Upload
zakary-narramore
View
229
Download
0
Tags:
Embed Size (px)
Citation preview
Patrick Zuza
Patrick Zuzas Album
2012
530287
eng - iTunNORM 0000025B 00000003 0000ABE5 0000026B 000001A1 0000011F 00007E61 00007ECA 000001BC 000001BC
eng - iTunSMPB 00000000 00000210 0000070B 0000000000038865 00000000 00000000 00000000 00000000 00000000 00000000 00000000 00000000
Model
BIM Ex Plan
Integration
CodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Integration
BIM Project Execution Plan Overview
Mission StatementldquoCreationrsquos one true aim is to enhance the quality of the communities we work with through innovative ideas and sustainable designrdquo
Project Mission StatementldquoTo create a lsquohigh performancersquo elementary school that functions as a multipurpose space for the community through a collaborative multi-disciplinary environmentrdquo
-ingenuity -quality -enjoyment -integrity
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
BIM Project Execution Plan Overview
Goals for Bimbull Design a constructable elementary school for the
communitybull Integrate on the design to enhance the building for a
broader user groupbull Incorporate energy efficiency while being mindful of cost by
focusing on both short term and lifetime cost benefitsbull Use BIM as a tool to improve our building design amp
construction processbull - Achieve LEED Certification for the building
- Understand the effects of discipline specific decisions on the broader project team
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
BIM Project Execution Project Schedule
PROJECT MILESTONE ESTIMATED START
ESTIMATED COMPLETION
PROJECT DELIVERABLE
INVOLVED PROJECT STAKEHOLDERS
Preliminary Planning 9112 91412 Presentation 1 MEP Struct CM
Schematic Design 91412 10312 Presentation 2 MEP Struct CM
Design Development 10312 102412 Presentation3 MEP Struct CM
Construction Documents 102412 111212 Proposal MEP Struct CM
AEI Submission 111212 22212 Electronic Submission
MEP Struct CM
Short List Selection 22212 3812 None MEP Struct CM
Finalist Presentation 3812 4312 Final Presentation
MEP Struct CM
Award 4512 4512 None MEP Struct CM
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
For each phase of the project the project team willbull Check and ensure completeness and accuracy of modelbull Check amp ensure completeness and accuracy of BIM Project Execution Planbull Coordinate all updates for individual models specialized discipline models
and construction updates
Team Responsibilitiesbull Develop BIM Modelbull Update amp Synchronize changes with Central Filesbull Proper Maintenance of Model and File Saving bull Maintain amp Revise BIM Planbull Integrate Discipline Models into Architectural BIM Model
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Managementbull Scheduling amp Sequencingbull Site Logisticsbull Equipment Procurementbull Cost Estimatingbull Constructability Analysisbull 4D Modeling Needsbull Construction Trends bull Clash Detection amp Coordinationbull Value Engineering
LightingElectrical
bull Lighting Planbull Power Planbull Load Calculationsbull Electrical Equipment Proposalbull Daylightingbull Clash Detection amp Coordinationbull Value Engineering
Mechanical
bull Heating amp Cooling Loadingbull Mechanical System Designbull Plumbing Designbull Energy Saving Analysisbull Clash Detection amp Coordinationbull Value Engineering
Structuralbull Structural System Designbull Analysis of Structural System Optionsbull Load Calculationsbull Clash Detection amp Coordinationbull Value Engineering
TASK ROLE Staff Size
Hours Planned Weeks
Model Development
Architect(Collaborative)CM
ElectricalLighting
MechanicalStructural
822222
2 hrswk8 hrswk8 hrswk8 hrswk8 hrswk8 hrswk
388888
Model Review
CMElectricalLighting
MechanicalStructural
22222
1 hrwk1 hrwk1 hrwk1 hrwk1 hrwk
1616161616
Structural Analysis amp Design
Structural
2
10 hrswk
8
LightingElectrical Analysis amp
Design
LightingElectrical
2
10 hrswk
8
Mechanical Analysis amp
Design
Mechanical
2
10 hrswk
8
LEED Certification Plus+
Reviews
Collaborative
8
4 hrswk
6
Schedule Development
Construction
Manager
2
5 hrswk
2
Cost Estimating
Construction Manager
2
10 hrswk
2
Value Engineering
Collaborative
8
3 hrswk
Ongoing
3D Coordination
Structural LightingElectrical
MechanicalConstruction Manager
2222
4 hrswk4 hrswk4 hrswk7 hrswk
3333
4D Modeling
Construction Manager
2
5 hrswk
3
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
TASK ROLE Staff Size
Hours Planned
Weeks
Model Development
Architect(Collaborative) CM
Electrical Lighting
Mechanical Structural
8 2 2 2 2 2
2 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk
3 8 8 8 8 8
Model Review
CM Electrical Lighting
Mechanical Structural
2 2 2 2 2
1 hrwk 1 hrwk 1 hrwk 1 hrwk 1 hrwk
16 16 16 16 16
Structural Analysis
amp Design
Structural
2
10 hrswk
8
Integration
BIM Project Execution Software
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE
Revit 2013 ARCH Design Authoring
3DS Max 2013 ARCHLE Design Rendering
Revit MEP 2013 ME Mechanical Authoring
Trane Trace v700 ME Mechanical Calculations
Revit MEP 2013 LE LightingElectrical Authoring
ComCheck 2013 LE Lighting Requirements
DaySim 2013 LE Lighting Daylighting
Agi32 Version 22 LE LE Calculations
ComFen 2013 LE Glazing Analysis
Revit Structure 2013 STRUCT Structural Authoring
RAM v1403 STRUCT Structural Analysis
SAP 2013 STRUCT Frame Analysis
Structure Point 2013 STRUCT Structural Analysis
RS Means CostWorks 2013 CM Cost Estimation
Primavera 2013 CM Project Scheduling
Navisworks 2013 CM 4D Modeling
Navisworks 2013 CM Clash Detection
Record Modeling 2013 CM Revit
Revit Navisworks 2013 MEPCM Revit Navisworks
Integration
BIM Project Execution File Naming
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ
ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT
MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT
ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT
LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT
STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT
CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT
COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT
ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT
Integration
BIM Project Execution Quality Control
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
CHECKS DEFINITION RESPONSIBLE PARTY
RECOMMENDEDPROJECT MILESTONES
VisualEnsure there are no unintended model components and the design intent has been followed
ALL Daily
Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily
Model Integrity
Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale
All Daily
Structural
Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Structural
Local Materials
bull Native wood productsbull Local vendors
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Recyclability Reusability
bull Reduce cement CO2 emissionsbull Fly ashbull Slag
bull Ground up concrete for parking lot
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Efficient Systems
bull Combine materials to optimize the performance of each
bull Braced framebull CMUsbull Metal stud walls
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Informed Decisions
bull Recovery time after high wind or seismic event
bull Bolted connectionsbull Prefabricated materials amp precast
concrete
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Higher first costbull Requires large footprint
Geothermal Heat Pump with Ground Loops
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors
while unit is offbull Does not address latent load
effectively
Water Source Heat Pump
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Model
BIM Ex Plan
Integration
CodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Integration
BIM Project Execution Plan Overview
Mission StatementldquoCreationrsquos one true aim is to enhance the quality of the communities we work with through innovative ideas and sustainable designrdquo
Project Mission StatementldquoTo create a lsquohigh performancersquo elementary school that functions as a multipurpose space for the community through a collaborative multi-disciplinary environmentrdquo
-ingenuity -quality -enjoyment -integrity
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
BIM Project Execution Plan Overview
Goals for Bimbull Design a constructable elementary school for the
communitybull Integrate on the design to enhance the building for a
broader user groupbull Incorporate energy efficiency while being mindful of cost by
focusing on both short term and lifetime cost benefitsbull Use BIM as a tool to improve our building design amp
construction processbull - Achieve LEED Certification for the building
- Understand the effects of discipline specific decisions on the broader project team
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
BIM Project Execution Project Schedule
PROJECT MILESTONE ESTIMATED START
ESTIMATED COMPLETION
PROJECT DELIVERABLE
INVOLVED PROJECT STAKEHOLDERS
Preliminary Planning 9112 91412 Presentation 1 MEP Struct CM
Schematic Design 91412 10312 Presentation 2 MEP Struct CM
Design Development 10312 102412 Presentation3 MEP Struct CM
Construction Documents 102412 111212 Proposal MEP Struct CM
AEI Submission 111212 22212 Electronic Submission
MEP Struct CM
Short List Selection 22212 3812 None MEP Struct CM
Finalist Presentation 3812 4312 Final Presentation
MEP Struct CM
Award 4512 4512 None MEP Struct CM
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
For each phase of the project the project team willbull Check and ensure completeness and accuracy of modelbull Check amp ensure completeness and accuracy of BIM Project Execution Planbull Coordinate all updates for individual models specialized discipline models
and construction updates
Team Responsibilitiesbull Develop BIM Modelbull Update amp Synchronize changes with Central Filesbull Proper Maintenance of Model and File Saving bull Maintain amp Revise BIM Planbull Integrate Discipline Models into Architectural BIM Model
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Managementbull Scheduling amp Sequencingbull Site Logisticsbull Equipment Procurementbull Cost Estimatingbull Constructability Analysisbull 4D Modeling Needsbull Construction Trends bull Clash Detection amp Coordinationbull Value Engineering
LightingElectrical
bull Lighting Planbull Power Planbull Load Calculationsbull Electrical Equipment Proposalbull Daylightingbull Clash Detection amp Coordinationbull Value Engineering
Mechanical
bull Heating amp Cooling Loadingbull Mechanical System Designbull Plumbing Designbull Energy Saving Analysisbull Clash Detection amp Coordinationbull Value Engineering
Structuralbull Structural System Designbull Analysis of Structural System Optionsbull Load Calculationsbull Clash Detection amp Coordinationbull Value Engineering
TASK ROLE Staff Size
Hours Planned Weeks
Model Development
Architect(Collaborative)CM
ElectricalLighting
MechanicalStructural
822222
2 hrswk8 hrswk8 hrswk8 hrswk8 hrswk8 hrswk
388888
Model Review
CMElectricalLighting
MechanicalStructural
22222
1 hrwk1 hrwk1 hrwk1 hrwk1 hrwk
1616161616
Structural Analysis amp Design
Structural
2
10 hrswk
8
LightingElectrical Analysis amp
Design
LightingElectrical
2
10 hrswk
8
Mechanical Analysis amp
Design
Mechanical
2
10 hrswk
8
LEED Certification Plus+
Reviews
Collaborative
8
4 hrswk
6
Schedule Development
Construction
Manager
2
5 hrswk
2
Cost Estimating
Construction Manager
2
10 hrswk
2
Value Engineering
Collaborative
8
3 hrswk
Ongoing
3D Coordination
Structural LightingElectrical
MechanicalConstruction Manager
2222
4 hrswk4 hrswk4 hrswk7 hrswk
3333
4D Modeling
Construction Manager
2
5 hrswk
3
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
TASK ROLE Staff Size
Hours Planned
Weeks
Model Development
Architect(Collaborative) CM
Electrical Lighting
Mechanical Structural
8 2 2 2 2 2
2 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk
3 8 8 8 8 8
Model Review
CM Electrical Lighting
Mechanical Structural
2 2 2 2 2
1 hrwk 1 hrwk 1 hrwk 1 hrwk 1 hrwk
16 16 16 16 16
Structural Analysis
amp Design
Structural
2
10 hrswk
8
Integration
BIM Project Execution Software
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE
Revit 2013 ARCH Design Authoring
3DS Max 2013 ARCHLE Design Rendering
Revit MEP 2013 ME Mechanical Authoring
Trane Trace v700 ME Mechanical Calculations
Revit MEP 2013 LE LightingElectrical Authoring
ComCheck 2013 LE Lighting Requirements
DaySim 2013 LE Lighting Daylighting
Agi32 Version 22 LE LE Calculations
ComFen 2013 LE Glazing Analysis
Revit Structure 2013 STRUCT Structural Authoring
RAM v1403 STRUCT Structural Analysis
SAP 2013 STRUCT Frame Analysis
Structure Point 2013 STRUCT Structural Analysis
RS Means CostWorks 2013 CM Cost Estimation
Primavera 2013 CM Project Scheduling
Navisworks 2013 CM 4D Modeling
Navisworks 2013 CM Clash Detection
Record Modeling 2013 CM Revit
Revit Navisworks 2013 MEPCM Revit Navisworks
Integration
BIM Project Execution File Naming
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ
ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT
MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT
ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT
LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT
STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT
CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT
COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT
ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT
Integration
BIM Project Execution Quality Control
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
CHECKS DEFINITION RESPONSIBLE PARTY
RECOMMENDEDPROJECT MILESTONES
VisualEnsure there are no unintended model components and the design intent has been followed
ALL Daily
Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily
Model Integrity
Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale
All Daily
Structural
Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Structural
Local Materials
bull Native wood productsbull Local vendors
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Recyclability Reusability
bull Reduce cement CO2 emissionsbull Fly ashbull Slag
bull Ground up concrete for parking lot
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Efficient Systems
bull Combine materials to optimize the performance of each
bull Braced framebull CMUsbull Metal stud walls
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Informed Decisions
bull Recovery time after high wind or seismic event
bull Bolted connectionsbull Prefabricated materials amp precast
concrete
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Higher first costbull Requires large footprint
Geothermal Heat Pump with Ground Loops
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors
while unit is offbull Does not address latent load
effectively
Water Source Heat Pump
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Integration
BIM Project Execution Plan Overview
Mission StatementldquoCreationrsquos one true aim is to enhance the quality of the communities we work with through innovative ideas and sustainable designrdquo
Project Mission StatementldquoTo create a lsquohigh performancersquo elementary school that functions as a multipurpose space for the community through a collaborative multi-disciplinary environmentrdquo
-ingenuity -quality -enjoyment -integrity
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
BIM Project Execution Plan Overview
Goals for Bimbull Design a constructable elementary school for the
communitybull Integrate on the design to enhance the building for a
broader user groupbull Incorporate energy efficiency while being mindful of cost by
focusing on both short term and lifetime cost benefitsbull Use BIM as a tool to improve our building design amp
construction processbull - Achieve LEED Certification for the building
- Understand the effects of discipline specific decisions on the broader project team
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
BIM Project Execution Project Schedule
PROJECT MILESTONE ESTIMATED START
ESTIMATED COMPLETION
PROJECT DELIVERABLE
INVOLVED PROJECT STAKEHOLDERS
Preliminary Planning 9112 91412 Presentation 1 MEP Struct CM
Schematic Design 91412 10312 Presentation 2 MEP Struct CM
Design Development 10312 102412 Presentation3 MEP Struct CM
Construction Documents 102412 111212 Proposal MEP Struct CM
AEI Submission 111212 22212 Electronic Submission
MEP Struct CM
Short List Selection 22212 3812 None MEP Struct CM
Finalist Presentation 3812 4312 Final Presentation
MEP Struct CM
Award 4512 4512 None MEP Struct CM
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
For each phase of the project the project team willbull Check and ensure completeness and accuracy of modelbull Check amp ensure completeness and accuracy of BIM Project Execution Planbull Coordinate all updates for individual models specialized discipline models
and construction updates
Team Responsibilitiesbull Develop BIM Modelbull Update amp Synchronize changes with Central Filesbull Proper Maintenance of Model and File Saving bull Maintain amp Revise BIM Planbull Integrate Discipline Models into Architectural BIM Model
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Managementbull Scheduling amp Sequencingbull Site Logisticsbull Equipment Procurementbull Cost Estimatingbull Constructability Analysisbull 4D Modeling Needsbull Construction Trends bull Clash Detection amp Coordinationbull Value Engineering
LightingElectrical
bull Lighting Planbull Power Planbull Load Calculationsbull Electrical Equipment Proposalbull Daylightingbull Clash Detection amp Coordinationbull Value Engineering
Mechanical
bull Heating amp Cooling Loadingbull Mechanical System Designbull Plumbing Designbull Energy Saving Analysisbull Clash Detection amp Coordinationbull Value Engineering
Structuralbull Structural System Designbull Analysis of Structural System Optionsbull Load Calculationsbull Clash Detection amp Coordinationbull Value Engineering
TASK ROLE Staff Size
Hours Planned Weeks
Model Development
Architect(Collaborative)CM
ElectricalLighting
MechanicalStructural
822222
2 hrswk8 hrswk8 hrswk8 hrswk8 hrswk8 hrswk
388888
Model Review
CMElectricalLighting
MechanicalStructural
22222
1 hrwk1 hrwk1 hrwk1 hrwk1 hrwk
1616161616
Structural Analysis amp Design
Structural
2
10 hrswk
8
LightingElectrical Analysis amp
Design
LightingElectrical
2
10 hrswk
8
Mechanical Analysis amp
Design
Mechanical
2
10 hrswk
8
LEED Certification Plus+
Reviews
Collaborative
8
4 hrswk
6
Schedule Development
Construction
Manager
2
5 hrswk
2
Cost Estimating
Construction Manager
2
10 hrswk
2
Value Engineering
Collaborative
8
3 hrswk
Ongoing
3D Coordination
Structural LightingElectrical
MechanicalConstruction Manager
2222
4 hrswk4 hrswk4 hrswk7 hrswk
3333
4D Modeling
Construction Manager
2
5 hrswk
3
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
TASK ROLE Staff Size
Hours Planned
Weeks
Model Development
Architect(Collaborative) CM
Electrical Lighting
Mechanical Structural
8 2 2 2 2 2
2 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk
3 8 8 8 8 8
Model Review
CM Electrical Lighting
Mechanical Structural
2 2 2 2 2
1 hrwk 1 hrwk 1 hrwk 1 hrwk 1 hrwk
16 16 16 16 16
Structural Analysis
amp Design
Structural
2
10 hrswk
8
Integration
BIM Project Execution Software
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE
Revit 2013 ARCH Design Authoring
3DS Max 2013 ARCHLE Design Rendering
Revit MEP 2013 ME Mechanical Authoring
Trane Trace v700 ME Mechanical Calculations
Revit MEP 2013 LE LightingElectrical Authoring
ComCheck 2013 LE Lighting Requirements
DaySim 2013 LE Lighting Daylighting
Agi32 Version 22 LE LE Calculations
ComFen 2013 LE Glazing Analysis
Revit Structure 2013 STRUCT Structural Authoring
RAM v1403 STRUCT Structural Analysis
SAP 2013 STRUCT Frame Analysis
Structure Point 2013 STRUCT Structural Analysis
RS Means CostWorks 2013 CM Cost Estimation
Primavera 2013 CM Project Scheduling
Navisworks 2013 CM 4D Modeling
Navisworks 2013 CM Clash Detection
Record Modeling 2013 CM Revit
Revit Navisworks 2013 MEPCM Revit Navisworks
Integration
BIM Project Execution File Naming
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ
ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT
MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT
ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT
LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT
STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT
CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT
COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT
ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT
Integration
BIM Project Execution Quality Control
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
CHECKS DEFINITION RESPONSIBLE PARTY
RECOMMENDEDPROJECT MILESTONES
VisualEnsure there are no unintended model components and the design intent has been followed
ALL Daily
Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily
Model Integrity
Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale
All Daily
Structural
Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Structural
Local Materials
bull Native wood productsbull Local vendors
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Recyclability Reusability
bull Reduce cement CO2 emissionsbull Fly ashbull Slag
bull Ground up concrete for parking lot
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Efficient Systems
bull Combine materials to optimize the performance of each
bull Braced framebull CMUsbull Metal stud walls
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Informed Decisions
bull Recovery time after high wind or seismic event
bull Bolted connectionsbull Prefabricated materials amp precast
concrete
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Higher first costbull Requires large footprint
Geothermal Heat Pump with Ground Loops
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors
while unit is offbull Does not address latent load
effectively
Water Source Heat Pump
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Integration
BIM Project Execution Plan Overview
Mission StatementldquoCreationrsquos one true aim is to enhance the quality of the communities we work with through innovative ideas and sustainable designrdquo
Project Mission StatementldquoTo create a lsquohigh performancersquo elementary school that functions as a multipurpose space for the community through a collaborative multi-disciplinary environmentrdquo
-ingenuity -quality -enjoyment -integrity
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
BIM Project Execution Plan Overview
Goals for Bimbull Design a constructable elementary school for the
communitybull Integrate on the design to enhance the building for a
broader user groupbull Incorporate energy efficiency while being mindful of cost by
focusing on both short term and lifetime cost benefitsbull Use BIM as a tool to improve our building design amp
construction processbull - Achieve LEED Certification for the building
- Understand the effects of discipline specific decisions on the broader project team
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
BIM Project Execution Project Schedule
PROJECT MILESTONE ESTIMATED START
ESTIMATED COMPLETION
PROJECT DELIVERABLE
INVOLVED PROJECT STAKEHOLDERS
Preliminary Planning 9112 91412 Presentation 1 MEP Struct CM
Schematic Design 91412 10312 Presentation 2 MEP Struct CM
Design Development 10312 102412 Presentation3 MEP Struct CM
Construction Documents 102412 111212 Proposal MEP Struct CM
AEI Submission 111212 22212 Electronic Submission
MEP Struct CM
Short List Selection 22212 3812 None MEP Struct CM
Finalist Presentation 3812 4312 Final Presentation
MEP Struct CM
Award 4512 4512 None MEP Struct CM
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
For each phase of the project the project team willbull Check and ensure completeness and accuracy of modelbull Check amp ensure completeness and accuracy of BIM Project Execution Planbull Coordinate all updates for individual models specialized discipline models
and construction updates
Team Responsibilitiesbull Develop BIM Modelbull Update amp Synchronize changes with Central Filesbull Proper Maintenance of Model and File Saving bull Maintain amp Revise BIM Planbull Integrate Discipline Models into Architectural BIM Model
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Managementbull Scheduling amp Sequencingbull Site Logisticsbull Equipment Procurementbull Cost Estimatingbull Constructability Analysisbull 4D Modeling Needsbull Construction Trends bull Clash Detection amp Coordinationbull Value Engineering
LightingElectrical
bull Lighting Planbull Power Planbull Load Calculationsbull Electrical Equipment Proposalbull Daylightingbull Clash Detection amp Coordinationbull Value Engineering
Mechanical
bull Heating amp Cooling Loadingbull Mechanical System Designbull Plumbing Designbull Energy Saving Analysisbull Clash Detection amp Coordinationbull Value Engineering
Structuralbull Structural System Designbull Analysis of Structural System Optionsbull Load Calculationsbull Clash Detection amp Coordinationbull Value Engineering
TASK ROLE Staff Size
Hours Planned Weeks
Model Development
Architect(Collaborative)CM
ElectricalLighting
MechanicalStructural
822222
2 hrswk8 hrswk8 hrswk8 hrswk8 hrswk8 hrswk
388888
Model Review
CMElectricalLighting
MechanicalStructural
22222
1 hrwk1 hrwk1 hrwk1 hrwk1 hrwk
1616161616
Structural Analysis amp Design
Structural
2
10 hrswk
8
LightingElectrical Analysis amp
Design
LightingElectrical
2
10 hrswk
8
Mechanical Analysis amp
Design
Mechanical
2
10 hrswk
8
LEED Certification Plus+
Reviews
Collaborative
8
4 hrswk
6
Schedule Development
Construction
Manager
2
5 hrswk
2
Cost Estimating
Construction Manager
2
10 hrswk
2
Value Engineering
Collaborative
8
3 hrswk
Ongoing
3D Coordination
Structural LightingElectrical
MechanicalConstruction Manager
2222
4 hrswk4 hrswk4 hrswk7 hrswk
3333
4D Modeling
Construction Manager
2
5 hrswk
3
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
TASK ROLE Staff Size
Hours Planned
Weeks
Model Development
Architect(Collaborative) CM
Electrical Lighting
Mechanical Structural
8 2 2 2 2 2
2 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk
3 8 8 8 8 8
Model Review
CM Electrical Lighting
Mechanical Structural
2 2 2 2 2
1 hrwk 1 hrwk 1 hrwk 1 hrwk 1 hrwk
16 16 16 16 16
Structural Analysis
amp Design
Structural
2
10 hrswk
8
Integration
BIM Project Execution Software
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE
Revit 2013 ARCH Design Authoring
3DS Max 2013 ARCHLE Design Rendering
Revit MEP 2013 ME Mechanical Authoring
Trane Trace v700 ME Mechanical Calculations
Revit MEP 2013 LE LightingElectrical Authoring
ComCheck 2013 LE Lighting Requirements
DaySim 2013 LE Lighting Daylighting
Agi32 Version 22 LE LE Calculations
ComFen 2013 LE Glazing Analysis
Revit Structure 2013 STRUCT Structural Authoring
RAM v1403 STRUCT Structural Analysis
SAP 2013 STRUCT Frame Analysis
Structure Point 2013 STRUCT Structural Analysis
RS Means CostWorks 2013 CM Cost Estimation
Primavera 2013 CM Project Scheduling
Navisworks 2013 CM 4D Modeling
Navisworks 2013 CM Clash Detection
Record Modeling 2013 CM Revit
Revit Navisworks 2013 MEPCM Revit Navisworks
Integration
BIM Project Execution File Naming
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ
ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT
MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT
ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT
LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT
STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT
CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT
COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT
ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT
Integration
BIM Project Execution Quality Control
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
CHECKS DEFINITION RESPONSIBLE PARTY
RECOMMENDEDPROJECT MILESTONES
VisualEnsure there are no unintended model components and the design intent has been followed
ALL Daily
Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily
Model Integrity
Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale
All Daily
Structural
Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Structural
Local Materials
bull Native wood productsbull Local vendors
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Recyclability Reusability
bull Reduce cement CO2 emissionsbull Fly ashbull Slag
bull Ground up concrete for parking lot
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Efficient Systems
bull Combine materials to optimize the performance of each
bull Braced framebull CMUsbull Metal stud walls
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Informed Decisions
bull Recovery time after high wind or seismic event
bull Bolted connectionsbull Prefabricated materials amp precast
concrete
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Higher first costbull Requires large footprint
Geothermal Heat Pump with Ground Loops
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors
while unit is offbull Does not address latent load
effectively
Water Source Heat Pump
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Integration
BIM Project Execution Plan Overview
Goals for Bimbull Design a constructable elementary school for the
communitybull Integrate on the design to enhance the building for a
broader user groupbull Incorporate energy efficiency while being mindful of cost by
focusing on both short term and lifetime cost benefitsbull Use BIM as a tool to improve our building design amp
construction processbull - Achieve LEED Certification for the building
- Understand the effects of discipline specific decisions on the broader project team
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
BIM Project Execution Project Schedule
PROJECT MILESTONE ESTIMATED START
ESTIMATED COMPLETION
PROJECT DELIVERABLE
INVOLVED PROJECT STAKEHOLDERS
Preliminary Planning 9112 91412 Presentation 1 MEP Struct CM
Schematic Design 91412 10312 Presentation 2 MEP Struct CM
Design Development 10312 102412 Presentation3 MEP Struct CM
Construction Documents 102412 111212 Proposal MEP Struct CM
AEI Submission 111212 22212 Electronic Submission
MEP Struct CM
Short List Selection 22212 3812 None MEP Struct CM
Finalist Presentation 3812 4312 Final Presentation
MEP Struct CM
Award 4512 4512 None MEP Struct CM
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
For each phase of the project the project team willbull Check and ensure completeness and accuracy of modelbull Check amp ensure completeness and accuracy of BIM Project Execution Planbull Coordinate all updates for individual models specialized discipline models
and construction updates
Team Responsibilitiesbull Develop BIM Modelbull Update amp Synchronize changes with Central Filesbull Proper Maintenance of Model and File Saving bull Maintain amp Revise BIM Planbull Integrate Discipline Models into Architectural BIM Model
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Managementbull Scheduling amp Sequencingbull Site Logisticsbull Equipment Procurementbull Cost Estimatingbull Constructability Analysisbull 4D Modeling Needsbull Construction Trends bull Clash Detection amp Coordinationbull Value Engineering
LightingElectrical
bull Lighting Planbull Power Planbull Load Calculationsbull Electrical Equipment Proposalbull Daylightingbull Clash Detection amp Coordinationbull Value Engineering
Mechanical
bull Heating amp Cooling Loadingbull Mechanical System Designbull Plumbing Designbull Energy Saving Analysisbull Clash Detection amp Coordinationbull Value Engineering
Structuralbull Structural System Designbull Analysis of Structural System Optionsbull Load Calculationsbull Clash Detection amp Coordinationbull Value Engineering
TASK ROLE Staff Size
Hours Planned Weeks
Model Development
Architect(Collaborative)CM
ElectricalLighting
MechanicalStructural
822222
2 hrswk8 hrswk8 hrswk8 hrswk8 hrswk8 hrswk
388888
Model Review
CMElectricalLighting
MechanicalStructural
22222
1 hrwk1 hrwk1 hrwk1 hrwk1 hrwk
1616161616
Structural Analysis amp Design
Structural
2
10 hrswk
8
LightingElectrical Analysis amp
Design
LightingElectrical
2
10 hrswk
8
Mechanical Analysis amp
Design
Mechanical
2
10 hrswk
8
LEED Certification Plus+
Reviews
Collaborative
8
4 hrswk
6
Schedule Development
Construction
Manager
2
5 hrswk
2
Cost Estimating
Construction Manager
2
10 hrswk
2
Value Engineering
Collaborative
8
3 hrswk
Ongoing
3D Coordination
Structural LightingElectrical
MechanicalConstruction Manager
2222
4 hrswk4 hrswk4 hrswk7 hrswk
3333
4D Modeling
Construction Manager
2
5 hrswk
3
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
TASK ROLE Staff Size
Hours Planned
Weeks
Model Development
Architect(Collaborative) CM
Electrical Lighting
Mechanical Structural
8 2 2 2 2 2
2 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk
3 8 8 8 8 8
Model Review
CM Electrical Lighting
Mechanical Structural
2 2 2 2 2
1 hrwk 1 hrwk 1 hrwk 1 hrwk 1 hrwk
16 16 16 16 16
Structural Analysis
amp Design
Structural
2
10 hrswk
8
Integration
BIM Project Execution Software
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE
Revit 2013 ARCH Design Authoring
3DS Max 2013 ARCHLE Design Rendering
Revit MEP 2013 ME Mechanical Authoring
Trane Trace v700 ME Mechanical Calculations
Revit MEP 2013 LE LightingElectrical Authoring
ComCheck 2013 LE Lighting Requirements
DaySim 2013 LE Lighting Daylighting
Agi32 Version 22 LE LE Calculations
ComFen 2013 LE Glazing Analysis
Revit Structure 2013 STRUCT Structural Authoring
RAM v1403 STRUCT Structural Analysis
SAP 2013 STRUCT Frame Analysis
Structure Point 2013 STRUCT Structural Analysis
RS Means CostWorks 2013 CM Cost Estimation
Primavera 2013 CM Project Scheduling
Navisworks 2013 CM 4D Modeling
Navisworks 2013 CM Clash Detection
Record Modeling 2013 CM Revit
Revit Navisworks 2013 MEPCM Revit Navisworks
Integration
BIM Project Execution File Naming
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ
ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT
MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT
ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT
LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT
STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT
CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT
COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT
ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT
Integration
BIM Project Execution Quality Control
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
CHECKS DEFINITION RESPONSIBLE PARTY
RECOMMENDEDPROJECT MILESTONES
VisualEnsure there are no unintended model components and the design intent has been followed
ALL Daily
Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily
Model Integrity
Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale
All Daily
Structural
Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Structural
Local Materials
bull Native wood productsbull Local vendors
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Recyclability Reusability
bull Reduce cement CO2 emissionsbull Fly ashbull Slag
bull Ground up concrete for parking lot
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Efficient Systems
bull Combine materials to optimize the performance of each
bull Braced framebull CMUsbull Metal stud walls
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Informed Decisions
bull Recovery time after high wind or seismic event
bull Bolted connectionsbull Prefabricated materials amp precast
concrete
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Higher first costbull Requires large footprint
Geothermal Heat Pump with Ground Loops
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors
while unit is offbull Does not address latent load
effectively
Water Source Heat Pump
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Integration
BIM Project Execution Project Schedule
PROJECT MILESTONE ESTIMATED START
ESTIMATED COMPLETION
PROJECT DELIVERABLE
INVOLVED PROJECT STAKEHOLDERS
Preliminary Planning 9112 91412 Presentation 1 MEP Struct CM
Schematic Design 91412 10312 Presentation 2 MEP Struct CM
Design Development 10312 102412 Presentation3 MEP Struct CM
Construction Documents 102412 111212 Proposal MEP Struct CM
AEI Submission 111212 22212 Electronic Submission
MEP Struct CM
Short List Selection 22212 3812 None MEP Struct CM
Finalist Presentation 3812 4312 Final Presentation
MEP Struct CM
Award 4512 4512 None MEP Struct CM
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
For each phase of the project the project team willbull Check and ensure completeness and accuracy of modelbull Check amp ensure completeness and accuracy of BIM Project Execution Planbull Coordinate all updates for individual models specialized discipline models
and construction updates
Team Responsibilitiesbull Develop BIM Modelbull Update amp Synchronize changes with Central Filesbull Proper Maintenance of Model and File Saving bull Maintain amp Revise BIM Planbull Integrate Discipline Models into Architectural BIM Model
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Managementbull Scheduling amp Sequencingbull Site Logisticsbull Equipment Procurementbull Cost Estimatingbull Constructability Analysisbull 4D Modeling Needsbull Construction Trends bull Clash Detection amp Coordinationbull Value Engineering
LightingElectrical
bull Lighting Planbull Power Planbull Load Calculationsbull Electrical Equipment Proposalbull Daylightingbull Clash Detection amp Coordinationbull Value Engineering
Mechanical
bull Heating amp Cooling Loadingbull Mechanical System Designbull Plumbing Designbull Energy Saving Analysisbull Clash Detection amp Coordinationbull Value Engineering
Structuralbull Structural System Designbull Analysis of Structural System Optionsbull Load Calculationsbull Clash Detection amp Coordinationbull Value Engineering
TASK ROLE Staff Size
Hours Planned Weeks
Model Development
Architect(Collaborative)CM
ElectricalLighting
MechanicalStructural
822222
2 hrswk8 hrswk8 hrswk8 hrswk8 hrswk8 hrswk
388888
Model Review
CMElectricalLighting
MechanicalStructural
22222
1 hrwk1 hrwk1 hrwk1 hrwk1 hrwk
1616161616
Structural Analysis amp Design
Structural
2
10 hrswk
8
LightingElectrical Analysis amp
Design
LightingElectrical
2
10 hrswk
8
Mechanical Analysis amp
Design
Mechanical
2
10 hrswk
8
LEED Certification Plus+
Reviews
Collaborative
8
4 hrswk
6
Schedule Development
Construction
Manager
2
5 hrswk
2
Cost Estimating
Construction Manager
2
10 hrswk
2
Value Engineering
Collaborative
8
3 hrswk
Ongoing
3D Coordination
Structural LightingElectrical
MechanicalConstruction Manager
2222
4 hrswk4 hrswk4 hrswk7 hrswk
3333
4D Modeling
Construction Manager
2
5 hrswk
3
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
TASK ROLE Staff Size
Hours Planned
Weeks
Model Development
Architect(Collaborative) CM
Electrical Lighting
Mechanical Structural
8 2 2 2 2 2
2 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk
3 8 8 8 8 8
Model Review
CM Electrical Lighting
Mechanical Structural
2 2 2 2 2
1 hrwk 1 hrwk 1 hrwk 1 hrwk 1 hrwk
16 16 16 16 16
Structural Analysis
amp Design
Structural
2
10 hrswk
8
Integration
BIM Project Execution Software
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE
Revit 2013 ARCH Design Authoring
3DS Max 2013 ARCHLE Design Rendering
Revit MEP 2013 ME Mechanical Authoring
Trane Trace v700 ME Mechanical Calculations
Revit MEP 2013 LE LightingElectrical Authoring
ComCheck 2013 LE Lighting Requirements
DaySim 2013 LE Lighting Daylighting
Agi32 Version 22 LE LE Calculations
ComFen 2013 LE Glazing Analysis
Revit Structure 2013 STRUCT Structural Authoring
RAM v1403 STRUCT Structural Analysis
SAP 2013 STRUCT Frame Analysis
Structure Point 2013 STRUCT Structural Analysis
RS Means CostWorks 2013 CM Cost Estimation
Primavera 2013 CM Project Scheduling
Navisworks 2013 CM 4D Modeling
Navisworks 2013 CM Clash Detection
Record Modeling 2013 CM Revit
Revit Navisworks 2013 MEPCM Revit Navisworks
Integration
BIM Project Execution File Naming
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ
ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT
MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT
ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT
LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT
STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT
CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT
COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT
ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT
Integration
BIM Project Execution Quality Control
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
CHECKS DEFINITION RESPONSIBLE PARTY
RECOMMENDEDPROJECT MILESTONES
VisualEnsure there are no unintended model components and the design intent has been followed
ALL Daily
Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily
Model Integrity
Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale
All Daily
Structural
Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Structural
Local Materials
bull Native wood productsbull Local vendors
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Recyclability Reusability
bull Reduce cement CO2 emissionsbull Fly ashbull Slag
bull Ground up concrete for parking lot
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Efficient Systems
bull Combine materials to optimize the performance of each
bull Braced framebull CMUsbull Metal stud walls
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Informed Decisions
bull Recovery time after high wind or seismic event
bull Bolted connectionsbull Prefabricated materials amp precast
concrete
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Higher first costbull Requires large footprint
Geothermal Heat Pump with Ground Loops
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors
while unit is offbull Does not address latent load
effectively
Water Source Heat Pump
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
For each phase of the project the project team willbull Check and ensure completeness and accuracy of modelbull Check amp ensure completeness and accuracy of BIM Project Execution Planbull Coordinate all updates for individual models specialized discipline models
and construction updates
Team Responsibilitiesbull Develop BIM Modelbull Update amp Synchronize changes with Central Filesbull Proper Maintenance of Model and File Saving bull Maintain amp Revise BIM Planbull Integrate Discipline Models into Architectural BIM Model
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Managementbull Scheduling amp Sequencingbull Site Logisticsbull Equipment Procurementbull Cost Estimatingbull Constructability Analysisbull 4D Modeling Needsbull Construction Trends bull Clash Detection amp Coordinationbull Value Engineering
LightingElectrical
bull Lighting Planbull Power Planbull Load Calculationsbull Electrical Equipment Proposalbull Daylightingbull Clash Detection amp Coordinationbull Value Engineering
Mechanical
bull Heating amp Cooling Loadingbull Mechanical System Designbull Plumbing Designbull Energy Saving Analysisbull Clash Detection amp Coordinationbull Value Engineering
Structuralbull Structural System Designbull Analysis of Structural System Optionsbull Load Calculationsbull Clash Detection amp Coordinationbull Value Engineering
TASK ROLE Staff Size
Hours Planned Weeks
Model Development
Architect(Collaborative)CM
ElectricalLighting
MechanicalStructural
822222
2 hrswk8 hrswk8 hrswk8 hrswk8 hrswk8 hrswk
388888
Model Review
CMElectricalLighting
MechanicalStructural
22222
1 hrwk1 hrwk1 hrwk1 hrwk1 hrwk
1616161616
Structural Analysis amp Design
Structural
2
10 hrswk
8
LightingElectrical Analysis amp
Design
LightingElectrical
2
10 hrswk
8
Mechanical Analysis amp
Design
Mechanical
2
10 hrswk
8
LEED Certification Plus+
Reviews
Collaborative
8
4 hrswk
6
Schedule Development
Construction
Manager
2
5 hrswk
2
Cost Estimating
Construction Manager
2
10 hrswk
2
Value Engineering
Collaborative
8
3 hrswk
Ongoing
3D Coordination
Structural LightingElectrical
MechanicalConstruction Manager
2222
4 hrswk4 hrswk4 hrswk7 hrswk
3333
4D Modeling
Construction Manager
2
5 hrswk
3
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
TASK ROLE Staff Size
Hours Planned
Weeks
Model Development
Architect(Collaborative) CM
Electrical Lighting
Mechanical Structural
8 2 2 2 2 2
2 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk
3 8 8 8 8 8
Model Review
CM Electrical Lighting
Mechanical Structural
2 2 2 2 2
1 hrwk 1 hrwk 1 hrwk 1 hrwk 1 hrwk
16 16 16 16 16
Structural Analysis
amp Design
Structural
2
10 hrswk
8
Integration
BIM Project Execution Software
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE
Revit 2013 ARCH Design Authoring
3DS Max 2013 ARCHLE Design Rendering
Revit MEP 2013 ME Mechanical Authoring
Trane Trace v700 ME Mechanical Calculations
Revit MEP 2013 LE LightingElectrical Authoring
ComCheck 2013 LE Lighting Requirements
DaySim 2013 LE Lighting Daylighting
Agi32 Version 22 LE LE Calculations
ComFen 2013 LE Glazing Analysis
Revit Structure 2013 STRUCT Structural Authoring
RAM v1403 STRUCT Structural Analysis
SAP 2013 STRUCT Frame Analysis
Structure Point 2013 STRUCT Structural Analysis
RS Means CostWorks 2013 CM Cost Estimation
Primavera 2013 CM Project Scheduling
Navisworks 2013 CM 4D Modeling
Navisworks 2013 CM Clash Detection
Record Modeling 2013 CM Revit
Revit Navisworks 2013 MEPCM Revit Navisworks
Integration
BIM Project Execution File Naming
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ
ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT
MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT
ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT
LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT
STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT
CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT
COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT
ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT
Integration
BIM Project Execution Quality Control
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
CHECKS DEFINITION RESPONSIBLE PARTY
RECOMMENDEDPROJECT MILESTONES
VisualEnsure there are no unintended model components and the design intent has been followed
ALL Daily
Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily
Model Integrity
Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale
All Daily
Structural
Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Structural
Local Materials
bull Native wood productsbull Local vendors
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Recyclability Reusability
bull Reduce cement CO2 emissionsbull Fly ashbull Slag
bull Ground up concrete for parking lot
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Efficient Systems
bull Combine materials to optimize the performance of each
bull Braced framebull CMUsbull Metal stud walls
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Informed Decisions
bull Recovery time after high wind or seismic event
bull Bolted connectionsbull Prefabricated materials amp precast
concrete
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Higher first costbull Requires large footprint
Geothermal Heat Pump with Ground Loops
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors
while unit is offbull Does not address latent load
effectively
Water Source Heat Pump
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Managementbull Scheduling amp Sequencingbull Site Logisticsbull Equipment Procurementbull Cost Estimatingbull Constructability Analysisbull 4D Modeling Needsbull Construction Trends bull Clash Detection amp Coordinationbull Value Engineering
LightingElectrical
bull Lighting Planbull Power Planbull Load Calculationsbull Electrical Equipment Proposalbull Daylightingbull Clash Detection amp Coordinationbull Value Engineering
Mechanical
bull Heating amp Cooling Loadingbull Mechanical System Designbull Plumbing Designbull Energy Saving Analysisbull Clash Detection amp Coordinationbull Value Engineering
Structuralbull Structural System Designbull Analysis of Structural System Optionsbull Load Calculationsbull Clash Detection amp Coordinationbull Value Engineering
TASK ROLE Staff Size
Hours Planned Weeks
Model Development
Architect(Collaborative)CM
ElectricalLighting
MechanicalStructural
822222
2 hrswk8 hrswk8 hrswk8 hrswk8 hrswk8 hrswk
388888
Model Review
CMElectricalLighting
MechanicalStructural
22222
1 hrwk1 hrwk1 hrwk1 hrwk1 hrwk
1616161616
Structural Analysis amp Design
Structural
2
10 hrswk
8
LightingElectrical Analysis amp
Design
LightingElectrical
2
10 hrswk
8
Mechanical Analysis amp
Design
Mechanical
2
10 hrswk
8
LEED Certification Plus+
Reviews
Collaborative
8
4 hrswk
6
Schedule Development
Construction
Manager
2
5 hrswk
2
Cost Estimating
Construction Manager
2
10 hrswk
2
Value Engineering
Collaborative
8
3 hrswk
Ongoing
3D Coordination
Structural LightingElectrical
MechanicalConstruction Manager
2222
4 hrswk4 hrswk4 hrswk7 hrswk
3333
4D Modeling
Construction Manager
2
5 hrswk
3
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
TASK ROLE Staff Size
Hours Planned
Weeks
Model Development
Architect(Collaborative) CM
Electrical Lighting
Mechanical Structural
8 2 2 2 2 2
2 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk
3 8 8 8 8 8
Model Review
CM Electrical Lighting
Mechanical Structural
2 2 2 2 2
1 hrwk 1 hrwk 1 hrwk 1 hrwk 1 hrwk
16 16 16 16 16
Structural Analysis
amp Design
Structural
2
10 hrswk
8
Integration
BIM Project Execution Software
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE
Revit 2013 ARCH Design Authoring
3DS Max 2013 ARCHLE Design Rendering
Revit MEP 2013 ME Mechanical Authoring
Trane Trace v700 ME Mechanical Calculations
Revit MEP 2013 LE LightingElectrical Authoring
ComCheck 2013 LE Lighting Requirements
DaySim 2013 LE Lighting Daylighting
Agi32 Version 22 LE LE Calculations
ComFen 2013 LE Glazing Analysis
Revit Structure 2013 STRUCT Structural Authoring
RAM v1403 STRUCT Structural Analysis
SAP 2013 STRUCT Frame Analysis
Structure Point 2013 STRUCT Structural Analysis
RS Means CostWorks 2013 CM Cost Estimation
Primavera 2013 CM Project Scheduling
Navisworks 2013 CM 4D Modeling
Navisworks 2013 CM Clash Detection
Record Modeling 2013 CM Revit
Revit Navisworks 2013 MEPCM Revit Navisworks
Integration
BIM Project Execution File Naming
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ
ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT
MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT
ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT
LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT
STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT
CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT
COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT
ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT
Integration
BIM Project Execution Quality Control
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
CHECKS DEFINITION RESPONSIBLE PARTY
RECOMMENDEDPROJECT MILESTONES
VisualEnsure there are no unintended model components and the design intent has been followed
ALL Daily
Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily
Model Integrity
Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale
All Daily
Structural
Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Structural
Local Materials
bull Native wood productsbull Local vendors
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Recyclability Reusability
bull Reduce cement CO2 emissionsbull Fly ashbull Slag
bull Ground up concrete for parking lot
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Efficient Systems
bull Combine materials to optimize the performance of each
bull Braced framebull CMUsbull Metal stud walls
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Informed Decisions
bull Recovery time after high wind or seismic event
bull Bolted connectionsbull Prefabricated materials amp precast
concrete
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Higher first costbull Requires large footprint
Geothermal Heat Pump with Ground Loops
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors
while unit is offbull Does not address latent load
effectively
Water Source Heat Pump
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
TASK ROLE Staff Size
Hours Planned Weeks
Model Development
Architect(Collaborative)CM
ElectricalLighting
MechanicalStructural
822222
2 hrswk8 hrswk8 hrswk8 hrswk8 hrswk8 hrswk
388888
Model Review
CMElectricalLighting
MechanicalStructural
22222
1 hrwk1 hrwk1 hrwk1 hrwk1 hrwk
1616161616
Structural Analysis amp Design
Structural
2
10 hrswk
8
LightingElectrical Analysis amp
Design
LightingElectrical
2
10 hrswk
8
Mechanical Analysis amp
Design
Mechanical
2
10 hrswk
8
LEED Certification Plus+
Reviews
Collaborative
8
4 hrswk
6
Schedule Development
Construction
Manager
2
5 hrswk
2
Cost Estimating
Construction Manager
2
10 hrswk
2
Value Engineering
Collaborative
8
3 hrswk
Ongoing
3D Coordination
Structural LightingElectrical
MechanicalConstruction Manager
2222
4 hrswk4 hrswk4 hrswk7 hrswk
3333
4D Modeling
Construction Manager
2
5 hrswk
3
Integration
BIM Project Execution Roles amp Organization
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
TASK ROLE Staff Size
Hours Planned
Weeks
Model Development
Architect(Collaborative) CM
Electrical Lighting
Mechanical Structural
8 2 2 2 2 2
2 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk
3 8 8 8 8 8
Model Review
CM Electrical Lighting
Mechanical Structural
2 2 2 2 2
1 hrwk 1 hrwk 1 hrwk 1 hrwk 1 hrwk
16 16 16 16 16
Structural Analysis
amp Design
Structural
2
10 hrswk
8
Integration
BIM Project Execution Software
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE
Revit 2013 ARCH Design Authoring
3DS Max 2013 ARCHLE Design Rendering
Revit MEP 2013 ME Mechanical Authoring
Trane Trace v700 ME Mechanical Calculations
Revit MEP 2013 LE LightingElectrical Authoring
ComCheck 2013 LE Lighting Requirements
DaySim 2013 LE Lighting Daylighting
Agi32 Version 22 LE LE Calculations
ComFen 2013 LE Glazing Analysis
Revit Structure 2013 STRUCT Structural Authoring
RAM v1403 STRUCT Structural Analysis
SAP 2013 STRUCT Frame Analysis
Structure Point 2013 STRUCT Structural Analysis
RS Means CostWorks 2013 CM Cost Estimation
Primavera 2013 CM Project Scheduling
Navisworks 2013 CM 4D Modeling
Navisworks 2013 CM Clash Detection
Record Modeling 2013 CM Revit
Revit Navisworks 2013 MEPCM Revit Navisworks
Integration
BIM Project Execution File Naming
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ
ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT
MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT
ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT
LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT
STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT
CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT
COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT
ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT
Integration
BIM Project Execution Quality Control
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
CHECKS DEFINITION RESPONSIBLE PARTY
RECOMMENDEDPROJECT MILESTONES
VisualEnsure there are no unintended model components and the design intent has been followed
ALL Daily
Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily
Model Integrity
Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale
All Daily
Structural
Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Structural
Local Materials
bull Native wood productsbull Local vendors
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Recyclability Reusability
bull Reduce cement CO2 emissionsbull Fly ashbull Slag
bull Ground up concrete for parking lot
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Efficient Systems
bull Combine materials to optimize the performance of each
bull Braced framebull CMUsbull Metal stud walls
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Informed Decisions
bull Recovery time after high wind or seismic event
bull Bolted connectionsbull Prefabricated materials amp precast
concrete
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Higher first costbull Requires large footprint
Geothermal Heat Pump with Ground Loops
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors
while unit is offbull Does not address latent load
effectively
Water Source Heat Pump
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Integration
BIM Project Execution Software
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE
Revit 2013 ARCH Design Authoring
3DS Max 2013 ARCHLE Design Rendering
Revit MEP 2013 ME Mechanical Authoring
Trane Trace v700 ME Mechanical Calculations
Revit MEP 2013 LE LightingElectrical Authoring
ComCheck 2013 LE Lighting Requirements
DaySim 2013 LE Lighting Daylighting
Agi32 Version 22 LE LE Calculations
ComFen 2013 LE Glazing Analysis
Revit Structure 2013 STRUCT Structural Authoring
RAM v1403 STRUCT Structural Analysis
SAP 2013 STRUCT Frame Analysis
Structure Point 2013 STRUCT Structural Analysis
RS Means CostWorks 2013 CM Cost Estimation
Primavera 2013 CM Project Scheduling
Navisworks 2013 CM 4D Modeling
Navisworks 2013 CM Clash Detection
Record Modeling 2013 CM Revit
Revit Navisworks 2013 MEPCM Revit Navisworks
Integration
BIM Project Execution File Naming
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ
ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT
MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT
ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT
LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT
STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT
CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT
COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT
ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT
Integration
BIM Project Execution Quality Control
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
CHECKS DEFINITION RESPONSIBLE PARTY
RECOMMENDEDPROJECT MILESTONES
VisualEnsure there are no unintended model components and the design intent has been followed
ALL Daily
Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily
Model Integrity
Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale
All Daily
Structural
Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Structural
Local Materials
bull Native wood productsbull Local vendors
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Recyclability Reusability
bull Reduce cement CO2 emissionsbull Fly ashbull Slag
bull Ground up concrete for parking lot
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Efficient Systems
bull Combine materials to optimize the performance of each
bull Braced framebull CMUsbull Metal stud walls
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Informed Decisions
bull Recovery time after high wind or seismic event
bull Bolted connectionsbull Prefabricated materials amp precast
concrete
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Higher first costbull Requires large footprint
Geothermal Heat Pump with Ground Loops
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors
while unit is offbull Does not address latent load
effectively
Water Source Heat Pump
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Integration
BIM Project Execution File Naming
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ
ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT
MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT
ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT
LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT
STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT
CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT
COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT
ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT
Integration
BIM Project Execution Quality Control
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
CHECKS DEFINITION RESPONSIBLE PARTY
RECOMMENDEDPROJECT MILESTONES
VisualEnsure there are no unintended model components and the design intent has been followed
ALL Daily
Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily
Model Integrity
Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale
All Daily
Structural
Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Structural
Local Materials
bull Native wood productsbull Local vendors
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Recyclability Reusability
bull Reduce cement CO2 emissionsbull Fly ashbull Slag
bull Ground up concrete for parking lot
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Efficient Systems
bull Combine materials to optimize the performance of each
bull Braced framebull CMUsbull Metal stud walls
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Informed Decisions
bull Recovery time after high wind or seismic event
bull Bolted connectionsbull Prefabricated materials amp precast
concrete
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Higher first costbull Requires large footprint
Geothermal Heat Pump with Ground Loops
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors
while unit is offbull Does not address latent load
effectively
Water Source Heat Pump
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Integration
BIM Project Execution Quality Control
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
CHECKS DEFINITION RESPONSIBLE PARTY
RECOMMENDEDPROJECT MILESTONES
VisualEnsure there are no unintended model components and the design intent has been followed
ALL Daily
Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily
Model Integrity
Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale
All Daily
Structural
Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Structural
Local Materials
bull Native wood productsbull Local vendors
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Recyclability Reusability
bull Reduce cement CO2 emissionsbull Fly ashbull Slag
bull Ground up concrete for parking lot
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Efficient Systems
bull Combine materials to optimize the performance of each
bull Braced framebull CMUsbull Metal stud walls
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Informed Decisions
bull Recovery time after high wind or seismic event
bull Bolted connectionsbull Prefabricated materials amp precast
concrete
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Higher first costbull Requires large footprint
Geothermal Heat Pump with Ground Loops
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors
while unit is offbull Does not address latent load
effectively
Water Source Heat Pump
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Structural
Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Structural
Local Materials
bull Native wood productsbull Local vendors
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Recyclability Reusability
bull Reduce cement CO2 emissionsbull Fly ashbull Slag
bull Ground up concrete for parking lot
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Efficient Systems
bull Combine materials to optimize the performance of each
bull Braced framebull CMUsbull Metal stud walls
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Informed Decisions
bull Recovery time after high wind or seismic event
bull Bolted connectionsbull Prefabricated materials amp precast
concrete
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Higher first costbull Requires large footprint
Geothermal Heat Pump with Ground Loops
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors
while unit is offbull Does not address latent load
effectively
Water Source Heat Pump
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Structural
Local Materials
bull Native wood productsbull Local vendors
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Recyclability Reusability
bull Reduce cement CO2 emissionsbull Fly ashbull Slag
bull Ground up concrete for parking lot
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Efficient Systems
bull Combine materials to optimize the performance of each
bull Braced framebull CMUsbull Metal stud walls
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Informed Decisions
bull Recovery time after high wind or seismic event
bull Bolted connectionsbull Prefabricated materials amp precast
concrete
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Higher first costbull Requires large footprint
Geothermal Heat Pump with Ground Loops
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors
while unit is offbull Does not address latent load
effectively
Water Source Heat Pump
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Structural
Recyclability Reusability
bull Reduce cement CO2 emissionsbull Fly ashbull Slag
bull Ground up concrete for parking lot
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Efficient Systems
bull Combine materials to optimize the performance of each
bull Braced framebull CMUsbull Metal stud walls
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Informed Decisions
bull Recovery time after high wind or seismic event
bull Bolted connectionsbull Prefabricated materials amp precast
concrete
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Higher first costbull Requires large footprint
Geothermal Heat Pump with Ground Loops
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors
while unit is offbull Does not address latent load
effectively
Water Source Heat Pump
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Structural
Efficient Systems
bull Combine materials to optimize the performance of each
bull Braced framebull CMUsbull Metal stud walls
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Structural
Informed Decisions
bull Recovery time after high wind or seismic event
bull Bolted connectionsbull Prefabricated materials amp precast
concrete
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Higher first costbull Requires large footprint
Geothermal Heat Pump with Ground Loops
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors
while unit is offbull Does not address latent load
effectively
Water Source Heat Pump
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Structural
Informed Decisions
bull Recovery time after high wind or seismic event
bull Bolted connectionsbull Prefabricated materials amp precast
concrete
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Higher first costbull Requires large footprint
Geothermal Heat Pump with Ground Loops
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors
while unit is offbull Does not address latent load
effectively
Water Source Heat Pump
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Higher first costbull Requires large footprint
Geothermal Heat Pump with Ground Loops
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors
while unit is offbull Does not address latent load
effectively
Water Source Heat Pump
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and
coolingbull Good for larger buildings
Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors
while unit is offbull Does not address latent load
effectively
Water Source Heat Pump
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical System Options
bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM
warm air
Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass
Solar Wall
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Mechanical
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LEED Design Ideasbull Water use reductionbull Enhanced refrigeration
managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
LightingElectrical
Electrical Design
bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting
bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design
Supplemental Energy
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
LightingElectrical
Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers
bull Roller Shades bull Automated
bull Window Glazingbull Frit
Shading
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
LightingElectrical
Lighting
bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards
bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures
Controls
All images from googlecom
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
LightingElectrical
LEED Design Ideas
All images from googlecom
bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting
Design
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Construction Management
Funding amp costsModel
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Project Delaysbull State Funding
Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop
httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Construction Management
Prefabrication amp Modularization
Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety
Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Construction Management
Sustainable Materials
Sustainability- The Capacity to endure
Possible Materialsbull Cork Flooring
bull Agricultural Waste Products
bull Green Roof amp Cool Roof
bull Supplementary Cementitious Materials
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Construction Management
Proactive Commissioning Plan
Proactive - acting in anticipation of future problems needs or changes
Commissioning Goalsbull Optimize Energy Use
bull Minimize Operating Costs
bull Ensure Proper Building Systems Documentation
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
All images from googlecom
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Construction Management
Operations amp Maintenance
Carry design and construction earned benefits through to operations
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Construction Management Structural Mechanical LightingElectrical Architecture
Construction Management
Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces
Lead Times for Equipment
Value Engineering of Systems
Operating Costs of the Building
Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment
installation
Constructability Issues Material Selection Functionality
Structural
system selection phasing cranes and equipment cost excavation transport requirements
Shaft locations Roof loads from
equipment Loads in plenum space
Column layout and bay spacing
Ceiling depth for recessed fixtures
WindowDaylighting area
FaccediladeAppearance of building
Overhangs Roof systems
Mechanical
Costs of equipmentinstallation
Payback period of geothermal systems
Intersection of duct work with structural beamscolumns
Thermal Mass Placement of air handlers Material selection
Coolingheating loads from equipment daylighting
Coordinate plenum space
Location of diffusers w fixtures etc
Designated location for MEP room
Limited plenum space
LightingElectrical
Costs of equipmentinstallation
Payback period for photovoltaics
WindowDaylighting area Material effects
reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with
specific lighting needs
Location of fixtures w diffusers etc
Wiring for all elecmech equipment
Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for
heatelec Coordinate plenum
space
Window Layout Materials Architectural Cove
Spaces
Architecture Material Selection
Faccedilade Bay spacinglocation of
columns Blending materials to
environment Overall aesthetics Functionality
Ceiling types for hidden ductequipment
Area for equipment
Window location for daylightingskylights
Outdoor lighting will influence appearance
Lighting to accent spaces
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Integration
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
A Few Examples of Integration Points
bull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Northeast Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Southwest Isometric
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Individual floors
Individual Ceilings
Plenum Space
14rsquo WallsGeneric Wall Type
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Construction Codes
PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA
Mechanical Codes
IMCASHRAE 621ASHRAE 55ASHRAE 901
LightingElectrical Codes
ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011
Structural Codes
PA Uniform Construction CodeInternational Building Code 2009ASCE7
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Looking forward
bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Deliverables
bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule
bull Rombull Assemblies Estimate
Model
Bim Ex PlanIntegrationCodesLooking Forward
Research
Mechanical Lightingelectrical Constructionmanagement
Integration structural
Mechanical Lightingelectrical Constructionmanagement
Integration structural