Upload
others
View
24
Download
5
Embed Size (px)
Citation preview
Supervisor Structure 1
Model Curriculum
1. Supervisor Structure
SECTOR: SUB-SECTOR: OCCUPATION:
REF ID: NSQF LEVEL:
Construction Real Estate and Infrastructure Construction MASONRY CON/Q0111, V1.0 6
Supervisor Structure 2
TABLE OF CONTENTS
1. Curriculum 01
2. Trainer Prerequisites 17
3. Annexure: Assessment Criteria 18
Supervisor Structure 1
Supervisor Structure CURRICULUM / SYLLABUS
This program is aimed at training candidates for the job of a “Supervisor Structure”, in the “Construction” Sector/Industry and aims at building the following key competencies amongst the learner
Program Name Supervisor Structure
Qualification Pack Name & Reference ID
CON/Q0111, v1.0
Version No. 1.0 Version Update Date 23-08-2017
Pre-requisites to Training
Preferably 12th standard with 15 years site experience in same
occupation for non-trained worker/ 5 years site experience as a certified
Foreman Concrete / Foreman Reinforcement / Foreman
Formwork/Foreman Scaffolding for trained worker.
Training Outcomes After completing this programme, participants will be able to:
Read & interpret drawings, specifications and standards for structural execution: - Read and interpret drawings, manufacturers’ specification, and work method statement for masonry, bar bending, scaffolding, shuttering carpentry and concreting works.
Allocate, monitor tools, equipment and resources for structural execution work and procure approvals for relevant work:-Allocating tools, equipment and resources for the execution of structural works and monitoring them, along with procuring approvals for the structural execution works.
Supervise and monitor execution of System/shuttering Carpentry works: - Supervising and monitoring the execution of system/shuttering carpentry works on the construction site.
Supervise and monitor execution of concreting works: - Supervising and monitoring the execution of various concreting works being carried out at the site.
Supervise and monitor execution of bar bending works:- Supervising and monitoring the execution of various bar bending works at site
Supervise and monitor execution of scaffolding works: - Supervising and monitoring the execution of scaffolding works being carried out at the site.
Plan, arrange and manage resources for execution of relevant work:- Planning, arranging and managing resources for execution of relevant work
Plan and organize work to meet expected outcomes:- Organised working procedure within a team at site
Supervise, monitor and evaluate performance of subordinates at workplace: - Supervising, monitoring and evaluating subordinates performance at site.
Manage workplace for safe and healthy work environment: - Importance of Health & Safety aspects, its management & measures to be followed while working.
Supervisor Structure 2
This course encompasses 10 out of 10 National Occupational Standards (NOS) of “Supervisor Structure” Qualification Pack issued by “Construction Skill Development Council of India”.
Sr. No.
Module Key Learning Outcomes Equipment Required
1 Introduction Theory Duration (hh:mm) 08:00 Practical Duration (hh:mm) 00:00
Introduction to QP/NOS of supervisor
structure
Role description/ functions of the job role
Expected personal attributes from the job
role
Brief description about course content,
mode of learning and duration of course
Future possible progression and career
development provisions on completion of
the course
computer basics – MS Office, Internet, E-
Leadership development program
1. Classroom having seating requirement for 30 people.
2. Projector 3. Blackboard
2 Read & interpret drawings, specifications and standards for structural execution Theory Duration (hh:mm) 60:00 Practical Duration (hh:mm) 60:00 Corresponding NOS Code CON/N0132
Theory:-
Different architectural drawing, structural
detail drawing and specifications for
masonry, bar bending, concreting,
scaffolding and shuttering carpentry
works.
Procedure to read plan, elevation and
sectional drawings
principals involved in reading and
interpreting various relevant drawings
read and interpret drawing for masonry,
bar bending, concreting, scaffolding and
shuttering carpentry and convert them to
simple hand sketch
Simplified sketch preparation from the
architectural drawings
Work schedule for masonry, bar
bending, concreting, scaffolding and
shuttering carpentry works
Standards and specifications for
execution masonry, bar bending,
concreting, scaffolding and shuttering
carpentry works.
Reading of manufacturer’s specification
and work method statement for
masonry, bar bending, concreting,
scaffolding and shuttering carpentry
works.
Demonstration/ Practical :-
Demonstrate reading & understanding
details from relevant drawings
Demonstrate reading & understanding
details from schedule of work
1. Classroom having seating requirement for 30 people.
2. Projector 3. Blackboard 4. pencil
Supervisor Structure 3
Sr. No.
Module Key Learning Outcomes Equipment Required
Demonstrate reading & understanding
specification and standards provided for
relevant works
Demonstrate reading & understanding
of specification provided in the relevant
drawing
Demonstrate reading & understanding
of schedule provided for completion of
work
Demonstrate reading & understanding
of method statement for execution of
work
Demonstrate reading & understanding
of manufactures specification for
operation of power tools
Calculate quantity of materials, time
and resources required from relevant
schematic working drawings
Demonstrate process to convey
structural changes to workman by
making a simplified sketch
3 Allocate, monitor tools, equipment and resources for structural execution work and procure approvals for relevant work Theory Duration (hh:mm) 44:00 Practical Duration (hh:mm) 00:00 OJT (hh:mm) 44:00 Corresponding NOS Code CON/N0133
Theory:-
Knowledge of company policies and hierarchy for reporting any anomaly
Knowledge of optimum utilization of equipment based on usage and availability
procedure to read relevant structural drawings and extract technical specifications related to concreting, bar bending, shuttering carpentry, scaffolding works
Procedure of writing reports for submission to concerned authority
Details of the process of material request and indent
Procedure to determine work methods based on best use of relevant resources
Procedure of optimum utilization and allocation of tools, equipment and resources as per requirement
Procedure to carry out productivity calculation
Productivity norms for various activities and equipment
Process of providing status information
Various types of documentations required to resource management such as preparation of indents, material and
**Since the demonstration/ practical training is being conducted on-site to get the required competencies the tools required will be acquirable at site.
Supervisor Structure 4
Sr. No.
Module Key Learning Outcomes Equipment Required
manpower calculation, preparation of daily labor reports etc.
Procedure followed for filling of pre-approval checklist and post completion checklists
Format and procedure for work permit system
Procedure followed for obtaining clearance from various department prior to commencement of work
Procedure to prepare sketches on relevant work from drawings
Procedure to providing mobilization order to sub-contractors
how to maintain record and file for relevant work
Procedure for Attending Snag list /rectifications in time before handing over of work for other activities like
finishing, MEP etc.
Demonstration/ Practical :-
Demonstrate calculation of manpower, tools, and materials required for the task
notify concerned superior of resources and equipment needs
determine method of lifting, route and mode of transportation of relevant materials from stock yard to erection point
Demonstrate allocation of manpower to various activities on the basis of work requirement
check completed works ensure its compliance as per drawing and quality thereby ensuring productivity of manpower
Provide instructions to workmen on the safe and correct use of tools and equipment as per manufacturer’s instructions /specification
Demonstrate reporting to the concerned authorities for equipment breakdown, discrepancies found in the jobs
provide status information on work received, in progress, backlog, and work assignments completed as requirement
Demonstrate procedure to coordinate between various departments for execution of work
Demonstrate process of taking approval from concerned authority
Supervisor Structure 5
Sr. No.
Module Key Learning Outcomes Equipment Required
before allocation of resource and material
Demonstrate process of taking safety clearance from EHS department before commencing work
Demonstrate process of taking clearance from services department before commencing work
Demonstrate process of taking reviewing estimates, preparing sketches and reports on labor expenditures and materials used
provide documentation to concerned superior for preparation of project deliverables to client
Demonstrate process of taking carrying out checks and fill checklist after completion of work
4 Supervise and monitor execution of System/Shuttering Carpentry works Theory Duration (hh:mm) 74:00 Practical Duration (hh:mm) 00:00 OJT (hh:mm) 74:00
Corresponding NOS Code CON/N0134
Theory:-
General arrangement
drawing/numeration drawings and
formwork drawing
Guidelines provided in Indian Standard
code of practice applicable for
shuttering carpentry tasks
Sequential activity for shuttering of
different structural elements using
various types of formwork system
Visual quality checks for timber and
plywood and other formwork materials
Wooden shutter making, fabrication of
wooden/steel shutter boards
Staging for shuttering works, placing
and fixing of shutter as per drawings
Tools, consumables, materials and
equipment related to shuttering
carpentry works
Procedure for installation, operations for
jump form system including use of
cranes and hydraulic system
Safe rigging procedures ensuring safe
lifting, lowering and shifting of heavy
materials
Storing and stacking of formwork
material
Productivity norms for shuttering
carpentry works
Man, materials and machinery
requirement
**Since the demonstration/ practical training is being conducted on-site to get the required competencies the tools required will be acquirable at site.
Supervisor Structure 6
Sr. No.
Module Key Learning Outcomes Equipment Required
Environment, Health and safety
Demonstration/ Practical :-
Demonstrate reading of numeration
/general arrangement drawing
Demonstrate reading of formwork
drawing
Demonstrate use of advance power
tools related to formwork carpentry
Demonstration visual quality check for
timber, plywood and other formwork
material
Demonstration for checking of wooden
shutter boards for their size, support ,
stability
Demonstration for checking of
fabricated metal shutter boards
Demonstration for checking of staging
and other associated support
Demonstrate how to carried out
checking for shuttering within tolerance
as per drawing
Describe procedure of installation and
operation for jump form system
Describe standard method for loading,
unloading, storing and stacking of
formwork material in yard/site and
identification of wrong handling of
formwork material
Calculation of man, and time
requirement based on productivity
norms for shuttering work
Calculation of shuttering material
Demonstration of generic and trade
safety
HSE compliance related to shuttering
works
5 Supervise and monitor execution of concreting works
Theory Duration (hh:mm) 74:00
Practical Duration (hh:mm) 00:00 OJT (hh:mm)
Theory:-
Guidelines provided in Indian Standard
code of practice applicable for
concreting tasks i.e. standard tolerance
levels for all aspects of concreting work
(including pouring, screening, levelling
and finishing)
Procedure to measure and check lines
and levels for maintaining layout and
alignment
**Since the demonstration/ practical training is being conducted on-site to get the required competencies the tools required will be acquirable at site.
Supervisor Structure 7
Sr. No.
Module Key Learning Outcomes Equipment Required
74:00 Corresponding NOS Code CON/N0135
standard practices, materials, and
methods of the various concreting
procedures for various type of finish
,complex structure, slip form concreting
,hot and cold weather concreting
practices
Different tools and equipment and their
use in concreting works
Various structural drawings relevant to
concreting works
methodology for estimation of required
resource and material
difference and comparison between pre
cast and in situ concreting works
basic properties and mix proportions of
concrete
appropriate proportions for the mixing of
concrete to ensure consistency
methodology for checking line ,level
and alignment for various concreting
methodology of concreting works in
horizontal, vertical and inclined surfaces
different type of high quality concrete
finish
sequence of pour
variation of slump w.r.t rate of pour
Details of different type of vibrators
used(internal/external vibrators),their
accessibility and influence area
Process of concrete vibration in
congested areas
Details on construction joints/cold joints
Different curing technique of form
finished concrete self-compact concrete
Difference in initial, final setting of
concrete and their checks
Procedure for setting of pump and
connecting concrete pipe lines and its
different types of connections, staging
requirements of pipe line for high raise
structure.
Process and correct positioning of the
pump hose when pumping the SCC
Supervisor Structure 8
Sr. No.
Module Key Learning Outcomes Equipment Required
Methodology for hot/cold weather
concreting works
Pre & post pour checks for concreting
operation
Various major risks associated with hot
and cold weather concrete
Demonstration/ Practical :-
Demonstrate planning and scheduling
of projects by making schedule plan
estimate time and materials required for
task
Demonstrate process of maintaining
records and file and carry out
preparation of reports for concreting
works
Demonstrate supervision of concreting
task such as form finish concrete
structure, complex structure, slip form
concreting and concreting in extreme
weather
Carry out estimates of personnel
required for a job
Demonstrate checks to inspect work
progress, equipment to ensure work as
per quality and safety
Demonstrate recording of information
such as personnel, production, or
operational data, details of the
concreting works covering grade of
concrete, area and volume of pour,
number of workers ,tools and
equipment deployed for work and
achieved productivity on specified forms
or reports
Carry out analysis of the more complex
construction or repair jobs to determine
methods and materials
Carry out coordinating work activities
with other construction project activities
Carry out coordinating with batching
plant and construction site confirming
continuity of supply of concrete
check, inspect and ensure completion
of preparatory works prior to concreting
at construction site/yard
Perform checks to inspect bracing and
shoring of concrete forms to ensure
Supervisor Structure 9
Sr. No.
Module Key Learning Outcomes Equipment Required
their stability before and during pouring
Perform checks to inspect the fixing and
setting of pump line ,machinery for
pouring of concrete
Provide instruction on the use of
suitable type of pump w.r.t the
discharge and head of concrete
indicate positions for pouring chutes
and runways, cranes, or paving
machines to facilitate conveying
concrete from mixer to forms
direct and monitor workers who spread,
vibrate, screed, and float concrete to
ensure that concrete is compacted to
desired consistency and surface is
finished to specified uniformity and
smoothness
check for bulking and loose formwork
during concreting
Perform checks to ensure execution of
concreting in extreme hot/cold weather
6 Supervise and monitor execution of bar-bending works Theory Duration (hh:mm) 74:00 Practical Duration (hh:mm) 00:00 OJT (hh:mm) 74:00 Corresponding NOS Code CON/N0136
Theory:-
Understanding of general arrangement
/numeration drawings and bar bending
schedule
Standard operation procedure for power
tools and CNC machine for cutting and
bending machines
Sequence of fixings and fixing of rebar’s
for different types of structural elements
Sequential activity for placing and fixing
of inserts, sleeves, conduits and anchors
Tools, consumables, materials and
equipment related to bar bending works
Unloading process of steel
reinforcement at the yard
Storing and stacking of reinforcement
steel at the yard
Monitoring of reinforcement works at
yard
Methods of mechanical connection of
rebar
Pre-fabricated cage and their erection
process
Optimization of cut steel rods
**Since the demonstration/ practical training is being conducted on-site to get the required competencies the tools required will be acquirable at site.
Supervisor Structure 10
Sr. No.
Module Key Learning Outcomes Equipment Required
Productivity norms for reinforcement
works
Man, materials and machinery
requirement
Scaffolding works for working platforms
and access.
Environment, Health and safety
Demonstration/ Practical :-
Demonstrate reading of numeration
/general arrangement drawing
Demonstrate reading of bar bending
schedule
Demonstrate use of power tools for
cutting and bending of reinforcement bar
Describe the working procedure of CNC
machine for cutting and bending of
reinforcement steel and stirrups making
Demonstrate the inputs method in the
CNC machine *
Describe reinforcement steel work
procedure related to placing and fixing
for different types of structures and their
element
Describe standard method for storing
and stacking of reinforcement steel in
yard and identification of wrong handling
of reinforcement steel
Monitoring of reinforcement steel works
in yard/site (cutting, bending, tagging)
Demonstration of different types
mechanical coupler fixing
Demonstrate the pre-fabricated rebar
cage making and erection process.
How to organize cutting of steel based
on cutting length requirement
Calculation of man and time requirement
based on productivity norms for
reinforcement works
Calculation of reinforcement steel
Demonstration of generic and trade
safety
HSE compliance related to
reinforcement works
Note : Points marked with asterisk can be checked if facility is available for CNC machine
Supervisor Structure 11
Sr. No.
Module Key Learning Outcomes Equipment Required
7 Supervise and monitor execution of Scaffolding works Theory Duration (hh:mm) 74:00 Practical Duration (hh:mm) 00:00 OJT (hh:mm) 74:00 Corresponding NOS Code CON/N0137
Theory
General arrangement
drawing/numeration drawings and
formwork drawing
Sequential activity for scaffolding using
various types of scaffolding
system(Cup-lock, frame scaffolding,
customized scaffolding)
Visual quality checks for scaffolding
materials
Visual quality checks for ground
compactness
Knowledge on Materials and
components of different types of
scaffolding system & standard
procedures of erection (Cup-lock, Tube
& clamp ,Ring lock ,Wedge lock ,Frame
scaffolding & customized scaffolding)
Tools, consumables and equipment
related to scaffolding works
Scaffolding material lifting , lowering
and shifting
Storing and stacking of scaffolding
material
Productivity norms for scaffolding works
Man, materials and machinery
requirement
Safety hazards related to scaffolding
(pinch points, hot surfaces, electrical )
and prevention against them
Knowledge of Scaffold inspection.
Environment, Health and safety
Demonstration/ Practical :-
Demonstrate reading of scaffolding
drawing
Demonstration visual quality check for
scaffolding material
Demonstration visual quality check for
ground compactness
Demonstration for checking of
scaffolding and other associated
support
Demonstrate how to check erected
scaffolding as per drawing
Describe procedure of installation and
operation for jump form system
**Since the demonstration/ practical training is being conducted on-site to get the required competencies the tools required will be acquirable at site.
Supervisor Structure 12
Sr. No.
Module Key Learning Outcomes Equipment Required
Describe standard method for loading,
unloading, storing and stacking of
formwork material in yard/site and
identification of wrong handling of
formwork material
Calculation of man and time
requirement based on productivity
norms for scaffolding works
Calculation of scaffolding material
Demonstration of generic and trade
safety
8 Plan, arrange and manage resources for execution of relevant work Theory Duration (hh:mm) 24:00 Practical Duration (hh:mm) 00:00 OJT (hh:mm) 24:00 Corresponding NOS Code CON/N7001
Theory: -
Method of estimating quantities and
determining quantum of work
Knowledge of Productivity Norms for
various activities
Method of resource calculation and
ascertaining timelines for assigned task
Method of submitting the requirement to
seniors
Method of to identifying priority and
critical activity of a task
Method and technique on briefing team
members about relevant work
Importance of daily productivity report
and its preparation
Importance of daily attendance register
and its preparation
Method of calculation of quantum of
relevant work
Method of calculation of tools and
material requirement
Method of optimization of available
resources
Different check to evaluate progress and
quality of relevant works
Organizing resources and quality
checks to be performed as per
requirement of the structural execution
works
Demonstration/ Practical (D/P) :-
Prepare work schedule as per
planning
Determine quantum of work and
calculate manpower required for work.
Supervisor Structure 13
Sr. No.
Module Key Learning Outcomes Equipment Required
Submit manpower requirement to
seniors and procure approval of the
same.
Allocate resources for the work
Allocate material , equipment and tools
to workmen and extract the work as
per plan
Provide clear instruction to workman
and extract work as per schedule.
Explain deviation in works and justify
the same
Minimize wastage as per standard
working method
Prepare format for daily labour
attendance
Prepare format for daily productivity
report and calculate the daily
productivity for a given work
9 Plan and organize work to meet expected outcomes Theory Duration (hh:mm) 24:00 Practical Duration (hh:mm) 00:00 OJT (hh:mm) 24:00 Corresponding NOS Code CON/N8002
Theory: -
Method of resource planning and
ascertaining timelines for assigned task
Organizing resources and quality
checks to be performed as per
requirement of the structural execution
works
Method of preparation of work schedule
Method of estimation of resources from
drawings/ schedules
Monitoring procedure of ongoing works
and inspection of completed works to
ensure compliance with all safety and
quality parameters
Method of preparation of observation
data sheet, inspection report
Method of reconcile material used for
assigned task
Method of preparation of budget for
structural execution works
Demonstration/ Practical (D/P) :-
Prepare work schedule as per
planning
Arrange material and required tools/
fixtures prior to start any work
Explain deviation in works and justify
the same
**Since the demonstration/ practical training is being conducted on-site to get the required competencies the tools required will be acquirable at site.
Supervisor Structure 14
Sr. No.
Module Key Learning Outcomes Equipment Required
Suggest alternative arrangement/ use
of equipment in case of emergency
situation
Coordinate with subordinates and
different trade personnel
Minimize wastage as per standard
working method
10 Supervise, monitor and evaluate performance of subordinates at workplace Theory Duration (hh:mm) 24:00 Practical Duration (hh:mm) 00:00 OJT (hh:mm) 24:00 Corresponding NOS Code CON/N8003
Theory: -
Setting up timelines for completion of
activities as per resource deployed and
productivity norms
Managing manpower and allocation of
manpower as per deadline provided for
assign task
Critical quality aspects to be checked in
the ongoing/ completed structural
execution works
How to provide timely instructions to the
subordinates during ongoing structural
execution works
How to evaluate strengths and
weakness of subordinate workers and
utilize them appropriately as per job
requirement
Method of supervising activities to
increase
productivity of workers and achieving set quality and safety standards for the structural execution works
Demonstration/ Practical (D/P): -
Instruct subordinates for applicable
working methods and safety norms for
assigned structural execution works
Seek work related clarifications from
subordinates and provide support/
guidance as per requirement of the job
Observe each subordinate as per their
strength and weaknesses and deploy
them as per criticality/ emergency of the
job
Implement organizational/ quality /
safety work methods while undertaking
any job and ensure compliance to the
same by subordinates
**Since the demonstration/ practical training is being conducted on-site to get the required competencies the tools required will be acquirable at site.
11 Manage workplace for safe and healthy work environment
Theory: -
Types of hazards involved in
construction sites
1. Safety Helmets 2. Face shield 3. Overalls
Supervisor Structure 15
Sr. No.
Module Key Learning Outcomes Equipment Required
Theory Duration (hh:mm) 24:00 Practical Duration (hh:mm) 00:00 OJT (hh:mm) 24:00 Corresponding NOS Code CON/N9002
Types of hazards involved in structural
execution works
Process of hazard analysis for
structural execution works
Detailed safety norms as per standard
practice and organizational policy,
procedure of providing CPR, first aids,
use of regular and job specific PPEs as
per requirement
classification of fire and use of fire
protection devices
Emergency safety control measures
and actions to be taken under
emergency situation
Concept of: -
1. First Aid process
2. Use of fire extinguisher
3. Classification of fires and fire
extinguisher
4. Safety drills
5. Types and use of PPEs as per
general and structural execution
works safety norms
Reporting procedure to the concerned
authority in emergency situations
Standard procedure of handling,
storing and stacking material, tools and
equipment for structural execution
works
What is safe disposal of waste, type of
waste and their disposal
Type of power tools ,their power ratings
and area of application
basic ergonomic principles as per
applicability
Demonstration/ Practical (D/P): - The skills will be developed and practiced while carrying out following trade related activities in a predictable and familiar working condition.
Fill structural execution works permits
and work approval documents
Selection of PPEs and use them
appropriately as per working need of
structural execution works, handling,
storing, stacking and shifting of
4. Knee pads 5. Safety shoes 6. Safety belts 7. Safety harness 8. Safety Gloves 9. Safety goggles 10. Particle masks 11. Ear Plugs 12. Reflective
jackets 13. Fire
Extinguisher 14. Fire prevention
kit 15. First Aid box 16. Safety tags 17. Safety Notice
board **Since the demonstration/ practical training is being conducted on-site to get the required competencies the tools required will be acquirable at site.
Supervisor Structure 16
Sr. No.
Module Key Learning Outcomes Equipment Required
materials, tools and equipment used for
structural execution works
Selection of PPEs and use them
appropriately as per working need of
cutting and bending bars, drilling in
stones, , etc.
Analysis of hazards involved in
structural execution works circuits/
connections by external effects and
taking necessary steps or informing to
seniors
Identification of locations, situations/
circumstances, malpractices which can
be hazardous for general or structural
execution works
Selection of fire extinguisher based on
classification of fire, standard practice
of storing & stacking firefighting
equipments/ materials at work locations
Disposal of waste materials as per their
nature and effects on weather.
Total Duration Theory Duration 504:00 Practical Duration 60:00
**Since the demonstration/ practical training is being conducted on-site to get the required competencies the tools required will be acquirable at site. Infrastructure Classroom for theory and assessment with 30 study chairs ,Workshop/Mock-up yard for practical training and assessment ,Toilet/Urinals (Separate for gents and Ladies), 3 phase power supply points , Single phase power supply points, Fire extinguishers (mechanical foam, DCP, CO2 and sand buckets with stand), First aid kit, Tool box with lock and key PPEs Safety Helmets, Face shield, Overalls, Knee pads, Safety shoes, Safety belts, Safety harness, Safety Gloves, Safety goggles, Particle masks, Ear Plugs, Reflective jackets, Fire Extinguisher, Fire prevention kit, First Aid box, Safety tags, Safety Notice board
Grand Total Course Duration: 1000 Hours, 0 Minutes {Including Mandatory 436 hours of OJT (project site experience)} (This syllabus/ curriculum has been approved by Construction Skill Development Council of India)
Supervisor Structure 17
Trainer Prerequisites for Job role: “Supervisor Structure” mapped to Qualification Pack: “CON/Q0111, v1.0”
Sr. No.
Area Details
1 Description To deliver accredited training service, mapping to the curriculum detailed above, in accordance with the Qualification Pack “CON/Q0111”.
2 Personal Attributes
Aptitude for conducting training, and pre/ post work to ensure competent, employable candidates at the end of the training. Strong communication skills, interpersonal skills, ability to work as part of a team; a passion for quality and for developing others; well-organised and focused, eager to learn and keep oneself updated with the latest in the mentioned field
3 Minimum Educational Qualifications
ITI/12th standard pass
4a Domain Certification
Trainer/Assessor- 70% in each NOS of Qualification Pack “CON/Q0111” & 80% overall , Lead trainer/Lead Assessors- 70% in each NOS of Qualification Pack “CON/Q0111” & 90% overall
4b Platform Certification
Trainer/Assessor-80% in each NOS of Qualification Pack “MEP/Q0102” or “MEP/Q0104”, Lead trainer/ Lead Assessors- 90% in each NOS of Qualification Pack “MEP/Q0101” or “MEP/Q0103”and overall 90%
5 Experience i. Technical Degree holder with minimum three years of Field experience and preferably two years of teaching experience or, ii. In case of a Diploma Holder five years of field experience and preferably two years of teaching experience or, iii. In case of ITI/12th pass minimum eight years of field experience and preferably two years of teaching Experience.
Supervisor Structure 18
CRITERIA FOR ASSESSMENT OF TRAINEES
Job Role Supervisor Structure
Qualification Pack CON/Q0111
Sector Skill Council Construction
Guidelines for Assessment 1. Criteria for assessment for each Qualification Pack will be created by the Sector Skill Council. Each
Performance Criteria (PC) will be assigned marks proportional to its importance in NOS. SSC will also lay down
proportion of marks for Theory and Skills Practical for each PC.
2. The assessment for the knowledge part will be based on knowledge bank of questions created by Assessment
Bodies subject to approval by SSC
3. Individual assessment agencies will create unique question papers for knowledge/theory part for assessment
of candidates as per assessment criteria given below
4. Individual assessment agencies will create unique evaluations for skill practical for every student at each
examination/training centre based on assessment criteria.
5. The passing percentage for each QP will be 70%. To pass the Qualification Pack, every trainee should score a
minimum of 70% individually in each NOS.
6. The Assessor shall check the final outcome of the practices while evaluating the steps performed to achieve
the final outcome.
7. The trainee shall be provided with a chance to repeat the test to correct his procedures in case of improper
performance, with a deduction of marks for each iteration.
8. After the certain number of iteration as decided by SSC the trainee is marked as fail, scoring zero marks for
the procedure for the practical activity.
9. In case of successfully passing only certain number of NOSs, the trainee is eligible to take subsequent
assessment on the balance NOSs to pass the Qualification Pack within the specified timeframe set by SSC.
10. Minimum duration of Assessment of each QP shall be of 4hrs/trainee.
Supervisor Structure 19
Marks Allocation
Assessment outcomes
Assessment Criteria for outcomes Total Mark
Out Of Theory Skills Practical
CON/N0132: Read & interpret drawings, specifications and standards for structural execution
PC1. read & interpret details from relevant drawings
100
11 5.5 5.5
PC2. read & interpret details from schedule of work 11 5.5 5.5
PC3. read and understand specification and standards provided for relevant works
11 5.5 5.5
PC4. read and understand all specification provided in the relevant drawing
11 5.5 5.5
PC5. read and understand schedule provided for completion of work
11 5.5 5.5
PC6. read method statement for execution of work 11 5.5 5.5
PC7. read, understand & follow manufactures specification for operation of power tools
11 5.5 5.5
PC8. carry out calculation of required quantity of materials from relevant schematic working drawings
12 6 6
PC9. convey structural changes to workman in the form of sketches
11 5.5 5.5
Total 100 50 50
CON/N0133: Allocate, monitor tools, equipments and resources for structural execution work and procure approvals for relevant work
PC1. confirm hours worked and description of work performed for employee with concerned superior
100
4 2 2
PC2. provide inputs regarding requirements for manpower, tools, and materials as per work requirements
4 2 2
PC3. notify concerned superior of resources and equipment needs
4 2 2
PC4. determine method of lifting, route and mode of transportation of relevant materials from stock yard to erection point
4 2 2
PC5. determine resources to be used in accordance with safety practices to be observed during concreting, bar-bending, scaffolding and masonry, shuttering carpentry works
5 2.5 2.5
PC6. allocate manpower to respective activities on the basis of work requirement
4 2 2
PC7. ensure productivity of manpower by providing instruction, checking completed works as per drawing and reporting to senior authorities
5 2.5 2.5
PC8. instruct workmen on the safe and correct use of tools and equipments as per manufacturer’s instructions /specification
5 2.5 2.5
PC9. report efficiently to the concerned authorities for equipment breakdown, discrepancies found in the jobs
5 2.5 2.5
Supervisor Structure 20
PC10. provide status information on work received, in progress, backlog, and work assignments completed as requirement
5 2.5 2.5
PC11. inform the concerned superior on specific areas where the work needs to be adjusted in accordance with site conditions and material deliveries
5 2.5 2.5
PC12. coordinate between various departments for execution of work
4 2 2
PC13. take approval from concerned authority before allocation of resource and material
5 2.5 2.5
PC14. take safety clearance from EHS department before commencing work
4 2 2
PC15. take clearance from services department before commencing work
4 2 2
PC16. ensure all pre preparatory works have finished before starting work
4 2 2
PC17. review estimates, prepares sketches and reports on labor expenditures and materials used
4 2 2
PC18. provide documentation to concerned superior for preparation of project deliverables to client
5 2.5 2.5
PC19. carry out checks and fill checklist after completion of work
4 2 2
PC20. provide clearance and mobility order to subcontractors for mobilization of resource and material at next workspace
4 2 2
PC21. maintain records and files and prepare reports on labour deployment, work done and productivity
4 2 2
PC22. ensure proper quality of work within agreed timeline
4 2 2
PC23. ensure that rectifications ( if any ) are carried out in time
4 2 2
Total 100 50 50
CON/N0134: Supervise and monitor execution of System/shuttering Carpentry works
PC1. read & interpret drawings, formwork specification and standards
100
4 2 2
PC2. assist in sequencing key activities related to shuttering carpentry works for making schedule
4 2 2
PC3. assist in planning of duration and time require for identified key activities
3 1.5 1.5
PC4. keep records of carpenters' time and materials used for each job
4 2 2
PC5. supervise closely carpentry jobs requiring a high degree of skill
4 2 2
PC6. ensure survey works and preparatory works are complete so as to provide required level & reference
4 2 2
PC7. check and ensure quality of plywood & timber prior to use
4 2 2
PC8. ensure availability of all tools, components, materials & fixture for assembling of shutters
3 1.5 1.5
Supervisor Structure 21
PC9. check & ensure shutter is fabricated as per workshop drawing
4 2 2
PC10. check & ensure all components & fixture are fixed properly
4 2 2
PC11. check and ensure erected formwork is as per specified standards
4 2 2
PC12. ensure that appropriate procedure is followed while erecting formwork and while installing necessary supports, braces, penetrations, embedded parts, etc
4 2 2
PC13. check provision for lifting arrangement are provided in case of lifting of heavy weight formwork
4 2 2
PC14. monitor installation of jump form system using cranes or hydraulic system
4 2 2
PC15. monitor operation of jump form system 4 2 2
PC16. monitor proper functioning of hydraulic jack and cranes
4 2 2
PC17. monitor lifting ensuring line, level & alignment 4 2 2
PC18. monitor rising of formwork using hydraulic jacks and cranes
4 2 2
PC19. ensure lifting & lowering of formwork material using crane is done safely and appropriately
4 2 2
PC20. ensure all working platform are safe for performing shuttering activity
4 2 2
PC21. ensure safe storage and stacking of formwork components
3 1.5 1.5
PC22. ensure that formwork is dismantled sequentially and safety after receiving
4 2 2
PC23. ensure that all manufacturer’s instructions/ specification are followed while dismantling standardized formwork
3 1.5 1.5
PC24. provide assistance on complex jobs and ensure proper erection and dismantling of shuttering and formwork system
4 2 2
PC25. provide estimates of personnel and material required for a job
4 2 2
PC26. keep records and compiles reports of work performed by carpentry crew
4 2 2
Total 100 50 50
CON/N00135: Supervise and monitor execution of concreting works
PC1. plan and schedule projects, estimate time and materials, supervise subordinates, maintain records and file and prepare reports for concreting works
100
5 2.5 2.5
PC2. supervise closely concreting task requiring high degree of skill such as form finish concrete structure, complex structure, slip form concreting and concreting in extreme weather
5 2.5 2.5
Supervisor Structure 22
PC3. provide estimates of personnel and material required for a job
5 2.5 2.5
PC4. inspect work progress, equipment, or construction sites to verify safety or to ensure that specifications are met
5 2.5 2.5
PC5. record information such as personnel, production, or operational data on specified forms or reports
5 2.5 2.5
PC6. analyzes the more complex construction or repair jobs to determine methods and materials
5 2.5 2.5
PC7. coordinate work activities with other construction project activities
5 2.5 2.5
PC8. coordinate with batching plant and construction site confirming continuity of supply of concrete
5 2.5 2.5
PC9. reads specification sheets for information, such as sizes of aggregates and proportions of cement and water required, to ensure that concrete is mixed according to specifications
5 2.5 2.5
PC10. check, inspect and ensure completion of preparatory works prior to concreting at construction site/yard
5 2.5 2.5
PC11. inspects bracing and shoring of concrete forms to ensure their stability before and during pouring
5 2.5 2.5
PC12. inspect the fixing and setting of pump line ,machinery for pouring of concrete
5 2.5 2.5
PC13. instruct of the use of suitable type of pump w.r.t the discharge and head of concrete
5 2.5 2.5
PC14. record details of the concreting works covering grade of concrete, area and volume of pour, number of workers ,tools and equipment deployed for work and achieved productivity
5 2.5 2.5
PC15. indicates positions for pouring chutes and runways, cranes, or paving machines to facilitate conveying concrete from mixer to forms
5 2.5 2.5
PC16. directs workers who spread, vibrate, screed, and float concrete to ensure that concrete is compacted to desired consistency and surface is finished to specified uniformity and smoothness
5 2.5 2.5
PC17. check for bulking and loose formwork during concreting
5 2.5 2.5
PC18. ensure execution of concreting in extreme hot/cold weather as per standard practices and specification
5 2.5 2.5
PC19. examines concrete, after forms are stripped, and gives instruction to workers to repair defects, such as roughness and honeycombed appearance
5 2.5 2.5
PC20. prescribe methods for curing concrete, such as covering surface of green (fresh) concrete with burlap,
5 2.5 2.5
Supervisor Structure 23
plastic, earth, straw, or chemical compound, to prevent green concrete from drying out rapidly or freezing
Total 100 50 50
CON/N0136: Supervise and monitor execution of bar-bending works
PC1. plan and schedule projects, estimate time and materials, supervise subordinates, maintain records and file and prepare reports for bar bending works
100
4 2 2
PC2. supervise bar bending task requiring high degree of skill
4 2 2
PC3. provide estimates of personnel and material required for a job
3 1.5 1.5
PC4. inspect work progress, equipment, or construction sites to verify safety or to ensure that specifications are met
4 2 2
PC5. record information such as personnel, production, or operational data on specified forms or reports
3 1.5 1.5
PC6. coordinate work activities with other construction project activities
3 1.5 1.5
PC7. read, understand & follow manufactures specification for operation of power tools and CNC machine for cutting and bending
4 2 2
PC8. carry out weighing of steel reinforcement before unloading at site in coordination with the stores
4 2 2
PC9. ensure standard practices for storing and stacking of reinforcement steel at the yard
3 1.5 1.5
PC10. monitor all rebar’s cutting and bending activity at yard
4 2 2
PC11. ensure bundling/tagging and stacking of cut & bent bars as per bar marking the BBS
4 2 2
PC12. ensure all tools, tackles, consumables, materials and equipments are available before commencement of work
4 2 2
PC13. ensure scaffolding is complete as per required / specified heights/requirements, method, load carrying capacity, etc
4 2 2
PC14. ensure working platforms and access stairs are safe for working
3 1.5 1.5
PC15. ensure completion of surveying, marking and preparatory arrangement
4 2 2
PC16. check and ensure use of approved BBS for execution of reinforcement work
4 2 2
PC17. optimize use of already available cut steel rods to minimize wastage
3 1.5 1.5
PC18. plan sequence of insertion and fixing of rebars for different types of structures
4 2 2
PC19. co-relate the sequence of reinforcement placing with fixing of inserts, sleeves, conduits and anchors
4 2 2
PC20. check and ensure correct ties used for tying of reinforcement
4 2 2
Supervisor Structure 24
PC21. inspect and check quality of mechanical connections of rebar
4 2 2
PC22. inspect and check the quality of pre-fabricated reinforcement cage & erection process
4 2 2
PC23. ensure rebars, cast-in items, corrugated sleeve pipes, recesses, lifting hooks and inserts are correctly positioned and properly secured, within specified tolerance levels
4 2 2
PC24. ensure that the joints and edges of the mould, bolts, stoppers, tie rods, side props and rubber seal are intact and properly secured
4 2 2
PC25. check for stiffening of cage before lifting for stacking/erection
4 2 2
PC26. ensure completion of work as per agreed time schedule and quality
3 1.5 1.5
PC27. maintain productivity report for executed work 3 1.5 1.5
Total 100 50 50
CON/N0137: Supervise and monitor execution of scaffolding works
PC1. plan and schedule projects, estimate time and materials, supervise subordinates, maintain records and file and prepare reports for scaffolding works
100
4 2 2
PC2. supervise scaffolding task requiring high degree of skill
4 2 2
PC3. provide estimates of personnel and material required for a job
3 1.5 1.5
PC4. inspect work progress, equipment, or construction sites to verify safety or to ensure that specifications are met
4 2 2
PC5. record information such as personnel, production, or operational data on specified forms or reports
4 2 2
PC6. coordinate work activities with other construction project activities
4 2 2
PC7. ensure completion of surveying, marking and other preparatory arrangement
4 2 2
PC8. ensure all tools, tackles, consumables, components, materials and fixtures are available before commencement of work
3 1.5 1.5
PC9. ensure that standard procedure is followed during erection of scaffold
4 2 2
PC10. ensure lifting & lowering of scaffold material manually or by using crane is done safely and appropriately
4 2 2
PC11. ensure height of scaffold erected is within permissible limits
4 2 2
PC12. ensure all working platform are properly fixed for carrying out subsequent activity
4 2 2
PC13. check scaffold is resting on a firm base and well compacted ground
4 2 2
Supervisor Structure 25
PC14. check erected scaffold is in plumb and level as per requirements
4 2 2
PC15. check scaffold for rigidity and ensured stability 4 2 2
PC16. check ladder or stairway has been attached for access
4 2 2
PC17. ensure scaffolds are used only for intended purpose
4 2 2
PC18. ensure maintenance of safety protocol while using or accessing scaffold
4 2 2
PC19. check positioning of scaffold so as not to contact energized power line
4 2 2
PC20. check all guardrails, toe board, walk way boards, fall protection are in place to ensure safety
4 2 2
PC21. check for other safety hazards (pinch points, hot surfaces, electrical) if any and prevention against them
3 1.5 1.5
PC22. check scaffold is tagged for its purpose (safe for use, unsafe for use, scaffold incomplete)
4 2 2
PC23. check and ensure scaffold is supported with permanent structure at regular interval as per standard practices
3 1.5 1.5
PC24. check scaffold with respect to inspection checklist
4 2 2
PC25. record details of erected scaffold and document inspection checklist
4 2 2
PC26. check positioning of scaffold so as not to contact energized power line
4 2 2
Total 100 50 50
CON/N7001: Plan, arrange and manage resources for execution of relevant work
PC1. determine quantum and nature of work under assigned activity
100
5 2.5 2.5
PC2. calculate requirement of manpower for assigned activities 8 4 4
PC3. submit manpower requirement to superiors 5 2.5 2.5
PC4. allocate and extract work as per plan 8 4 4
PC5. provide clear instructions to workmen for execution of work 8 4 4
PC6. ensure optimum utilization of manpower resources 8 4 4
PC7. record the daily labour attendance 8 4 4
PC8. record the daily productivity report 8 4 4
Supervisor Structure 26
PC9. estimate quantity of assigned work 8 4 4
PC10. estimate requirement for material, components and fixtures 8 4 4
PC11. estimate equipment, tools and accessories required 8 4 4
PC12. submit material, equipment and tool requirement to superiors 8 4 4
PC13. allocate material , equipment and tools to workmen and extract the work as per plan 8 4 4
PC14. provide clear instructions for optimized use of resources 8 4 4
Total 100 50 50
CON/N8002: Plan and organize work to meet expected outcomes
PC1. understand clearly the targets and timelines set by superiors
100
13 6.5 6.5
PC2. plan activities as per schedule and sequence 10 5 5
PC3. provide guidance to the subordinates to obtain desired outcome
13 6.5 6.5
PC4. plan housekeeping activities prior to and post completion of work 8 4 4
PC5. list and arrange required resources prior to commencement of work 10 5 5
PC6. select and employ correct tools, tackles and equipment for completion of desired work 8 4 4
PC7. complete the work with allocated resources 8 4 4
PC8. engage allocated manpower in an appropriate manner 5 2.5 2.5
PC9. use resources in an optimum manner to avoid any unnecessary wastage 5 2.5 2.5
PC10. employ tools, tackles and equipment with care to avoid damage to the same 5 2.5 2.5
Supervisor Structure 27
PC11. organize work output, materials used, tools and tackles deployed, 10 5 5
PC12. processes adopted to be in line with the specified standards and instructions 8 4 4
Total 100 40 60
CON/N8003: Supervise, monitor and evaluate performance of subordinates at workplace
PC1. fix expected targets for the respective gang as per site requirements and allocate work to subordinates
100
15 7.5 7.5
PC2. establish expected performance standards and expectations for the respective gang of workers to meet the desired outcomes
15 7.5 7.5
PC3. inspect assigned work to the respected gang of workers through progressive checking
20 10 10
PC4. observe and verify the work activities performed by the subordinates at the construction site
20 10 10
PC5. monitor overall performance of subordinates on the designed measures to ensure quality requirements set by the concerned authority
15 7.5 7.5
PC6. ensure adherence to the organizational policies and procedures for all relevant construction activities by the workmen subordinations
15 7.5 7.5
Total 100 50 50
CON/N9002: Manage workplace for safe and healthy work environment
PC1. ensure proper housekeeping at workplace
100
5 2.5 2.5
PC2. implement safe handling , stacking methods at workplace / store 5 2.5 2.5
PC3. insure that health and safety plan is followed by all subordinates 5 2.5 2.5
PC4. identify any hazard in workplace and notify them to appropriate authority 5 2.5 2.5
PC5. ensure that all safety and protection installation are correctly placed & adequate 5 2.5 2.5
PC6. ensure safe access is available at work place for movement of workers & materials 5 2.5 2.5
PC7. ensure safe use of tools and tackles by the workmen as per applicability 5 2.5 2.5
PC8. ensure appropriate use of following Personal Protective Equipment (PPE) as per applicability:
10 5 5
Head Protection (Helmets)
Ear Protection
Fall Protection
Foot Protection
Supervisor Structure 28
Face and Eye Protection,
Hand &Body Protection
Respiratory Protection
PC9. maintain entrances & exit from confined spaces , excavated pits and other location in concurrence with safety parameters or instruction form safety personals.
5 2.5 2.5
PC10. ensure organizational policies and procedures are followed for health , safety and welfare, in relation to:
10 5 5
methods of receiving or sourcing information
dealing with accidents and emergencies associated
with the work and environment
reporting
stooping work
evacuation
fire risks and safe exit procedures
PC11. follow procedures for accident recording and reporting as per organizational and statuary requirements
5 2.5 2.5
PC12. ensure effective adherence to response to emergency procedures / protocols
7.5 3.75 3.75
PC13. report any case of emergency / risks to the concern people at the construction site
7.5 3.75 3.75
PC14. report any perceived risk hazards to the superiors / concerned EHS
7.5 3.75 3.75
PC15. demonstrate the use of fire protection equipments for different type of fire hazard
7.5 3.75 3.75
PC16. implement control measures to reduce risk & meet legal requirement as per organizational policies
5 2.5 2.5
Total 100 50 50