Work ID : 057043101001080024
: West Godavari
: P.R.I. Sub-Division, Tanuku
: Iragavaram
GOVERNMENT OF ANDHRA PRADESH
PANCHAYATI RAJ ENGINEERING DEPARTMENT
EAST GODAVARI DISTRICT
Proejct for Comprehesive Development of SC/ST Colonies
G O NO 389
WORKING Cum RECAST ESTIMATE
Name of the Sub-
division
Name of the Mandal
Name of the work Comprehensive Development - Providing Internal
Roads with CC Drains in SC, ST localities in Relangi
Village of Iragavaram Mandal
Estimate Cost Rs.315.00Lakhs/ Rs.315.00Lakhs
Name of the District
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 2/89
Rs 315.00 Lakhs
The 1st working estimate was approved on dated.11.03.2013 of the CE,
MGNREGS, PR, Hyderabad with following provisions.
Total Length of Roads
Total Length of Shoulders Proposed 9236.7
Specification Report to accompanying the 2nd Working cum Recast estimate prepared for the work
Comprehensive Development - Providing Internal Roads with CC Drains in SC, ST localities in
Relangi Village of Iragavaram Mandal
Working Estimate Amount
The above work was administratively sanctioned under GO MS No 389 in MGNREGS
Grant Vide Proceedings Rc No D1/3//2011 (SC/ST Colonies) Dt.27-1-2012 of District Collector, West
Godavari District, Eluru. The total length of the road is 9236.70 Metres
The Estimate is technically sanctioned in TSR No.179/2011-12 Dt.01-02-2012 by the
Chief Engineer,PR , NREGS, Hyderabad with following provisions. The work ID is 057043101001080024.
The Original estimate approved with following lengths.
Total Length of Roads 9236.70mincluding existing CC
roads length
The 1st working estimate data was approved on dt.11.3.2013 without Municipal
allowence, but this village comes in the radius of 12km from Tanuku municipality and original estimate
was approved with Municipal allowence. And for RSSR data tasks giving the NMRs for wage seekers
having job cards (bonafied labor) in the village and for CSSR tasks Mazdoors, Masons are coming other
areas and they are eligible for getting municiple allowences.
Hence, this working estimate has been prepared for CSSR rates for WBM Gr-II
materials & 20mm-12mm size HBG metal with approved Quotations for the year 2012-13 by EE, PRI,
Eluru, because the agreement period of material tenders is completing on 31.3.2013 and for continuing
the work, the WBM Gr-II material rates & 20mm-12mm size HBG metal are approved vide Circular
No.7826/EGS/DEE(SS)/2012 dt.22.02.2013 of the Commissioner, RD, Hyderabad and with Municipal
allowence for 1st class masons, 2nd class masons & mazdoors in CSSR 2012-13 rates for already
executed quanities. The cement & steel rates are allowed as per date of recording.
The thickness of roads are executed as per IRC:SP:62-2004 "Table 5 for Concrete
Pavement Thickness for Rural Roads" for Low traffic (wheel load-30kN) in Zone-III in . A few roads
executed with thickness of 125mm and 150mm for narrow streets, dead end streets and with one side
feeder channel & other side houses.
Total Length of CC Drain Proposed 8172.00m
Total Length of Shoulders Proposed 9236.70m
Total Length of Gravel Road Proposed 8200.00m
Total Length of WBM Road Proposed 8200.00m
Total Length of CC Road Proposed 8502.00m
Total Length of CC Road Proposed 8502.00m
Total Length of CC Drain Proposed 8335.00m
163m excess to connect
the lead drains which
are near by the localities
of the village
9236.70m
Total Length of Gravel Road Proposed 8200.00m
Total Length of WBM Road Proposed 8200.00m
Page 2 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 3/89
Length of CC Drain to be executed with CSSR 2013-14
proposed in 2nd working estimates rates3700.00m
CC Drain
8502.00m
Length of CC Roads executed with CSSR 2011-12
with Original estimates rates0.00m
Length of CC Roads executed with CSSR 2012-13
with 1st working estimates rates4291.05m
Balance Length of CC Roads to be executed with
CSSR 2013-14 proposed in 2nd working estimates
rates
4210.95m
Out of Balance Length of GSB Roads to be executed
with CSSR 2013-14 proposed in 2nd working
estimates rates
4804.20m
Length of WBM Gr-II layer Roads executed with CSSR
2011-12 with Original estimates rates1923.00m
existing CC roads & new
CC roads
GSB Layer
Length of GSB Roads executed with CSSR 2011-12
with Original estimates rates1659.00m
CC Road
Total Length of WBM Gr-II layer Roads Proposed in
Original estimate8200.00m
Balance Length of WBM Gr-II layer Roads to be
executed with CSSR 2013-14 proposed in 2nd working
estimates rates
3018.40m
Total Length of CC Roads Proposed in Originalestimate
CC drain proposed on
one side of road are
proposed& for narrow
streets less than 2m
width roads drains are
removed
Total Length of CC Drain Proposed in Original estimate 8172.00m
Length of WBM Gr-II layer executed with CSSR 2012-
13 with 1st working estimates rates3258.60m
Length of CC Drainexecuted with CSSR 2012-13 with
1st working estimates rates0.00m
Length of CC Drain executed with CSSR 2011-12 withOriginal estimates rates
0.00m
The 2nd working estimate was with following provisions.
Total Length of Roads 9236.70m
Total Length of GSB Roads Proposed in Original
estimate8200.00m
And the balance lengths for GSB layer, WBM Gr-II layer and CC roads after
executing lengths with CSSR 2012-13 & approved metal rates, are prepared with CSSR 2013-14 rates
vide Circular No.7826/EGS/DEE(SS)/2012 dt.22.02.2013 of the Commissioner, RD, Hyderabad and
Circular No.5622/EGS/DEE(T)/2013 dated.5.12.2013 of the Commissioner, RD, Hyderabad and with
Municipal allowence for 1st class masons, 2nd class masons & mazdoors in CSSR 2013-14 rates. The
current cement & steel rates are allowed.
WBM Gr-II layer
Length of GSB Roads executed with CSSR 2012-13
with 1st working estimates rates1736.80m
Page 3 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 4/89
Executive Engineer Deputy Executive Engineer Mandal Engineering Officer
PRI Div Eluru PRI Sub Dvn Tanuku MPP Iragavaram
The 2nd working estimate has been prepared with the specifications approved in 1st
working estimate and with Part-I for work already executed with approved rates in 1st working estimate
and approved rates for metal with e tender rates and quotations approved by EE, PRI, Eluru. And Part-II
prepared for balance lengths with CSSR 2013-14 vide Circular No.7826/EGS/DEE(SS)/2012
dt.22.02.2013 of the Commissioner, RD, Hyderabad.The Work will be executed as per standard
specifications of MGNREGS norms & APDSS.
2) Provision for Construction of GRAVEL SUB BASE / SHOULDERS by providing well graded meterial
(i.e 66% of Gravel having stone aggregate of 9.5 mm to 4.75mm size and 34% of Sand of size less than
2.6mm ) for a balance length 4804.20m width 3.50m of thickness 0.15 on earthen road formation and for
shoulders of Newly constructed CC road length 8502.00m width 0.60m of thickness 0.10m are proposed.
3) Provision for Construction of WBM road surface for base to CC pavement of balance length 3018.40m
width 3.30m thickness 0.075m as per cross section communicated.
4) Provision for Construction of CC pavement of balance length 4210.95m width 2.50m thickness 0.125mas per cross section communicated.
5) Provision for Name board is proposed.
6) Provision for VAT 5%, QC charges at 0.50%, and flactuations of rates in cement and stell are
proposed.
Length of Shoulders to be executed with CSSR 2013-
14 proposed in 2nd working estimates rates8502.00m
length of shoulders
restricted to New CC
road laid
Gravel Shoulders
1) Provision for Construction of CC drain of length 3700.00m of type 4 cross section is proposed on one
side of streets in SC and ST localities to connect the out let near the SC and ST localities and cross
drains of 46Nos are proposed to the existing CC roads and slab culverts of 4Nos of 0.75m vent are
proposed to cross the PR roads.
Total Length of Shoulders Proposed in Original
estimate9236.70m
Page 4 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 5/89
Working Estimat Rs.315.00Lakhs/ Rs.315
Quantites and Rates shall be as per technically sanctioned estimate.
Rates shall be worked out as per standard data basing on rates available in RSSR and CSSR.
Road Work (RW)
Rate Per
Unit
(in Rs)
1 CC12.Collection & Supply of material containing 66% (61% to
71%) of gravel having aggregates of 9.5 mm to 4.75 mm size,
and 34% (29% to 39%) of sand of size less than 2.36 mm to
obtain CBR Value not less than 15 and plasticity index <6% in
soaked condition when compacted including cost, conveyance,seigniorage and labour charges and stacking to Departmental
guage for pre measurements as per MORD standards for Sub
Base as per Technical Specification clause 401 MORD & as
per Table 400.1 Grading III towards construction of Sub-base
for compaction upto OMC excluding sand
cum 16693 811.75 279.62
2 CC14.Collection & Supply of material containing 66% (61% to
71%) of gravel having aggregates of 9.5 mm to 4.75 mm size,
and 34% (29% to 39%) of sand of size less than 2.36 mm to
obtain CBR Value not less than 15 and plasticity index <6% in
soaked condition when compacted including cost, conveyance,
seigniorage and labour charges and stacking to Departmental
guage for pre measurements as per MORD standards for Sub
Base as per Technical Specification clause 401 MORD & as
per Table 400.1 Grading III towards construction of Sub-base
for compaction upto OMC excluding Gravel
cum 16695 811.75 185.31
3 CC24.Engaging unskilled labour for spreading the collected
Gravel with sand / stonedust / coarse graded material Grade B /
Grade III and sectioning to sub base & shoulders (RSSR)
cum 16705 811.75 14.70
4 CC25.Compaction of collected gravel / sand / stonedust /
coarse graded material Grade B / Grade III to OMC using 8-l0T
Static Road Roller to achieve CBR value not less than15 and
plasticity index <6% with required waterings and keeping the
rolled surface wet for a period of 15 days as per standards for
Sub Base CSSR
cum 16706 811.75 101.69
5 CC26.Supply and collection of mixer of stone aggregates
having 50% of 60-63mm HBG metal ,46% of 40-45mm HBG
metal and 4% of 19-22mm HBG metal including cost
,conveyance, seigniorage charges, loading, unloading and
stacking to departmental gauge for pre measurements for WBM
Grade.II surfaces per MORD standards (91mm loose to 75 mm
com acted CSSR excludin screenin s
cum 16707 427.54 1149.50
Part - I: Work Executed
with CSSR2011-12
C) Abstract estimate
Comprehensive Development - Providing Internal Roads with CC Drains in SC, ST l
in Relangi Village of Iragavaram Mandal
S. No Task Name Unit Task code Qty
Page 5 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 6/89
Rate Per
Unit
(in Rs)
S. No Task Name Unit Task code Qty
6 CC28.Supply and collection of mixer of stone aggregates
having 50% of 60-63mm HBG metal ,46% of 40-45mm HBG
metal and 4% of 19-22mm HBG metal including cost
,conveyance, seigniorage charges, loading, unloading and
stacking to departmental gauge for pre measurements for WBM
Grade.II surfaces per MORD standards (91mm loose to 75 mm
compacted) (CSSR) excluding Grade II Metal
cum 16709 427.54 232.26
7 CC30.Spreading & compaction of the collected mixer of stone
aggregates in uniform thicknesses and with good gravel for
blindage, hand packing and rolling with 8-l0T Power Road
Roller in stages to proper grade and camber with required
waterings and compacting to the required density grading 2 as
per technical specifications clause 405 MORD/404 MORTH
keeping the rolled surface wet for a period of 15 days including
brooming for (91 mm loose to 75 mm compacted) (CSSR)
cum 16711 427.54 290.28
8 CC33.Earthwork in excavation for side drain structure as per
drawing and technical specifications Clause 305.1 including
setting out, construction of shoring and bracing, removal of
stumps and other deleterious material and disposal upto a leadof 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical
Specification 305 MORD / 304 MORTH (RSSR)
cum 16714 50.42 71.08
With CSSR 2012-139 CC07.Cost and conveyance of sand for filling including all
char es but excludin labour char es for fillin CSSR
cum 16688 2.59 637.65
10 CC09.Engaging Unskilled Labour for filling foundation with
sand but excluding cost & conveyance of sand (RSSR)
cum 16690 2.59 16.64
11 CC12.Collection & Supply of material containing 66% (61% to
71%) of gravel having aggregates of 9.5 mm to 4.75 mm size,
and 34% (29% to 39%) of sand of size less than 2.36 mm to
obtain CBR Value not less than 15 and plasticity index <6% in
soaked condition when compacted including cost, conveyance,
seigniorage and labour charges and stacking to Departmental
guage for pre measurements as per MORD standards for Sub
Base as per Technical Specification clause 401 MORD & as
per Table 400.1 Grading III towards construction of Sub-base
for compaction upto OMC excluding sand
cum 16693 875.32 336.50
12 CC14.Collection & Supply of material containing 66% (61% to
71%) of gravel having aggregates of 9.5 mm to 4.75 mm size,
and 34% (29% to 39%) of sand of size less than 2.36 mm to
obtain CBR Value not less than 15 and plasticity index <6% in
soaked condition when compacted including cost, conveyance,
seigniorage and labour charges and stacking to Departmentalguage for pre measurements as per MORD standards for Sub
Base as per Technical Specification clause 401 MORD & as
per Table 400.1 Grading III towards construction of Sub-base
for compaction upto OMC excluding Gravel
cum 16695 875.32 223.18
13 CC24.Engaging unskilled labour for spreading the collected
Gravel with sand / stonedust / coarse graded material Grade B /
Grade III and sectioning to sub base & shoulders (RSSR)
cum 16705 875.32 16.64
Page 6 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 7/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 8/89
Rate Per
Unit
(in Rs)
S. No Task Name Unit Task code Qty
21 CC43.Supply of Sand for Plain vibrated Cement Concrete M 15
grade using 67% of 20mm HBG graded metal & 33% of 12mm
HBG graded metal mechanically mixed including cost and
conveyance of all materials inclusve of seignorage
charges,centering ,laying, vibrating and curing and machine
mixing charges for Side Walls of Side Drains etc., complete as
per drawings and technical specification Clauses 802, 804, 805,806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200
MORTH
cum 16724 5.08 347.83
22 CC45.Plain vibrated Cement Concrete M 15 grade using 67%
of 20mm HBG graded metal & 33% of 12mm HBG graded
metal mechanically mixed including cost and conveyance of all
materials inclusve of seignorage charges,centering ,laying,
vibrating and curing and machine mixing charges for Side
Walls of Side Drains etc., complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202
and 1204 MORD and 1500, 1700 & 2200 MORTH
cum 16726 5.08 960.27
23 CC46.Sipply and delivary of cement for Construction of un-
reinforced, jointed at expansion and construction joint only,
plain cement concrete pavement, thickness as per design, over a
prepared sub base, with 43 grade cement or any other type as
per clause 1501.22 M30(Grade), coarse and fine agregates
conforming to IS:383 maximum size of coarse agregate not
exceeding 25mm, mixed in a concrete mixer of not less than
0.2cum capacity and using approved mix design, laid in
approved fixed side form work (steel channel, laying and fixing
of 125 micron thick polythene film, wedges, steel plates
including levelling the form work as per drawing), spreading
the concrete with shovels, rakes, compacted using plate
vibrators and finished in continous operation including
provision of contraction and expansion, construction joints
using Mastic pad/ primer, construction joint, admixtures as
approved, curing of concrete slabs for 14 days, and water
finishing to lines and grade as per drawing and technical
specification clause 1501.22 including seignorage
charges.(without dowel bars) upto May 2013
cum 16727 1386.98 1575.00
Page 8 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 9/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 10/89
Rate Per
Unit
(in Rs)
S. No Task Name Unit Task code Qty
25 CC49.Supply of Sand for Construction of un-reinforced,
jointed at expansion and construction joint only, plain cement
concrete pavement, thickness as per design, over a prepared sub
base, with 43 grade cement or any other type as per clause
1501.22 M30(Grade), coarse and fine agregates conforming to
IS:383 maximum size of coarse agregate not exceeding 25mm,
mixed in a concrete mixer of not less than 0.2cum capacity andusing approved mix design, laid in approved fixed side form
work (steel channel, laying and fixing of 125 micron thick
polythene film, wedges, steel plates including levelling the form
work as per drawing), spreading the concrete with shovels,
rakes, compacted using plate vibrators and finished in
continous operation including provision of contraction and
expansion, construction joints using Mastic pad/ primer,
construction joint, admixtures as approved, curing of concrete
slabs for 14 days, and water finishing to lines and grade as
per drawing and technical specification clause 1501.22
including seignorage charges.(without dowel bars)
cum 16730 1963.87 326.09
26 CC51.Construction of un-reinforced, jointed at expansion andconstruction joint only, plain cement concrete pavement,
thickness as per design, over a prepared sub base, with 43 grade
cement or any other type as per clause 1501.22 M30(Grade),
coarse and fine agregates conforming to IS:383 maximum size
of coarse agregate not exceeding 25mm, mixed in a concrete
mixer of not less than 0.2cum capacity and using approved mix
design, laid in approved fixed side form work (steel channel,
laying and fixing of 125 micron thick polythene film, wedges,
steel plates including levelling the form work as per drawing),
spreading the concrete with shovels, rakes, compacted using
plate vibrators and finished in continous operation including
provision of contraction and expansion, construction joints
using Mastic pad/ primer, construction joint, admixtures asapproved, curing of concrete slabs for 14 days, and water
finishing to lines and grade as per drawing and technical
specification clause 1501.22 including seignorage
charges.(without dowel bars) Excluding Cement,Sand,Metal
cum 16732 1963.87 1245.75
27 CC52.Supply of Cement for RCC M-20 Nominal mix using 20
mm to 12 mm Graded size crushed hard granite metal including
C/c of all materials, taxes, operational, incidental and labour
charges such as machine mixing, laying concrete, curing etc.,
complete but excluding cost of steel and its fabrication charges
for finished item of work for Slab over drain.
cum 16733 2.71 1815.00
28 CC53.Collection and Supply of Metal for RCC M-20 Nominalmix using 20 mm to 12 mm Graded size crushed hard granite
metal including C/c of all materials, taxes, operational,
incidental and labour charges such as machine mixing, laying
concrete, curing etc., complete but excluding cost of steel and
its fabrication charges for finished item of work for Slab over
drain.
cum 16734 2.71 1420.00
Page 10 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 11/89
Rate Per
Unit
(in Rs)
S. No Task Name Unit Task code Qty
29 CC55.Supply of Sand for RCC M-20 Nominal mix using 20
mm to 12 mm Graded size crushed hard granite metal including
C/c of all materials, taxes, operational, incidental and labour
charges such as machine mixing, laying concrete, curing etc.,
complete but excluding cost of steel and its fabrication charges
for finished item of work for Slab over drain.
cum 16736 2.71 326.09
30 CC57.RCC M-20 Nominal mix using 20 mm to 12 mm Graded
size crushed hard granite metal including C/c of all materials,
taxes, operational, incidental and labour charges such as
machine mixing, laying concrete, curing etc., complete but
excluding cost of steel and its fabrication charges for finished
item of work for Slab over drain excluding cement,metal and
sand
cum 16738 2.71 1008.79
31 CC58.Supplying HYSD bar reinforcement in slab over drain
etc.,complete
MT 16739 0.129 44625.00
32 CC59.Engaging labour for fitting and placing HYSD bar
reinforcement in slab over drain complete and technical
specifications including cost of binding wire
day 16740 0.129 5740.00
1 CC07.Cost and conveyance of sand for filling including all
charges but excluding labour charges for filling (CSSR)
cum 16688 564.08 688.51
2 CC09.Engaging Unskilled Labour for filling foundation with
sand but excluding cost & conveyance of sand (RSSR)
cum 16690 564.08 16.64
3 CC12.Collection & Supply of material containing 66% (61% to
71%) of gravel having aggregates of 9.5 mm to 4.75 mm size,
and 34% (29% to 39%) of sand of size less than 2.36 mm to
obtain CBR Value not less than 15 and plasticity index <6% in
soaked condition when compacted including cost, conveyance,
seigniorage and labour charges and stacking to Departmental
guage for pre measurements as per MORD standards for Sub
Base as per Technical Specification clause 401 MORD & as
per Table 400.1 Grading III towards construction of Sub-base
for compaction upto OMC excluding sand
cum 16693 2522.21 374.09
4 CC14.Collection & Supply of material containing 66% (61% to
71%) of gravel having aggregates of 9.5 mm to 4.75 mm size,
and 34% (29% to 39%) of sand of size less than 2.36 mm to
obtain CBR Value not less than 15 and plasticity index <6% in
soaked condition when compacted including cost, conveyance,
seigniorage and labour charges and stacking to Departmental
guage for pre measurements as per MORD standards for Sub
Base as per Technical Specification clause 401 MORD & as
per Table 400.1 Grading III towards construction of Sub-basefor compaction upto OMC excluding Gravel
cum 16695 2522.21 240.98
5 CC24.Engaging unskilled labour for spreading the collected
Gravel with sand / stonedust / coarse graded material Grade B /
Grade III and sectioning to sub base & shoulders (RSSR)
cum 16705 2522.21 16.64
Part I Sub Total
PART -II To be ExecutedWith Current SSR 2013-14
Page 11 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 12/89
Rate Per
Unit
(in Rs)
S. No Task Name Unit Task code Qty
6 CC25.Compaction of collected gravel / sand / stonedust /
coarse graded material Grade B / Grade III to OMC using 8-l0T
Static Road Roller to achieve CBR value not less than15 and
plasticity index <6% with required waterings and keeping the
rolled surface wet for a period of 15 days as per standards for
Sub Base CSSR
cum 16706 2522.21 126.96
7 CC26.Supply and collection of mixer of stone aggregates
having 50% of 60-63mm HBG metal ,46% of 40-45mm HBG
metal and 4% of 19-22mm HBG metal including cost
,conveyance, seigniorage charges, loading, unloading and
stacking to departmental gauge for pre measurements for WBM
Grade.II surfaces per MORD standards (91mm loose to 75 mm
com acted CSSR excludin screenin s
cum 16707 747.05 1401.32
8 CC28.Supply and collection of mixer of stone aggregates
having 50% of 60-63mm HBG metal ,46% of 40-45mm HBG
metal and 4% of 19-22mm HBG metal including cost
,conveyance, seigniorage charges, loading, unloading and
stacking to departmental gauge for pre measurements for WBM
Grade.II surfaces per MORD standards (91mm loose to 75 mm
compacted) (CSSR) excluding Grade II Metal
cum 16709 747.05 276.92
9 CC30.Spreading & compaction of the collected mixer of stone
aggregates in uniform thicknesses and with good gravel for
blindage, hand packing and rolling with 8-l0T Power Road
Roller in stages to proper grade and camber with required
waterings and compacting to the required density grading 2 as
per technical specifications clause 405 MORD/404 MORTH
keeping the rolled surface wet for a period of 15 days including
brooming for (91 mm loose to 75 mm compacted) (CSSR)
cum 16711 747.05 384.49
10 CC33.Earthwork in excavation for side drain structure as per
drawing and technical specifications Clause 305.1 including
setting out, construction of shoring and bracing, removal of
stumps and other deleterious material and disposal upto a leadof 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical
Specification 305 MORD / 304 MORTH (RSSR)
cum 16714 1926.49 80.47
11 CC40.Supply and delivery of Cement for Plain vibrated Cement
Concrete M 15 grade using 67% of 20mm HBG graded metal
& 33% of 12mm HBG graded metal mechanically mixed
including cost and conveyance of all materials inclusve of
seignorage charges,centering ,laying, vibrating and curing and
machine mixing charges for Side Walls of Side Drains etc.,
complete as per drawings and technical specification Clauses
802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500,
1700 & 2200 MORTH
Bag 16721 726.41 1450.00
Page 12 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 13/89
Rate Per
Unit
(in Rs)
S. No Task Name Unit Task code Qty
12 CC41.Collection and supply of Metal for Plain vibrated Cement
Concrete M 15 grade using 67% of 20mm HBG graded metal
& 33% of 12mm HBG graded metal mechanically mixed
including cost and conveyance of all materials inclusve of
seignorage charges,centering ,laying, vibrating and curing and
machine mixing charges for Side Walls of Side Drains etc.,
complete as per drawings and technical specification Clauses802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500,
1700 & 2200 MORTH
cum 16722 726.41 1551.89
13 CC43.Supply of Sand for Plain vibrated Cement Concrete M 15
grade using 67% of 20mm HBG graded metal & 33% of 12mm
HBG graded metal mechanically mixed including cost and
conveyance of all materials inclusve of seignorage
charges,centering ,laying, vibrating and curing and machine
mixing charges for Side Walls of Side Drains etc., complete as
per drawings and technical specification Clauses 802, 804, 805,
806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200
cum 16724 726.41 378.48
14 CC45.Plain vibrated Cement Concrete M 15 grade using 67%
of 20mm HBG graded metal & 33% of 12mm HBG gradedmetal mechanically mixed including cost and conveyance of all
materials inclusve of seignorage charges,centering ,laying,
vibrating and curing and machine mixing charges for Side
Walls of Side Drains etc., complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202
and 1204 MORD and 1500, 1700 & 2200 MORTH
cum 16726 726.41 3043.36
15 CC46.Sipply and delivary of cement for Construction of un-
reinforced, jointed at expansion and construction joint only,
plain cement concrete pavement, thickness as per design, over a
prepared sub base, with 43 grade cement or any other type as
per clause 1501.22 M30(Grade), coarse and fine agregates
conforming to IS:383 maximum size of coarse agregate notexceeding 25mm, mixed in a concrete mixer of not less than
0.2cum capacity and using approved mix design, laid in
approved fixed side form work (steel channel, laying and fixing
of 125 micron thick polythene film, wedges, steel plates
including levelling the form work as per drawing), spreading
the concrete with shovels, rakes, compacted using plate
vibrators and finished in continous operation including
provision of contraction and expansion, construction joints
using Mastic pad/ primer, construction joint, admixtures as
approved, curing of concrete slabs for 14 days, and water
finishing to lines and grade as per drawing and technical
specification clause 1501.22 including seignorage
cum 16727 1315.92 2030.00
Page 13 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 14/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 15/89
Rate Per
Unit
(in Rs)
S. No Task Name Unit Task code Qty
18 CC51.Construction of un-reinforced, jointed at expansion and
construction joint only, plain cement concrete pavement,
thickness as per design, over a prepared sub base, with 43 grade
cement or any other type as per clause 1501.22 M30(Grade),
coarse and fine agregates conforming to IS:383 maximum size
of coarse agregate not exceeding 25mm, mixed in a concrete
mixer of not less than 0.2cum capacity and using approved mixdesign, laid in approved fixed side form work (steel channel,
laying and fixing of 125 micron thick polythene film, wedges,
steel plates including levelling the form work as per drawing),
spreading the concrete with shovels, rakes, compacted using
plate vibrators and finished in continous operation including
provision of contraction and expansion, construction joints
using Mastic pad/ primer, construction joint, admixtures as
approved, curing of concrete slabs for 14 days, and water
finishing to lines and grade as per drawing and technical
specification clause 1501.22 including seignorage
charges.(without dowel bars) Excluding Cement,Sand,Metal
cum 16732 1315.92 1388.82
19 CC52.Supply of Cement for RCC M-20 Nominal mix using 20
mm to 12 mm Graded size crushed hard granite metal including
C/c of all materials, taxes, operational, incidental and labour
charges such as machine mixing, laying concrete, curing etc.,
complete but excluding cost of steel and its fabrication charges
for finished item of work for Slab over drain.
cum 16733 40.20 1914.00
20 CC53.Collection and Supply of Metal for RCC M-20 Nominal
mix using 20 mm to 12 mm Graded size crushed hard granite
metal including C/c of all materials, taxes, operational,
incidental and labour charges such as machine mixing, laying
concrete, curing etc., complete but excluding cost of steel and
its fabrication charges for finished item of work for Slab over drain.
cum 16734 40.20 1551.89
21 CC55.Supply of Sand for RCC M-20 Nominal mix using 20
mm to 12 mm Graded size crushed hard granite metal including
C/c of all materials, taxes, operational, incidental and labour
charges such as machine mixing, laying concrete, curing etc.,
complete but excluding cost of steel and its fabrication charges
for finished item of work for Slab over drain.
cum 16736 40.20 354.83
22 CC57.RCC M-20 Nominal mix using 20 mm to 12 mm Graded
size crushed hard granite metal including C/c of all materials,
taxes, operational, incidental and labour charges such as
machine mixing, laying concrete, curing etc., complete but
excluding cost of steel and its fabrication charges for finished
item of work for Slab over drain excluding cement,metal andsand
cum 16738 40.20 1192.95
23 CC58.Supplying HYSD bar reinforcement in slab over drain
etc.,complete
MT 16739 3.00 44100.00
24 CC59.Engaging labour for fitting and placing HYSD bar
reinforcement in slab over drain complete and technical
specifications including cost of binding wire
day 16740 3.00 6920.00
Additional Tasks
Page 15 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 16/89
Rate Per
Unit
(in Rs)
S. No Task Name Unit Task code Qty
25 Collection & Supply of good gravel including
cost,conveyance, seigniorage and labour charges and
stacking to Departmental guage for pre-measurements
for blinda e,shoulders
Cum Addl Task 1020.24 440.11
26 Engaging unskilled labour for spreading the collected Gravel
and sectioning for Blindage,Shoulders (RSSR)
Cum Addl Task 1020.24 16.64
27 Compaction of collected well graded granular soil to OMC using
8-10T Power Road Roller to achieve CBR value not <15% and
plasticity index <6% with required waterings and keeping the
rolled surface wet for a period of 15 days as per MoRD
standards for Shoulders (CSSR)
Cum Addl Task 1020.24 114.24
28 Seniorage charges for Gravel Cum 4762.12 22.00
29 Seniorage charges for Metal Cum 6621.14 50.00
30 Seniorage charges for Sand Cum 3886.25 40.00
31 Supply and fixing of MS name board of size 4feet X 3feet size
including painting and required lettering as per standard
specifications
No Addl Task 1.00 3000.00
32 VAT at 5 % on all items of work except of Cement Component
33 Provision towards QC Charges at 0.5% on Overall estimate
cost except on VAT and Supervisor charges.
34 Unforeseen items
Total
Deputy Executive Engineer Mandal EngineerinPRI Sub Dvn Tanuku MPP Iragavar
Executive Engineer
PRI Div Eluru
Sub Total for Part II
Sub Total (Part I+Part II+ Seniorage charges+Name board)
Page 16 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 17/89
.00Lakhs
Amount
(Rs.)
226982
150425
11933
82547
491457
ocalities
Page 17 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 18/89
Amount
(Rs.)
99300
124104
3584
1652
43
294545
195354
14565
Page 18 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 19/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 20/89
Amount
(Rs.)
1767
4878
2184498
Page 20 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 21/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 22/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 23/89
Amount
(Rs.)
884
2734
5757
740
12477361
388371
9386
943540
607797
41969
Page 23 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 24/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 25/89
Amount
(Rs.)
1127312
274936
2210738
2671322
Page 25 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 26/89
Amount
(Rs.)
2042164
466928
Page 26 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 27/89
Amount
(Rs.)
1827573
76949
62391
14265
47960
132300
20760
Page 27 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 28/89
Amount
(Rs.)
449018
16977
116552
16618721
104767
331057
155450
3000
29690356
1102354
142444
564846
31500000
0
Officer am
Page 28 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 29/89
Working Estimate : Rs.315.00Lakhs
Quantites and Rates shall be as per technically sanctioned estimate.
Rates shall be worked out as per standard data basing on rates available in RSSR and CSSR.
Road Work (RW)
L B D
CC12.Collection & Supply of material containing 66% (61% to
71%) of gravel having aggregates of 9.5 mm to 4.75 mm size,
and 34% (29% to 39%) of sand of size less than 2.36 mm to
obtain CBR Value not less than 15 and plasticity index <6% in
soaked condition when compacted including cost, conveyance,
seigniorage and labour charges and stacking to Departmental
guage for pre measurements as per MORD standards for Sub
Base as per Technical Specification clause 401 MORD & as
per Table 400.1 Grading III towards construction of Sub-base
for compaction upto OMC excluding sand
cum 16693 811.75
Road 36 Chilivaripeta on PR road in village limits
(MBNo.826B/ELR/NREGS/11-12) 1 229.00 3.50 0.15 120.23
Road 41 From Dhayam Yesebu H to Kamana Srinu H at
Bobbarajupalem (MBNo.826B/ELR/NREGS/11-12) 1 226.00 3.30 0.15 111.87
Road45 From Community Hall to Tatipaka Baburao H at
Bobbarajupalem (MBNo.826B/ELR/NREGS/11-12) 1 205.00 2.00 0.15 61.50
Road 64 From Approach road to Antinavaripalem from R&B
road to Manupati Gangayya H at Antinavaripalem
(MBNo.826B/ELR/NREGS/11-12) 1 100.00 3.50 0.15 52.50
Road 7 Approach road to Indiranagar from Relangi via
Punthalo musalamma temple at Relangi
(MBNo.824B/ELR/NREGS/11-12) 1 287.00 3.50 0.15 150.66
Road 13 From Mandapati Varadaraju H to Aabotula
Bhaskararao H at Indiranagar (MBNo.824B/ELR/NREGS/11-
12) 1 175.00 3.50 0.15 91.88
Road 15 From Muppeti Salman H to Chirra Charles H at
Indiranagar (MBNo.824B/ELR/NREGS/11-12) 1 186.00 3.50 0.15 97.65
Road 5 From Manupati Subbamma H to Manupati
Ramakrishna H at Relangi (MBNo.824B/ELR/NREGS/11-12)
1 210.00 3.30 0.15 103.95
Road 22 From Boora Jamimdar H to Reddimilli Bhimamma H
at Indiranagar (MBNo.827B/ELR/NREGS/11-12)
1 41.00 3.50 0.15 21.53
1659.00 811.75
2 CC14.Collection & Supply of material containing 66% (61%
to 71%) of gravel having aggregates of 9.5 mm to 4.75 mm
size, and 34% (29% to 39%) of sand of size less than 2.36mm to obtain CBR Value not less than 15 and plasticity index
<6% in soaked condition when compacted including cost,
conveyance, seigniorage and labour charges and stacking to
Departmental guage for pre measurements as per MORD
standards for Sub Base as per Technical Specification clause
401 MORD & as per Table 400.1 Grading III towards
construction of Sub-base for compaction upto OMC excluding
Gravel
cum 16695 811.75
Comprehensive Development - Providing Internal Roads with CC Drains in SC, ST
localities in Relangi Village of Iragavaram Mandal
Detailed estimateS No
Descitpion of item of work NoMeausurements Content
s
Part - I: Work Executed1
Page 29 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 30/89
L B D
S NoDescitpion of item of work No
Meausurements Content
s
3 CC24.Engaging unskilled labour for spreading the
collected Gravel with sand / stonedust / coarse graded
material Grade B / Grade III and sectioning to sub base &
shoulders (RSSR)
cum 16705 811.75
4 CC25.Compaction of collected gravel / sand / stonedust /
coarse graded material Grade B / Grade III to OMC using 8-l0T
Static Road Roller to achieve CBR value not less than15 and
plasticity index <6% with required waterings and keeping the
rolled surface wet for a period of 15 days as per standards for Sub Base (CSSR)
cum 16706 811.75
CC26.Supply and collection of mixer of stone aggregates
having 50% of 60-63mm HBG metal ,46% of 40-45mm HBG
metal and 4% of 19-22mm HBG metal including cost
,conveyance, seigniorage charges, loading, unloading and
stacking to departmental gauge for pre measurements for
WBM Grade.II surfaces per MORD standards (91mm loose to
75 mm compacted) (CSSR) excluding screenings
cum 16707 427.54
Road 36 Chilivaripeta on PR road in village limits
(MBNo.826B/ELR/NREGS/11-12) 1 229.00 3.30 0.075 56.68
Road 37 From Anganwadi Center on PR road to SC peta at
Chukkavarithota (MBNo.826B/ELR/NREGS/11-12) 1 90.00 3.30 0.075 22.28
1 120.00 2.20 0.075 19.80
1 114.00 3.00 0.075 25.65
(MBNo.828B/ELR/NREGS/11-12) 1 335.00 2.50 0.075 62.81
Road 41 From Dhayam Yesebu H to Kamana Srinu H at
Bobbarajupalem (MBNo.826B/ELR/NREGS/11-12) 1 364.00 3.00 0.075 81.90
Road 64 From Approach road to Antinavaripalem from R&B
road to Manupati Gangayya H at Antinavaripalem
(MBNo.826B/ELR/NREGS/11-12) 1 331.00 3.30 0.075 81.92
Road 40 Approach road to Bobbarajupalem SC peta from
Pandi Nageswararao H in Bobbarajupalem
(MBNo.828B/ELR/NREGS/11-12) 1 340.00 3.00 0.075 76.50
1923.00 427.54
6 CC28.Supply and collection of mixer of stone aggregates
having 50% of 60-63mm HBG metal ,46% of 40-45mm HBG
metal and 4% of 19-22mm HBG metal including cost
,conveyance, seigniorage charges, loading, unloading and
stacking to departmental gauge for pre measurements for
WBM Grade.II surfaces per MORD standards (91mm loose to
75 mm compacted) (CSSR) excluding Grade II Metal
cum 16709 427.54
7 CC30.Spreading & compaction of the collected mixer of
stone aggregates in uniform thicknesses and with good gravel
for blindage, hand packing and rolling with 8-l0T Power Road
Roller in stages to proper grade and camber with required
waterings and compacting to the required density grading 2 as
per technical specifications clause 405 MORD/404 MORTH
keeping the rolled surface wet for a period of 15 days including
brooming for (91 mm loose to 75 mm compacted) (CSSR)
cum 16711 427.54
CC33.Earthwork in excavation for side drain structure as
per drawing and technical specifications Clause 305.1
including setting out, construction of shoring and bracing,
removal of stumps and other deleterious material and disposal
upto a lead of 50 m, dressing of sides and bottom and
backfilling in trenches with excavated suitable material as per
Technical Specification 305 MORD / 304 MORTH (RSSR)
cum 16714 50.42
5
8
Page 30 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 31/89
L B D
S NoDescitpion of item of work No
Meausurements Content
s
FOR SIDE DRAINS
Road 11 from Chebrolu Ramakrishna H to Geddam Adam H in
Indiraagar (MBNo.825B/ELR/NREGS/11-12) 1 64.00 1.01 0.78 50.42
50.42
50.42
CC12.Collection & Supply of material containing 66% (61% to
71%) of gravel having aggregates of 9.5 mm to 4.75 mm size,
and 34% (29% to 39%) of sand of size less than 2.36 mm to
obtain CBR Value not less than 15 and plasticity index <6% in
soaked condition when compacted including cost, conveyance,
seigniorage and labour charges and stacking to Departmental
guage for pre measurements as per MORD standards for Sub
Base as per Technical Specification clause 401 MORD & as
per Table 400.1 Grading III towards construction of Sub-base
for compaction upto OMC excluding sand
cum 16693 875.32
Road 5 From Manupati Subbamma H to Manupati
Ramakrishna H at Relangi (vp22, MB
No.824B/ELR/NREGS/11-12)
1 14.15 3.50 0.15 7.43Road 13 From Manupati Subbamma H to Manupati
Ramakrishna H at Relangi (vp22, MB
No.824B/ELR/NREGS/11-12) 1 30.00 3.50 0.15 15.75
Road 17 From Ambata Srinu H to Pothuraju H in Indiranagar
(vp29, MB No.827B/ELR/NREGS/11-12) 1 169.55 3.50 0.15 89.01
Road 18 From Community Hall to Chevakula Mesiyya H at
Indiranagar (vp29, MB No.827B/ELR/NREGS/11-12) 1 61.30 3.50 0.15 32.18
Road 19 From Savarapu Nageswararao H at Marlapudi
Sharuna babu H at Indiranagar (vp29, MB
No.827B/ELR/NREGS/11-12) 1 99.50 3.50 0.15 52.23
Road 21 From Polamuri Subbarao H to Pothuraju H at
Indiranagar (vp29, MB No.827B/ELR/NREGS/11-12) 1 81.00 3.50 0.15 42.52
Road 23 From Penumatla Bheemanna H to Reddimilli
Bheemayya H at Indiranagar (vp29, MBNo.827B/ELR/NREGS/11-12) 1 82.50 3.50 0.15 43.31
Road 24 From Ketha Narasimhamurthy H to Geddam Gottiyya
H at Indiranagar (vp29, MB No.827B/ELR/NREGS/11-12)
1 119.00 2.00 0.15 35.70
Road 25 From Marlapudi Ganganna H to Marlapudi Peda
Anjineyulu H at MV Peta(vp29, MB No.827B/ELR/NREGS/11-
12) 1 61.00 3.50 0.15 32.03
1 199.00 3.50 0.15 104.47
Road 26 From Marlapudi Nageswararao H to Kankipati
Ramarao H at MV Peta (vp29, MB No.827B/ELR/NREGS/11-
12) 1 105.50 3.50 0.15 55.39
1 117.00 3.50 0.15 61.43
Road 27 From Chintakuntala Mandulu H to Setti Abraham H at
MV peta (vp29, MB No.827B/ELR/NREGS/11-12)1 63.00 3.50 0.15 33.07
Road 28 From Chili Yeliyya H to Marlapudi John Mojesh at MV
Peta (vp29, MB No.827B/ELR/NREGS/11-12)
1 94.00 3.50 0.15 49.35
Road 31 From Sanamantra Pallirao H to Chili Perraju at
Chilivaripeta (vp29, MB No.827B/ELR/NREGS/11-12) 1 40.00 3.50 0.15 21.00
Road 32 From Church to CSL at Chilivaripeta (vp29, MB
No.827B/ELR/NREGS/11-12) 1 56.00 3.50 0.15 29.40
Road 42 From Thipparala Krishna Apparao H to School
Building at Bobbarajupalem (vp15, MB
No.828B/ELR/NREGS/11-12) 1 86.00 2.75 0.15 35.48
with CSSR 2012-13)9
Page 31 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 32/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 33/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 34/89
L B D
S NoDescitpion of item of work No
Meausurements Content
s
CC46.Sipply and delivary of cement for Construction of un-
reinforced, jointed at expansion and construction joint only,
plain cement concrete pavement, thickness as per design, over
a prepared sub base, with 43 grade cement or any other type
as per clause 1501.22 M30(Grade), coarse and fine agregates
conforming to IS:383 maximum size of coarse agregate not
exceeding 25mm, mixed in a concrete mixer of not less than
0.2cum capacity and using approved mix design, laid in
approved fixed side form work (steel channel, laying and fixing
of 125 micron thick polythene film, wedges, steel plates
including levelling the form work as per drawing), spreading the
concrete with shovels, rakes, compacted using plate vibrators
and finished in continous operation including provision of
contraction and expansion, construction joints using Mastic
pad/ primer, construction joint, admixtures as approved, curing
of concrete slabs for 14 days, and water finishing to lines and
grade as per drawing and technical specification clause
1501.22 including seignorage charges.(without dowel bars)
tonne 16727 1963.87
(vp10 MBNo.928A/ELR/NREGS/12-13)
Road 40 Approach road to Bobbarajupalem SC peta from 1 195.00 2.75 0.170 91.131 6.00 2.80 0.170 2.86
1 5.00 2.95 0.170 2.51
1 5.00 2.90 0.170 2.47
1 12.00 2.80 0.170 5.71
1 5.00 3.00 0.170 2.55
1 4.00 3.10 0.170 2.11
1 10.00 2.925 0.170 4.97
1 30.00 2.80 0.170 14.28
1 15.00 2.775 0.170 7.08
1 4.00 2.775 0.170 1.89
1 5.00 3.05 0.170 2.59
1 15.00 3.025 0.170 7.71
1 30.00 2.75 0.170 14.03
Appoaches vp 5 of MB928A/ELR/NREGS/12-13 6.98
Road 41 From Dhayam Yesebu H to Kamana Srinu H at
Bobbarajupalem (vp10 MBNo.928A/ELR/NREGS/12-13)
1 45.45 2.50 0.170 19.32
1 8.50 3.15 0.170 4.55
on culvert 1 12.50 3.67 0.170 7.79
1 120.00 2.50 0.170 51.00
Road 43 From Dhake Bhimanna H to Sabbiti Cleve H at
Bobbarajupalem (vp10 MBNo.928A/ELR/NREGS/12-13)
1 34.00 1.80 0.125 7.65
Road 44 From Community Hall to Petla Kanthayya H at
Bobbarajupalem (vp10 MBNo.928A/ELR/NREGS/12-13)
1 27.00 1.50 0.125 5.05
bell 1 2.00 1.80 0.125 0.45
Road 45 From Community Hall to Tatipaka Baburao H at
Bobbarajupalem (vp10 MBNo.928A/ELR/NREGS/12-13)1 180.00 1.80 0.125 40.50
1 3.00 1.95 0.125 0.73
1 4.00 2.30 0.125 1.15
1 4.50 1.95 0.125 1.10
Road 46 From Community Hall to Dhaim Bappanna H at
Bobbarajupalem (vp10 MBNo.928A/ELR/NREGS/12-13)
1 34.00 1.50 0.125 6.36
Road 67 From Bandula Prabhakar rao H toTatipaka Prasad H
at Bobbarajupalem (vp10 MBNo.928A/ELR/NREGS/12-13)
1 32.20 1.50 0.125 6.02
(vp15 MBNo.928A/ELR/NREGS/12-13) 0.00
16
Page 34 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 35/89
L B D
S NoDescitpion of item of work No
Meausurements Content
s
Road 1 From Vetnari Hospital to SC Colony Church at
Relangi(vp15 MBNo.928A/ELR/NREGS/12-13) Bell 1 4.10 3.59 0.170 2.50
1 4.90 3.275 0.170 2.73
1 233.30 2.75 0.170 109.02
1 10.00 3.075 0.170 5.23
1 2.30 4.15 0.170 1.62
Deduct culvert portion -1 1.00 2.75 0.170 -0.47
Road 36 Chilivaripeta on PR road in village limits (vp15
MBNo.928A/ELR/NREGS/12-13) 1 26.80 2.75 0.170 12.53
after culvert gap approach 1 2.60 4.75 0.170 2.10
1 36.40 2.75 0.170 17.01
appoaches 1 1.60 4.60 0.170 1.25
between culvert gaps 1 4.80 2.75 0.170 2.24
approaches 1 2.50 4.45 0.170 1.89
1 75.00 2.75 0.170 35.05
at culvert gap 1 9.50 2.75 0.170 4.44
(vp22 MBNo.926A/ELR/NREGS/12-13)
Road 13 From Mandapati Varadaraju H to Aabotula
Bhaskararao H at Indiranagar (vp22
MBNo.926A/ELR/NREGS/12-13) 1 203.00 2.75 0.170 94.87
Road 15 From Muppeti Salman H to Chirra Charles H at
Indiranagar (vp22 MBNo.926A/ELR/NREGS/12-13) 1 20.10 2.75 0.170 9.40
1 20.70 2.75 0.170 9.68
1 21.00 2.75 0.170 9.821 18.50 2.75 0.170 8.65
1 21.10 2.75 0.170 9.86
1 21.00 2.75 0.170 9.82
1 23.20 2.75 0.170 10.85
Road 4 From Indiranagar to SC colony church at Relangi
(vp22, MB No.926A/ELR/NREGS/12-13) Approach road to BT
road 1 2.30 3.60 0.170 1.41
1 9.30 3.00 0.170 4.74
Approach to CC road 1 2.10 4.50 0.170 1.61
after culvert gap 1 83.00 3.00 0.170 42.33
turng 1 10.00 3.10 0.170 5.27
1 10.00 3.275 0.170 5.57
1 10.00 3.25 0.170 5.53
1 10.00 3.075 0.170 5.231 14.70 3.00 0.170 7.50
after culvert gap 1 25.00 3.00 0.170 12.75
turng 1 10.00 3.225 0.170 5.48
1 10.00 3.35 0.170 5.70
1 58.00 3.625 0.170 35.74
1 8.90 3.733 0.200 6.64
1 23.60 3.30 0.200 15.58
Road 3 From Isac master H to Ele. School at Relangi (vp22,
MB No.926A/ELR/NREGS/12-13) 1 7.50 3.28 0.170 4.18
1 35.00 2.75 0.170 16.36
1 4.00 2.80 0.170 1.90
1 2.80 3.125 0.170 1.49
1 3.50 3.367 0.170 2.00
1 2.00 3.10 0.170 1.05
1 89.80 2.75 0.170 41.98
Road 67 From John Master H to MD Bhasha H (vp22, MB
No.926A/ELR/NREGS/12-13) 1 5.00 2.600 0.150 1.95
1 10.00 2.475 0.150 3.71
1 77.00 2.50 0.150 28.88
bell 1 1.70 2.95 0.150 0.75
1 3.15 2.133 0.150 1.01
1 19.30 2.50 0.150 7.24
1 2.00 3.00 0.150 0.90
(vp36, MB No.927A/ELR/NREGS/12-13)
Page 35 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 36/89
L B D
S NoDescitpion of item of work No
Meausurements Content
s
Road 25 From Marlapudi Ganganna H to Marlapudi Peda
Anjineyulu H at MV Peta (vp36, MB No.927A/ELR/NREGS/12-
13) 1 100.00 2.75 0.170 46.73
Bell 1 1.50 3.925 0.170 1.00
turng 1 5.00 3.483 0.170 2.96
turng 1 4.00 3.40 0.170 2.31
1 6.10 2.925 0.170 3.03
1 39.00 2.75 0.170 18.23
junction 1 11.00 3.025 0.170 5.66
Bell & junction 1 9.80 3.083 0.170 5.14
1 5.00 2.80 0.170 2.38
1 65.40 2.75 0.170 30.57
Road 26 From Marlapudi Nageswararao H to Kankipati
Ramarao H at MV Peta (vp36, MB No.927A/ELR/NREGS/12-
13) 1 50.00 2.75 0.170 23.38
1 1.00 2.775 0.170 0.47
1 2.65 3.275 0.170 1.48
1 2.85 5.025 0.170 2.43
1 2.35 8.050 0.170 3.22
after CC road crossing & drain gap 1 5.00 3.075 0.125 1.92
1 27.00 2.750 0.125 9.28
1 5.50 2.875 0.125 1.98
1 3.50 4.250 0.125 1.86
1 7.60 2.867 0.125 2.721 109.00 2.750 0.125 37.47
Road 27 From Chintakuntala Mandulu H to Setti Abraham H at
MV peta (vp36, MB No.927A/ELR/NREGS/12-13)
1 63.00 2.750 0.125 21.66
Road 65 (vp36, MB No.927A/ELR/NREGS/12-13) Bell 1 1.80 3.050 0.125 0.68
1 4.00 2.775 0.125 1.39
1 14.00 2.750 0.125 4.81
1 3.30 2.925 0.125 1.21
turng 1 3.10 3.400 0.125 1.32
Bell 1 4.10 3.075 0.125 1.58
1 45.70 2.750 0.125 15.71
Road 28 From Chili Yeliyya H to Marlapudi John Mojesh at MV
Peta (vp36, MB No.927A/ELR/NREGS/12-13)
1 5.00 2.925 0.125 1.831 51.50 2.750 0.125 17.70
1 5.30 2.875 0.125 1.90
1 2.50 3.050 0.125 0.95
1 28.00 2.750 0.125 9.63
Road 20 From Mandapati Veeraswamy H to Geddada
Raheyulu H at Indiranagar (vp36, MB
No.927A/ELR/NREGS/12-13) 1 217.00 2.750 0.170 101.44
Approach to CC road 0.5 1.40 3.350 0.170 0.40
0.5 1.10 3.475 0.170 0.32
1 4.80 2.875 0.170 2.35
Road 24 From Ketha Narasimhamurthy H to Geddam Gottiyya
H at Indiranagar (vp36, MB No.927A/ELR/NREGS/12-13)
1 4.00 2.675 0.125 1.34
1 5.90 2.050 0.125 1.51
gap for culvert 1 10.00 1.650 0.125 2.061 2.60 1.725 0.125 0.56
1 1.40 2.250 0.125 0.39
1 3.50 2.300 0.125 1.01
1 50.00 1.600 0.125 10.00
1 1.80 1.700 0.125 0.38
1 3.30 1.750 0.125 0.72
1 4.00 1.600 0.125 0.80
1 16.00 1.600 0.125 3.20
near toilets 1 2.00 1.200 0.125 0.30
Page 36 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 37/89
L B D
S NoDescitpion of item of work No
Meausurements Content
s
Road 22 From Boora Jamimdar H to Reddimilli Bhimamma H
at Indiranagar (vp36, MB No.927A/ELR/NREGS/12-13)
1 35.00 2.750 0.170 16.36
1 7.40 3.325 0.170 4.18
1386.98
(vp28, MB No.926A/ELR/NREGS/12-13) dt.25.6.13
Road 2 from SC Colony Church to R&B road (vp28, MB
No.926A/ELR/NREGS/12-13) 1 19.00 3.30 0.200 12.54
1 5.80 3.35 0.200 3.891 4.30 3.30 0.200 2.84
1 4.70 3.35 0.200 3.15
1 5.00 3.35 0.200 3.35
1 5.00 3.30 0.200 3.30
1 5.00 3.35 0.200 3.35
1 5.00 3.425 0.200 3.43
1 5.00 3.50 0.200 3.50
1 3.00 3.675 0.200 2.20
1 5.30 3.775 0.200 4.00
1 10.00 3.525 0.200 7.05
1 69.00 3.30 0.200 45.54
Bell & Approach 1 5.00 3.783 0.200 3.78
1 184.00 3.30 0.200 121.44
Deduct culvert portion -1 1.00 3.30 0.200 -0.66
1 11.50 3.35 0.200 7.71
1 10.00 3.55 0.200 7.10
Bell 1 6.90 4.40 0.200 6.07
(vp17 MBNo.928A/ELR/NREGS/12-13) dt.26.6.13
Road 36 Chilivaripeta on PR road in village limits (vp17
MBNo.928A/ELR/NREGS/12-13) balance bit 1 141.70 2.75 0.170 66.22
(vp42, MB No.927A/ELR/NREGS/12-13) dt.26.6.13
Road 21 From Polamuri Subbarao H to Pothuraju H at
Indiranagar (vp42, MB No.927A/ELR/NREGS/12-13) 1 4.00 3.900 0.170 2.65
1 8.00 3.050 0.170 4.15
1 20.00 2.750 0.170 9.35
1 6.60 3.075 0.170 3.45
1 36.60 2.750 0.170 17.10
Road 23 From Penumatla Bheemanna H to Reddimilli
Bheemayya H at Indiranagar (vp42, MBNo.927A/ELR/NREGS/12-13) 1 20.00 2.750 0.170 9.35
existing cc road 1 55.00 2.750 0.170 25.70
Road 17 From Ambata Srinu H to Pothuraju H at Indiranagar
(vp42, MB No.927A/ELR/NREGS/12-13) 1 20.70 2.750 0.170 9.68
after gap 1 21.60 2.750 0.170 10.10
after gap 1 45.30 2.750 0.170 21.17
after gap 1 21.10 2.750 0.170 9.86
after gap 1 37.30 2.750 0.170 17.44
Road 18 From Community Hall to Chevakula Mesiyya H at
Indiranagar (vp42, MB No.927A/ELR/NREGS/12-13)
1 13.00 3.425 0.170 7.57
1 42.50 2.750 0.170 19.86
1 4.00 2.850 0.170 1.94
1 2.30 4.175 0.170 1.63
Road 19 From Savarapu Nageswararao H at Marlapudi
Sharuna babu H at Indiranagar (vp42, MB
No.927A/ELR/NREGS/12-13) 1 11.00 3.275 0.170 6.12
1 92.00 2.750 0.170 43.00
Road 31 From Sanamantra Pallirao H to Chili Perraju at
Chilivaripeta (vp42, MB No.927A/ELR/NREGS/12-13) 1 10.00 3.525 0.170 5.99
1 30.70 2.750 0.170 14.35
Road 32 From Church to CSL at Chilivaripeta (vp42, MB
No.927A/ELR/NREGS/12-13) 1 6.20 3.100 0.170 3.27
1 50.00 2.750 0.170 23.37
576.89
Total 4291.05 1963.87
Sub Total upto dt 10.5.2013
Sub Total upto dt 24.6.2013
Page 37 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 38/89
L B D
S NoDescitpion of item of work No
Meausurements Content
s
17 CC47.Supply and collection of metal for Construction of
un-reinforced, jointed at expansion and construction joint only,
plain cement concrete pavement, thickness as per design, over
a prepared sub base, with 43 grade cement or any other type
as per clause 1501.22 M30(Grade), coarse and fine agregates
conforming to IS:383 maximum size of coarse agregate not
exceeding 25mm, mixed in a concrete mixer of not less than
0.2cum capacity and using approved mix design, laid in
approved fixed side form work (steel channel, laying and fixing
of 125 micron thick polythene film, wedges, steel plates
including levelling the form work as per drawing), spreading the
concrete with shovels, rakes, compacted using plate vibrators
and finished in continous operation including provision of
contraction and expansion, construction joints using Mastic
pad/ primer, construction joint, admixtures as approved, curing
of concrete slabs for 14 days, and water finishing to lines and
grade as per drawing and technical specification clause
1501.22 including seignorage charges.(without dowel bars)
cum 16728 1963.87
18 CC49.Supply of Sand for Construction of un-reinforced,
jointed at expansion and construction joint only, plain cement
concrete pavement, thickness as per design, over a prepared
sub base, with 43 grade cement or any other type as per
clause 1501.22 M30(Grade), coarse and fine agregates
conforming to IS:383 maximum size of coarse agregate not
exceeding 25mm, mixed in a concrete mixer of not less than
0.2cum capacity and using approved mix design, laid in
approved fixed side form work (steel channel, laying and fixing
of 125 micron thick polythene film, wedges, steel plates
including levelling the form work as per drawing), spreading the
concrete with shovels, rakes, compacted using plate vibrators
and finished in continous operation including provision of
contraction and expansion, construction joints using Mastic
pad/ primer, construction joint, admixtures as approved, curing
of concrete slabs for 14 days, and water finishing to lines and
grade as per drawing and technical specification clause
1501.22 including seignorage charges.(without dowel bars)
cum 16730 1963.87
Page 38 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 39/89
L B D
S NoDescitpion of item of work No
Meausurements Content
s
19 CC51.Construction of un-reinforced, jointed at expansion and
construction joint only, plain cement concrete pavement,
thickness as per design, over a prepared sub base, with 43
grade cement or any other type as per clause 1501.22
M30(Grade), coarse and fine agregates conforming to IS:383
maximum size of coarse agregate not exceeding 25mm, mixed
in a concrete mixer of not less than 0.2cum capacity and using
approved mix design, laid in approved fixed side form work
(steel channel, laying and fixing of 125 micron thick polythene
film, wedges, steel plates including levelling the form work as
per drawing), spreading the concrete with shovels, rakes,
compacted using plate vibrators and finished in continous
operation including provision of contraction and expansion,
construction joints using Mastic pad/ primer, construction joint,
admixtures as approved, curing of concrete slabs for 14 days,
and water finishing to lines and grade as per drawing and
technical specification clause 1501.22 including seignorage
charges.(without dowel bars) Excluding Cement,Sand,Metal
cum 16732 1963.87
CC33.Earthwork in excavation for side drain structure as
per drawing and technical specifications Clause 305.1
including setting out, construction of shoring and bracing,
removal of stumps and other deleterious material and disposal
upto a lead of 50 m, dressing of sides and bottom and
backfilling in trenches with excavated suitable material as per
Technical Specification 305 MORD / 304 MORTH (RSSR)
cum 16714 10.15
for cross drains (vp 24 MB 828B/ELR/NREGS/11-12) 2 4.70 1.20 0.90 10.15
10.15
10.15
CC07.Cost and conveyance of sand for fil ling including all
charges but excluding labour charges for filling (CSSR)
cum 16688 2.59
for cross drains (vp 24 MB 828B/ELR/NREGS/11-12) 2 4.70 1.20 0.23 2.59
2.59
22 CC09.Engaging Unskilled Labour for fill ing foundation with
sand but excluding cost & conveyance of sand (RSSR)
cum 16690 2.59
CC40.Supply and delivery of Cement for Plain vibrated
Cement Concrete M 15 grade using 67% of 20mm HBG
graded metal & 33% of 12mm HBG graded metal
mechanically mixed including cost and conveyance of all
materials inclusve of seignorage charges,centering ,laying,
vibrating and curing and machine mixing charges for Side
Drains Bed & Side Walls etc., complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202
and 1204 MORD and 1500, 1700 & 2200 MORTH
Bag 16721 5.08
Cross drains 2 4.70 1.20 0.15 1.69
Cross drains for side walls 4 4.70 0.30 0.50 2.82
Approaches 2 4.70 0.30 0.20 0.56
5.08
21
20
23
Page 39 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 40/89
L B D
S NoDescitpion of item of work No
Meausurements Content
s
24 CC41.Collection and supply of Metal for Plain vibrated
Cement Concrete M 15 grade using 67% of 20mm HBG
graded metal & 33% of 12mm HBG graded metal
mechanically mixed including cost and conveyance of all
materials inclusve of seignorage charges,centering ,laying,
vibrating and curing and machine mixing charges for Side
Drains Bed & Side Walls etc., complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202
and 1204 MORD and 1500, 1700 & 2200 MORTH
cum 16722 5.08
25 CC43.Supply of Sand for Plain vibrated Cement Concrete M
15 grade using 67% of 20mm HBG graded metal & 33% of
12mm HBG graded metal mechanically mixed including cost
and conveyance of all materials inclusve of seignorage
charges,centering ,laying, vibrating and curing and machine
mixing charges for Side Drains Bed & Side Walls etc.,
complete as per drawings and technical specification Clauses
802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500,
1700 & 2200 MORTH
cum 16724 5.08
26 CC45.Plain vibrated Cement Concrete M 15 grade using 67%
of 20mm HBG graded metal & 33% of 12mm HBG graded
metal mechanically mixed including cost and conveyance of all
materials inclusve of seignorage charges,centering ,laying,
vibrating and curing and machine mixing charges for Side
Drains Bed & Side Walls etc., complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202
and 1204 MORD and 1500, 1700 & 2200 MORTH
cum 16726 5.08
CC52.Supply of Cement for RCC M-20 Nominal mix using 20
mm to 12 mm Graded size crushed hard granite metal
including C/c of all materials, taxes, operational, incidental and
labour charges such as machine mixing, laying concrete,
curing etc., complete but excluding cost of steel and its
fabrication charges for finished item of work for Slab over
drain.
cum 16733 2.71
(vp 27 MB 828B/ELR/NREGS/11-12) 2 4.70 1.20 0.24 2.712.71
28 CC53.Collection and Supply of Metal for RCC M-20 Nominal
mix using 20 mm to 12 mm Graded size crushed hard granite
metal including C/c of all materials, taxes, operational,
incidental and labour charges such as machine mixing, laying
concrete, curing etc., complete but excluding cost of steel and
its fabrication charges for finished item of work for Slab over
drain.
cum 16734 2.71
29 CC55.Supply of Sand for RCC M-20 Nominal mix using 20 mm
to 12 mm Graded size crushed hard granite metal including C/c
of all materials, taxes, operational, incidental and labour
charges such as machine mixing, laying concrete, curing etc.,
complete but excluding cost of steel and its fabrication charges
for finished item of work for Slab over drain.
cum 16736 2.71
30 CC57.RCC M-20 Nominal mix using 20 mm to 12 mm Graded
size crushed hard granite metal including C/c of all materials,
taxes, operational, incidental and labour charges such as
machine mixing, laying concrete, curing etc., complete but
excluding cost of steel and its fabrication charges for finished
item of work for Slab over drain excluding cement,metal and
sand
cum 16738 2.71
27
Page 40 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 41/89
L B D
S NoDescitpion of item of work No
Meausurements Content
s
31 CC58.Supplying HYSD bar reinforcement in slab over drain
etc.,complete (vp 26 MB 828B/ELR/NREGS/11-12)
MT 16739 0.12900
32 CC59.Engaging labour for fitting and placing HYSD bar
reinforcement in slab over drain complete and technical
specifications including cost of binding wire
day 16740 0.1290
CC12.Collection & Supply of material containing 66% (61% to
71%) of gravel having aggregates of 9.5 mm to 4.75 mm size,
and 34% (29% to 39%) of sand of size less than 2.36 mm to
obtain CBR Value not less than 15 and plasticity index <6% in
soaked condition when compacted including cost, conveyance,
seigniorage and labour charges and stacking to Departmental
guage for pre measurements as per MORD standards for Sub
Base as per Technical Specification clause 401 MORD & as
per Table 400.1 Grading III towards construction of Sub-base
for compaction upto OMC excluding sand
cum 16714 2522.21
Total Length proposed 8200.00 0.00
Deduct length already executed -1659.00
Deduct length already executed -1736.80
Balance length 1 4804.20 3.50 0.15 2522.212522.21
2522.21
34 CC14.Collection & Supply of material containing 66% (61%
to 71%) of gravel having aggregates of 9.5 mm to 4.75 mm
size, and 34% (29% to 39%) of sand of size less than 2.36
mm to obtain CBR Value not less than 15 and plasticity index
<6% in soaked condition when compacted including cost,
conveyance, seigniorage and labour charges and stacking to
Departmental guage for pre measurements as per MORD
standards for Sub Base as per Technical Specification clause
401 MORD & as per Table 400.1 Grading III towards
construction of Sub-base for compaction upto OMC excluding
Gravel
cum 16695 2522.21
35 CC24.Engaging unskilled labour for spreading the
collected Gravel with sand / stonedust / coarse graded
material Grade B / Grade III and sectioning to sub base &
shoulders (RSSR)
cum 16705 2522.21
36 CC25.Compaction of collected gravel / sand / stonedust /
coarse graded material Grade B / Grade III to OMC using 8-l0T
Static Road Roller to achieve CBR value not less than15 and
plasticity index <6% with required waterings and keeping the
rolled surface wet for a period of 15 days as per standards for
Sub Base (CSSR)
cum 16706 2522.21
CC26.Supply and collection of mixer of stone aggregates
having 50% of 60-63mm HBG metal ,46% of 40-45mm HBG
metal and 4% of 19-22mm HBG metal including cost
,conveyance, seigniorage charges, loading, unloading and
stacking to departmental gauge for pre measurements for
WBM Grade.II surfaces per MORD standards (91mm loose to
75 mm compacted) (CSSR) excluding screenings
cum 16707 747.05
Total Length proposed 8200.00
Deduct length already executed -1923.00
Deduct length already executed -3258.60
Balance length 1 3018.40 3.30 0.075 747.05
747.05
PART -II To be ExecutedWith Current SSR 2013-14
33
37
Page 41 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 42/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 43/89
L B D
S NoDescitpion of item of work No
Meausurements Content
s
Cross drains for existing CC roads 12 6.00 0.75 0.78 42.12
Deduct already executed -1 64.00 1.01 0.78 -50.42
1926.49
1926.49
CC40.Supply and delivery of Cement for Plain vibrated
Cement Concrete M 15 grade using 67% of 20mm HBG
graded metal & 33% of 12mm HBG graded metal
mechanically mixed including cost and conveyance of all
materials inclusve of seignorage charges,centering ,laying,
vibrating and curing and machine mixing charges for Side
Walls of Side Drains etc., complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202
and 1204 MORD and 1500, 1700 & 2200 MORTH
Bag 16721 726.41
Internal Roads 1 2975.00 0.55 0.55 899.94
Internal Roads-1
2975.00 (0.30+0.10)/
2 0.40 -238.00
For Slab culverts bottom 4 6.50 3.00 0.15 11.70
For slab culvert side walls 8 6.50 0.60 1.20 37.44
Cross drains for existing CC roads 12 6.00 0.75 0.10 5.40
Cross drains for side walls 24 6.00 0.23 0.30 9.94
726.41
47 CC41.Collection and supply of Metal for Plain vibrated
Cement Concrete M 15 grade using 67% of 20mm HBG
graded metal & 33% of 12mm HBG graded metal
mechanically mixed including cost and conveyance of all
materials inclusve of seignorage charges,centering ,laying,
vibrating and curing and machine mixing charges for Side
Walls of Side Drains etc., complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202
and 1204 MORD and 1500, 1700 & 2200 MORTH
cum 16722 726.41
48 CC43.Supply of Sand for Plain vibrated Cement Concrete M
15 grade using 67% of 20mm HBG graded metal & 33% of
12mm HBG graded metal mechanically mixed including cost
and conveyance of all materials inclusve of seignorage
charges,centering ,laying, vibrating and curing and machine
mixing charges for Side Walls of Side Drains etc., complete
as per drawings and technical specification Clauses 802, 804,
805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200
MORTH
cum 16724 726.41
49 CC45.Plain vibrated Cement Concrete M 15 grade using 67%
of 20mm HBG graded metal & 33% of 12mm HBG graded
metal mechanically mixed including cost and conveyance of all
materials inclusve of seignorage charges,centering ,laying,
vibrating and curing and machine mixing charges for Side
Walls of Side Drains etc., complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202
and 1204 MORD and 1500, 1700 & 2200 MORTH
cum 16726 726.41
46
Page 43 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 44/89
L B D
S NoDescitpion of item of work No
Meausurements Content
s
CC46.Sipply and delivary of cement for Construction of un-
reinforced, jointed at expansion and construction joint only,
plain cement concrete pavement, thickness as per design, over
a prepared sub base, with 43 grade cement or any other type
as per clause 1501.22 M30(Grade), coarse and fine agregates
conforming to IS:383 maximum size of coarse agregate not
exceeding 25mm, mixed in a concrete mixer of not less than
0.2cum capacity and using approved mix design, laid in
approved fixed side form work (steel channel, laying and fixing
of 125 micron thick polythene film, wedges, steel plates
including levelling the form work as per drawing), spreading the
concrete with shovels, rakes, compacted using plate vibrators
and finished in continous operation including provision of
contraction and expansion, construction joints using Mastic
pad/ primer, construction joint, admixtures as approved, curing
of concrete slabs for 14 days, and water finishing to lines and
grade as per drawing and technical specification clause
1501.22 including seignorage charges.(without dowel bars)
tonne 16727 1315.92
0.00
1 2580.24 3.00 0.170 1315.92
1315.92
51 CC47.Supply and collection of metal for Construction of
un-reinforced, jointed at expansion and construction joint only,
plain cement concrete pavement, thickness as per design, over
a prepared sub base, with 43 grade cement or any other type
as per clause 1501.22 M30(Grade), coarse and fine agregates
conforming to IS:383 maximum size of coarse agregate not
exceeding 25mm, mixed in a concrete mixer of not less than
0.2cum capacity and using approved mix design, laid in
approved fixed side form work (steel channel, laying and fixing
of 125 micron thick polythene film, wedges, steel plates
including levelling the form work as per drawing), spreading theconcrete with shovels, rakes, compacted using plate vibrators
and finished in continous operation including provision of
contraction and expansion, construction joints using Mastic
pad/ primer, construction joint, admixtures as approved, curing
of concrete slabs for 14 days, and water finishing to lines and
grade as per drawing and technical specification clause
1501.22 including seignorage charges.(without dowel bars)
cum 16728 1315.92
50
Page 44 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 45/89
L B D
S NoDescitpion of item of work No
Meausurements Content
s
52 CC49.Supply of Sand for Construction of un-reinforced,
jointed at expansion and construction joint only, plain cement
concrete pavement, thickness as per design, over a prepared
sub base, with 43 grade cement or any other type as per
clause 1501.22 M30(Grade), coarse and fine agregates
conforming to IS:383 maximum size of coarse agregate not
exceeding 25mm, mixed in a concrete mixer of not less than
0.2cum capacity and using approved mix design, laid in
approved fixed side form work (steel channel, laying and fixing
of 125 micron thick polythene film, wedges, steel plates
including levelling the form work as per drawing), spreading the
concrete with shovels, rakes, compacted using plate vibrators
and finished in continous operation including provision of
contraction and expansion, construction joints using Mastic
pad/ primer, construction joint, admixtures as approved, curing
of concrete slabs for 14 days, and water finishing to lines and
grade as per drawing and technical specification clause
1501.22 including seignorage charges.(without dowel bars)
cum 16730 1315.92
53 CC51.Construction of un-reinforced, jointed at expansion and
construction joint only, plain cement concrete pavement,
thickness as per design, over a prepared sub base, with 43grade cement or any other type as per clause 1501.22
M30(Grade), coarse and fine agregates conforming to IS:383
maximum size of coarse agregate not exceeding 25mm, mixed
in a concrete mixer of not less than 0.2cum capacity and using
approved mix design, laid in approved fixed side form work
(steel channel, laying and fixing of 125 micron thick polythene
film, wedges, steel plates including levelling the form work as
per drawing), spreading the concrete with shovels, rakes,
compacted using plate vibrators and finished in continous
operation including provision of contraction and expansion,
construction joints using Mastic pad/ primer, construction joint,
admixtures as approved, curing of concrete slabs for 14 days,
and water finishing to lines and grade as per drawing and
technical specification clause 1501.22 including seignorage
charges.(without dowel bars) Excluding Cement,Sand,Metal
cum 16732 1315.92
CC52.Supply of Cement for RCC M-20 Nominal mix using 20
mm to 12 mm Graded size crushed hard granite metal
including C/c of all materials, taxes, operational, incidental and
labour charges such as machine mixing, laying concrete,
curing etc., complete but excluding cost of steel and its
fabrication charges for finished item of work for Slab over
drain.
cum 16733 40.20
46 4.50 0.75 0.20 31.05
Slab culverts 4 6.50 1.35 0.24 8.42
Side walls on slab culverts 8 1.35 0.15 0.45 0.73
40.20
55 CC53.Collection and Supply of Metal for RCC M-20 Nominal
mix using 20 mm to 12 mm Graded size crushed hard granite
metal including C/c of all materials, taxes, operational,
incidental and labour charges such as machine mixing, laying
concrete, curing etc., complete but excluding cost of steel and
its fabrication charges for finished item of work for Slab over
drain.
cum 16734 40.20
54
Page 45 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 46/89
L B D
S NoDescitpion of item of work No
Meausurements Content
s
56 CC55.Supply of Sand for RCC M-20 Nominal mix using 20 mm
to 12 mm Graded size crushed hard granite metal including C/c
of all materials, taxes, operational, incidental and labour
charges such as machine mixing, laying concrete, curing etc.,
complete but excluding cost of steel and its fabrication charges
for finished item of work for Slab over drain.
cum 16736 40.20
57 CC57.RCC M-20 Nominal mix using 20 mm to 12 mm Graded
size crushed hard granite metal including C/c of all materials,taxes, operational, incidental and labour charges such as
machine mixing, laying concrete, curing etc., complete but
excluding cost of steel and its fabrication charges for finished
item of work for Slab over drain excluding cement,metal and
sand
cum 16738 40.20
58 CC58.Supplying HYSD bar reinforcement in slab over drain
etc.,complete
MT 16739 3.0000
59 CC59.Engaging labour for fitting and placing HYSD bar
reinforcement in slab over drain complete and technical
specifications including cost of binding wire
day 16740 3.0000
Additional Tasks
60 Supply and fixing of MS name board of size 4feet X 3feet size
including painting and required lettering as per standard
specifications
No 1No
Deputy Executive Engineer Mandal Engineering Officer
PRI Sub Dvn Tanuku MPP Iragavaram
Executive Engineer
PRI Div Eluru
Page 46 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 47/89
S.No Decription Qty Gravel Sand Metal
1 Gravel Sub Base Part I SSR11-12 811.75 689.99 284.11
SSR 12-13 875.32 744.02 306.36
Gravel Sub Base Part II 2522.21 2143.87 882.77
2 Metal Collection Part I SSR 11-12 427.54 517.32
SSR 12-13 875.32 1059.14
Metal Collection Part II 747.05 903.94
3 Type B Screenings 427.54 102.61
875.32 210.08
747.05 179.29
4 Binding with gravel in metal layer Part I SSR11-12 427.54 34.20
SSR 12-13 875.32 70.03
Binding with gravel in metal layer Part II 747.05 59.76
5 Gravel Blindage and shoulders 1020.24 1020.24
6 Sand Filling for Drains 2.59 2.59
564.08 564.08
7 M 15 for side walls 5.08 2.44 4.57
726.41 348.68 653.77
8 RCC M 20 Grade Cover slab 2.71 1.22 2.44
40.20 18.09 36.18
9 M 30 Grade CC Road 1963.87 883.74 1767.48
1315.92 592.17 1184.33
Total 4762.12 3886.25 6621.14
X X X
Rate 22.00 40.00 50.00
Amount 104767 155450 331057
Grand Total 591274
Deputy Executive Engineer Mandal Engineering Officer PRI Sub Dvn Tanuku MPP Iragavaram
Executive Engineer
PRI Div Eluru
Seigniorage Caluculations
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 48/89
CC ROAD
Sl.
No.Description of item Unit Qty Rate Amount
1 2 3 4 5 6
Unit-1cum A:taking output = 1cum
Rate as per Current RSSR for formation of road cum 1.00 80.47 80.47
A: 80.47
Compaction of newly formed embankment in layers upto
OMC to meet requirement of tables 300.1 and 300.2 as
per technical specification (clause 301.5) including
conveyance of water using 8 to 10T Static Road Roller
as per (CSSR)
Taking Output =100Cum.
a) Machinery:
Water tanker 6kl Capacity with water Hrs 2.00 624.00 1248.00Three wheeled 8-10T static roller Hrs 1.25 1038.40 1298.00
Sub- to ta l for Mater ia l comp onent (Machinery) 2546.00
Cost for 100 cum (a) 2546.00
b) Rate per cum = (a) / 100 cum 25.46
C: (=b) cum 25.46Cost and conveyance of sand for filling including all
charges but excluding labour charges for filling (CSSR)
Unit:1cum
a) Material:
Sand [Sand for Filling] cum 1.00 688.51 688.51
Rate per 1.00 cum (a) cum 688.51
B (iii)(ii): (=a) / C cum 688.514 Seigniorage charges for Sand
Payment :Dcum
Engaging Unskilled Labour for filling foundation with sand
but excluding cost & conveyance of sand (RSSR)
a) Rate per 1cum as per RSSR cum 1 16.64 16.64
A: (=a) 16.64
Taking Output =1 cum {Compacted}
a) Material:
i) Gravel @ 66% cum 0.85 440.11 374.09
Sub-total for Material 374.09
B (iii): (=a (ii)) 374.09
C: (=a(i)) 374.09
2
RBR-EECD- 3 Page 297 of revised data Part II for Roads and Bridges
3
Qunatity 7 task * 1 * Senary charges
of rate
5
DATA 2013-14
1 Engaging Unskilled Labour for earth work excavation in Ordinary Soils AT SITE with initial
lead & initial lift and breaking clods and sectioning for formation of embankment - for roads
(RSSR)
6 Collection & Supply of material containing 66% (61% to 71%) of gravel having
aggregates of 9.5 mm to 4.75 mm size, and 34% (29% to 39%) of sand of
size less than 2.36 mm to obtain CBR Value not less than 15 and plasticity index
<6% in soaked condition when compacted including cost, conveyance,
seigniorage and labour charges and stacking to Departmental guage for premeasurements as per MORD standards for Sub Base as per Technical
Specification clause 401 MORD & as per Table 400.1 Grading III towards
construction of Sub-base for compaction upto OMC excluding sand
Page 48 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 49/89
Sl.
No.Description of item Unit Qty Rate Amount
7 Seigniorage charges for Gravel GSB2
Payment :Dcum
Taking Output =1 cum {Compacted}
a) Material:
ii) Sand @ 34% [Sand for Filling] cum 0.35 688.51 240.98
Sub-total for Material 240.98
B (iii): (=a (ii)) /C 240.98
9 Seigniorage charges for SAND GSB2
Payment :Dcum
a) Rate per 1cum as per RSSR cum 1 16.64 16.64
A: (=a) 16.64
Compaction of collected gravel / sand / stonedust /
coarse graded material Grade B / Grade III to OMC
using 8-l0T Static Road Roller to achieve CBR value not
less than15 and plasticity index <6% with required
waterings and keeping the rolled surface wet for a period
of 15 days as per standards for Sub Base (CSSR)
WEM
Taking Output =300 cum
a)MachineryTractor with Rotavator @ 25 cum per hour Hrs 12.00 422.00 5064.00Water tanker 6kl Capacity Hrs 3.00 624.00 1872.00Three wheeled 8-10 T Static roller @10.00cum /Hr. Hrs 30.00 1038.40 31152.00
Sub- to ta l for Machinery 38088.00
i. Rate per 300 cum 38088.00
a) Rate per 1.00 cum Com pact (i / 300) 126.96
C: (=a) 126.96
WBM Grading 2
Supply and collection of mixer of stone aggregates
having 50% of 60-63mm HBG metal ,46% of 40-45mm
HBG metal and 4% of 19-22mm HBG metal includingcost ,conveyance, seigniorage charges, loading,
unloading and stacking to departmental gauge for pre
measurements for WBM Grade.II surfaces per MORD
standards (91mm loose to 75 mm compacted) (CSSR)
excluding screenings
Taking Output =360 cum
a) Material
cum 217.80 945.32 205890.7
Qunatity 14 task * 0.35 * Senary
charges of rate
10 Engaging unskilled labour for spreading the collected Gravel with sand /
stonedust / coarse graded material Grade B / Grade III and sectioning to sub
base & shoulders (RSSR)
11
12
RBR-SBBS-9(A)(II)(i), Page No. 338 of revised data Part II for Roads and bridges
Grade II Metal:Consisting of 63mm to 45 mm IRC
Qunatity 12 task * 0.85 * Senary
charges of rate
8 Collection & Supply of material containing 66% (61% to 71%) of gravel having
aggregates of 9.5 mm to 4.75 mm size, and 34% (29% to 39%) of sand of
size less than 2.36 mm to obtain CBR Value not less than 15 and plasticity index
<6% in soaked condition when compacted including cost, conveyance,
seigniorage and labour charges and stacking to Departmental guage for pre
measurements as per MORD standards for Sub Base as per Technical
Specification clause 401 MORD & as per Table 400.1 Grading III towards
construction of Sub-base for compaction upto OMC excluding Gravel
Page 49 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 50/89
Sl.
No.Description of item Unit Qty Rate Amount
cum 200.38 1,331.32 266769.9
cum 17.42 1,826.32 31814.49i) Sub-Total for Graded Metal including screening
504475.09
ii) Rate per 360.00 cum Compact (=i) 1401.32
B (ii): ((=a i)/360) 1401.32
As per SSR 1401.32For Rate Approval for quotationsTaking Output =1cum
a) Material
Grade II Metal:63mm to 60 mm IRC HBG metal 50% cum 0.50 945.32 472.6640-45mm HBG IRC metal cum 0.46 1,331.32 612.407219mm to 22mm IRC HBG metal 4% cum 0.04 1,826.32 73.0528
i) Sub-Total for Graded Metal including screening1158.12
ii) Rate per 360.00 cum Compact (=i) 1158.12
B (ii): ((=a i)/360) 1158.12
Rate Approved by quotations 1150.00
Taking Output =360 cum
a) Material
cum 217.80 1,150.00 250470
cum 200.38 1,150.00 230437
cum 17.42 1,150.00 20033
i) Sub-Total for Graded Metal including screening500940.00
ii) Rate per 360.00 cum Compact (=i) 1391.50
B (ii): ((=a i)/360) 1391.50
Rate Approved by quotations for Compacted
quantity1391.50
26 Seigniorage charges for GRII Metal WBMPayment :D/B
cum
Taking Output =360 cum
Stone Screening
Type B 11.2 mm for Grading 2 @ 0.18 / 0.20 cum/10sqm
[WEM]
cum 86.40 1,153.82 99690.05
i) Sub-Total for Graded Metal including screening99690.05
iii) Rate per 1.00cum Compact = ii/360 276.92
C: (a(iii) - B (ii)) 276.92
14 Seigniorage charges for GRII Metal Screenings WBM
Payment :Dcum
Qunatity 25 task * 435.60/360 *Senary charges of Metal
13 Supply and collection of mixer of stone aggregates having 50% of 60-63mm
HBG metal ,46% of 40-45mm HBG metal and 4% of 19-22mm HBG metal
including cost ,conveyance, seigniorage charges, loading, unloading and
stacking to departmental gauge for pre measurements for WBM Grade.II
surfaces per MORD standards (91mm loose to 75 mm compacted) (CSSR)
excluding Grade II Metal
RBR-SBBS-9(A)(II)(i), Page No. 338 of revised data Part II for Roads and bridges
Qunatity 27 task * 86.40/360 * 50
meta an mm to mm
metal 4%
Grade II Metal:Consisting of 63mm to 45 mm IRC
HBG/HBT metal 96% and 19mm to 22mm IRC HBG
metal 4%
Page 50 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 51/89
Sl.
No.Description of item Unit Qty Rate Amount
Taking Output = 360 cum
a) Materials
Gravel using as Binding material @ 0.06cum per 10 sqm
for Grading 2 materialcum 28.80 440.11 12675.17
Sub-total for Material Component 12675.17
b) Labour:
Mazdoor(skilled) days 12.08 280.00 3382.40Mazdoor(Unskilled) days 250.00 280.00 70000.00 Add MA @ 20% 73382.40 0.00
Sub- to ta l of Labour Comp onent 73382.40
c) Machinary:
Water tanker 6Kl capacity Hrs 24.00 624.00 14976.00Three wheel 8-10T static roller @10cum per hour Hrs 36.00 1038.40 37382.40
Sub- to ta l of Machinery 52358.40d) Rate per 360.00cum for a compacted thickness of
75mm (a+b+c)138415.97
e) Rate per 1.00 Cum Compact ( d/ 360 ) 384.49
C: (= e) 384.49
16 Seigniorage charges for GRII Gravel
Payment :Dcum
Engaging unskilled labour for spreading the collected
Gravel for Protective Carpet (RSSR)
a) Rate per 1cum as per RSSR cum 1 16.64 16.64
16.64
for Side drain
Unit-1cum
taking output = 1cum
Rate as per Current RSSR for formation of road cum 1.00 80.47 80.47
A: 80.47
RBR-SBST-5
Unit = Bag
(a) Material
i) Cement kg 250.00 5800.00 1450.00
B(ii): (=a(iii)) 1450.00
19 Su pp ly an d d eliv ery o f Cem en t fo r Plain vibrated Cement Concrete M 15
grade using 67% of 20mm HBG graded metal & 33% of 12mm HBG graded
metal mechanically mixed including cost and conveyance of all materials
inclusve of seignorage charges,centering ,laying, vibrating and curing and
machine mixing charges for Side Walls of Side Drains etc., complete as per
drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and
Qunatity 29 task * 28.8/360 * 22
17
18 Earthwork in excavation for side drain structure as per drawing and technical
specifications Clause 305.1 including setting out, construction of shoring and
bracing, removal of stumps and other deleterious material and disposal upto a
lead of 50 m, dressing of sides and bottom and backfilling in trenches with
excavated suitable material as per Technical Specification 305 MORD / 304
MORTH (RSSR)
15 Spreading & compaction of the collected mixer of stone aggregates in uniform
thicknesses and with good gravel for blindage, hand packing and rolling with 8-
l0T Power Road Roller in stages to proper grade and camber with required
waterings and compacting to the required density grading 2 as per technical
specifications clause 405 MORD/404 MORTH keeping the rolled surface wet for
a period of 15 days including brooming for (91 mm loose to 75 mm compacted)
(CSSR)
RBR-SBBS-9(A)(II)(i), Pg338 of revised data Part II for Roads and bridges
Page 51 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 52/89
Sl.
No.Description of item Unit Qty Rate Amount
RBR-SBST-5
Unit = cum
(a) Material
iii) Aggregates
cum 0.54 1826.32986.21
cum 0.36 1571.32565.68
As per SSR 1551.89
For Rate Approval for quotationsTaking Output =1cum
a) Material
20mm HBG SS5 metal cum 0.60 1,826.32 1095.7912mm HBG SS5 meta cum 0.40 1,571.32 628.53
i) Sub-Total for Graded Metal including screening1724.32
ii) Rate per 1cum 1724.32
Rate Approved by quotations 1720.00
Taking Output =1cum
a) Material
cum 0.54 1,720.00 928.80
cum 0.36 1,720.00 619.20
i) Sub-Total for SS5 Metal 1548.00
ii) Rate per 1cum 1548.00Rate Approved by quotations 1548.00
21 Seigniorage charges for Metal M15 Side Wall
Payment :B/D cum
RBR-SBST-5
Unit = cum
(a) Material
ii) Coarse sand [Sand for Mortar] cum 0.48 788.51 378.48
B(iii): (a(ii)) 378.48
23 Seigniorage charges for Sand M15 Side Wall
Payment :D cum
Qunatity 40 task * 0.9 * 50
22 Su pp ly o f San d fo r Plain vibrated Cement Concrete M 15 grade using 67% of
20mm HBG graded metal & 33% of 12mm HBG graded metal mechanically
mixed including cost and conveyance of all materials inclusve of seignorage
charges,centering ,laying, vibrating and curing and machine mixing charges for
Side Walls of Side Drains etc., complete as per drawings and technical
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500,
1700 & 2200 MORTH
Qunatity 42 task * 0.48 * 40
20 Co llec tio n an d s up ply o f Metal fo r Plain vibrated Cement Concrete M 15
grade using 67% of 20mm HBG graded metal & 33% of 12mm HBG graded
metal mechanically mixed including cost and conveyance of all materials
inclusve of seignorage charges,centering ,laying, vibrating and curing and
machine mixing charges for Side Walls of Side Drains etc., complete as per
drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and
1204 MORD and 1500, 1700 & 2200 MORTH
20mm to 12mm HBG/HBT graded Metal:Consisting of
20mm metal 60% and12mm metal 40%
20mm to 12mm HBG/HBT graded Metal:Consisting of
20mm metal 60% and12mm metal 40%
Page 52 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 53/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 54/89
Sl.
No.Description of item Unit Qty Rate Amount
Unit = cum
Taking output = 75cum (172.50 t)
(240x2.5 x 0..125)=75cum
c) Material
Cum 40.50 1826.32 73965.96
Cum 27.00 1571.3242425.64
As per SSR 1551.89
For Rate Approval for quotationsTaking Output =1cum
a) Material
20mm HBG SS5 metal cum 0.60 1,826.32 1095.7912mm HBG SS5 meta cum 0.40 1,571.32 628.53
i) Sub-Total for SS5 Metal 1724.32ii) Rate per 1cum 1724.32
Rate Approved by quotations 1720.00
Taking Output =75cum
a) Material
cum 40.50 1,720.00 69660.00
cum 27.00 1,720.00 46440.00
i) Sub-Total for SS5 Metal 116100.00ii) Rate per 1cum 1548.00
Rate Approved by quotations 1548.00
27 Seigniorage charges for Metal M30
Payment :B/D cum
28 Cement Concrete Pavement
Qunatity 46 task * 0.9 * 50
Su pp ly an d c ollec tio n o f m etal fo r Construction of un-reinforced, jointed at
expansion and construction joint only, plain cement concrete pavement,
thickness as per design, over a prepared sub base, with 43 grade cement or any
other type as per clause 1501.22 M30(Grade), coarse and fine agregates
conforming to IS:383 maximum size of coarse agregate not exceeding 25mm,
mixed in a concrete mixer of not less than 0.2cum capacity and using approved
mix design, laid in approved fixed side form work (steel channel, laying and fixing
of 125 micron thick polythene film, wedges, steel plates including levelling theform work as per drawing), spreading the concrete with shovels, rakes,
compacted using plate vibrators and finished in continous operation including
provision of contraction and expansion, construction joints using Mastic pad/
primer, construction joint, admixtures as approved, curing of concrete slabs for
14 days, and water finishing to l ines and grade as per drawing and technical
specification clause 1501.22 including seignorage charges.(without dowel
bars)
20mm to 12mm HBG/HBT graded Metal:Consisting of
20mm metal 60% and12mm metal 40%
20mm to 12mm HBG/HBT graded Metal:Consisting of
20mm metal 60% and12mm metal 40%
Page 54 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 55/89
Sl.
No.Description of item Unit Qty Rate Amount
Unit = cum
Taking output = 75cum (172.50 t)
(240x2.5 x 0..125)=75cum
c) Material
ii) Sand as per IS:383 /stone dust with proper binding
compound and conforming to clause 1500.2.4.2. @ 0.45
cum of concrete [Sand for mortar]
cum 33.75 788.51
26612.21
B(iii)(i): (=c(ii)) 354.83
29 Seigniorage charges for Sand M30
Payment :Dcum
30 Cement Concrete Pavement
Unit = cum
Taking output = 75cum (172.50 t)
(240x2.5 x 0..125)=75cum
a) Labour
Mason (1st class) day 5.00 350.00 1750.00Mason (2nd class) day 5.00 320.00 1600.00Mazdoor (unskilled) day 150.0 280.00 42000.00Mazdoor(skilled) day 6.00 280.00 1680.00Mazdoor (semi-skilled) day 6.00 280.00 1680.00 Add MA @ 20% 48,710.00 0.00
Sub- to ta l for Labou r 48710.00
b) Machinery
Concrete mixer 0.40/0.28cum capacity ( 6 mixers) Hour 36.00 417.40 15026.40Plate vibrator Hour 9.00 48.00 432.00Water tanker 6 Kl. Capacity Hour 5.00 624.00 3120.00
iv) other materials
Sup ply o f San d fo r Construction of un-reinforced, jointed at expansion and
construction joint only, plain cement concrete pavement, thickness as per
design, over a prepared sub base, with 43 grade cement or any other type as
per clause 1501.22 M30(Grade), coarse and fine agregates conforming to
IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a
concrete mixer of not less than 0.2cum capacity and using approved mix design,
laid in approved fixed side form work (steel channel, laying and fixing of 125
micron thick polythene film, wedges, steel plates including levelling the form workas per drawing), spreading the concrete with shovels, rakes, compacted using
plate vibrators and finished in continous operation including provision of
contraction and expansion, construction joints using Mastic pad/ primer,
construction joint, admixtures as approved, curing of concrete slabs for 14 days,
and water finishing to lines and grade as per drawing and technical specification
clause 1501.22 including seignorage charges.(without dowel bars)
Qunatity 48 task * 0.45 * 40
Construction of un-reinforced, jointed at expansion and construction joint only,
plain cement concrete pavement, thickness as per design, over a prepared sub
base, with 43 grade cement or any other type as per clause 1501.22
M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of
coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than
0.2cum capacity and using approved mix design, laid in approved fixed side form
work (steel channel, laying and fixing of 125 micron thick polythene film, wedges,
steel plates including levelling the form work as per drawing), spreading theconcrete with shovels, rakes, compacted using plate vibrators and finished in
continous operation including provision of contraction and expansion,
construction joints using Mastic pad/ primer, construction joint, admixtures as
approved, curing of concrete slabs for 14 days, and water finishing to lines and
grade as per drawing and technical specif ication clause 1501.22 including
seignorage charges.(without dowel bars) Exclud ing Cement,Sand,Meta l
Page 55 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 56/89
Sl.
No.Description of item Unit Qty Rate Amount
Polythene sheet 125 micron (240X2.5X1.10=660) sqm 660 15.00 9900.00Bitumen primer @ 100ml. Per joint for 60 joints tonne 0.005 29982.73 149.91Mastic Pad 2.5x.0.125x60=18.75 sqm 18.75 925.00 17343.75
Sub- to ta l for Machinery and Other mater ia ls 45972.06
(d) Formwork @ 3% on material, labour and
machiner % 6+48+a+b) 9479.10
C: 104161.161388.82
Unit = Bag
(a) Material
i) Cement kg 330.00 5800.00 1914.0
Payment Particulars for 1cum
B(i): (=a(i)) 1914.00
Unit = cum
(a) Material
iii) Aggregates
cum 0.54 1826.32 986.21cum 0.36
1571.32 565.68
Payment Particulars for 1cum 1551.89
B(ii)(i)=a(iii) 1551.89As per SSR 1551.89
33 Seigniorage charges for Metal RCC M20
Payment :B/D cum
Unit = cum
(a) Material
ii) Coarse sand [Sand for mortar] cum 0.45 788.51 354.83
Payment Particulars for 1cum 354.83
B(iii)(i): (=a(ii)) 354.83
35 Seigniorage charges for Sand RCC M20
Payment :Dcum
Unit = cum
(b) Labour
Mate day 0.00 0.00
Qunatity 52 task * 0.9 * 50
34 Su pp ly o f San d fo r RCC M-20 Nominal mix using 20 mm to 12 mm Graded
size crushed hard granite metal including C/c of all materials, taxes, operational,
incidental and labour charges such as machine mixing, laying concrete, curing
etc., complete but excluding cost of steel and its fabrication charges for finished
item of work for Slab over drain.
Qunatity 53 task * 0.45 * 40
36 RCC M-20 Nominal mix using 20 mm to 12 mm Graded size crushed hard
granite metal including C/c of all materials, taxes, operational, incidental and
labour charges such as machine mixing, laying concrete, curing etc., complete
but excluding cost of steel and its fabrication charges for finished item of work for
Slab over drain exclud ing c ement,metal and sand
31 Su p pl y o f Cemen t f or RCC M-20 Nominal mix using 20 mm to 12 mm Graded
size crushed hard granite metal including C/c of all materials, taxes, operational,
incidental and labour charges such as machine mixing, laying concrete, curing
etc., complete but excluding cost of steel and its fabrication charges for finished
item of work for Slab over drain.
32 Col le ct io n a nd Supp ly o f Met al f o r RCC M-20 Nominal mix using 20 mm to 12mm Graded size crushed hard granite metal including C/c of all materials, taxes,
operational, incidental and labour charges such as machine mixing, laying
concrete, curing etc., complete but excluding cost of steel and its fabrication
charges for finished item of work for Slab over drain.
20mm to 12mm HBG/HBT graded Metal:Consisting of
20mm metal 60% and12mm metal 40%
Page 56 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 57/89
Sl.
No.Description of item Unit Qty Rate Amount
Mason (1st Class) day 0.10 350.00 35.00Mazdoor (Unskilled) day 1.39 280.00 389.20 Add MA @ 20% 424.20 0.00
Sub- to ta l for Labou r
c) Machinery 424.20
Concrete mixer 0.4/0.28 cum capacity hr / cum 0.40 417.40 166.96
Vibrator charges with 60mm needle vibrator petrrol hour 0.40 162.20 64.88Water tanker 6 kl capacity hour 0.13 624.00 81.12
Sub- to ta l for Machinary 312.96
d) For formwork @10% on (a+b+c):
%
0.10(task
51+52+54
+b+c)
455.79
C: 1192.95
Supplying HYSD bar reinforcement in slab over drain
etc.,complete
(a) Material
HYSD/TMT/ MS bars including 5 per cent for overlaps
and wastage
MT 1.05042000.00 44100.00
C=(a) 44100.00
Engaging labour for fitting and placing HYSD bar
reinforcement in slab over drain complete and technical
specifications including cost of binding wire(a) Labour
Blacksmith / Bar bender day 10.00 370.00 3700.00Mazdoor (Unskilled) day 10.00 280.00 2800.00b)Binding wire kg 6.00 70.00 420.00 Add MA @ 20% 6500.00 0.00
c. Sub- to ta l for Labour& Bin ding wire 6920.00
C: (=c) 6920.00
Taking Output =1 cum
a) Material:
Gravel cum 1.00 440.11 440.11
C: (=a) 440.11
40 Seigniorage charges for Gravel
Payment :Dcum
a) Rate per 1cum as per RSSR cum 1 16.64 16.64A: (=a) 16.64
OUT PUT for 300cum
Three wheeled 8-10 T Static roller @10.00cum /Hr.hrs 30.00 1038.40 31152.00
Water tanker 6kl capacity including water hrs 5.00 624.00 3120.00
A)Total Rate of 300.0cum 34272.00
42
Compaction of collected well graded granular soil to OMC using 8-10T Power Road Roller to
achieve CBR value not <15% and plasticity index <6% with required waterings and keeping the
rolled surface wet for a period of 15 days as per MoRD standards for Shoulders (CSSR)
39 Collection & Supply of good gravel including cost,conveyance, seigniorage
and labour charges and stacking to Departmental guage for pre-measurements
for blindage,shoulders
Qunatity 134 task * 1.00 * Senary
charges of rate
41 Engaging unskilled labour for spreading the collected Gravel and
sectioning for Blindage,Shoulders (RSSR)
37
38
Page 57 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 58/89
Sl.
No.Description of item Unit Qty Rate Amount
Rate for 1 cum ( =A/300) 114.24
43 Supply and fixing of MS name board of size 4feet X
3feet size including painting and required lettering as
per standard specifications
No. 1 3000.00
Deputy Executive Engineer Mandal Engineering Officer
PRI Sub Dvn Tanuku MPP Iragavaram
Executive Engineer
PRI Div Eluru
Page 58 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 59/89
Name of the work:
Estimate Cost:
Rs 315.00 Lakhs
Type Rates
Initial cost
of material
excluding
seigniorag
e charges
Blastin
g
charge
s
Machine
crushing
charges
Sub Tota
(6+7+8)
1 2 3 4 5 6 7 8 9
L1 Gravel cum Manual Arugolanu 31.00 342.11 98.00 98.00
L2 Coarse Sand for Filling cum Manual Vadapalli 38.00 403.51 285.00 285.00
L3
26.50mm - 4.75mm size
grading B material for granular
sub base
cum Manual
L4Sand (for Granular sub base
2.36mm below )cum Manual Vadapalli 38.00 403.51 285.00 285.00
L5 Sand for Concrete cum Manual Vadapalli 38.00 403.51 385.00 385.00
L6 Stone Dust cum Manual
63-60mm IRC HBG metal cum Manual Pangidi 52.00 526.32 419.00 419.00
40-45mm IRC HBG metal cum Manual Pangidi 52.00 526.32 588.00 70.00 147.00 805.00
19-22mm IRC HBG metal cum Manual Pangidi 52.00 526.32 984.00 70.00 246.00 1300.00
Grade II Metal:Consisting of
63mm to 45 mm IRC
HBG/HBT metal 96% and
19mm to 22mm IRC HBG
metal 4%
cum E Tender
L8
Grade III Metal:Consisting of 53mm to
22.4mm IRC HBG/HBT metal 95%
and 20mm to 10 mm IRC HBG metal5%
cum
20mm HBG metal cum Manual Pangidi 52.00 526.32 984.00 70.00 246.00 1300.0012mm HBG metal cum Manual Pangidi 52.00 526.32 780.00 70.00 195.00 1045.00
20mm to 12mm HBG/HBT
graded Metal:Consisting of
20mm metal 60% and12mm
metal 40%
cum E Tender
L7
L9
LEAD STATEMENT (2013-2014 C.S.S.R.)
Comprehensive Development - Providing Internal Roads with CC Drains in SC, ST locali
Material
Name of the
Quarry
Lead in
km
Conveyan
ce
(excluding
Contractor
's Profit
14%)
Material Compon
Page 59 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 60/89
Type Rates
Initial cost
of material
excluding
seigniorag
e charges
Blastin
g
charge
s
Machine
crushing
charges
Sub Tota
(6+7+8)
1 2 3 4 5 6 7 8 9
Material
Name of the
Quarry
Lead in
km
Conveyan
ce
(excluding
Contractor
's Profit
14%)
Material Compon
L1040 mm nominal HBG/HBT
Graded Metalcum Manual Pangidi 52.00 526.32 588.00 70.00 147.00 805.00
L11
Graded Metal consisting of
60% of 40mm and 40% of
20mm to 10mm graded
HBG/HBT metal
cum
L12 Cement MT October2013 5800.00 5800.00
L13RCC Pipes NP3 class 600mm
ØRmt manual
L14RCC Collars NP3 class
600mm ØRmt
L15 Water kl
L16 Water tanker 6kl Capacity hr 624.00
L17Three wheeled 8-10 T Static
roller @10.00cum /Hr.hr Fixed
L18Tractor with Rotavator @ 25
cum per hour hr Fixed
L19
Mechanical concrete mixer
0.4/0.28 cum capacity fitted
with water measuring device
and preferably also with load
cell.
hr Fixed
L20 Needle Vibrator hr Fixed
L21 Plate vibrator hr Fixed
L22Polythene sheet 125 micron
(240X2.5X1.10=660)
sqmFixed
L23Bitumen primer @ 100ml. Per
joint for 60 joints
tonneManual
29982.73
L24Mastic Pad
2.5x.0.125x60=18.75
sqmFixed
L25Vibrator charges with 60mm
needle vibrator petrrol
hr Fixed
L26
HYSD/TMT/ MS bars
including 5 per cent for
overlaps and wastage
MT Manual
L27 Binding wire kg Fixed
Page 60 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 61/89
Type Rates
Initial cost
of material
excluding
seigniorag
e charges
Blastin
g
charge
s
Machine
crushing
charges
Sub Total
(6+7+8)Se
e
1 2 3 4 5 6 7 8 9
Material
Name of the
Quarry
Lead in
km
Conveyan
ce
(excluding
Contractor
's Profit
14%)
Material Component
L28 Mason (1st class) day Fixed
L29 Mason (2nd class) day Fixed
L30 Mazdoor (skilled) day Fixed
L31 Mazdoor(Unskilled) day Fixed
L32 Mazdoor (semi-skilled) day Fixed
L33 Blacksmith / Bar bender day Fixed
L34 i) 9.5 mm to 4.75 mm cum Manual
L35 i i)4.75 mm to 2.36 mm cum Manual
L36 5-7 mm HBGM/C Metal cum Manual Pangidi 52.00 526.32 504.00 70.00 126.00 700.00
2.36 -5 mmHBG M/CMetal cum Manual Pangidi 52.00 526.32 308.00 70.00 77.00 455.00
L36Average Rate for Screenings cum
L37
Formwork as per Plinth Beam
centering charges of CSSR cum
Manual 2158
2) Certified that this village is situated within the range of 12km radius in Tanuku municipal area
Executive Engineer Deputy Executive Engineer Mandal En
PRI Div Eluru PRI Sub Dvn Tanuku MPP
1) Certified that the some Item rates are worked out by the Department Communicated rates as per Mandal
Lead and the remining rates to the leads are correct to the best of my knowledge
Page 61 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 62/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 63/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 64/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 65/89
Sl.
No.Description of item Unit Qty Rate Amount
Gravel using as Binding material @ 0.06cum per 10 sqm
for Grading 2 materialcum 28.80 395.88 11401.34
Sub-total for Material Component 11401.34
b) Labour:
Mazdoor(skilled) days 12.08 250.00 3020.00Mazdoor(Unskilled) days 250.00 250.00 62500.00 Add MA @ 20% 65520.00 0.00
Sub- to ta l of Labour Comp onent 65520.00
c) Machinary:
Water tanker 6Kl capacity Hrs 24.00 372.00 8928.00Three wheel 8-10T static roller @10cum per hour Hrs 36.00 920.60 33141.60
Sub- to ta l of Machinery 42069.60
d) Rate per 360.00cum for a compacted thickness of
75mm (a+b+c)118990.94
e) Rate per 1.00 Cum Compact ( d/ 360 ) 330.53
C: (= e) 330.53
RBR-SBST-5
Unit = Bag
(a) Material
i) Cement kg 250.00 5500.00 1375.00
B(ii): (=a(iii)) 1375.00
RBR-SBST-5
Unit = cum
(a) Material
iii) Aggregates
cum 0.54 1674.28 904.11cum 0.36 1469.28 528.94
As per SSR 1433.05
For Rate Approval for quotationsTaking Output =1cum
a) Material
20mm HBG SS5 metal cum 0.60 1,674.28 1004.5712mm HBG SS5 meta cum 0.40 1,469.28 587.71
i) Sub-Total for Graded Metal including screening1592.28
ii) Rate per 1cum 1592.28
Rate Approved by quotations 1577.78
Taking Output =1cum
a) Material
cum 0.54 1,577.78 852.00
cum 0.36 1,577.78 568.00
i) Sub-Total for SS5 Metal 1420.00
19
20 Co llec tio n an d s up ply o f Metal fo r Plain vibrated Cement Concrete M 15
grade using 67% of 20mm HBG graded metal & 33% of 12mm HBG graded
metal mechanically mixed including cost and conveyance of all materials
inclusve of seignorage charges,centering ,laying, vibrating and curing and
machine mixing charges for Side Walls of Side Drains etc., complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and
1204 MORD and 1500, 1700 & 2200 MORTH
20mm to 12mm HBG/HBT graded Metal:Consisting of
20mm metal 60% and12mm metal 40%
20mm to 12mm HBG/HBT graded Metal:Consisting of
20mm metal 60% and12mm metal 40%
Su pp ly an d d eliv ery o f Cem en t fo r Plain vibrated Cement Concrete M 15
grade using 67% of 20mm HBG graded metal & 33% of 12mm HBG graded
metal mechanically mixed including cost and conveyance of all materials
inclusve of seignorage charges,centering ,laying, vibrating and curing and
machine mixing charges for Side Walls of Side Drains etc., complete as per
drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and
Page 65 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 66/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 67/89
Sl.
No.Description of item Unit Qty Rate Amount
Unit = cum
Taking output = 75cum (172.50 t)
(240x2.5 x 0..125)=75cum
c) Material
Cum 40.50 1674.28 67808.34
Cum 27.00 1469.28 39670.56As per SSR 1433.05
For Rate Approval for quotationsTaking Output =1cum
a) Material
20mm HBG SS5 metal cum 0.60 1,674.28 1004.5712mm HBG SS5 meta cum 0.40 1,469.28 587.71
i) Sub-Total for SS5 Metal 1592.28ii) Rate per 1cum 1592.28
Rate Approved by quotations 1577.78
Taking Output =75cum
a) Materialcum 40.50 1,577.78 63900.09
cum 27.00 1,577.78 42600.06
i) Sub-Total for SS5 Metal 106500.15ii) Rate per 1cum 1420.00
Rate Approved by quotations 1420.0030 Cement Concrete Pavement
Unit = cum
Taking output = 75cum (172.50 t)
(240x2.5 x 0..125)=75cum
Construction of un-reinforced, jointed at expansion and construction joint only,
plain cement concrete pavement, thickness as per design, over a prepared sub
base, with 43 grade cement or any other type as per clause 1501.22
M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of
coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than
0.2cum capacity and using approved mix design, laid in approved fixed side form
work (steel channel, laying and fixing of 125 micron thick polythene film, wedges,steel plates including levelling the form work as per drawing), spreading the
concrete with shovels, rakes, compacted using plate vibrators and finished in
continous operation including provision of contraction and expansion,
construction joints using Mastic pad/ primer, construction joint, admixtures as
approved, curing of concrete slabs for 14 days, and water finishing to lines and
grade as per drawing and technical specification clause 1501.22 including
seignorage charges.(without dowel bars) Exclud ing Cement,Sand,Meta l
Su pp ly an d c ollec tio n o f m etal fo r Construction of un-reinforced, jointed at
expansion and construction joint only, plain cement concrete pavement,
thickness as per design, over a prepared sub base, with 43 grade cement or any
other type as per clause 1501.22 M30(Grade), coarse and fine agregates
conforming to IS:383 maximum size of coarse agregate not exceeding 25mm,
mixed in a concrete mixer of not less than 0.2cum capacity and using approved
mix design, laid in approved fixed side form work (steel channel, laying and fixing
of 125 micron thick polythene film, wedges, steel plates including levelling theform work as per drawing), spreading the concrete with shovels, rakes,
compacted using plate vibrators and finished in continous operation including
provision of contraction and expansion, construction joints using Mastic pad/
primer, construction joint, admixtures as approved, curing of concrete slabs for
14 days, and water finishing to l ines and grade as per drawing and technical
specification clause 1501.22 including seignorage charges.(without dowel
bars)
20mm to 12mm HBG/HBT graded Metal:Consisting of
20mm metal 60% and12mm metal 40%
20mm to 12mm HBG/HBT graded Metal:Consisting of
20mm metal 60% and12mm metal 40%
Page 67 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 68/89
Sl.
No.Description of item Unit Qty Rate Amount
a) Labour
Mason (1st class) day 5.00 315.00 1575.00Mason (2nd class) day 5.00 285.00 1425.00Mazdoor (unskilled) day 150.0 250.00 37500.00Mazdoor(skilled) day 6.00 250.00 1500.00Mazdoor (semi-skilled) day 6.00 250.00 1500.00 Add MA @ 20% 43,500.00
0.00Sub- to ta l for Labou r 43500.00
b) Machinery
Concrete mixer 0.40/0.28cum capacity ( 6 mixers) Hour 36.00 370.00 13320.00Plate vibrator Hour 9.00 42.00 378.00Water tanker 6 Kl. Capacity Hour 5.00 372.00 1860.00
iv) other materials
Polythene sheet 125 micron (240X2.5X1.10=660) sqm 660 15.00 9900.00Bitumen primer @ 100ml. Per joint for 60 joints tonne 0.005 29982.73 149.91Mastic Pad 2.5x.0.125x60=18.75 sqm 18.75 869.00 16293.75
Sub- to ta l for Machinery and Other mater ia ls 41901.66
(d) Formwork @ 3% on material, labour and
machiner % 6+48+a+b) 8029.62
C: 93431.29
1245.75
Unit = Bag
(a) Material
i) Cement kg 330.00 5500.00 1815.0
Payment Particulars for 1cum
B(i): (=a(i)) 1815.00
Unit = cum
(a) Material
iii) Aggregates
cum 0.54 1674.28 904.11
cum 0.36 1469.28 528.94
Payment Particulars for 1cum 1433.05
B(ii)(i)=a(iii) 1433.05As per SSR 1433.05
For Rate Approval for quotationsTaking Output =1cum
a) Material
20mm HBG SS5 metal cum 0.60 1,674.28 1004.5712mm HBG SS5 meta cum 0.40 1,469.28 587.71
i) Sub-Total for Graded Metal 1592.28ii) Rate per 1cum 1592.28
Rate Approved by quotations 1577.78
Taking Output =1cum
31
32
Sup p ly o f Cemen t f or RCC M-20 Nominal mix using 20 mm to 12 mm Graded
size crushed hard granite metal including C/c of all materials, taxes, operational,
incidental and labour charges such as machine mixing, laying concrete, curing
etc., complete but excluding cost of steel and its fabrication charges for finished
item of work for Slab over drain.
Co ll ec ti on a nd Supp ly o f Met al f o r RCC M-20 Nominal mix using 20 mm to 12
mm Graded size crushed hard granite metal including C/c of all materials, taxes,
operational, incidental and labour charges such as machine mixing, laying
concrete, curing etc., complete but excluding cost of steel and its fabrication
charges for finished item of work for Slab over drain.
20mm to 12mm HBG/HBT graded Metal:Consisting of
20mm metal 60% and12mm metal 40%
Page 68 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 69/89
Sl.
No.Description of item Unit Qty Rate Amount
a) Material
cum 0.54 1,577.78 852.00
cum 0.36 1,577.78 568.00
i) Sub-Total for SS5 Metal 1420.00ii) Rate per 1cum 1420.00
Rate Approved by Quotations 1420.00
Unit = cum
(b) Labour
Mate day 0.00 0.00Mason (1st Class) day 0.10 315.00 31.50Mazdoor (Unskilled) day 1.39 250.00 347.50 Add MA @ 20% 379.00 0.00
Sub- to ta l for Labou r
c) Machinery 379.00Concrete mixer 0.4/0.28 cum capacity hr / cum 0.40 370.00 148.00Vibrator charges with 60mm needle vibrator petrrol
hour
0.4042.00 16.80
Water tanker 6 kl capacity hour 0.13 372.00 48.36
Sub- to ta l for Machinary 213.16
d) For formwork @10% on (a+b+c):
%
0.10(task
51+52+54
+b+c)
416.63
C: 1008.79
Supplying HYSD bar reinforcement in slab over drain
etc.,complete(a) Material
HYSD/TMT/ MS bars including 5 per cent for overlapsand wastage
MT 1.050 42500.00 44625.00
C=(a) 44625.00Engaging labour for fitting and placing HYSD bar
reinforcement in slab over drain complete and technical
specifications including cost of binding wire
(a) Labour
Blacksmith / Bar bender day 10.00 285.00 2850.00Mazdoor (Unskilled) day 10.00 250.00 2500.00b)Binding wire kg 6.00 65.00 390.00 Add MA @ 20% 5350.00 0.00
c. Sub- to ta l for Labour& Binding w ire 5740.00
C: (=c) 5740.00
Deputy Executive Engineer Mandal Engineering Officer
PRI Sub Dvn Tanuku MPP Iragavaram
Executive Engineer
PRI Div Eluru
37
38
36
20mm to 12mm HBG/HBT graded Metal:Consisting of
20mm metal 60% and12mm metal 40%
RCC M-20 Nominal mix using 20 mm to 12 mm Graded size crushed hardgranite metal including C/c of all materials, taxes, operational, incidental and
labour charges such as machine mixing, laying concrete, curing etc., complete
but excluding cost of steel and its fabrication charges for finished item of work for
Slab over drain exclud ing c ement,metal and sand
Page 69 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 70/89
Name of the work:
Estimate Cost:
Rs.315.00Lakhs
Type Rates
Initial cost
of material
excluding
seigniorag
e charges
Blastin
g
charge
s
Machine
crushing
charges
Sub Tota
(6+7+8)
1 2 3 4 5 6 7 8 9
L1 Gravel cum Manual Arugolanu 31.00 320.88 75.00 75.00
L2 Coarse Sand for Filling cum Manual Vadapalli 38.00 389.65 248.00 248.00
L3
26.50mm - 4.75mm size
grading B material for granular
sub base
cum Manual
L4Sand (for Granular sub base
2.36mm below )cum Manual Vadapalli 38.00 389.65 248.00 248.00
L5 Sand for Mortar cum Manual Vadapalli 38.00 389.65 335.00 335.00
L6 Stone Dust cum Manual
63-60mm IRC HBG metal cum Manual Pangidi 52.00 490.53 378.00 378.00
40-45mm IRC HBG metal cum Manual Pangidi 52.00 490.53 530.00 70.00 132.50 732.50
19-22mm IRC HBG metal cum Manual Pangidi 52.00 490.53 998.00 70.00 249.50 1317.50
Grade II Metal:Consisting of
63mm to 45 mm IRC
HBG/HBT metal 96% and
19mm to 22mm IRC HBG
metal 4%
cum E Tender
L8
Grade III Metal:Consisting of 53mm to
22.4mm IRC HBG/HBT metal 95%
and 20mm to 10 mm IRC HBG metal5%
cum
20mm HBG metal cum Manual Pangidi 52.00 490.53 891.00 70.00 222.75 1183.7512mm HBG metal cum Manual Pangidi 52.00 490.53 727.00 70.00 181.75 978.75
20mm to 12mm HBG/HBT
graded Metal:Consisting of
20mm metal 60% and12mm
metal 40%
cum E Tender
L7
L9
LEAD STATEMENT (2012-2013 C.S.S.R.)
Comprehensive Development - Providing Internal Roads with CC Drains in SC, ST locali
Material
Name of the
Quarry
Lead in
km
Conveyan
ce
(excluding
Contractor
's Profit
14%)
Material Compon
Page 70 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 71/89
Type Rates
Initial cost
of material
excluding
seigniorag
e charges
Blastin
g
charge
s
Machine
crushing
charges
Sub Total
(6+7+8)
1 2 3 4 5 6 7 8 9
Material
Name of the
Quarry
Lead in
km
Conveyan
ce
(excluding
Contractor
's Profit
14%)
Material Compon
L1040 mm nominal HBG/HBT
Graded Metalcum Manual Pangidi 52.00 490.53 530.00 70.00 132.50 732.50
L11
Graded Metal consisting of
60% of 40mm and 40% of
20mm to 10mm graded
HBG/HBT metal
cum
L12 Cement Aprial & May 2013 MT Febuary2013 4500.00 4500.00
Cement June 2013 MT Jun-13 5500.00 5500.00
L13RCC Pipes NP3 class 600mm
ØRmt manual
L14RCC Collars NP3 class
600mm ØRmt
L15 Water kl
L16 Water tanker 6kl Capacity hr 372.00
L17Three wheeled 8-10 T Static
roller @10.00cum /Hr.hr Fixed
L18Tractor with Rotavator @ 25
cum per hour hr Fixed
L19
Mechanical concrete mixer
0.4/0.28 cum capacity fitted
with water measuring device
and preferably also with load
cell.
hr Fixed
L20 Vibrator hr Fixed
L21 Plate vibrator hr Fixed
L22Polythene sheet 125 micron
(240X2.5X1.10=660)
sqmFixed
L23Bitumen primer @ 100ml. Per
joint for 60 joints
tonneManual
29982.73
L24Mastic Pad
2.5x.0.125x60=18.75
sqmFixed
L25Vibrator charges with 60mm
needle vibrator petrrol
hr Fixed
L26
HYSD/TMT/ MS bars
including 5 per cent for
overlaps and wastage
MT June-13
Page 71 of 89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 72/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 73/89
Sl.
No.Description of item Unit Qty Rate Amount
Remark
s
Linkage
with Lead
1 2 3 4 5 6 7
Taking Output = 360 cum
a) Materials
Gravel using as Binding material @ 0.06cum per 10 sqm
for Grading 2 materialcum 28.80 328.96 9474.05 L1
Sub-total for Material Component 9474.05
b) Labour:
Mazdoor(skilled) days 12.08 215.00 2597.20 L30
Mazdoor(Unskilled) days 250.00 215.00 53750.00 L31
Add MA @ 20% 56347.20 0.00Sub- to ta l of Labour Comp onent 56347.20
c) Machinary:
Water tanker 6Kl capacity Hrs 24.00 345.00 8280.00 L16
Three wheel 8-10T static roller @10cum per hour Hrs 36.00 844.40 30398.40 L17
Sub- to ta l of Machinery 38678.40
d) Rate per 360.00cum for a compacted thickness of
75mm (a+b+c)104499.65
e) Rate per 1.00 Cum Compact ( d/ 360 ) 290.28
C: (= e) 290.28
Executive Engineer Deputy Executive Engineer Mandal Engineering Officer
PRI Div Eluru PRI Sub Dvn Tanuku MPP Iragavaram
SUPPLEMENTRY DATA 2011-12
1 Spreading & compaction of the collected mixer of stone aggregates in uniform
thicknesses and with good gravel for blindage, hand packing and rolling with 8-
l0T Power Road Roller in stages to proper grade and camber with required
waterings and compacting to the required density grading 2 as per technical
specifications clause 405 MORD/404 MORTH keeping the rolled surface wet for a period of 15 days including brooming for (91 mm loose to 75 mm compacted)
(CSSR)
RBR-SBBS-9(A)(II)(i), Pg338 of revised data Part II for Roads and bridges
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 74/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 75/89
Name of the work:
Estimate Cost:
Rs.315.00Lakhs
Type Rates
Initial cost
of material
excluding
seigniorag
e charges
Blastin
g
charge
s
Machine
crushing
charges
Sub Total
(6+7+8)
A
Seig
e ch
1 2 3 4 5 6 7 8 9 1
L1 Gravel cum Manual Arugolanu 31.00 270.96 58.00 58.00
L2 Coarse Sand for Filling cum Manual Vadapalli 38.00 319.47 210.00 210.00
L3
26.50mm - 4.75mm size
grading B material for granular
sub base
cum Manual
L4Sand (for Granular sub base
2.36mm below )cum Manual Vadapalli 38.00 319.47 210.00 210.00
L5 Sand for Mortar cum Manual Vadapalli 38.00 319.47 285.00 285.00
L6 Stone Dust cum Manual
L7
Grade II Metal:Consisting of
63mm to 45 mm IRC
HBG/HBT metal 96% and
19mm to 22mm IRC HBG
metal 4%
cum E Tender
L8
Grade III Metal:Consisting of 53mm to
22.4mm IRC HBG/HBT metal 95%
and 20mm to 10 mm IRC HBG metal
5%
cum
L9
20mm to 12mm HBG/HBT
graded Metal:Consisting of
20mm metal 60% and12mmmetal 40%
cum E Tender
L1040 mm nominal HBG/HBT
Graded Metalcum Manual Pangidi 52.00 416.49 500.00 70.00 125.00 695.00
L11
Graded Metal consisting of
60% of 40mm and 40% of
20mm to 10mm graded
HBG/HBT metal
cum
L12 Cement MT Etender 4780.00 4780.00
LEAD STATEMENT (2011-2012 S.S.R.)
Material
Name of the
Quarry
Lead in
km
Conveyan
ce
(excluding
Contractor
's Profit
14%)
Material Component
Comprehensive Development - Providing Internal Roads with CC Drains in SC, ST localities in
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 76/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 77/89
Type Rates
Initial cost
of material
excluding
seigniorag
e charges
Blastin
g
charge
s
Machine
crushing
charges
Sub Total
(6+7+8)
Add
Seigniora
e charge
1 2 3 4 5 6 7 8 9 10
Material
Name of the
Quarry
Lead in
km
Conveyan
ce
(excluding
Contractor
's Profit
14%)
Material Component
L34 i) 9.5 mm to 4.75 mm cum Manual
L35 i i)4.75 mm to 2.36 mm cum Manual
L36 5-7 mm HBGM/C Metal cum Manual Pangidi 52.00 416.49 430.00 70.00 107.50 607.50 50.0
2.36 -5 mmHBG M/CMetal cum Manual Pangidi 52.00 416.49 260.00 70.00 65.00 395.00 50.0
L36Average Rate for Screenings cum
L37
Formwork as per Plinth Beam
centering charges of CSSR cum
Manual 1788
2) Certified that this village is situated within the range of 12km radius in Tanuku municipal area
Executive Engineer Deputy Executive Engineer Mandal Engineer
PRI Div Eluru PRI Sub Dvn Tanuku MPP Iragav
1) Certified that the some Item rates are worked out by the Department Communicated rates as per Mandal Averag
Lead and the remining rates to the leads are correct to the best of my knowledge
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 78/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 79/89
Rate Per
Unit
Amount Rate Per
Unit
Amount E
(in Rs) (Rs.) (in Rs) (Rs.) (
S.
No
Task Name Qty Qty
811.77 14.70 11933 811.75 14.70 11933
3434.03 16.64 57142 875.32 16.64 14565
2522.21 16.64 41969
4245.80 69075 4209.28 68467
811.77101.69 82549 811.75 101.69 82547
3434.03110.46 379322 875.32 110.46 96688
2522.21 126.96 320219
4245.80 461871 4209.28 499453
427.54 1149.50 491454 427.54 1149.50 491457
1553.561149.50 1785814 789.18 1280.00 1010150
747.05 1401.32 1046861
1981.10 2277269 1963.77 2548469
427.54232.26 99299 427.54 232.26 99300
1553.56256.03 397753 789.18 256.03 202054
747.05 276.92 206872
1981.10 497052 1963.77 508226
427.54 290.28124104 427.54 321.58 137488
1553.56 330.53513498 789.18 366.93 289574
747.05 425.26 317690
1981.10 637602 1963.77 744753
9CC30.Spreading & compact ion of the col lected mixer of stone
aggregates in uniform thicknesses and with good gravel for
blindage, hand packing and rolling with 8-l0T Power Road Roller in
stages to proper grade and camber with required water ings and
compacting to the required density grading 2 as per technical
specifications clause 405 MORD/404 MORTH keeping the rolled
surface wet for a period of 15 days including brooming for (91 mm
loose to 75 mm compacted) (CSSR)
8
CC28.Supply and collection of mixer of stone aggregates having
50% of 60-63mm HBG metal ,46% of 40-45mm HBG metal and 4%
of 19-22mm HBG metal including cost ,conveyance, seigniorage
charges, loading, unloading and stacking to departmental gauge for
pre measurements for WBM Grade.II surfaces per MORD
standards (91mm loose to 75 mm compacted) (CSSR) excluding
Grade II Metal
7CC26.Supply and collection of mixer of stone aggregates having
50% of 60-63mm HBG metal ,46% of 40-45mm HBG metal and 4%
of 19-22mm HBG metal including cost ,conveyance, seigniorage
charges, loading, unloading and stacking to departmental gauge for
pre measurements for WBM Grade.II surfaces per MORD
standards (91mm loose to 75 mm compacted) (CSSR) excluding
screenings
CC25.Compaction of collected gravel / sand / stonedust / coarse
graded material Grade B / Grade III to OMC using 8-l0T Static Road
Rol ler to achieve CBR value not less than15 and plastici ty index
<6% with required waterings and keeping the rolled surface wet for
a period of 15 days as per standards for Sub Base (CSSR)
6
CC24.Engaging unskilled labour for spreading the collected Gravel
with sand / stonedust / coarse graded material Grade B / Grade III
and sectioning to sub base & shoulders (RSSR)
5
Page 79 of 97
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 80/89
Rate Per
Unit
Amount Rate Per
Unit
Amount
(in Rs) (Rs.) (in Rs) (Rs.)
S.
No
Task Name Qty Qty
50.42 71.08 3584 50.42 71.08 3584
6689.83 80.47 538331 10.15 80.47 817
2367.58 80.47 190519
6740.25 541915 2428.15 194920
1921.57 1125.00 2161766 5.08 1375.00 6984
0 887.73 1450.00 1287203
1921.57 2161766 892.81 1294187
1921.57 1125.00 2161766 5.08 1420.00 7214
0 887.73 1551.89 1377651
1921.57 2161766 892.81 1384865
1921.57 347.83 668383 5.08 347.83 1767
887.73 378.48 335991
1921.57 668383 892.81 337758
12
CC41.Collection and supply of Metal for Plain vibrated Cement
Concrete M 15 grade using 67% of 20mm HBG graded metal &
33% of 12mm HBG graded metal mechanically mixed including
cost and conveyance of all materials inclusve of seignorage
charges,centering ,laying, vibrating and curing and machine mixing
charges for Side Walls of Side Drains etc., complete as per
drawings and technical specification Clauses 802, 804, 805, 806,
807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH
13 CC43.Supply of Sand for Plain vibrated Cement Concrete M 15
grade using 67% of 20mm HBG graded metal & 33% of 12mm HBG
graded metal mechanically mixed including cost and conveyance
of all materials inclusve of seignorage charges,centering ,laying,
vibrating and curing and machine mixing charges for Side Walls of
Side Drains etc., complete as per drawings and technical
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200 MORTH
11
CC40.Supply and delivery of Cement for Plain vibrated Cement
Concrete M 15 grade using 67% of 20mm HBG graded metal &
33% of 12mm HBG graded metal mechanically mixed including
cost and conveyance of all materials inclusve of seignorage
charges,centering ,laying, vibrating and curing and machine mixing
charges for Side Walls of Side Drains etc., complete as per
drawings and technical specification Clauses 802, 804, 805, 806,
807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH
10
CC33.Earthwork in excavation for s ide drain structure as per
drawing and technical specifications Clause 305.1 including settingout, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with
excavated suitable material as per Technical Specification 305
MORD / 304 MORTH (RSSR)
Page 80 of 97
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 81/89
Rate Per
Unit
Amount Rate Per
Unit
Amount
(in Rs) (Rs.) (in Rs) (Rs.)
S.
No
Task Name Qty Qty
1921.57 957.36 1839632 5.08 1043.65 5302
0 887.73 1348.69 1197267
1921.57 1839632 892.81 1202568
2656.88 1575.00 4184578 1386.98 1575.00 2184498
576.89 1925.00 1110513
1315.92 2320.00 3052939
2656.88 4184578 3279.79 6347950
14
CC45.Plain vibrated Cement Concrete M 15 grade using 67% of
20mm HBG graded metal & 33% of 12mm HBG graded metalmechanically mixed including cost and conveyance of all materials
inclusve of seignorage charges,centering ,laying, vibrating and
curing and machine mixing charges for Side Walls of Side Drains
etc., complete as per drawings and technical specification Clauses
802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 &
2200 MORTH
15
CC46.Sipply and delivary of cement for Construction of un-
reinforced, jointed at expansion and construction joint only, plain
cement concrete pavement, thickness as per design, over a
prepared sub base, with 43 grade cement or any other type as per
clause 1501.22 M30(Grade), coarse and fine agregates conformingto IS:383 maximum size of coarse agregate not exceeding 25mm,
mixed in a concrete mixer of not less than 0.2cum capacity and
using approved mix design, laid in approved fixed side form work
(steel channel, laying and fixing of 125 micron thick polythene film,
wedges, steel plates including levell ing the form work as per
drawing), spreading the concrete with shovels, rakes, compacted
using plate vibrators and finished in continous operation including
provision of contraction and expansion, construction joints using
Mastic pad/ primer, construction joint, admixtures as approved,
curing of concrete slabs for 14 days, and water finishing to lines
and grade as per drawing and technical specification clause
1501.22 including seignorage charges.(without dowel bars)
Page 81 of 97
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 82/89
Rate Per
Unit
Amount Rate Per
Unit
Amou
(in Rs) (Rs.) (in Rs) (Rs.
S.
No
Task Name Qty Qty
2656.88 1125.00 2988984 1963.87 1420.00 2788
1315.92 1551.89 2042
2656.88 2988984 3279.79 4830
2656.88 326.09 866387 1963.87 326.09 640
1315.92 354.83 466
2656.88 866387 3279.79 1107
CC49.Supply of Sand for Construction of un-reinforced, jointed at
expansion and construction joint only, plain cement concrete
pavement, thickness as per design, over a prepared sub base, with
43 grade cement or any other type as per clause 1501.22
M30(Grade), coarse and fine agregates conforming to IS:383
maximum size of coarse agregate not exceeding 25mm, mixed in a
concrete mixer of not less than 0.2cum capacity and using
approved mix design, laid in approved fixed side form work (steel
channel, laying and fixing of 125 micron thick polythene film,
wedges, steel plates including levelling the form work as per
drawing), spreading the concrete with shovels, rakes, compacted
using plate vibrators and finished in continous operation including
provision of contraction and expansion, construction joints using
Mastic pad/ primer, construct ion joint, admixtures as approved,
curing of concrete slabs for 14 days, and water fin ishing to lines
and grade as per drawing and technical specification clause
1501.22 including seignorage charges.(without dowel bars)
17
16
CC47.Supply and collection of metal for Construction of un-
reinforced, jointed at expansion and construction joint only, plain
cement concrete pavement, thickness as per design, over a
prepared sub base, with 43 grade cement or any other type as per
clause 1501.22 M30(Grade), coarse and fine agregates conforming
to IS:383 maximum size of coarse agregate not exceeding 25mm,
mixed in a concrete mixer of not less than 0.2cum capacity and
using approved mix design, laid in approved fixed side form work
(steel channel, laying and fixing of 125 micron thick polythene film,
wedges, steel plates including levelling the form work as per
drawing), spreading the concrete with shovels, rakes, compacted
using plate vibrators and finished in continous operation including
provision of contraction and expansion, construction joints using
Mastic pad/ primer, construct ion joint, admixtures as approved,
curing of concrete slabs for 14 days, and water fin ishing to lines
and grade as per drawing and technical specification clause
1501.22 including seignorage charges.(without dowel bars)
Page 82 of 97
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 83/89
Rate Per
Unit
Amount Rate Per
Unit
Amount
(in Rs) (Rs.) (in Rs) (Rs.)
S.
No
Task Name Qty Qty
2656.88 1263.63 3357313 1963.87 1365.23 268113
1315.92 1531.31 201507
2656.88 3357313 3279.79 469621
69.90 1485.00 103806 2.71 1815.00 491
40.20 1914.00 7694
69.90 103806 42.91 8186
19
18
CC51.Construction of un-reinforced, jointed at expansion and
construction joint only, plain cement concrete pavement, thickness
as per design, over a prepared sub base, with 43 grade cement or
any other type as per clause 1501.22 M30(Grade), coarse and fine
agregates conforming to IS:383 maximum size of coarse agregate
not exceeding 25mm, mixed in a concrete mixer of not less than
0.2cum capacity and using approved mix design, laid in approved
fixed side form work (steel channel, laying and fixing of 125 micron
thick polythene film, wedges, steel plates including levelling the
form work as per drawing), spreading the concrete with shovels,
rakes, compacted using plate vibrators and finished in continous
operation inc luding prov is ion of contraction and expansion,
construction joints using Mastic pad/ primer, construction joint,
admixtures as approved, curing of concrete slabs for 14 days, and
water finishing to l ines and grade as per drawing and technicalspecification clause 1501.22 including seignorage charges.(without
dowel bars) Excluding Cement,Sand,Metal
CC52.Supply of Cement for RCC M-20 Nominal mix using 20 mm to
12 mm Graded size crushed hard granite metal including C/c of all
materials, taxes, operational, incidental and labour charges such as
machine mixing, laying concrete, curing etc., complete but
excluding cost of steel and its fabrication charges for finished itemof work for Slab over drain.
Page 83 of 97
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 84/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 85/89
Rate Per
Unit
Amount Rate Per
Unit
Amount Exce
(in Rs) (Rs.) (in Rs) (Rs.) (in R
S.
No
Task Name Qty Qty
8.50 2560.00 21760 0.129 6810.00 878
3.00 8220.00 24660
8.50 21760 3.129 25538 3
25 CC RW 16 S/F of MS Name Board of s ize 2`.6" x 4` .0" including
painting and required lettering1.00 3000.00 3000.00 1.00 3000.00 3000
26Collection & Supply of good gravel including cost,conveyance,
seigniorage and labour charges and stacking to Departmental
guage for pre-measurements for blindage,shoulders
1847.34 395.88 731325 1020.24 440.11 449018
27 Engaging unskilled labour for spreading the collected Gravel and
sectioning for Blindage,Shoulders (RSSR)1847.34 16.64 30740 1020.24 16.64 16977
28Compaction of collected well graded granular soil to OMC using 8-
10T Power Road Roller to achieve CBR value not <15% and
plasticity index <6% with required waterings and keeping the rolledsur face wet for a period of 15 days as per MoRD standards for
Shoulders (CSSR)
1847.34 98.26 181520 1020.24 114.24 116552
29 CC RW 18 OP02 Seniorage charges on quantity of metal 6953.49 50.00 347675 6766.33 50.00 338316
30 CC RW 17 O 04 Seniorage charges of gravel 5614.75 22.00 123525 4762.12 22.00 104767
31 CC RW 19 OP 03 Seniorage Charges on quantity of sand 6658.46 40.00 266338 4093.74 40.00 163750
32 Provision for Mastic Pads as perCSSR
33 CC RW 21 CP01 VAT @ 4% / 5% 1074498 1102354 27
34 CCRW 22 OP06 QC Charges @ 0.50% 139701 142444 2
35 Provision for Price Varation Charges 916117 564846
Total 31500000 32062513 6165
-562513
Executive Engineer Deputy Executive Engineer Mand
PRI Div Eluru PRI Sub Dvn Tanuku
CC59.Engaging labour for fitting and placing HYSD bar
reinforcement in slab over drain complete and technicalspecifications including cost of binding wire
24
Page 85 of 97
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 86/89
Lead in KM Sand/ Gravel Metal
1 20.88 18.77
2 29.21 26.32
3 39.04 39.04
4 47.37 47.37
5 55.70 55.70
6 64.03 64.03
7 72.36 72.36
8 80.69 80.69
9 89.02 89.0210 97.35 97.35
11 105.68 105.68
12 114.01 114.01
13 122.34 122.34
14 130.67 130.67
15 139.00 139.00
16 147.33 147.33
17 155.66 155.66
18 163.99 163.99
19 172.32 172.32
20 180.65 180.65
21 188.98 188.98
22 197.31 197.3123 205.64 205.64
24 213.97 213.97
25 222.30 222.30
26 230.63 230.63
27 238.96 238.96
28 247.29 247.29
29 255.62 255.62
30 263.95 263.95
31 270.88 270.88
32 277.81 277.81
33 284.74 284.74
34 291.67 291.67
35 298.60 298.60
36 305.53 305.5337 312.46 312.46
38 319.39 319.39
39 326.32 326.32
40 333.25 333.25
41 340.18 340.18
42 347.11 347.11
43 354.04 354.04
44 360.97 360.97
45 367.90 367.90
46 374.83 374.83
47 381.76 381.76
48 388.69 388.69
49 395.62 395.62
50 402.55 402.55
51 409.48 409.48
52 416.41 416.41
53 423.34 423.34
54 430.27 430.27
55 437.20 437.20
56 444.13 444.13
57 451.06 451.06
58 457.99 457.99
59 464.92 464.92
60 471.85 471.85
CONVEYANCE 2011-2012
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 87/89
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 88/89
CONVEYANCE 2012-2013
Lead in KM Sand/ Gravel Metal
1 24.56 23.42
2 34.39 32.81
3 45.79 45.79
4 55.61 55.61
5 65.44 65.44
6 75.26 75.26
7 85.08 85.088 94.90 94.90
9 104.72 104.72
10 114.54 114.54
11 124.36 124.36
12 134.18 134.18
13 144.00 144.00
14 153.82 153.82
15 163.64 163.64
16 173.46 173.46
17 183.28 183.28
18 193.10 193.10
19 202.92 202.92
20 212.74 212.74
21 222.56 222.5622 232.38 232.38
23 242.20 242.20
24 252.02 252.02
25 261.84 261.84
26 271.66 271.66
27 281.48 281.48
28 291.30 291.30
29 301.12 301.12
30 310.94 310.94
31 319.10 319.10
32 327.26 327.26
33 335.42 335.42
34 343.58 343.5835 351.74 351.74
36 359.90 359.90
37 368.06 368.06
38 376.22 376.22
39 384.38 384.38
40 392.54 392.54
41 400.70 400.70
42 408.86 408.86
43 417.02 417.02
44 425.18 425.18
45 433.34 433.34
46 441.50 441.50
47 449.66 449.66
48 457.82 457.8249 465.98 465.98
50 474.14 474.14
51 482.30 482.30
52 490.46 490.46
53 498.62 498.62
54 506.78 506.78
55 514.94 514.94
56 523.10 523.10
57 531.26 531.26
58 539.42 539.42
59 547.58 547.58
8/10/2019 Model Working Estimate_NREGS
http://slidepdf.com/reader/full/model-working-estimatenregs 89/89
60 555.74 555.74
61 563.90 563.90
62 572.06 572.06
63 580.22 580.22
64 588.38 588.38
65 596.54 596.54
66 604.70 604.70
67 612.86 612.86
68 621.02 621.0269 629.18 629.18
70 637.34 637.34
71 645.50 645.50
72 653.66 653.66
73 661.82 661.82
74 669.98 669.98
75 678.14 678.14
76 686.30 686.30
77 694.46 694.46
78 702.62 702.62
79 710.78 710.78
80 718.94 718.94
81 727.10 727.10
82 735.26 735.2683 743.42 743.42
84 751.58 751.58
85 759.74 759.74
86 767.90 767.90
87 776.06 776.06
88 784.22 784.22
89 792.38 792.38
90 800.54 800.54
91 808.70 808.70
92 816.86 816.86
93 825.02 825.02
94 833.18 833.18
95 841.34 841.3496 849.50 849.50
97 857.66 857.66
98 865.82 865.82
99 873.98 873.98
100 882.14 882.14
101 890.30 890.30
102 898.46 898.46
103 906.62 906.62
104 914.78 914.78
105 922.94 922.94