNTABLE AVERAGE RATING
Standards on when to receive 5,4, 3, 2, 1 Alloted Budget RBF CST NPS SPN JALB MGD CGRR AVF 5 4 3 2 1
a. Publication of vacant positions
100% of vacant positions certified as to correctness & completeness in three (3) working days after receipt with at least 2 negative feedbacks.
None
-
-
-
-
-
-
-
-
-
-
E=100%; Q=no neg. feedback; T= upon receipt
Q=1 neg. feedback; T=2nd day
Q=2-5 neg. feedbacks; T=3rd-5th wd
E=less than 100%; Q=6-9 neg. feedbacks; T=6th-15th wd
Q=10 & more neg. feedbacks; T=16th wd & more
b. Appointment (CSC Form 33), Position Description Form (PDF) & Assumption of Duties
100% of these documents certified as to correctness & completeness in three (3) working days upon receipt with at least 2 negative feedbacks.
100% of these documents reviewed in an average of 1 day and with one (1) negative feedbacks.
•
•
-
-
-
•
-
-
•
•
E=100%; Q=no neg. feedback; T= upon receipt
Q=1 neg. feedback; T=2nd day
Q=2-5 neg. feedbacks; T=3rd-5th wd
E=less than 100%; Q=6-9 neg. feedbacks; T=6th-15th wd
Q=10 & more neg. feedbacks; T=16th wd & more
c. Plantilla of Casual Employees
100% of Casual Appointments for renewal of appointment certified as to correctness & completeness in three (3) working days upon receipt with at least 2 negative feedbacks.
100% of Casual Appointments reviewed in one (1) wd upon receipt with at least 1 negative feedback.
•
•
-
-
-
•
-
-
•
•
E=100%; Q=no neg. feedback; T= upon receipt
Q=1 neg. feedback; T=2nd day
Q=2-5 neg. feedbacks; T=3rd-5th wd
E=less than 100%; Q=6-9 neg. feedbacks; T=6th-15th wd
Q=10 & more neg. feedbacks; T=16th wd & more
d. Notice of Salary Adjustment (NOSA)/Notice of Salary Increment (NOSI)
100% of NOSA/NOSI certified as to correctness & completeness in three (3) working days after receipt with at least 2 negative feedbacks.
100% of NOSA certified as to correctness & completeness upon receipt with no negative feedback.
•
-
•
-
-
-
-
-
•
•
E=100%; Q=no neg. feedback; T= upon receipt
Q=1 neg. feedback; T=2nd day
Q=2-5 neg. feedbacks; T=3rd-5th wd
E=less than 100%; Q=6-9 neg. feedbacks; T=6th-15th wd
Q=10 & more neg. feedbacks; T=16th wd & more
e. Orientation of office policies, rules and regulations.
100% of newly hired CSWs and Jos oriented on office policies, rules and regulations one (1) day before deployment.
100% of newly hired CSWs and Jos oriented on office policies, rules and regulations one (1) day before deployment.
•
-
-
-
-
•
-
-
•
•
E=100%; T= 1 wd before deployment
-
T=upon deployment
E=less than 100%; T=after deployment
-
f. Agreement for Contract of Service Workers & Job-Orders
100% of contracts of agreement for renewal of CSWs & JOs signed in three (3) working days upon receipt.
100% of contracts of agreement of CSWs & JOs reviewed upon receipt.
•
-
-
-
-
•
-
-
•
•
E=100%; T= upon receipt
T=2nd day
T=3rd-5th wd
E=less than 100%; T=6th- 15th wd
T=16th wd & more
100% of contracts of agreement of newly hired CSWs & JOs signed in three (3) working days upon receipt with at least two (2) negative feedbacks.
100% of contracts of agreement of newly hired CSWs & JOs signed in three (3) working days upon receipt.
•
•
•
•
E=100%; T= upon receipt
T=2nd day
T=3rd-5th wd
E=less than 100%; T=6th- 15th wd
T=16th wd & more
PAP's SUCCESS INDICATOR ACCOMPLISHMENT
(JAN-JUNE)
INDIVIDUAL ACCOUNTABLE AVERAGE RATING
Standards on when to receive 5,4, 3, 2, 1 Alloted Budget RBF CST NPS SPN JALB MGD CGRR AVF 5 4 3 2 1
g. Facilitate in-house trainings/orientations/ workshops to be conducted by accredited Learning Service Providers (LSP).
Three (3) trainings, orientations and workshops facilitated and conducted for the semester January-June 2016 with at least good/satisfactory rating feedback.
Facilitated 4 in-house trainings from Jan-June 2016 with at VS feedback.
•
•
-
-
-
•
-
-
•
•
E=130%; Q=Excellent
E=115%; Q=VS
E=100%; Q=Good
E=75%; Q=Fair
E-less than 50%; Q=Poor
d. Recommendation of Training Design
100% of Training Design recommended for approval in three (3) working days upon receipt with at least 2 negative feedbacks.
100% of Training Design reviewed in an average of 1 day or upon receipt with no negative feedbacks.
•
•
•
•
E=100%; Q=no neg. feedback; T= upon receipt
Q=1 neg. feedback; T=2nd day
Q=2-5 neg. feedbacks; T=3rd-5th wd
E=less than 100%; Q=6-9 neg. feedbacks; T=6th-15th wd
Q=10 & more neg. feedbacks; T=16th wd &
more
e. Conduct of Medical Services, Breastfeeding, Safety ,Health and Wellness programs or activities.
100% of clients attended within 20 minutes upon arrival in the Infirmary and Breastfeeding Area.
100% of clients attended within 3- 5 minutes upon arrival in the Infirmary and Breastfeeding Area.
-
-
-
-
5.00
-
-
-
5.00
48
E=100%; T-10- 15 mins.
T-16-19 mins.
T-20-25 mins.
E=less than 100%; T-26-35 mins.
T-36 mins.
Facilitate and monitor weekly health and wellness activities of personnel (Zumba Class, Taking of blood pressure, city cycling & posting of health news).
Facilitated and monitored weekly health and wellness activities of personnel.
-
-
-
-
4.70
-
-
-
4.70
49
E=100% monitored weekly;
-
-
E=less 100% monitored weekly;
-
4. Good Governance Condition a. Ensure 100% of cash advances granted to the personnel of HRD are liquidated.
100% of cash advances granted to the staff of the unit are liquidated in 5 wd from end of activity & within 30 days from end of official travel.
100% of cash advances granted to the staff of the unit are liquidated in an average of 1-2 wd from end of activity & within 1-5 days from end of official travel.
•
•
•
•
•
-
-
-
•
•
E=100%; T=after end of activity & within 15 days from end of OB
T=2-3 days after end of activity & within 16-25 days
T=4-5 days after end of activity & within 26-30 days
E=less than 100%; T=6-12 days after end of activity & after 1 month from OB
T=13 days & beyond and within 2 mos, from date of OB
100% of cash advances liquidated in five (5) working days from end of activity & within 30 days from end of official travel.
None
-
-
-
-
-
-
-
-
-
•
E=100%; T=after end of activity & within 15 days from end of OB
T=2-3 days after end of activity & within 16-25 days
T=4-5 days after end of activity & within 26-30 days
E=less than 100%; T=6-12 days after end of activity & after 1 month from OB
T=13 days & beyond and within 2 mos, from date of OB
b. Submission of Statement of Assets, Liabilities and Networth (SALN)
Ensure 100% of employees submit SALN to HRD on or before March 30.
100% of employees submit SALN to HRD not later than March 15, 2016.
•
•
•
•
•
-
-
-
•
•
E=100%; T=Mar. 15
T=Mar. 16-26
T=Mar. 27-30
E=less than 100%; T=Apr. 1- 15
T=Apr. 16 & beyond
PAP's SUCCESS INDICATOR ACCOMPLISHMENT
(JAN-JUNE)
INDIVIDUAL ACCOUNTABLE AVERAGE RATING
Standards on when to receive 5,4, 3, 2, 1 Alloted Budget RBF CST NPS SPN JALB MGD CGRR AVF 5 4 3 2 1
Submit SALN on or before March 30.
Submitted my SALN on Mar. 1, 2016.
•
-
-
-
-
-
-
-
•
•
E=with SALN; T=May 5
T=May 6-13
T=May 14-15
E=no SALN; T=May 16-25
T=beyond May 26 & Jul 16
Ensure 100% of employees' SALN are submitted to Office of the Ombudsman every June 30.
100% of SALN of employees submitted on May 18, 2016
•
-
•
-
-
-
-
-
•
•
E=100%; T=June 15
T=June 16-29
T=June 30
E=less than 100%; T=Jul. 1- 15
T=beyond July 16
Ensure 100% of employees' SALN are submitted to CSC FO every June 15.
100% of SALN of employees submitted on June 8, 2016
•
-
•
-
-
-
-
-
•
•
E=100%; T=June 8
T=June 9-14
T=June 15
E=less than 100%; T=June 16-25
T=beyond June 26
Ensure 100% of newly appointed employees submit SALN to HRD within 30 days from date of assumption of duties.
100% of newly hired employees on 3/16/2016 filed SALN in an average of 10 days upon assumption of duties.
•
-
•
-
-
-
-
-
•
•
E=100%; T=15 days upon assumption
T=16-25 days upon assumption
T=26-30 days upon assumption
E=less than 100%; T=after 1 month upon assumption
T=after 2 mos. Upon assumption
c. Ensure compliance to the provisions of the ARTA law
With at least Good Rating or 80%-89% numerical rating in all sub-areas under HRD (ID/Name plates of frontliners, PACD & Anti-fIxer Campaign)
Obtained 90.21% or VS Rating in all sub-areas under HRD per ARTA RCS
•
-
-
•
-
-
-
-
•
•
Q=100%-96%
Q=95%-90%
Q=89%-80%
Q=79-75%
Q=74% & low
5. Learning & Growth – Organization Capital a. Coaching of HRD Staff
100% of staff coached for program implementation strategy or development and with a corresponding Report.
100% of staff coached for program implementation strategy or development and with a corresponding Report.
•
•
-
-
-
-
-
-
•
•
E=100% & with a report
-
-
E=less than 100% of staff & no report
-
TOTAL RATING
FINAL AVERAGE RATING
• • • • • •
• • •
PAP's SUCCESS INDICATOR ACCOMPLISHMENT
(JAN-JUNE)
INDIVIDUAL ACCOUNTABLE AVERAGE RATING
Standards on when to receive 5,4, 3, 2, 1 Alloted Budget RBF CST NPS SPN JALB MGD CGRR AVF 5 4 3 2 1
Rater's Comments and Recommendation for Development Purposes of Rewards/Promotion.
PERFORMANCE MANAGEMENT TEAM (PMT)
VIRGILIO B. LUANSING I Chairperson
Acting Division Manager A, PDCD & OIC, EWRD
RICARDO B. FELIX III EMMA A. CUYO VICENTE ANICETO D. RUBIO RONALD P. SARMIENTO CRISTINA S. TADURAN Member Member Member Member Member Division Manager A, HRD Division Manager A, AD & OIC, TBD Sr. Water Utilities Mgt/Devt. Officer MNWDEU President Industrial Relations Management Officer C, HRD
Final Rating by: Position: Date:
CESAR H. FEDERIZON General Manager A July 15, 2016
The above rating has been discussed with me by my Head.
Name and signature of Ratee: Position: Date:
RICARDO B FELIX III Division Manager A July 15, 2016
Republic of the Philippines METROPOLITAN NAGA WATER DISTRICT
40 J. Miranda Avenue, Naga City
DIVISION PERFORMANCE COMMITMENT AND REVIEW (DPCR) ACCOUNTING DIVISION
I, EMMA A. CUYO , Division Manager A of Finance Division, commit to deliver and agree to be rated on the attainment of the following targets in accordance with the indicated measures for the period January 1 to June 30, 2016
Date:
EMMA A. CUYO Ratee
December 15, 2015
Accountable Person Standard on when to receive 5,4,3,2,1 PAP's Success Indicator Actual Accomplishment EAC
CBC
MCC
LUB
ABA
MBA
CMR
SHT
CLOA
HOR
EBP
BBB
CBA
CCV
LSU
EIA
EIC
JMB
AVV
NAC 5 4 3 2 1
Alloted Budget
GENERAL ADMINISTRATIVE SUPPORT ACCOUNTING DIVISION
1. Preparation and Submission of Financial Reports 1 Trial Balance 2 Balance Sheet 3 Income Statement 4 Cash Flow Statement 5 Statement of Changes in Equity
5 Financial Report submitted to
the Office of the General Manager (OGM) on the 25th day
of the succeeding month
5 Financial Report submitted to the Office of the General Manager (OGM) on the 20th day of the succeeding month
•
•
5 Financial Report
submitted to the Office of the General
Manager (OGM) on the 13th day
of the succeeding
month
5 Financial Report
submitted to the Office of the General
Manager (OGM) on the
17th day of the succeeding
month
5 Financial Report
submitted to the Office of the General
Manager (OGM) on the
25th day of the succeeding
month
5 Financial Report
submitted to the Office of the General
Manager (OGM) on the
30th day of the succeeding
month
5 Financial Report
submitted to the Office of the
General Manager (OGM)
beyond 30th day of the succeeding
month
2 Monthly Data Sheet (MDS)
5 MDS Reports submitted to the Office of the Gen. Manager
on the 30th day of the succeeding month
5 MDS Reports submitted to the Office of the General
Manager on the 20th day of the succeeding month
•
5 MDS Reports
submitted to the Office of
the Gen. Manager (OGM) 15th day of the
succeeding month
5 MDS Reports
submitted to the Office of
the Gen. Manager
(OGM) 20th day of the
succeeding month
5 MDS Reports
submitted to the Office of
the Gen. Manager
(OGM) 30th day of the
succeeding month
5 MDS Reports
submitted to the Office of
the Gen. Manager
(OGM) beyond 30th day of the
succeeding month
No MDS Report submitted
3. Financial Report with Comparative Figures
including notes to Financial Statement
1 set Financial reports
submitted to the OGM at the end of the 2nd month of the
following year
1 set Financial Reports submitted to the OGM on
February 20, 2016
•
1 set Financial reports
submitted to the OGM 1 day after end of the 2nd month of the following
year
1 set Financial reports
submitted to the OGM 1 day after end of the 2nd month of the following
year
1 set Financial reports
submitted to the OGM 2
days after the end of the 2nd month of the following year
1 set Financial reports
submitted to the OGM 3
days after the end of the 2nd month of the following year
No Financial report
submitted
5 - Outstanding
4 - Very Satisfactory
3 - Satisfactory
2 - Unsatisfactory
1 - Poor
APPROVED BY:
CESAR H. FEDERIZON General Manager A
Date:
Accountable Person Standard on when to receive 5,4,3,2,1 PAP's Success Indicator Actual Accomplishment
EAC
CBC
MCC
LUB
ABA
MBA
CMR
SHT
CLOA
HOR
EBP
BBB
CBA
CCV
LSU
EIA
EIC
JMB
AVV
NAC 5 4 3 2 1 Alloted Budget
4 Annual Report Annual Report submitted to the
OGM on March 25, 2016
Annual Report submitted to the OGM on March 24, 2016
•
Annual Report submitted to the OGM on
March 25, 2016
Annual Report submitted to the OGM on
March 26, 2016
Annual Report submitted to the OGM on
March 27, 2016
Annual Report submitted to the OGM on
March 28, 2016
No report submitted
5. Recording of Transaction in the Journals: a. Check Disbursement Journal b. Cash Disbursement Journal
100% of Transactions recorded in respective journals on the
15th day of the following month
100% of Transactions recorded in the respective journals on the 8th day of the following
month
•
•
100% of
Transactions recorded in respective
journals on the 8th day of the
following month
100% of
Transactions recorded in respective
journals on the 10th day of the
following month
100% of
Transactions recorded in respective
journals on the 15th day of the
following month
100% of
Transactions recorded in respective
journals on the 22nd day of the
following month
100% of
Transactions recorded in respective
journals beyond the 22nd day of
the following month
c. Cash Receipts and Deposit Journal 100% of Transactions recorded in the Cash Receipts and Deposit Journal on the 15th day of the
following month
100% of Transactions recorded in the Cash Receipts and Deposit Journals 10th day
of the following month
•
•
100% of Transactions
recorded in the Cash Receipts and Deposit
Journal on the 8th day of the
following month
100% of Transactions
recorded in the Cash Receipts and Deposit
Journal on the 10th day of the
following month
100% of Transactions
recorded in the Cash Receipts and Deposit
Journal on the 15th day of the
following month
100% of Transactions
recorded in the Cash Receipts and Deposit
Journal on the 23rd day of the
following month
100% of Transactions
recorded in the Cash Receipts and Deposit
Journal beyond 23rd day of the
following month
d. General Journal
100% Transactions recorded in the General Journal on the
20th day of the following month
100% Transactions recorded in the General
journals on the 10th day of the following month
•
•
100% Transactions
recorded in the General Journal on the 10th day of the following
month
100% Transactions
recorded in the General
Journal on the 13th day of the
following month
100% Transactions
recorded in the General
Journal on the 20th day of the
following month
100% Transactions
recorded in the General
Journal on the 30th day of the
following month
100% Transactions
recorded in the General Journal
beyond 30th day of the following
month
6. Posting in the Disbursement register a. Commercial Practices b. New Government Accounting System
6 Disbursement Voucher Register prepared 15 working days of the following month
6 Disbursement Voucher Register prepared 7 working days of the
following month
•
•
6 Disbursement
Voucher Register
prepared 7 working days of
the following month
6 Disbursement
Voucher Register
prepared 10 working days of
the following month
6 Disbursement
Voucher Register
prepared 15 working days of
the following month
6 Disbursement
Voucher Register
prepared 22 working days of
the following month
6 Disbursement
Voucher Register prepared
beyond 22 working days of
the following month
7. Preparation of Report of Supplies and Materials Issued (RSMI)
6 RSMI (office
6 RSMI (office
6 RSMI (office
Accountable Person Standard on when to receive 5,4,3,2,1 PAP's Success Indicator Actual Accomplishment
EAC
CBC
MCC
LUB
ABA
MBA
CMR
SHT
CLOA
HOR
EBP
BBB
CBA
CCV
LSU
EIA
EIC
JMB
AVV
NAC 5 4 3 2 1 Alloted Budget
a. Office Supplies
6 RSMI (office supplies) prepared within 7 working days
upon receipt of summary of supplies and materials issued
6 RSMI prepared within 5 working days from receipt
of summary of supplies and materials issued
•
•
6 RSMI (office supplies) prepared within 4
working days upon receipt of
summary of supplies and
materials issued
supplies) prepared within 5
working days upon receipt of
summary of supplies and
materials issued
supplies) prepared within 7
working days upon receipt of
summary of supplies and
materials issued
supplies) prepared within 11
working days upon receipt of
summary of supplies and
materials issued
6 RSMI (office supplies) prepared
beyond 11 working days
upon receipt of summary of supplies and
materials issued
b. Chemicals & Filtering Materials c. Materials and Fittings
6 RSMI prepared within 10 working days upon receipt of
summary of supplies and materials issued
6 RSMI prepared within 7 working days upon receipt of
summary of supplies and materials issued
•
•
6 RSMI
prepared within 5
working days upon receipt of
summary of supplies and
materials issued
6 RSMI
prepared within 7
working days upon receipt of
summary of supplies and
materials issued
6 RSMI
prepared within 10
working days upon receipt of
summary of supplies and
materials issued
6 RSMI
prepared within 15
working days upon receipt of
summary of supplies and
materials issued
6 RSMI
prepared beyond 15
working days upon receipt of
summary of supplies and
materials issued
8. Preparation of Disbursement Vouchers (DV)
100% Disbursement Vouchers prepared within 10 mintes upon receipt of complete documents
100% or 918/918 Disbursement Vocuhers
prepared within 10 minutes upon receipt of complete
documents
•
100% Disbursement
Vouchers prepared within 5 mintes upon
receipt of complete
documents
100% Disbursement
Vouchers prepared within 7 mintes upon
receipt of complete
documents
100% Disbursement
Vouchers prepared within 10 mintes upon
receipt of complete
documents
100%
Disbursement Vouchers prepared within 15
mintes upon receipt of complete
documents
100%
Disbursement Vouchers prepared
beyond 10 mintes upon
receipt of complete
documents
9 Encoding of Disbursement Vouchers (DV) to New Government Accounting System (NGAS)
600 Disbursement Vouchers 100% correctly prepared within
10 minutes upon receipt of complete documents
918 Disbursement Vouchers posted in the register 5
minutes upon receipt of the Voucher
•
900 DV prepared within
5 mins. Upon receipt of complete
documents
660 DV prepared within
7 mins. Upon receipt of complete
documents
600 DV prepared within 10 mins. Upon
receipt of complete
documents
360 DV prepared
within 15 mins. Upon receipt of
complete documents
360 DV
prepared beyond 15 mins. Upon receipt of complete
documents
10. Preparation of Journal Entry Vouchers (JEV)
100% Journal Entry Vouchers prepared 20 minutes upon
receipt of the complete supporting documents
100% or 2007/2007 Journal Entry Vouchers prepared 10
minutes upon receipt of complete supporting
documents
•
100% JEV prepared within 10 mins. upon
receipt of complete
supporting documents
100% JEV prepared within 15 mins. upon
receipt of complete
supporting documents
100% JEV prepared within 20 mins. upon
receipt of complete
supporting documents
100% JEV prepared
within 30 mins. upon receipt of
complete supporting documents
100% JEV prepared
beyond 33 mins. upon receipt of complete
supporting documents
Accountable Person Standard on when to receive 5,4,3,2,1 PAP's Success Indicator Actual Accomplishment
EAC
CBC
MCC
LUB
ABA
MBA
CMR
SHT
CLOA
HOR
EBP
BBB
CBA
CCV
LSU
EIA
EIC
JMB
AVV
NAC 5 4 3 2 1 Alloted Budget
11. Preparation of report on Checks Issued for Accrued Leave
6 Reports on Checks Issued for Accrued Leave prepared on the 10th day of the following month
6 Reports on Checks Issued for
Accrued Leave prepared on the 5th day of the following
month
•
6 Reports on Inventory of
records prepared on the 5th day of the
following month
6 Reports on Inventory of
records prepared on
the 7th day of the following
month
6 Reports on Inventory of
records prepared on
the 10th day of the following
month
6 Reports on Inventory of
records prepared on
the 12th day of the following
month
6 Reports on Inventory of
records prepared
beyond the 12th day of the
following month
12. Preparation of the following : a. Petty Cash Fund Vouchers
100% Petty Cash Fund Voucher prepared within 5 minutes from receipt of complete supporting
documents
100% or 1031/1031 Petty Cash Fund Voucher prepared within
2 minutes from receipt of complete supporting
documents
•
100% Petty Cash Fund Voucher
prepared within 3 minutes from
receipt of complete supporting documents
100% Petty Cash Fund Voucher
prepared within 4 minutes from
receipt of complete supporting documents
100% Petty Cash Fund Voucher
prepared within 5 minutes from
receipt of complete supporting documents
560 Petty Cash Fund Voucher
prepared within 6 mins. from receipt
of complete supporting documents
480 Petty Cash Fund Voucher prepared
beyond 6 mins. from receipt of
complete supporting documents
b. Report of Petty Cash Fund
100% Replenishment of petty cash fund within 1 hour upon
receipt of supporting documents
100% or 20/20 Replenishment of petty cash
fund within 30 minutes upon receipt of complete
supporting documents
•
100% Replenishment of petty cash fund within
30mins upon receipt of
supporting documents
100% Replenishment of petty cash fund within
45mins upon receipt of
supporting documents
100% Replenishment of petty cash fund within 1
hour upon receipt of
supporting documents
100% Replenishment of petty cash
fund within 1.5 hour upon receipt of
supporting documents
100% Replenishment of petty cash fund beyond 1.5 hour upon
receipt of supporting documents
13. Preparation of Monthly Depreciation Schedule
6 Monthly Depreciation schedules prepared on the 10th
day of the succeeding month with no error
6 Monthly Depreciation scheduled prepared on the 5th day of the succeeding
month
•
6 Monthly Depreciation
schedules prepared on the 5th day of the
succeeding month
6 Monthly Depreciation
schedules prepared on
the 7th day of the succeeding
month
6 Monthly Depreciation
schedules prepared on
the 10th day of the succeeding
month
6 Monthly Depreciation
schedules prepared on
the 15th day of the succeeding
month
6 Monthly
Depreciation schedules prepared
beyond 15th day of the succeeding
month
14. Preparation of Report of Construction in Progress
6 Reports of Construction Work In progress prepared on the 20th day of the succeeding
month with no error
6 Report of Construction Work In progress prepared on the 18th day of the succeeding
month
•
6 Reports of Construction
Work In progress
prepared on the 10th day of the
succeeding month
6 Reports of Construction
Work In progress
prepared on the 15th day of the succeeding
month
6 Reports of Construction
Work In progress
prepared on the 20th day of the succeeding
month
6 Reports of Construction
Work In progress
prepared on the 30th day of the succeeding
month
6 Reports of Construction
Work In progress prepared
beyond 30th day of the succeeding
month
Accountable Person Standard on when to receive 5,4,3,2,1 PAP's Success Indicator Actual Accomplishment
EAC
CBC
MCC
LUB
ABA
MBA
CMR
SHT
CLOA
HOR
EBP
BBB
CBA
CCV
LSU
EIA
EIC
JMB
AVV
NAC 5 4 3 2 1 Alloted Budget
15. Posting of Account balances in the BIR General Ledger
100% Account balances posted in the General Ledger on the
30th day of the succeding month with no error
100% account balances posted in the General Ledger
on the 28th day of the succeding month
•
100% Account balances posted in the General Ledger on the
15th day of the succeding
month
100% Account balances
posted in the General Ledger on the 20th day
of the succeding
month
100% Account balances
posted in the General Ledger on the 30th day
of the succeding
month
100% Account balances
posted in the General Ledger on the 31st day
of the succeding
month
100% Account balances posted in the General Ledger beyond 31st day of the
succeding month
16 Summarizes the following :
a. Franchise Tax Payable
6 reports of Franchise Tax 100% accurately summarized within 2
hours on the 20th day of the following month
6 reports of Franchise Tax 100% accurately
summarized within 1 hour on the 10th day of the
following month
•
6 reports of Franchise Tax
100% accurately summarized
within 1 hours on the 20th day of the following
month
6 reports of
Franchise Tax 100%
accurately summarized
within 1 hour & 20 mins. on the 20th day of the
following month
6 reports of Franchise Tax
100% accurately
summarized within 2 hours
on the 20th day of the following
month
6 reports of Franchise Tax
100% accurately
summarized within 3 hours
on the 20th day of the following
month
No report made
b. Weekly gasoline expense
24 reports of weekly gasoline expense 100% accurately
encoded within 30 minutes upon receipt of gasoline bills
26 reports of weekly gasoline expense 100%
accurately encoded within 15 minutes upon receipt of
gasoline bills
•
36 reports of weekly gasoline expense 100%
accurately encoded within
15 minutes upon receipt of
gasoline bills
26 reports of weekly gasoline expense 100%
accurately encoded within
20 minutes upon receipt of
gasoline bills
24 reports of weekly gasoline expense 100%
accurately encoded within
30 minutes upon receipt of
gasoline bills
14 reports of weekly gasoline expense 100%
accurately encoded within
45 minutes upon receipt of
gasoline bills
No summary prepared
c. Transportation expense of O & M personnel for reimbursement
12 summary of travelling expense of O & M Personnel
100% accurately encoded within 20 minutes after the receipt of
the documents
12 summary of Travelling expense of O & M Personnel 100% accurately encoded in 10 mins. After the receipt of
the documents
•
12 summary of travelling
expense of O & M Personnel
100% accurately encoded within
10 minutes after the receipt
of the documents
12 summary of
travelling expense of O &
M Personnel 100%
accurately encoded within
13 minutes after the
receipt of the documents
12 summary of
travelling expense of O &
M Personnel 100%
accurately encoded within
20 minutes after the
receipt of the documents
12 summary of
travelling expense of O &
M Personnel 100%
accurately encoded within
30 minutes after the
receipt of the documents
No summary encoded
Accountable Person Standard on when to receive 5,4,3,2,1 PAP's Success Indicator Actual Accomplishment
EAC
CBC
MCC
LUB
ABA
MBA
CMR
SHT
CLOA
HOR
EBP
BBB
CBA
CCV
LSU
EIA
EIC
JMB
AVV
NAC 5 4 3 2 1 Alloted Budget
d. Summary of meal allowance of WDRD and NRWMD
8 summary of meal allowance of WDRD and NRWMD 100% accurately encoded in 20
minutes upon receipt of the documents
8 summary of meal allowance of WDRD and NRWMD 100%
accurately encoded in 10 minutes upon receipt of the
documents
•
8 summary of meal allowance of WDRD and
NRWMD 100% accurately
encoded in 10 minutes upon receipt of the
documents
8 summary of meal allowance of WDRD and
NRWMD 100% accurately
encoded in 13 minutes upon receipt of the
documents
8 summary of meal allowance of WDRD and
NRWMD 100% accurately
encoded in 20 minutes upon receipt of the
documents
8 summary of meal allowance of WDRD and
NRWMD 100% accurately
encoded in 30 minutes upon receipt of the documents
17. Preparation of report on inventory of records
6 Reports on Inventory of records prepared on the 10th day of the following month
6 Reports of Inventory of Record prepared on the 5th day of the following month
•
6 Reports on Inventory of
records prepared on the 5th day of the
following month
6 Reports on Inventory of
records prepared on
the 7th day of the following
month
6 Reports on Inventory of
records prepared on
the 10th day of the following
month
6 Reports on Inventory of
records prepared on
the 12th day of the following
month
6 Reports on Inventory of
records prepared
beyond the 12th day of the
following month
18. Preparation of Bank Reconciliation
Bank Reconciliation prepared within 1 hour upon receipt of
Daily Cash Position report
Bank Reconciliation prepared within 30 minutes upon
receipt of Daily Cash Position report
•
Bank Reconciliation
prepared within 30 minutes
upon receipt of DCP
Bank Reconciliation
prepared within 45 minutes
upon receipt of DCP
Bank Reconciliation
prepared within 1 hour upon
receipt of DCP
Bank Reconciliation
prepared within 1 hour 15 mins. upon receipt of DCP
Bank Reconciliation
prepared beyond 1 hour 15 mins. upon receipt of DCP
19 Posting of Transaction in the General Ledger
Transaction in the General ledger posted 30th days of the
following month
100% Transactions recorded in the General journals on the
15th day of the following month
•
Transaction in the General
Ledger posted 15th day of the
following month
Transaction in the General
Ledger posted 20th day of the
following month
Transaction in the General
Ledger posted 30th day of the
following month
Transaction in
the General Ledger posted beyond 30th
day of the following
month
No posting made
20. Posting of transaction in the Subsidiary Ledger
Transaction in the Subsidiary ledger 100% accurately posted 30th day of the following month
Transaction in the Subsidiary Ledger 100% accurately posted 20th days of the
following month
•
Transaction in the Subsidiary Ledger posted 15th day of the
following month
Transaction in the Subsidiary Ledger posted 20th day of the
following month
Transaction in the Subsidiary Ledger posted 30th day of the
following month
Transaction in the Subsidiary Ledger posted beyond 30th
day of the following
month
No posting made
21. Posting of issuances and receipts in the supplies and stock card
100% of posted Receipts and issuance in the supplies and
stock cards on the 30th day of the following month
100% of posted receipts and issuance in the supplies and stock cards on the 15th day of the following month
•
100% of posted Receipts and
issuance in the supplies and
stock cards on the 15th day of the following
month
100% of posted Receipts and
issuance in the supplies and
stock cards on the 20th day of the following
month
100% of posted Receipts and
issuance in the supplies and
stock cards on the 30th day of the following
month
100% of posted
Receipts and issuance in the supplies and
stock cards on the 45th day of the following
month
100% of posted
Receipts and issuance in the supplies and stock cards
beyond 30th day of the following
month
Accountable Person Standard on when to receive 5,4,3,2,1 PAP's Success Indicator Actual Accomplishment
EAC
CBC
MCC
LUB
ABA
MBA
CMR
SHT
CLOA
HOR
EBP
BBB
CBA
CCV
LSU
EIA
EIC
JMB
AVV
NAC 5 4 3 2 1 Alloted Budget
22. Preparation of Provident Fund Reports
Provident Fund Reports prepared within 10 days from
receipt of Provident Fund Passbooks
Provident Fund Reports prepared within 3 days from
receipt of Provident Passbooks
•
Provident Fund Reports
prepared within 5 days from receipt of
Provident Fund Passbooks
Provident Fund Reports
prepared within 7 days from
receipt of Provident Fund
Passbooks
Provident Fund Reports
prepared within 10 days from
receipt of Provident Fund
Passbooks
Provident Fund Reports
prepared within 15 days from receipt of Provident Fund
Passbooks
Provident Fund Reports
prepared beyond 15 days from receipt of Provident Fund
Passbooks
23. Preparation of Payroll ( Voucher) a. Permanent
b. Casual
12 Payrolls (voucher) prepared on the 12th day of the month
12 payrolls (voucher) prepared on the 12th day of
the month
•
12 Payrolls (voucher)
prepared on the 6th day of the
month
12 Payrolls (voucher)
prepared on the 8th day of
the month
12 Payrolls (voucher)
prepared on the 12th day of
the month
12 Payrolls (voucher)
prepared on the 18th day of
the month
12 Payrolls (voucher) prepared
beyond 12th day of the
month
24 Preparation of Payroll :
a. Permanent
b. Casual
12 Payrolls prepared on the 12th day of the month
12 payrolls prepared on the 12th day of the month
•
12 Payrolls prepared on the 12th day of the
month
12 Payrolls prepared on
the 13th day of the month
12 Payrolls prepared on
the 14th day of the month
12 Payrolls prepared on
the 15th day of the month
12 Payrolls prepared
beyond 15th day of the
month
b. Contract of Service Workers
12 Payrolls prepared 3 working days after receipt of summary of
attendance
12 payrolls prepared working 2 days after the receipt of the
summary of attendance
•
•
12 Payrolls prepared 1
working day after receipt of
summary of attendance
12 Payrolls prepared 2
working days after receipt of
summary of attendance
12 Payrolls prepared 3
working days after receipt of
summary of attendance
12 Payrolls prepared 5
working days after receipt of
summary of attendance
12 Payrolls prepared beyond 5
working days after receipt of
summary of attendance
c. Other benefits / Bonuses (Regular & Casual)
100% of payrolls prepared within 3 days upon receipt of
supporting documents
100% of payrolls prepared within 2 days upon receipt of
supporting documents
•
100% of payrolls
prepared within 1 day upon receipt of
supporting documents
100% of payrolls
prepared within 2 days upon
receipt of supporting documents
100% of payrolls
prepared within 3 days upon
receipt of supporting documents
100% of payrolls
prepared within 5 days
upon receipt of supporting documents
100% of payrolls
prepared beyond 5 days upon receipt of
supporting documents
C. Night Differential
12 night differential payrolls prepared 4 days after receipt of
summary of attendance
12 payrolls of night differentials prepared 2 days
after the receipt of the summary of attendance
•
12 payrolls prepared 2 days after receipt of
summary of attendance
12 payrolls prepared 3 days after receipt of
summary of attendance
12 payrolls prepared 4 days after receipt of
summary of attendance
12 payrolls prepared 5 days after receipt of summary of attendance
12 payrolls prepared
beyond 5 days after receipt of
summary of attendance
Accountable Person Standard on when to receive 5,4,3,2,1 PAP's Success Indicator Actual Accomplishment
EAC
CBC
MCC
LUB
ABA
MBA
CMR
SHT
CLOA
HOR
EBP
BBB
CBA
CCV
LSU
EIA
EIC
JMB
AVV
NAC 5 4 3 2 1 Alloted Budget
D. Overtime for O & M personnel
6 payrolls prepared 4 working days after receipt of summary of
attendance
6 payrolls prepared 2 working
days after the receipt of the summary of attendance
•
6 payrolls prepared 2
working days after receipt of
summary of attendance
6 payrolls prepared 3
working days after receipt of
summary of attendance
6 payrolls prepared 4
working days after receipt of
summary of attendance
6 payrolls prepared 5
working days after receipt of
summary of attendance
6 payrolls prepared beyond 5
working days after receipt of
summary of attendance
25 Monthly Disbursement Summary
6 summary of monthly disbursement prepared on the
18th day of the following month
6 summary of Monthly Disbursement prepared on the 9th day of the following
month
•
6 summary of
monthly disbursement
prepared on the 9th day of the
following month
6 summary of
monthly disbursement prepared on
the 12th day of the following
month
6 summary of
monthly disbursement prepared on
the 18th day of the following
month
6 summary of
monthly disbursement prepared on
the 27th day of the following
month
6 summary of monthly
disbursement prepared
beyond 27th day of the following
month
26.Preparation of Summary of Remittance a. GSIS
6 Summary of GSIS Remittance prepared on the 10th day of the following month with no error
6 summary of GSIS Remittance prepared on the 18th day of the present / current month
•
6 Summary of
GSIS Remittance
prepared on the 10th day of the
following month
-
-
-
6 Summary of GSIS
Remittance prepared
beyond 10th day of the following
month
b. HDMF
b.1. Permanent / Casual
6 Summary of Remittances prepared on the 15th day of the
following month
6 summary of Remittances prepared on the 22nd day of
the current month
•
6 Summary of
Remittance prepared on the 15th day of the
following month
-
-
-
6 Summary of
Remittance beyond 15th
day of the following
month
b.2. Contract of Service Worker
6 Summary of Remittance prepared on the 15th day of the
following month
12 payrolls prepared 10th day of the following month
•
6 Summary of
Remittance prepared on the 15th day of the
following month
-
-
-
6 Summary of Remittance
prepared beyond 20th
day of the following
month
c. Philhealth
6 Summary of Remittance prepared on the 20th of the
following month
12 summary of remittance prepared on the 22nd day of
the current month
•
6 Summary of Remittance
prepared on the 20th of the following
month
-
-
-
6 Summary of Remittance
prepared on the 20th of the following
month
d. BIR
100%
100%
Accountable Person Standard on when to receive 5,4,3,2,1 PAP's Success Indicator Actual Accomplishment
EAC
CBC
MCC
LUB
ABA
MBA
CMR
SHT
CLOA
HOR
EBP
BBB
CBA
CCV
LSU
EIA
EIC
JMB
AVV
NAC 5 4 3 2 1 Alloted Budget
100% Summary of Remittance prepared on the 10th day of the
following month
100% or 18/18 Summary of
Remittance prepared on the 5th day of the following
month
•
Summaries of Remittance
prepared on the 10th day of the
of following month
-
-
-
Summaries of Remittance
prepared beyond 10th day of the of
following month
27 Preparation of Annual Information Return of Taxes from Suppliers (1604-E)
Annual Information Return of Taxes Withheld from various
suppliers prepared on the 30th day of the succeeding year
Annual information Return of Taxes Withheld from various
suppliers prepared on the 25th day of the succeeding
year
•
BIR Return prepared on the 28th day of the succeeding year
BIR Return prepared on
the 29th day of the succeeding
year
BIR Return prepared on
the 30th day of the succeeding
year
BIR Return prepared on
the 31st day of the succeeding
year
BIR Return prepared
beyond the 31st day of the succeeding year
28 Preparation of Summary List of Taxes Withheld on employees' compensation (1604-CF)
1 Summary of List of taxes withheld on employees'
compensation prepared every 15th day of January
1 Summary List of taxes withheld on employees'
compensation prepared 13th day of January
•
1 Summary of List of taxes withheld on employees'
compensation prepared on the
15th day of January
-
-
-
1 Summary of List of taxes withheld on employees'
compensation prepared
beyond 15th day of January
29. Printing of General and Subsidiary Ledger Printing of General and
Subsidiary Ledgers on the 28th day of February
Printing of General and
Subsidiary Ledgers on the 20th day of February
•
Printing made on the 14th
day of February
Printing made on the 19th
day of February
Printing made
on the 28th day of February
Printing made beyond 28th
day of February
No printing was made
TREASURY AND BUDGET DIVISION 30.Preparation and Submission of Reports
a. Daily Cash Position (DCP)
100% DCP prepared within 30 minutes upon receipt of supporting documents
100% or 145/45 DCP prepared with no error within 30
minutes upon receipt of supporting documents
•
100% DCP prepared within
15 minutes upon receipt of
supporting documents
100% DCP prepared within
20 minutes upon receipt of
supporting documents
100% DCP prepared within
30 minutes upon receipt of
supporting documents
100% DCP prepared within 45
minutes upon receipt of
supporting documents
100% DCP prepared
beyond 45 minutes upon
receipt of supporting documents
b. Cash Receipt and Deposit Record (CRDR)
100% CRDR prepared within 45 minutes upon receipt of supporting
documents
100% or 145/145 CRDR prepared within 45 mins.
upon receipt of supporting documents
•
100% CRDR prepared within 23 minutes upon
receipt of supporting
documents
100% CRDR prepared within 30 minutes upon
receipt of supporting
documents
100% CRDR prepared within 45 minutes upon
receipt of supporting
documents
100% CRDR prepared within
1 hour upon receipt of supporting
documents
100% CRDR prepared beyond
1 hour upon receipt of supporting
documents
Accountable Person Standard on when to receive 5,4,3,2,1 PAP's Success Indicator Actual Accomplishment
EAC
CBC
MCC
LUB
ABA
MBA
CMR
SHT
CLOA
HOR
EBP
BBB
CBA
CCV
LSU
EIA
EIC
JMB
AVV
NAC 5 4 3 2 1 Alloted Budget
c. Report of Collection and Deposit (RCD)
100% RCD prepared within 30 minutes upon receipt of supporting documents
100% or 145/145 RCD prepared within 30 minutes upon receipt of supporting
documents
•
100% RCD prepared within 15
minutes upon receipt of
supporting documents
100% RCD prepared within 20
minutes upon receipt of
supporting documents
100% RCD prepared within 30
minutes upon receipt of
supporting documents
100% RCD prepared within 45
minutes upon receipt of
supporting documents
100% RCD prepared
beyond 45 minutes upon
receipt of supporting documents
d.Report of Check Issued (RCI)
100% RCI prepared 5 pm the following day upon receipt of Disbursement Vouchers (DV)
100% or 110/110 RCI prepared 5 pm the following day upon
receipt of Disbursement Vouchers (DV)
•
100% RCI
prepared 8- 12am the
following day upon receipt of Disbursement Vouchers (DV)
100% RCI
prepared 1-4 pm the
following day upon receipt of Disbursement Vouchers (DV)
100% RCI
prepared 5pm the following
day upon receipt of
Disbursement Vouchers (DV)
100% RCI
beyond 5pm the following
day upon receipt of
Disbursement Vouchers (DV)
100% RCI prepared
beyond 5pm the following
day upon receipt of
Disbursement Vouchers (DV)
e. Cash Disbursement Record ( CDR )
6 CDR prepared on the 5th working day of the succeeding
month
6 CDR prepared on the 4th working day of the succeeding
month
•
6 CDR prepared on the 3rd
working day of the succeeding
month
6 CDR prepared on the 4th
working day of the succeeding
month
6 CDR prepared on the 5th
working day of the succeeding
month
6 CDR prepared on the 8th
working day of the succeeding
month
6 CDR prepared beyond 8th
working day of the succeeding
month
f. Daily Collection Report (DCR) 100% DCR prepared with within
30 minutes after cut-off time
100% or 113/113 DCR prepared with within 15
minutes after cut-off time
•
•
•
•
•
•
•
•
100% DCR prepared with
within 15 minutes after cut-off time
100% DCR prepared with
within 20 minutes after cut-off time
100% DCR prepared with
within 30 minutes after cut-off time
100% DCR prepared with
within 45 minutes after cut-off time
100% DCR prepared
beyond 45 minutes after cut-off time
g. Daily Remittance Report (DRR) 100% DRR prepared with within
20 minutes after cut-off time
100% DRR prepared with within 10 minutes after cut-off
time
•
•
•
•
•
•
•
•
100% DRR prepared with
within 10 minutes after cut-off time
100% DRR prepared with
within 15 minutes after cut-off time
100% DRR prepared with
within 20 minutes after cut-off time
100% DRR prepared with
within 30 minutes after cut-off time
100% DRR prepared
beyond 30 minutes after cut-off time
h. Summary of Daily Collection
100% Summary of Daily Collection prepared within 1
hour after cut-off time
100% or 140/140 Summary of Daily Collection prepared within 1 hour after cut-off
time
•
100% Summary of Daily
Collection prepared within 30 mins. after cut-off time
100% Summary of Daily
Collection prepared within 45 mins. after cut-off time
100% Summary of Daily
Collection prepared within 1 hour after cut-
off time
100% Summary
of Daily Collection prepared
within 1 hour & 30 mins. after cut-off time
100% Summary
of Daily Collection prepared
beyond 1 hour & 30 mins.after
cut-off time
i. Summary of Time Deposits
6 summary of time deposits prepared on the 5th day of the
succeeding month
6 summary of time deposits prepared on the 3rd day of the
succeeding month
•
6 summary of time deposits
prepared on the 3rd day of the
succeeding month
6 summary of time deposits prepared on
the 4th day of the succeeding
month
Summary of Time Deposits prepared on
the 5th day of the succeeding
month
Summary of Time Deposits prepared on
the 8th day of the succeeding
month
Summary of Time Deposits
prepared on the 8th day of the
succeeding month
Accountable Person Standard on when to receive 5,4,3,2,1 PAP's Success Indicator Actual Accomplishment
EAC
CBC
MCC
LUB
ABA
MBA
CMR
SHT
CLOA
HOR
EBP
BBB
CBA
CCV
LSU
EIA
EIC
JMB
AVV
NAC 5 4 3 2 1 Alloted Budget
31 Preparation of Summary of Deposits
100% Summary of Deposits prepared 1 hour upon receipt of
supporting documents
100% or 82/82 Summary of Deposits prepared 1 hour
upon receipt of supporting documents
•
100% Summary of Deposits prepared 30 mins upon receipt of
supporting documents
100% Summary of Deposits prepared 45 mins upon receipt of
supporting documents
100% Summary of Deposits prepared 1 hour upon receipt of
supporting documents
100% Summary of Deposits
prepared 1 .5 hour upon receipt of
supporting documents
100% Summary
of Deposits prepared
beyond 1.5 hour upon receipt of
supporting documents
32 Checking of Summary of Deposits
100% Summary of Deposits checked 30 mins after receipt of
document
100% or 121/121 Summary of
Deposits checked 30 mins after receipt of document
•
100% Summary
of Deposits checked 15 mins after receipt of document
100% Summary
of Deposits checked 20 mins after receipt of document
100% Summary
of Deposits checked 30 mins after receipt of document
100% Summary
of Deposits checked 45 mins after receipt of document
100% Summary
of Deposits checked
beyond 45 mins after receipt of
document
33 Summary of Returned Check
100% Summary of Returned Check prepared 1 hour after receipt of complete documents
100% or 12/12 Summary of Returned Check prepared 1
hour after receipt of complete documents
•
100% Summary
of Returned Check
prepared 30 minutes after
receipt of complete
documents
100% Summary
of Returned Check
prepared 40 minutes after
receipt of complete
documents
100% Summary
of Returned Check
prepared 1 hour after receipt of complete
documents
100%
Summary of Returned
Check prepared 1 hour & 30
minutes after receipt of complete
documents
100% Summary
of Returned Check
prepared beyond 1 hour and 30 minutes after receipt of
complete documents
34 Encodes and Prints of Receipts (SM Collection)
100% printed receipts for SM collection 2 hours upon receipt
of e-mailed summary of payment from SM
100% or 18258/18258 printed receipts for SM collection 42 mins upon receipt of e-mailed summary of payment from SM
•
100% encoded and printed
receipts for SM collection 1 hour upon
receipt of e- mailed
summary of payment from
SM
100% encodede and printed
receipts for SM collection 1.5 hours upon receipt of e-
mailed summary of
payment from SM
100% Encoded and printed
receipts for SM collection 2 hours upon receipt of e-
mailed summary of
payment from SM
100% Encoded and printed
receipts for SM collection 2.5 hours upon receipt of e-
mailed summary of
payment from SM
Loose bill receipt not
issued
a. Loose Bill Receipts
100% Loose bill receipts issued within 5 minutes upon receipt
of payment
100% Loose bill receipts issued within 2 minutes upon receipt of payment
•
•
•
•
•
•
•
100% Loose bill receipts issued
within 3 minutes upon
receipt of payment
100% Loose bill receipts issued
within 4 minutes upon
receipt of payment
100% Loose bill receipts issued
within 5 minutes upon
receipt of payment
100% Loose bill receipts issued
within 6 minutes upon
receipt of payment
100% Loose bill receipts issued
within beyond 6 minutes upon
receipt of payment
b. Offical Receipts (OR)
100% of OR issued within 5 minutes upon receipt of
payment
100% 0r 6396/6396 OR issued within 5 minutes upon receipt
of payment
•
100% of OR
issued within 3 minutes upon
receipt of payment
100% of OR
issued within 4 minutes upon
receipt of payment
100% of OR
issued within 5 minutes upon
receipt of payment
100% of OR
issued within 8 minutes upon
receipt of payment
100% of OR
issued within 8 minutes upon
receipt of payment
Accountable Person Standard on when to receive 5,4,3,2,1 PAP's Success Indicator Actual Accomplishment
EAC
CBC
MCC
LUB
ABA
MBA
CMR
SHT
CLOA
HOR
EBP
BBB
CBA
CCV
LSU
EIA
EIC
JMB
AVV
NAC 5 4 3 2 1 Alloted Budget
c. Report of Accountablility of Accountable Forms
6 Report prepared within 5 working days of the succeeding
month
6 reports prepared within 2 days of the succeeding mon
th
•
•
•
•
•
•
•
•
•
6 report prepared within 3 working days
of the succeeding
month
6 report prepared within 4 working days
of the succeeding
month
6 report prepared within 5 working days
of the succeeding
month
6 report prepared within 8
working days of the succeeding
month
6 report prepared beyond 8
working days of the succeeding
month
35 Preparation of Summary of Checked Loose Bills Issued
5 Summary of Checked Loose Bills Issued prepared on the
10th day of the following month
5 Summary of Checked Loose Bills Issued prepared on the
10th day of the following month
•
5 Reports of loose bills
issued prepared on the 5th day of the
following month
5 Reports of loose bills
issued prepared on the 7th day
of the following month
5 Reports of loose bills
issued prepared on the 10th day of the following
month
5 Reports of loose bills
issued prepared on
the 15th day of the following
month
5 Reports of loose bills
issued prepared beyond 15th
day of the following
month
36 2. Preparation of Report of Loose Bill Receipts Binded
6 Report of Loose Bill receipt binded on the 15th day of the
following month
6 Report of Loose Bill receipt binded on the 15th day of the following month
•
6 Report of Loose Bill
receipt binded prepared on the 7th day of the
following month
6 Report of Loose Bill
receipt binded prepared on
the 10th day of the following
month
6 Report of Loose Bill
receipt binded prepared on
the 15th day of the following
month
6 Report of Loose Bill
receipt binded prepared on
the 20th day of the following
month
6 Report of Loose Bill
receipt binded prepared
beyond the 20th day of the
following month
37 Preparation of Certification / Summary of Annual Water Bill Receipts Issued
1 certification / Summary of Annual Water Bill Receeipts
issued prepared every 15th of January
1 certification / Summary of Annual Water Bill Receeipts
issued prepared every 15th of January
•
1 certification /
Summary of Annual Water Bill Receeipts
issued prepared every 15th of
January
-
-
-
1 certification /
Summary of Annual Water Bill Receeipts
issued prepared beyond 15th of
January
38 Disbursement of Checks
a. bank transactions
100% Check disbursements disbursed 3 days after date of
cheque
100% or 138/138 Check disbursements disbursed 2 days after date of cheque
•
100% Check
disbursements disbursed 3
days after date of cheque
-
-
-
100% Check disbursements
disbursed beyond 3 days after date of
cheque
b. Local Suppliers
100% Check disbursements disbursed 3 days after date of
cheque
100% or 184/184 Check disbursements disbursed 3 days after date of cheque
•
100% Check
disbursements disbursed 3
days after date of cheque
-
-
-
100% Check
disbursements disbursed 3
days after date of cheque
39. Preparation of Budget Utilization Slip (BUS)
Accountable Person Standard on when to receive 5,4,3,2,1 PAP's Success Indicator Actual Accomplishment
EAC
CBC
MCC
LUB
ABA
MBA
CMR
SHT
CLOA
HOR
EBP
BBB
CBA
CCV
LSU
EIA
EIC
JMB
AVV
NAC 5 4 3 2 1 Alloted Budget
100% of BUS prepared 3 days upon receipt of complete
supporting documents
100% or 1766/1766 of BUS prepared 1 day upon receipt of complete
supporting documents
•
100% of BUS
prepared 1 day upon receipt of
complete supporting documents
100% of BUS
prepared 2 days upon receipt of
complete supporting documents
100% of BUS
prepared 3 days upon receipt of
complete supporting documents
100% of BUS
prepared 4 days upon receipt of complete
supporting documents
100% of BUS
prepared beyond 4 days upon receipt of
complete supporting documents
40. Preparation of the Budget Utilization Registry
6 Budget Utilization registry prepared within 10 days from
receipt of the journals
6 Budget Utilization Registry prepared within 10 days from
receipt of the journals
•
6 Budget
Utilization registry
prepared within 5 days from
receipt of the journals
6 Budget
Utilization registry
prepared within 7 days from
receipt of the journals
6 Budget
Utilization registry
prepared within 10 days from receipt of the
journals
6 Budget
Utilization registry
prepared within 15 days from receipt of
the journals
6 Budget Utilization
registry prepared
beyond 15 days from
receipt of the journals
41. Preparation of Statement of Budget Utilization
6 Statement of Budget Utilization prepared on the 10th
day of the succeeding month
6 Statement of Budget Utilization prepared on the 10th day of the succeeding
month
•
6 Statement of
Budget Utilization
prepared on the 5th day of the
succeeding month
6 Statement of
Budget Utilization
prepared on the 7th day of the succeeding
month
6 Statement of
Budget Utilization
prepared on the 10th day of the succeeding
month
6 Statement of
Budget Utilization
prepared on the 15th day of the succeeding
month
6 Statement of
Budget Utilization
prepared on the 15th day of the
succeeding month
42. Report of Capital Expenditures
6 Reports of Capital Expenditures prepared on the
30th day of the succeeding month
6 Reports of Capital Expenditures prepared on the
22nd day of the succeeding month
•
6 Reports of Capital
Expenditures prepared on the 15th day of the
succeeding month
6 Reports of Capital
Expenditures prepared on
the 20th day of the succeeding
month
6 Reports of Capital
Expenditures prepared on
the 30th day of the succeeding
month
6 Reports of Capital
Expenditures prepared on
the 31st day of the succeeding
month
6 Reports of
Capital Expenditures
prepared beyond 31st
day of the succeeding
month
43 Final Realignment for Budget Year 2015
Final realignment prepared on the 25th day of February, 2016
Final Realignment prepared on the 9th day of Feb. 2016
•
Final realignment
prepared on the 12th day of
February, 2016
Final realignment prepared on
the 17th day of February, 2016
Final realignment prepared on
the 25th day of February, 2016
Final realignment prepared on
the 29th day of February, 2016
Final realignment
prepared beyond 29th
day of February, 2016
Accountable Person Standard on when to receive 5,4,3,2,1 PAP's Success Indicator Actual Accomplishment
EAC
CBC
MCC
LUB
ABA
MBA
CMR
SHT
CLOA
HOR
EBP
BBB
CBA
CCV
LSU
EIA
EIC
JMB
AVV
NAC 5 4 3 2 1 Alloted Budget
44 5-yr. Payroll Projection for the proposed additional Plantilla of Positions for DBM's approval
5-yr. Payroll projection for the Proposed additional Plantilla of
Positions for DBM's approval prepared within 7 days upon submission of final listing of positions from each division
5- yr. Payroll projection for the Proposed additional Plantilla
of Positions for DBM's approval prepared within 3
days upon submission of final listing of positions from each
division
•
5-yr. Payroll projection for the Proposed
additional Plantilla of
Positions for DBM's approval prepared within
3 days upon submission of final listing of positions from each division
5-yr. Payroll projection for the Proposed
additional Plantilla of
Positions for DBM's approval prepared within
5 days upon submission of final listing of
positions from each division
5-yr. Payroll projection for the Proposed
additional Plantilla of
Positions for DBM's approval prepared within
7 days upon submission of final listing of
positions from each division
5-yr. Payroll
projection for the Proposed
additional Plantilla of
Positions for DBM's approval
prepared within 10 days
upon submission of final listing of positions from each division with 6 error
5-yr. Payroll
projection for the Proposed
additional Plantilla of
Positions for DBM's approval
prepared beyond 10 days
upon submission of final listing of
positions from each division with 6 error
45 Report of disposition of Cash Balances
Report of Disposition of Cash Balance prepared on the 25th
day of March, 2016
Report of Disposition of Cash Balance prepared on the 4th
day of March, 2016
•
Report of
Disposition of Cash Balance
prepared on the 12th day of March, 2016
Report of
Disposition of Cash Balance prepared on
the 17th day of March, 2016
Report of
Disposition of Cash Balance prepared on
the 25th day of March, 2016
Report of
Disposition of Cash Balance prepared on
the 31st day of March, 2016
Report of Disposition of Cash Balance
prepared beyond 31st
day of March, 2016
46 Summary Report of CAN Incentive for 2015
Summary Report of CAN Incentive for 2015 prepared within 7 days after closing of prior year & approval of cash
balance disposition report
Summary Report of CNA Incentive for 2015 prepared within 3 days after closing of prior year & approval of cash
balance disposition report
•
Summary
Report of CAN Incentive for
2015 prepared within 3 days
after closing of prior year & approval of
cash balance disposition
report
Summary
Report of CAN Incentive for
2015 prepared within 5 days
after closing of prior year & approval of
cash balance disposition
report
Summary
Report of CAN Incentive for
2015 prepared within 7 days
after closing of prior year & approval of
cash balance disposition
report
Summary
Report of CAN Incentive for
2015 prepared within 10 days after closing of
prior year & approval of
cash balance disposition
report
Summary
Report of CAN Incentive for
2015 prepared beyond 10 days after closing of
prior year & approval of
cash balance disposition
report
47 Report of Budget & Actual Expenses 5 reports, prepared on the 30th
day of the succeeding month
5 reports, prepared on the 22nd day of the succeeding
month
•
6 reports
prepared on the 15th day of the
succeeding month
6 reports
prepared on the 20th day of the succeeding
month
5 reports,
prepared on the 30th day of the succeeding
month
6 reports
prepared on the 33rd day of the succeeding
month
6 reports prepared
beyond 33rd day of the succeeding
month
48 Submission of Statements of Assets, Liabilities and Networth (SALN)
Submitted SALN to HRD on or before the 30th day of March
Submitted SALN to HRD on or before the February 26, 2016 • • • • • •
• • • • • • • • • • • •
Submitted on
the 21st of March, 2016
Submitted on
the 22nd - 29th of March, 2016
Submitted on
the 30th of March, 2016
Submitted on the 1st - 19th day of April,
2016
Submitted on the beyond 19th day of April, 2016
49 Individual Performance Commitment and Review (IPCR) Rating
100% sumission of IPCR for July - December, 2015 on the 15th day
of January , 2016
100% sumission of IPCR for July - December, 2015 on the
8th day of January , 2016
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
100% submitted on the 10th day
of January, 2016
100% submitted on
the 11th - 14th day of January,
2016
100%
submitted on the 15th day of January, 2016
100% submitted on
the 16th - 24th day of January,
2016
100% submitted on the 25th day
of January, 2016
Accountable Person Standard on when to receive 5,4,3,2,1 PAP's Success Indicator Actual Accomplishment
EAC
•
CBC
•
MCC
•
LUB
ABA
MBA
•
CMR
•
SHT
CLOA
HOR
EBP
BBB
CBA
CCV
LSU
EIA
EIC
JMB
•
AVV
NAC 5 4 3 2 1
Alloted Budget
50 Liquidation of Cash Advances
100% cash advance liquidated within the prescribed period
100% cash advance
liquidated within the prescribed
period
-
-
-
100% cash advance
liquidated beyond the prescribed
period
51 Monthly Accomplishment Report
100% of MAR submitted 3 working days of succeeding
month.
100% of MAR submitted 3 working days of succeeding
month.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
100% of MAR submitted 1
working day of succeeding
month.
100% of MAR submitted 2
working days of succeeding
month.
100% of MAR submitted 3
working days of succeeding
month.
100% of MAR submitted 4
working days of succeeding
month.
100% of MAR submitted 5
working days of succeeding
month.
Rater's Comments and Recommendation for Development Purposes of Rewards/Promotion:
MNWD PERFORMANCE MANAGEMENT TEAM (PMT)
The above rating has been discussed with me by my Division Chief.
CRISTINA S. TADURAN EMMA A. CUYO Chairperson Member Member
VICENTE ANICETO D. RUBIO RONALD P. SARMIENTO Member Member
Name and signature of Ratee: VIRGILIO B. LUANSING I Position: Date:
Final Rating by: CESAR H. FEDERIZON
RICARDO B. FELIX III Position: General Manager Date: Member