No. NEPRA/R/LAG-86/ 2 3). 8 June 27, 2013
Mr. Wang Yongiang Chief Executive Officer Hydrochina Dawood Power (Pvt.) Ltd. [formerly Dawood Power (Pvt.) Limited] 1900-B Saima Trade Towers,
Chundrigar Road, Karachi-74000
Subject: Modification-II in Generation Licence No. WPGL/05/2006 — Hydrochina Dawood Power (Pvt.) Ltd. [formerly Dawood Power (Pvt.) Ltd.]
Reference: Your letter No. POU/907/12 dated October 05, 2012.
It is intimated that the Authority has approved "Licensee Proposed Modification" in
Generation Licence No. WPGL/05/2006 (issued on December 29, 2006) in respect of M/s
Hydrochina Dawood Power (Pvt.) Ltd. [formerly Dawood Power (Pvt.) Limited] pursuant to
Regulation 10(11) of the NEPRA Licensing (Application & Modification Procedure)
Regulations, 1999.
2. Enclosed please find herewith Modification-II in the Generation Licence No.
WPGL/05/2006, as approved by the Authority. Further, the determination of the Authority in the
matter is also attached. 46-ER REci
Encl:/As above P-11 11 9 REGiSTRAR
Copy to:
1. Chief Executive Officer, Hyderabad Electric Supply Company (HESCO), WAPDA Water Wing Complex, Hussainabad, Hyderabad
2. Director General, Pakistan Environmental Protection Agency, House No. 311, Main Margalla Road, F-11/3, Islamabad.
National Electric Power Regulatory Authority (NEPRA)
Islamabad - Pakistan
MODIFICATION GENERATION LICENCE
WPGL/05/2006
In exercise of the Powers conferred upon the National Electric Power Regulatory Authority (NEPRA) under Section-26 of the Regulation of Generation, Transmission and Distribution of Electric Power Act 1997, the Authority hereby modifies the Generation Licence granted to HYDROCHINA Dawood Power (Pvt.) Limite (formerly Dawood Power (Private) Limited (No. WPGU05/2006 dated December 29, 2006 and expiring on June 29, 2028), to the extent of changes mentioned as here under:-
(i). Name of the Licensee in the Original Face Sheet is changed to HYDROCHINA Dawood Power (Private) Limited;
(ii). The Installed Capacity mentioned on the Face Sheet may be read as 49.50 MW instead of 50.00MW;
(iii). The Expiry Date of the Generation Licence in the Original Face Sheet is changed to June 29, 2034;
(iv). Changes in Articles of the Generation Licence as Revised Articles of Generation Licence;
(v). Changes in Schedule-I attached as Revised Schedule-I; and (vi). Changes in Schedule-II attached as Revised Schedule-II.
This Modification-II is given under my hand this P,71klay of June
Two Thousand & Thirteen
Registrar
Generation Licence Hydrochina Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
Article-1 Definitions
1.1 In this Licence
(a) "Act" means "the Regulation of Generation, Transmission and
Distribution of Electric Power Act, 1997 (XL of 1997)";
(b) "Authority" means "the National Electric Power Regulatory Authority
constituted under section 3 of the Act";
(c) "CPPA" means "the Central Power Purchasing Agency of NTDC" or
any other entity created for the like purpose;
(d) "Licensee" means "Hydrochina Dawood Power (Pvt.) Limited";
(e) "NTDC" means "the National Transmission and Despatch Company";
(f) "Policy" means "the Policy for Development of Renewable Energy for
Power Generation, 2006 of Government of Pakistan" as amended
from time to time;
(g) "Power Purchaser" means "the CPPA of NTDC" purchasing power on
behalf of XW-DISCOs;
(h) "Rules" mean "the National Electric Power Regulatory Authority
Licensing (Generation) Rules, 2000";
(i) "Wind Farm" means "a cluster of wind turbines in the same location
used for production of electric power";
(j) "XW DISCO" means "an Ex-WAPDA t .2 ution e 41 'A any engage 4; 0
Y G , w. REGISTRAR is
-P.
--1,
VC Ai V . --,
in
Page 2 of 7 Modification-II
Generation Licence Hydrochina Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
the distribution of electric power".
1.2 Words and expressions used but not defined herein bear the meaning given
thereto in the Act or in the Rules.
Article-2 Application of Rules
This Licence is issued subject to the provisions of the Rules, as amended
from time to time.
Article-3 Generation Facilities
3.1 The location, size (capacity in MW), technology, interconnection
arrangements, technical limits, technical and functional specifications and other
details specific to the Wind Farm of the Licensee are set out in Schedule-I to this
Licence.
3.2 The net capacity of the Wind Farm of the Licensee is set out in Schedule-II
hereto.
3.3 The Licensee shall provide the final arrangement, technical and financial
specifications and other specific details pertaining to its Wind Farm before its
commissioning.
Article-4 Term of Licence
4.1 The Licence is granted for a term of twenty (20) years after the Commercial
Operation Date (COD).
4.2 Unless suspended or revoked earlier, the Licensee may within ninety (90)
days prior to the expiry of the term of the Licence,
under the National Electric Power Regulatory
enewal of the Licence
(Application and ICLS/ V3::
Page 3 o
ii711 RFGISTRAR \I-c• Modification-II / ''-.,...
21\ )0-1. ■ Lb .,,,T.
',,,z__Al E ;),
R
REUSTRAR
/411
..-1
S.,
•
Page 4 of 7 Modification-II
Generation Licence Hydrochina Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
Modification Procedures) Regulations, 1999 as amended or replaced from time to
time.
Article-5 Licence fee
After the grant of the Generation Licence, the Licensee shall pay to the
Authority the Licence fee, in the amount and manner and at the time set out in the
National Electric Power Regulatory Authority (Fees) Rules, 2002.
Article-6 Tariff
The Licensee shall charge only such tariff which has been determined,
approved or specified by the Authority in terms of Rule-6 of the Rules.
Article-7
Competitive Trading Arrangement
7.1 The Licensee shall participate in such manner as may be directed by the
Authority from time to time for development of a Competitive Trading Arrangement.
The Licensee shall in good faith work towards implementation and operation of the
aforesaid Competitive Trading Arrangement in the manner and time period
specified by the Authority. Provided that, any such participation shall be subject to
any contract entered between the Licensee and another party with the approval of
the Authority.
7.2 Any variation or modification in the above-mentioned contracts for allowing
the parties thereto to participate wholly or partially in the Competitive Trading
Arrangement shall be subject to mutual agreement of the parties thereto and such
terms and conditions as may be approved by the Author y.
Generation Licence Hydrochina Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
Article-8 Maintenance of Records
For the purpose of sub-rule (1) of Rule 19 of the Rules, copies of records
and data shall be retained in standard and electronic form and all such records and
data shall, subject to just claims of confidentiality, be accessible by authorized
officers of the Authority.
Article-9 Compliance with Performance Standards
The Licensee shall comply with the relevant provisions of the National
Electric Power Regulatory Authority Performance (Generation) Rules 2009 as
amended from time to time.
Article-10 Compliance with Environmental Standards
The Licensee shall comply with the environmental standards as may be
prescribed by the relevant competent authority from time to time.
Article-11 Power off take Point and Voltage
The Licensee shall deliver power at the outgoing bus of its 132 KV grid
station. The up-gradation (step up) of generation voltage up to 132 KV will be the
responsibility of the Licensee.
Article-12 Performance Data of Wind Farm
The Licensee shall install monitoring mast with properly calibrated automatic
computerized wind speed recording meters at the same height as that of the wind
turbine generators and a compatible communication/SCADA system both at its
Wind Farm and control room of the Power Purchaw-- ansmission of wind
P (.0
#.' i41/
ii-", EG1STRAR -L.
Modification-II Page 5 of 7
\\.2 :.‘. ills s,.',A 0 aN
:,-"-
Generation Licence Hydrochina Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
speed and power output data to the control room of the Power Purchaser for record
of data.
Article-13 Provision of Information
13.1 The obligation of the Licensee to provide information to the Authority shall be
in accordance with Section 44 of the Act.
13.2 The Licensee shall in addition to 13.1 above, supply information to NTDC
regarding Wind data specific to the Licensee's site and other related information on
a regular basis and in a manner required by NTDC.
13.3 The Licensee shall be subject to such penalties as may be specified in the
relevant rules made by the Authority for failure to furnish such information as may
be required from time to time by the Authority and which is or ought to be or has
been in the control or possession of the Licensee.
Article-14 Emissions Trading /Carbon Credits
The Licensee shall process and obtain emissions/Carbon Credits
expeditiously and credit the proceeds to the Power Purchaser as per prevailing
Policy issued by the Government on the subject.
Article-15 Design & Manufacturing Standards
Wind Turbine Generation system shall be designed, manufactured and tested
according to the latest IEC standards or oth r equivalent standards. All plant and
equipment shall be un-used and brand new.
Generation Licence Hydrochina Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
Article-16 Power Curve
The power curve for the individual Wind Turbine provided by the
manufacturer and as mentioned in this Generation Licence shall form the basis in
determining the cumulative Power Curve of Wind Farm/Complex.
~JER RE
,c7st tSy V.34
GiSTRAR
JU Page 7 of 7
e/ Modification-II
r. pc, IA V
\
Generation Licence HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
SCHEDULE-I (Revised)
Modification-II
The Location, Size (i.e. Capacity in MW), Type of Technology, Interconnection Arrangements, Technical Limits, Technical/Functional Specifications and other details specific to the Generation Facilities of
the Licensee are described in this Schedule.
."--.—€R RE G0
if...v'
to( t.-91 ,,....TRAIR 1C age 1.13 i Rz G t ..., RPM si age 1 of 12 of Schedule-I
Modification-11 ---N \ ::Z,,
\,,,,./..\ 0
\0.\
\'....V l'̀ N i".:--P
Generation Licence HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
Wind Farm Location Map
Page 2 of 12 of Schedule-I Modification-II
BHANBORE SITES
Generation Licence HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
Wind Farm Location (Graphical)
Page 3 of 12 of Schedule-I Modification-II
Note. Survey Datum - Universal Transerve Mercator (JTM)
AREA = 1/24.33 ACRES
05 10 23
I 04 er- 17 ik .1,= 1,‘ 09
16
—J RE-USTRAR
i:Voage 4 of 12 of Schedule-I
NV, Modification-II R./
Generation Licence HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
Wind Farm Location (Tabular)
Border Point North East
1 N24°40'57.90" E67°29'45.48"
2 N24°40'27.54" E67°30'20.76"
3 N24°39'30.48" E67°30'22.08"
4 N24°39'43.68" E67°28'21.72"
5 N24°40'13,26" E67°28'12.18"
Wind Farm Micro-Sitting (Graphical)
Generation Licence HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
Wind Farm Micro-Sitting (Tabular)
Layout Number 1 - 33 WTGs - 1.5MW
UTM WGS84 (Zone 42)
WTG ID X Y VVTG1 346353.82 2728292.82 WTG2 346149.941 2728489.56 WTG3 345883.279 2728736.63 WTG4 345646.403 2728975.82 WTG5 345394.634 2729218.95 WTG6 347486.58 2728144.22 WTG7 347213.531 2728409.91 WTG8 347003.552 2728610.68 WTG9 346751.783 2728853.81 WTG10 346500.014 2729096.94 VVTG11 346248.246 2729340.07 VVTG12 345996.477 2729583.2 VVTG13 348605.29 2728009.21 WTG14 348331.581 2728210.48 VVTG15 348101.752 2728495.47 WTG16 347849.983 2728738.6 VVTG17 347598.214 2728981.73 VVTG18 347346.446 2729224.86 VVTG19 347094.677 2729467.99 VVTG20 346842.908 2729711.12 WTG21 346591.139 2729954.25 WTG22 348703.6 2728859.59 VV1G23 348451.831 2729102.72 WTG24 348200.062 2729345.85 WTG25 347948.293 2729588.98 WTG26 347696.524 2729832.11 WTG27 347444.756 2730075.24 WTG28 347185.501 2730287.26 WTG29 348787.29 2729710.04 VVTG30 348535.52 2729953.17 WTG31 348283.75 2730196.3 WTG32 348030.92 2730438.33 WTG33 347826.87 27AfT1-7-..
------ -',7 $,.._k
/6
ewe
4 REGiSTRAR ),_..1c_,EH':1'
., 1.-
ll ie e 5 of 12 of Schedule-1
Modification-11
Generation Licence HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
Single Line Diagram (Electrical System of the Wind Farm
0.x1,41 F1411 F,....••dr;1,1.-dir 11 - •1y- i
0 AJLII 1:utavmeut ILL I'D
0 — -- ' -'•• ''' " .
-e...
':
i 1
1 0
0 \ ,
••••••• •••• ........, I i l,
#r. , 0 i, 0, 0 .
„,..,...,,.,... •
T kW . • .:...,..,r .. • ,
i
\
0 - .
0
1 0.4 :/ :3*
••1-1 0
' "••• ' ' '-'• • "•" . 1...
i 0 -.• 1. -.■'• • ••• '
.•
E 1 0 ... ,..... •• ...
1 ..
••••• -.. ."- " '-4,.......'.-..„5-..., • .--,..• .,•: nr:•,R
0
El
— ..
4-
D •
—
• v. i...
0
-•-•
0
•-•••••
0 0 0
•-•.-*
0 IZI ilt
o 0
• -•••••
.
t 0 0
. ❑
- . . Yr.cod 11.rd ran SY; , I inr• II•agra
Page 6 of 12 of Schedule-I Modification-II
Generation Licence HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
INTERCONNECTION ARRANGEMENT FOR DISPERSAL OF POWER FROM
THE WIND FARM
The power generated by the Licensee/ HYDROCHINA Dawood Power
(Pvt.) Limited (HDPPL) from its Wind Farm shall be dispersed to the load center at
132 KV voltage level.
(2). The dispersal of power for the proposed wind farm of HDPPL will
consisting of the following:
(a). 132kV D/C from Gharo cluster to Thatta (55 km) using Rail
conductor constructed with the first wind farm in Gharo cluster.
(b). 220/132KV NTDC-Gharo substation at suitable location in Gharo
cluster that may be constructed in stages for 132KV and 220KV
levels depending on the respective quantum of wind power going to
be added in this cluster.
(c). 220/132KV NTDC-Jhampir substation at suitable location in Jhampir
cluster;
(d). A 120KM long 220KV double circuit from NTDC-Gharo to T. M.
Khan Road 220KV in Hyderabad ,looping in-out at NTDC-Jhampir
220KV substation;
(e). HYDROCHINA Dawood Wind Farm would be connected by looping
in-out one circuit of 132 KV double circuit of emanating from
Bhanbore sub cluster of wind farms to Gharo 220/132KV substatio ------------„N
7 4
-- ,..1 /
[1/ 4'-u, / .,..., • (..)/ /
ou REGusTRAR L" 7 of 12 of Schedule-I
Modification-II __%Z
k ig'
L._,/, 4-?"7"— ■
1.6"' ki3k)J>7
Generation Licence HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
The Bhanbore sub cluster will include other wind farms e.g. Zephyr
and Fauji.
(3). The final Interconnection and Transmission Arrangement(s) including
length of line, type of conductor etc. for the dispersal of power, if different from above,
s agreed by HDPPL, NTDC and HESCO* shall be communicated to NEPRA in due
)course of time.
• Hyderabad Electricity Supply Company Limited
' <''—‘f■A6-i-'--.P
04 If /
\
VP ge 8 of 12 of Schedule-I
t;;:
NV
_,,
, O\
T R Firi/5 Modification-II 1
s' "."'>. R./ .
''---:.1.7.....
Janishoro old
ile2, Jl_imFir
I T.C.F
Thalia'
Generation Licence HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
Schematic Diagram for Interconnection/Transmission Arrangement for Dispersal of
Power from HDPPL
Interconnection of 50 MW Dawood Wind Power Plant With Dawood PP, September 2014
Dadu Lakirra
JamshuruNzsv/
Oasimabad-11
KliahOi
NK Hala Road
K_Kt)Ilar
T,B,KII.Jri FM. Czynz N. I-.P.S T .M.K1L3EL
NCVJ Matl i
Sbalch Blarko
B.S. Karim
Suj awa I p.Pattio
F -f
in i
220 kV xf".0,1;_:_t-Ce,
TC"P Proposed 132kV for \VIPs t5i101 ( 0k1V Ai.kN;/ i. Lut
t ....s_\ -e-A,
',,:c..!;•,—.. .,/(t.:,
I ,qend
l 32 kV JuA-
C, hae.
ST R IL\ Page 9 of 12 of Scheduleyli
O Modification!!!
r Planners International
20 4- rI Daxtad skach-IDWG
Da wood Wind Power Plant Electrical &-Id Study
Sketch-3
a M.? Sakro Ladiun
Generation Licence HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
Detail of Generation Facility/
Wind Farmt
(A). General Information
(I
iI\
' Name of Applicant/Company
HYDROCHINA Dawood Power (Pvt.) Limited
(111
ii\
. Registered/Business Office
1900-B, Saima Towers, I.I. Chundrigar. Roa Karachi-74000, Pakistan
(iii) . Plant Location Near Port Qasim, Bhambore, Gharo Creek District Thatta, Sindh
(iv). TFyapceitoyf Generation Wind Power
(B). Wind Farm Capacity & Configuration
t\. ' '
Wind Turbine type, Make & Model
Goldwind Permanent Magnet Direct Drive GW82/1500
(ii). Installed Capacity of Wind Farm (MW)
49.50 MW
(iii). 'ill'
Number of Turbine
Units/Size of each Unit (MW)
33 x 1.50MW
(C). Wind Turbine Details
(a). Wind Turbine
(i). Quantity 33
(ii). Rated Power 1.5MW
(iii). Number of Blades 3 _
1{11ki
t As provided by HYDROCHINA Dawood Power (Pvt.) Limited
ifice( •14/ e 10 of 12 of Schedule-I —1
\ REGISTRAR IL'.1 Modification-II
L.IF_PC3
Generation Licence HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
(iv) Diameter of Blades 82 m
(v). Rotor Swept Area 5390m2
(vi). Cut-in Wind Speed 3m/s
(vii). Rated Wind Speed 11m/s
(viii). Cut-out Wind Speed 22m/s
(ix). Survival Wind Speed 52.5m/s
(x). Hub Height 70m
(xi). Rotational Speed 9-17.3 rad/s
(b). Generator
(i). Generator Capacity 1500 kW
(ii). Power Factor of Generators
0.982
(iii). Rated Voltage 620 V
(c). Compact Pre Fabricated Substation
(i). Quantity 33
(ii). Voltage Level 22kV
(d). 132kV Substation
(i). Main Transformer 2
(ii). Type SZ10-40000/132
(e). WTGs Foundation
(i). Quantity 33
(ii). Type Borehole pile
(iii). Natural Foundation Features
Offshore tidal flats E. '.-
: . c, water at shallow depth from 0.437,, -41.03m - sts of clay and
e 11 of 12 of Schedu
)L.
Modification-II
‘4-
-
Generation Licence HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
fine grained sand.
(f). Compact Pre Fabricated Substation Foundation
(i). Quantity 33 Each
(ii). Type Shallow foundation on natural ground
(iii). Natural Foundation Features
Offshore tidal flats with ground water at shallow depth from 0.43m to 1.03m consists of clay and fine grained sand.
(g). Wind Resource
(i. i
Annual Average Wind Speed
7.05 m/s (70m height)
(ii). Prevailing Winds SW
(iii). Annual Benchmark Energy
130.13GWh
(D). Other Details
Project (i). Commissioning date June 30, 2014
(Anticipated)
Expected Life of the Project from
(ii). Commercial 20 Years Operation date (COD)
Page 12 of 12 of Schedule-I Modification-II
Generation Licence HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
SCHEDULE-II (Revised)
Modification-II
The Total Installed/Gross ISO Capacity (MW), Total Annual Full Load Hours, Average Wind Turbine Generator (WTG) Availability, Total Gross Generation of the Generation Facility/Wind Farm (in GWh), Array & Miscellaneous Losses (GWh), Availability Losses (GWh), Balance of Plant Losses (GWh) and Annual Energy Generation (GWh) of the generation Facility /Wind Farm of Licensee is given in this Schedule
age 1 of 3 of Schedule-II Modification-II
Generation Licence HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
SCHEDULE-11
1. Total Installed Gross ISO Capacity of the Generation Facility /Wind Farm (MW/GWh) 49.5 MW
2. Total Annual Full Load Hours 2629 Hrs
3. Average Wind Turbine Generator (WTG) Availability 95 %
4. Total Gross Generation of the Generation Facility/Wind Farm (in GWh) 158.70 GWh
5. Array & Miscellaneous Losses GWh 6.35GWh
6. Availability Losses GWh 12.7GWh
7. Balance of Plant Losses GWh 9.52GWh
pt 8
Annual Energy Generation (20 year equivalent Net AEP) GWh 130.13GWh
9. Net Capacity Factor 30.01 %
'As provided by HYDROCHINA Dawood Power (Pvt.) Limited
0
1-1-f IC C/ -P.'
ge 2 of 3 of Schedule-II REGiSTRAR Modification-II
‘s•-/ LID 1-rt.
age 3 of 3 of Schedule-II Modification-II
Generation Licence HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore Gharo Creek
District Thatta Sindh
Note
All the above figures are indicative as provided by the Licensee. The Net
energy available to NTDC for dispatch will be determined through procedures
contained in the Energy Purchase Agreement.
National Electric Power Regulatory Authority (NEPRA)
Determination of the Authority In the Matter of Licensee Proposed Modification of
HYDROCHINA Dawood Power (Pvt.) Limited
June 19, 2013 Application No. LAG-86
(A). Background
(i). NEPRA granted a Generation Licence (No. WPGL/05/2006, dated
December 29, 2006) to HYDROCHINA Dawood Power (Pvt.) Limited (HCDPPL) for
its 50.00 MW Wind Farm (WF) proposed to be located at Near Port Qasim-
Bhambore, Gharo Creek, District Thatta in the Province of Sindh.
(ii). The sponsors of the project (i.e. The First Dawood Group) envisaged
installing forty (40x1.25 MW) Suzlon Wind Turbine Generators (WTGs). Despite
hectic efforts of the sponsors, the project could not be implemented. Later on, the
original sponsors (i.e. The First Dawood Group) sold their equity stake in the project
to Hydrochina international Engineering Company Limited (HCI).
(iii). After the acquisition of the project, the new sponsors of the project
decided to implement the project with some other WTG manufacturer/supplier
which required modification in the already granted Generation Licence.
(B). Communication of Licensee Proposed Modification
(i). HCDPPL in accordance with Regulation-10 of the National Electric
Power Regulatory Authority Licensing (Application & Modification Procedure)
Regulations, 1999 (the Regulations), communicated a Licensee Proposed
Modification (LPM) to the Authority oft,O.ctoter 08, 2012.
REGiSTRAR )>1
!Y.ET
(ii). HCDPPL in the "Text of the proposed Modification" & "Reason in
Support of Modification" statements informed that initially the project was envisaged
to be set up by installing Suzlon (1.25 MW) Wind Turbine Generators (WTGs)
however, the plan could not be materialized. Now HCI has acquired 93.33% shares
of the project. The new sponsors now intends to implement the project with
GoldWind (1.50 MW) WTGs.
(iii). Regarding the "Impact on Tariff', HCDPPL submitted that the company
obtained a Cost Plus Tariff vide determination of the Authority No. NEPRA/R/TRF-
111/DPPL-2008/1357-59, dated December 6, 2008. However, now the company is
planning to adopt Upfront Tariff for Wind Power Plants with all the assumptions and
conditions as announced by the Authority vide its determination dated October 6,
2011. About the "Quality of Service (QoS)" and "Performance", HCDPPL submitted
that the proposed modification will have better impact on the QoS and its
performance under the granted Generation Licence.
(C). Processing of LPM
(i). The Authority in Regulatory Meeting (RM-12-663), held on December
04, 2012 considered the communicated LPM of HCDPPL and admitted the same
for further processing. A Notice about the Communicated LPM was published in the
Newspapers of December 07, 2012, seeking comments from general public and
other stakeholders in favor or against the proposed LPM.
(ii). Apart from the notice in the press, separate notices were also sent to
experts, government ministries and representative organizations etc. inviting their
views and comments.
(D). Comments of Stakeholders
(i). In response to the above published notice of LPM in the press and
subsequent correspondences made with other stakeholders, NEPRA received
comments from five (05) stakeholders including Ministry of Water and Power
(MoW&P), Central Power Purchasing Agency (CPPA) of National Transmission and
Desptach Company Limited (taiTD"Olto cents of Karachi Shipyard and
Engineering Works Limited (KSY&EWL), Securities and Exchange Commission of
Pakistan (SECP) and Board of Investment (Bol) of Prime Minister's Secretariat.
(ii). The salient points of the comments offered by the above mentioned
stakeholders are summarized in the following paragraphs: -
(a). MoW&P in its comments submitted that the modification entails
changes in the technical specification of machinery etc. It does
not define a change of name. In such a case, this is to be treated
as a new entity for issue of a new Generation Licence. This
aspect may also be legally checked. Further the proposed
replaced turbine has a reduced net capacity than the already
installed turbine, which also needs to be scrutinized/inspected;
(b). CPPA expressed that due to the change in technology, the
modification is logical and understandable therefore, the same is
supported. HDCPPL did not mention type of WTG, while CPPA
support the Type-III and Type-IV WTG. CPPA would like to
highlight that HDDPL needs to ensure that their proposed plant
duly complies with the provisions of the Grid Code, approved by
NEPRA, as amended in April 2010 for Grid Integration of Wind
Power Plants, already enforced within the National Grid;
(c). KSY&EWL in its comments remarked that it does not have any
comments to offer in support or in position of the proposal;
(d). SECP remarked that the company was registered on December
28, 2004 at Karachi. The authorized share capital of the
Company is Rs. 5,000,000 and the paid up capital is Rs.
5,000,000. The Company is regular in filing of its statutory
returns;
(e). Bol supported the LPM of subject to ensuring of all the codal
(iii). The perspective of HCDPPL on the aforesaid position of CPPA was
sought. In its rejoinder, HCDPPL stated that type-III WTGs would be deployed for
the project which are acceptable to CPPA. Further, HCDPPL also confirmed that
the proposed WTG would fully comply with the Grid Code Criteria. Regarding, the
comments of MoW&P, it was submitted that the legal entity remains the same and
only the name of the legal entity has been changed. Approval for such change was
obtained from SECP. About the issue of the reduction in the capacity of HCDPPL, a
minor reduction of 0.5 MW Gross ISO has taken place due to the change in
technology of the power plant and AEDB & NTDC are in full cognizance of the
same. While recommending HCDPPL for the grant of the upfront wind tariff, AEDB
has also certified to NEPRA that the plant, machinery & turbines are new and of
acceptable quality and internationally certified. In view of the satisfactory response
of the HCDPPL, the Authority considered it appropriate to process the
communicated LPM further.
(E). Approval of LPM
(i). The Economic Growth of any Country is directly linked with the
availability of reliable, secure and cheaper supply of electricity. The existing energy
mix of the country is heavily skewed towards costlier thermal power plants, mainly
operating on imported furnace oil.
(ii). The continuously increasing trend in fuel prices is not only causing
severe pressure on the precious foreign exchange reserves of the country but is
also resulting in higher consumer end prices. In view of this, the Authority considers
it imperative that all the indigenous resources including Renewable Energy (RE),
should be explored and their development is encouraged for achieving sustainable
development.
(iii). In consideration of the above, the Authority had earlier granted a
Generation Licence (No. WPGL/05/2006, dated December 29, 2006) to HCDPPL
for an installed capacity of 50.00 MW, to be implemented with WTGs of Suzlon.
However, the project could not be implemented as sponsors could not finalize the
deal of supply of the WTGs with Suzlon. After the acquisition of the project by HCI,
the new sponsors have decided to ca pe11111?-; roject with new WTG (i.e. Gold
/1-S-111,
Wind /1.50 MW). Alternate Energy Development Board (AEDB), which had issued
the Letter of Intent (Lol) for the project has already given its consent to implement
the project with the proposed WTG technology of Gold Wind.
(iv). In view of the above, the Authority considers that the request of
HCDPPL to implement the project with WTGs of Gold wind is worth considering.
Accordingly, the Authority hereby approves the communicated LPM in the
Generation Licence of HCDPPL. The already granted Generation Licence (No.
WPGU05/2006, dated December 29, 2006) in the name of HCDPPL is hereby
modified. The Face Sheet indicating the required changes alongwith Revised
Schedule-I & II of the Generation Licence are attached as Annexure to this
determination. The grant of such a Licensee Proposed Modification would be
subject to the provisions contained in the NEPRA Act and relevant rules framed
there under.
Authorit
Habibullah Khilji Member
Maj (R) Haroon Rashid Member