11
Govern the AIT that tim showca flood b suburba valiant onslaug day, va The inu The floo infrastr from in complet same o access, followed assignm meeting digital r BACKGRO ment of Ja T Alumni As me, with b sed on the FLOODING arriers in A an resident attempts ght; on Frid ast amounts undation of odwaters re ucture, inc RENOVAT nsurance co ted in a sim ld form and process, d 40 years RATIONAL ments. Inst g places fo repositories Mod OUND: The pan in 198 ssociation (A bookshelve upper floo G: In Octob Ayuthaya a tial areas w to safegua day Octobe s of floodw AIT was to emained fo luding the ION: After ompensatio mple straig d format. H and use i ago when LE: Librarie tead moder or academi s, and won derniza original AI 81, and it a AITAA). It s dominat r. ber 2011, T and Pathum were subm ard our be r 21, AIT to aters gushe otal and com r over two ground floo r the flood, on for repa ghtforward However, to nformation this AIT lib es are no lo rn libraries c discussio nders of m ation o IT Library w acquired a was an exa ing the gr Thailand ex mthani wer merged und eloved cam oo succum ed inside th mplete, wit months an or of the Lib , the library airing its g manner, if oday library n in a ma brary was d onger place have eme on and inte modern arch of AIT Li was constru face-lift in ample of a round floor xperienced re breache der water. mpus and v bed to the he campus th water cre nd severely brary. y received ground floo AIT wante y users (fac nner totall esigned an es to mere rged as pla ellectual re hitecture an ibrary ucted with f 2007, cour typical univ r and spec its worst f d, industria After more valued com natural dis , forcing a esting at m y damaged an allocati or. The rep ed to maint culty, resea ly different d built. ely browse aces for im eflection; w nd design funds dona rtesy of su versity libr cial collect flooding on al estates e than two mmunity a saster. On t complete e more than tw almost the on of 10 m pair could tain the lib archers and t from the books or to mmersive le where med converge t Page | 1 ated by the pport from ary built at ions being record. As as well as o weeks of gainst this that fateful evacuation. wo meters. e entire AIT million Baht have been rary in the d students) e practices o complete arning and ia centers, to create a 1 e m t g s s f s l T t n e ) s e d , a

Modernization of AIT Library - Pronto Marketing · Page | 2 stimulating atmosphere. Thus, it is a good opportunity for the AIT library to be modernized to cater to the 21st century

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Modernization of AIT Library - Pronto Marketing · Page | 2 stimulating atmosphere. Thus, it is a good opportunity for the AIT library to be modernized to cater to the 21st century

 

Governthe AITthat timshowca

flood bsuburbavaliant onslaugday, vaThe inuThe flooinfrastr

from incompletsame oaccess, followed

assignmmeetingdigital r

BACKGROment of Ja

T Alumni Asme, with bsed on the

FLOODINGarriers in Aan residentattempts

ght; on Fridast amountsundation of odwaters reucture, inc

RENOVATnsurance coted in a simld form and process, d 40 years

RATIONALments. Instg places forepositories

Mod

OUND: The pan in 198

ssociation (Abookshelve upper floo

G: In OctobAyuthaya atial areas wto safegua

day Octobes of floodw AIT was toemained foluding the

ION: Afterompensatiomple straigd format. Hand use i

ago when

LE: Librarietead moderor academis, and won

derniza

original AI81, and it aAITAA). It s dominatr.

ber 2011, Tand Pathumwere submard our ber 21, AIT toaters gushe

otal and comr over two ground floo

r the flood,on for repaghtforward However, tonformationthis AIT lib

es are no lorn libraries c discussio

nders of m

ation o

IT Library wacquired a was an exaing the gr

Thailand exmthani wer

merged undeloved camoo succumed inside thmplete, wit months anor of the Lib

, the libraryairing its gmanner, if

oday libraryn in a mabrary was d

onger place have emeon and inte

modern arch

of AIT Li

was construface-lift in ample of a round floor

xperienced re breacheder water. mpus and vbed to the he campusth water crend severelybrary.

y received ground floof AIT wantey users (facnner totallesigned an

es to mererged as plaellectual rehitecture an

ibrary 

ucted with f2007, courtypical univr and spec

its worst fd, industriaAfter morevalued com natural dis, forcing a esting at my damaged

an allocatior. The reped to maintculty, resealy differentd built.

ely browse aces for imeflection; wnd design

 

funds donartesy of suversity librcial collect

flooding on al estates e than twommunity asaster. On tcomplete e

more than tw almost the

on of 10 mpair could tain the libarchers andt from the

books or tommersive lewhere medconverge t

Page | 1

ated by thepport fromary built ations being

record. Asas well as

o weeks ofgainst thisthat fatefulevacuation.wo meters.e entire AIT

million Bahthave beenrary in thed students)e practices

o completearning andia centers,to create a

1  

e m t g

s s f s l

T

t n e ) s

e d , a

Page 2: Modernization of AIT Library - Pronto Marketing · Page | 2 stimulating atmosphere. Thus, it is a good opportunity for the AIT library to be modernized to cater to the 21st century

Page | 2   

stimulating atmosphere. Thus, it is a good opportunity for the AIT library to be modernized to cater to the 21st century needs of the students and faculty in a more efficient and productive manner, so that they can avail of new and amazing services, benefit from emerging technologies, while simultaneously utilize the tailor-made spaces to study and collaborate.

FACILITIES: The following list highlights some new ideas that are being considered for inclusion in the renovation plan of the AIT Library.

All books, print materials, theses and special collections will be shelved on the upper floor of the library. Aided by an extensive online catalog, this will be a site for faculty and student designated and recommended text books and reading materials.

The ground floor of the library will become a modern marvel, with massive reading spaces. Instead of stocking books, the ground floor will have open spaces, computers, multimedia stations, carrels, and a large number of niche group study rooms and chambers. It will also house a VIP lounge, an exhibition area, and designated meeting rooms for alumni and visitors.

Faculty, researchers, and students will be able to enjoy many of available resources through vast online repositories containing e-books, subscriptions to online databases, online journals, and open-access publications.

A special multimedia lab is planned for video production, video conferencing, web-casting, webinars and for distance education.

There will be designated social areas and study spaces, all fitted with digital connection points that allow students to share, connect, and utilize library materials in a more productive manner. Digital connectivity will be a key feature of the new library.

Like many other modern university and college libraries, AIT library will share many of its resources online with students through e-books and a rich digital collection.

 

Page 3: Modernization of AIT Library - Pronto Marketing · Page | 2 stimulating atmosphere. Thus, it is a good opportunity for the AIT library to be modernized to cater to the 21st century

Page | 3   

STATUS OF AIT CAMPUS REHABILITATION AFTER FLOOD Total Compensation from Flood Insurance 440,326,718 Baht

Phase 1 Rehabilitation Expenses 297,046,562 Baht

Student Dormitories 78,386,816 Spent

SERD (Buildings and Equipment) 46,157,835 Spent

SET (Buildings and Equipment) 29,724,019 Spent

Campus Groundwork Development 23,942,610 Spent

AIT Conference Center 18,814,216 Spent

Non Academic Buildings 13,729,454 Spent

Administrative Building 13,274,571 Spent

Restoration of Campus Utilities 12,903,910 Spent

Fence and Lighting for Dykes 8,634,734 Spent

Staff & Faculty House 8,211,690 Spent

Student Union 6,137,515 Spent

SOM (Building and Equipment) 4,242,514 Spent

Renovation Miscellaneous Expenses 84,367 Spent

SERD (Additional Request) 9,215,460 Committed

Administrative (Additional Request) 2,000,000 Committed

Campus Utility (Additional Request) 365,593 Committed

Older Student Dorms Facelift 18,436,000 Committed

Renovation Miscellaneous Expenses 785,259 Committed

Staff & Faculty Houses 2,000,000 Committed

Phase 2 Rehabilitation Expenses 174,490,611 Baht

(1) Library Modernization 54,050,611 Committed

(2) Total Overhaul of 40-year Old Electrical Backbone 73,100,000 Planned

(3) Total Overhaul of 40-year Old Air Condition Backbone 31,840,000 Planned

(4) Total Overhaul of 40-year Old Water Supply Backbone 10,000,000 Planned

(5) Repair of Waste Water System 4,000,000 Planned

(6) Survey and Design Fees 1,500,000 Planned

Net Balance * -31,210,456 Baht

* Remark : The deficit will be raised through the Library Modernization Campaign.    

Page 4: Modernization of AIT Library - Pronto Marketing · Page | 2 stimulating atmosphere. Thus, it is a good opportunity for the AIT library to be modernized to cater to the 21st century

 

AIT

Othe floocampusmillion budget million million of 19 minforma

stakehoand stapartner

Campa

Expect

A A O

Curren

T LIBRATO C

On 15 Decod insurancs rehabilitatBaht, the

of the libraBaht. ThusUSD, in or

million Baht ation techno

In conclusiolders, partaff, alumnirs.

A

aign Goal:

ted Donati

Alumni/Ex-Board MemAlumni-LinOthers – To

nt Campaig

ARY SEEOMPLE

cember 201e compenstion. After fund remaary moderns, AIT needrder to com is also plaology in the

on, AIT setners and fr, parents

AIT Lib

50 million

ion by Pro

-Faculty/Pamber’s Linkeked Corporotal 0.1 mU

gn Total: 9

EKS 31 TE ITS

14, the Boasation of 13the overhaained for lnization incs to raise a

mplete the pnned to ene future.

eks to raisriends, inclof current

brary Mo

Baht (1.5 m

ospects

rents – USed Corporatration CSR USD

9,868,436.2

MILLIO LIBRAR

ard’s Execu33 million Bul cost for ibrary modlusive of aladditional fplanned mosure its ab

se fund of uding all B students,

oderniz

million USD

D500x1,00tions - CSR– Total of 0

27 Baht (19

ON BAHRY MOD

utive CommBaht to be uall infrastru

dernization ll new digitfund of 31 modernizatioility to ada

50 million oard memb major cor

zation C

D)

00 cases (0R USD10,000.8 mUSD

9.73% of g

T (US$ DERNIZ

mittee has used for theucture back is about al equipmemillion Bahn. In additpt to the ra

Baht (1.5 bers, formerporates ow

Campaig

.5 mUSD) 00x10 case

goal)

1 MILLZATION

approved e second phkbones of a13 million

ent is estimht, or approtion, a libraapid chang

million USDer and preswned by a

gn

s (0.1 mUS

Page | 4

LION)

the rest ofhase of thearound 120 Baht. The

mated as 54oximately 1ary reservee of library

D) from allsent facultyalumni and

SD)

4  

f e 0 e 4 1 e y

l y d

Page 5: Modernization of AIT Library - Pronto Marketing · Page | 2 stimulating atmosphere. Thus, it is a good opportunity for the AIT library to be modernized to cater to the 21st century

Page | 5   

WAYS TO DONATE

A. Bank transfers:

US Dollar Account Thai Baht Account

Kasikorn Bank Kasikorn Bank

Account Number: 178-92-0815-4 USD Account Number: 178-2-56209-4

Account Name: Asian Institute of Technology Account Name: Asian Institute of Technology

B. Cheque payable to “ASIAN INSTITUTE OF TECHNOLOGY” and post to

Director of Fundraising Unit Asian Institute of Technology PO Box 4, Klong Luang Pathumthani 12120, Thailand

C. Credit Card

Credit Card Details ⃝ VISA ⃝ MASTER ⃝ AMEX

Name:

Signature

16 Digit Card no.

_ _ _ _ - _ _ _ _ - _ _ _ _ - _ _ _ _

Expiry

_ _ / _ _ (mm/yy)

Secret code _ _ _ _ (for AMEX Donors only)

Please email the scanned copy or photo copy the pay-slip to [email protected] with cc: [email protected]

For more information or request for personal presentation, please contact Mr. Sanjeev Jayasinhe [email protected] Mobile +6681-890-4062 (English), or Khun Chalita Lertwinyu [email protected] Mobile +6681-813-0535 (English/Thai).  

 

 

 

 

Page 6: Modernization of AIT Library - Pronto Marketing · Page | 2 stimulating atmosphere. Thus, it is a good opportunity for the AIT library to be modernized to cater to the 21st century

Page | 6   

AIT LIBRARY MODERNIZATION

ORGANIZATION

AIT Board of Trustees

Subin Pinkayan (Chair)

Sohail Khan (Vice Chair)

Boonsrang Niampradit (Vice Chair)

John Nelson (Vice Chair

Bindu Lohani Kriengsak Chareonwongsak Sahas Bunditkul

Cao Shihai Lutfi Rauf Saida M.Tasneem

Dornath Aryal l Ly Bounkham Shantha Kottegoda

Eat Sophea Malik M. S. Khan Somkit Lertpaithoon

Harsh V. Shringla Manasvi Srisodapol Sumate Yamnoon

Jae Man Jeon Nguyen Tat Thanh Thanin Bumrungsap

Jocelyn Batoon-Garcia Ning Fukui Thierry Viteau

Kamjorn Tatiyakavee Niwes Hemvachiravarakorn Viphandh Roengpithya

Klas Molin Noritada Morita Worsak Kanok-Nukulchai

Kraiwood Kiattikomol Ricardo P. Pama

Honorable Advisers

Alastair M North Madhav P. Ghimire Shigeo Fuji Amod Mani Dixit Mamoru Shibayama Shinichiro Ohgaki

Angus Stuart Nguyen Ngoc Tuyen Shunji Murai Apichart Anukularmphai Paul Nugraha Soe Myint Chainarong Na Lampoon Piyal D. Hennayake Somkuan Watakeekul

Chaovalit Ekabut Pradap Pibulsonggram. Suman P. Sharma Francis J. Devadason Prasong Tharachai Sumate Tanthuwanit

Gajendra Singh Premalal De Silva Sunimal B. Weerasooriya Hiroki Yamaguchi Rafiul Ahad Thao Sokmuny

AIT Hall of Fame

HRH Princess Maha Chakri Sirindhorn

Subin Pinkayan Srisakdi Charmonman Anat Arbhabhirama Tongchat Hongladaromp Ricardo P. Pama Shamsuddin M. Qureshi

Prasert Patramai Shih-Yi G. Chen Yen Yi Tseng Boonsrang Niumpradit Djoko Santoso

Page 7: Modernization of AIT Library - Pronto Marketing · Page | 2 stimulating atmosphere. Thus, it is a good opportunity for the AIT library to be modernized to cater to the 21st century

Page | 7   

Hwa-Wei Lee Ram M. Shrestha Wachchi P. Ranjith Jaruwan Ruangswadipong Ranjith Premalal De Silva Weirong Willie Li

Joseph Paul Sianghio Robert J. Kay Yanyong Phataralaoha Karma Jimba Roger Downer Yoshi Watanabe Kiran Dongol Rukhsana Rahooja Yoshimasa Watanabe

Le Thanh Quyen S.M. Imamul Huq Yuba Raj Bhusal M. Kamal Uddin Sharif Uddin Zachieh Moh

 

 

---------------------------------------------------- 

Library Modernization Steering Committee

Worsak Kanok-Nukulchai (Chair) Sivanappan Kumar Kazuo Yamamoto Kanchana Kanchanasut

Chettiyapan Visvanathan Voratas Kachitvichyanukul Donyaprueth Krairit Jonathan L Shaw Nitin K Tripathi Shawn P Kelly

Rajendra P Shrestha Karma Rana Izel Ann M Dante

Library Modernization Committee

Worsak Kanok-Nukulchai Mukand S.Babel Shawn Patrick Kelly

Izel Ann Mojado-Dante Nguyen Thi Kim Oanh Syed M. Husain Bokhari

Juthathip Jongwanich Pakkamol Dherapongsthada Thanisa Choombala

Manukid Parnichkun Pranee Kiriyanant Thitima Olarikabutr

Mokbul M. Ahmad Sanjeev Jayasinghe Viraphan Samadi

Page 8: Modernization of AIT Library - Pronto Marketing · Page | 2 stimulating atmosphere. Thus, it is a good opportunity for the AIT library to be modernized to cater to the 21st century

08/01/58

2

Page 9: Modernization of AIT Library - Pronto Marketing · Page | 2 stimulating atmosphere. Thus, it is a good opportunity for the AIT library to be modernized to cater to the 21st century

08/01/58

3

Page 10: Modernization of AIT Library - Pronto Marketing · Page | 2 stimulating atmosphere. Thus, it is a good opportunity for the AIT library to be modernized to cater to the 21st century

08/01/58

4

Page 11: Modernization of AIT Library - Pronto Marketing · Page | 2 stimulating atmosphere. Thus, it is a good opportunity for the AIT library to be modernized to cater to the 21st century

"I have reviewed the description of the plan for the new library building and like it very much. The plan is very much in line with the current trend of academic libraries in the most advanced stage. 

Personally, I would like to make a donation toward the reconstruction fund. Hopefully other former faculty and AIT alumni would do likewise for a very important undertaking which is critically needed."

For more information, visit  www.modernlibrary.ait.ac.thContact: Director of FundraisingAsian Institute of Technology PO Box 4 Klong Luang, Pathumthani 12120, ThailandEmail: [email protected] Tel +66(0)2 524 6319