Upload
conrad-cobb
View
215
Download
0
Tags:
Embed Size (px)
Citation preview
MOBILITY
WWW.RAMKUMARSJAVA.COM
WWW.RAMKUMARSJAVA.COM
1.CORE HARDWARE FUNCTIONALITY IS EXPOSED THROUGH ___________
A. SIMPLE JAVA API
B. UI DESIGN
C. MOBILE APPLICATION DEVELOPER
D. NONE OF THE ABOVE.
WWW.RAMKUMARSJAVA.COM
2. ____________HELPS IN DEVELOPING AND TESTING ANDROID APPLICATIONS WITHOUT USING A PHYSICAL DEVICE.
A. APPLICATION DEVELOPER
B. ANDROID EMULATOR
C. APPLICATION BUILDING BLOCKS
D. ALL OF THE ABOVE
WWW.RAMKUMARSJAVA.COM
3.THE BROADCAST RECEIVER WHICH IS COMPLETELY ASYNCHRONOUS IS KNOWN AS
A. NORMAL BROADCASTS
B. ORDERED BROADCASTS
C. ASYNCHRONOUS BROADCAST
D. NONE OF THE ABOVE
WWW.RAMKUMARSJAVA.COM
4. By default ,every application in android runs in its own
a. Virtual machine b. Linux processes c. Unix process d. None of the above
WWW.RAMKUMARSJAVA.COM
5.IN WHICH DIRECTORY THE SYSTEM SHOULD ADD A NEW FILE TO REGENERATE THE FILES IN THE /GEN DIRECTORY.
A./SIR DIRECTORY
B./RES DIRECTORY
C./GEN DIRECTORY
D. NONE OF THE ABOVE
WWW.RAMKUMARSJAVA.COM
6.ANDROID SUPPORTS ________ AND _________
A. INTERNALIZATION AND LOCALIZATION.
B. OPTIMIZATION AND INTERNALIZATION
C. CUSTOMIZATION AND LOCALIZATION
D. OPTIMIZATION AND CUSTOMIZATION
WWW.RAMKUMARSJAVA.COM
7.LOG CAT USED FOR DEBUGGING IN ANDROID IS A ______________
A. SOFTWARE
B. TOOL
C. COMMAND
D. NONE OF THE ABOVE.
WWW.RAMKUMARSJAVA.COM
8. WHAT IS THE NAME OF ANDROID BUILDING BLOCK THAT HAS USER INTERFACE
A. SERVICE
B. ACTIVITY
C. CONTENT PROVIDER.
D. ALL OF THE ABOVE
WWW.RAMKUMARSJAVA.COM
9.________ LANGUAGE IS USED TO WRITE APPLICATIONS FOR IPHONE,IPAD.
A. C
B. C++
C. JAVA
D. OBJECTIVE-C
WWW.RAMKUMARSJAVA.COM
10.WHEN YOU CREATE A BACKGROUND TASK TO COMMUNICATE WITH A REMOTE WEB SERVER , WHICH CLASS MIGHT BE A GOOD BASE CLASS CANDIDATE FOR YOUR CLASS TO DERIVE FROM?
A. SERVICE PROVIDER
B. ACTIVITY
C. SERVICE
D. CONTENT PROVIDER
WWW.RAMKUMARSJAVA.COM
11.When was the Jelly Bean version of android relesed into market?
a. 2013 b. 2012 c. 2014 d. none of the above
Ans-2012
WWW.RAMKUMARSJAVA.COM
12. What does HAL stands for?
a. hardware abstraction layer b. hardware association layer c. hardware abstract layer d. none of the above
Ans- Hardware Abstraction layer
WWW.RAMKUMARSJAVA.COM
ACCENTURE
DELIVERY SUITE (ADS)
WWW.RAMKUMARSJAVA.COM
1. Accenture Delivery suite has which of the following advantages a. ADS provides a base for application development in SAP,
Oracle and SIEBEL technologies toob. ADS enables Multi-site delivery challenges achievablec. ADS gives support for Management onlyd. Cost is reduced since it encourages Component reusabilitye. ADS is a primary channel to achieve “CMMI”.
WWW.RAMKUMARSJAVA.COM
2. Which of the following portal is accessed by Accenture people across all Delivery centers?
a. Global Web portalb. WIREFRAMEc. Engagement Dashboardd. Global Delivery Dashboarde. Defects tracking sheet.
WWW.RAMKUMARSJAVA.COM
3. Which one of the following is used to execute the
methodology from both the process and
documentation standpoint?
a)ADM
b)ADT
c)ADMetrics
d)ADA
e)SIR.
WWW.RAMKUMARSJAVA.COM
4. Rational Purity Plus is used in following phase of
SDLC,
a)Analysis
b)System concept development
c)Build/Development phase
d)Testing phase to purify errors and defects
e)Just before deployment to enhance the quality by
removing defects.
WWW.RAMKUMARSJAVA.COM
5. Identify the processes that involves Project
Manager,
a)Prepare for Testing
b)Prepare a design
c)Project Initiation
d)Planning Workforce
e)All the above
f) None of the above.
WWW.RAMKUMARSJAVA.COM
6. ADM contains which of the following methods
a) Management methods
b) Strategy and planning methods
c) Development methods
d) Operations Methods
e) Testing & Deployment Methods
1. Only a, b and c
2. b and c,
3. a, b, c and d,
4. Only e,
5. None of the above.
WWW.RAMKUMARSJAVA.COM
7. Which one of the following process is specific for
Accenture IDC?
a) V- Model
b) Accenture Delivery Suite
c) Quality Management System & Supplier
management
d) Quality Management System
e) Internal Audit control.
WWW.RAMKUMARSJAVA.COM
8. A common web portal for all Delivery central across
the Globe has which of the following reports?
a.Requirement Traceability Matrix
b.Defects tracking sheet
c. Metrics Reports
d.Operational reports
e.Project- specific reports
f. All the above excluding ‘a’ and ‘b’.
WWW.RAMKUMARSJAVA.COM
9. Select the correct option from the following. (Phase – Key Role)
a) Plan – Business Architect, Analyze – Business Analyst, Design- Project
Manager, Build – Developer, Test – Tester, Deploy – Client and PM,
b) Plan – Project Manager, Analyze- Project Lead, Design – Designer, Build –
Developer, Test – Tester, Deploy – Client.
c) Plan – Business Architect, Analyze – Business Analyst, Design –
Application Designer, Build- Development lead, Test – Test Lead, Deploy-
Project Manager.
d) The roles for Plan, Analyze, Design, Build, Test, and Deploy phases are
Pre-defined whereas the responsibilities are assigned by corresponding
supervisors.
WWW.RAMKUMARSJAVA.COM
10. Predict the Correct definition for “Deliverables”.
a. Deliverables are the outcome of each and every phases in Application Development
b. Deliverables are as likes as Proof of concepts as we use in Prototype models
c. Deliverables are the Proof of Work what an individual or a team has performed in a
particular stage of Application development.
d. Deliverables are the Final Product that is to be delivered to the client.
WWW.RAMKUMARSJAVA.COM
11. Identify correct set of Test Deliverables.
a. Develop test approach, Create test plan, Prepare the Test Cycle Schedule,
Execute Test, sign – off
b. Develop test approach, Create work plan, Prepare Test Cases, Execute Test,
sign – off
c. Develop test approach, Create test plan, prepare work plan, create test data,
Execute test scripts, Sign-off
d. Develop Test scripts, Create Work plan, Prepare Test cases, Execute test scripts,
Document the Test results, Sign – off.
WWW.RAMKUMARSJAVA.COM
12. State “True or False” for the following scenario.
You are assigned to a project. The duration of the project is 3 weeks and it’s rated quantitatively as small Project. For a small project do you think the Tech Support Team will be accessible to you?
A. TrueB. False
WWW.RAMKUMARSJAVA.COM
13. State True or False.
Causal Analysis Resolution technique identifies the problem and fixes it, but it is not preventing from the error.
A. TrueB. False
WWW.RAMKUMARSJAVA.COM
QUALITY MANAGEMENT SYSTEM (QMS)
WWW.RAMKUMARSJAVA.COM
1. All company engagements, regardless of type of work, size or duration are required to conform to policy number
a) 0011
b) 0101
c) 0001
d) 1100
WWW.RAMKUMARSJAVA.COM
2. ADM is at CMMI of which level
a) 3
b) 5
c) 2
d) 1
WWW.RAMKUMARSJAVA.COM
3. QMS is at CMMI of Level
a) 5
b) 3
c) 4
d) None of the above
WWW.RAMKUMARSJAVA.COM
4. Quality management system has evolved from the core of
a) ADM
b) ADS
c) ADT
d) ADA
WWW.RAMKUMARSJAVA.COM
5. ________ is to offer our client what they are asking for like reliability,defect free etc…
a) Metrics
b) Quality
c) Methods
d) All the above
WWW.RAMKUMARSJAVA.COM
6. To consistently deliver high quality software solution to exceed customer expectation is called
a)QPCb)IDCQPCc) IDC
d)d)None of the above
WWW.RAMKUMARSJAVA.COM
7. OHSAS-
a) Occupational health and safety management
b) Occupying high stage and structure
c) Organizing high scripts and scenario
d) Offering Humanity and Security management
WWW.RAMKUMARSJAVA.COM
8. CMMI Level 5 Dev in
a) June 2012
b) June 2011
c) July 2011
d) Aug 2005
WWW.RAMKUMARSJAVA.COM
9. In IDC Quality Journey ISO 14001 deals with
a) Information Security
b) Environmental Management
c) Business Management
d) None
WWW.RAMKUMARSJAVA.COM
10. CMMI stage Representation optimizing work is to
a) Focus on process improvement
b) Process measured and controlled
c) Process characterized for the organization
d) Process characterized for the projects and is often reactive