East West Gateway Workshop Two - 5/21/14 MoDOT Sales Tax Candidate Project List Breakout #1 - Regional Priority: Medium ID Location Route Project Est. 2019 cost (millions $) Regional Priority Range H7 St. Louis Route D Replace signalized intersections with grade-separated crossings from I-270 to US 67 $105 Med H8 St. Louis City I-44 Interchange modifications at the I-55 interchange $87 Med H9 St. Louis Airport Access Consolidate and improve airport access - Banshee Rd./Scudder/I- 170/Airport/McDonnell $14 Med H10 St. Louis City Route H Corridor improvements from I-270 to Hall Street $15 Med H11 St. Louis I-64 Corridor improvements from Long Road to MO 141 $105 Med H12 St. Louis I-270 Interchange improvements at MO 364 $17 Med H13 St. Louis I-44 Corridor improvements from MO 141 to US 67 $170 Med H14 St. Louis Manchester Rd (Rte.100) Corridor improvements at Baxter/Sulphur Spring Road, Brentwood Blvd, Big Bend Blvd, Hanley Rd $185 Med H15 St. Louis City Route H / Hall St Improvements from East Grand to Riverview Drive to eliminate flooding $24 Med H16 St. Charles MO 94 Upgrade to an expressway from I-70 to Route 364 $200 Med H17 St. Charles I-70 Corridor improvements from Route T/W to I-64 $90 Med H18 St. Louis City Branch St Improvements from I-70 to Mississippi River levee, including sidewalks and bike lanes $5 Med H19 St. Louis Lindbergh tunnel Upgrade IT systems $1 Med H20 St. Louis I-44 Interchange improvements at Shrewsbury $140 Med H21 St. Charles US 61 Corridor improvements from I-64 to Lincoln County $93 Med H22 St. Charles F, T, TT, W, H, J, C, B, Y, V Systematic safety improvements including adding shoulders, widening lanes, correcting curves, adding guardrail, etc. $66 Med H23 St. Louis I-270 Corridor improvements from MO 100 to I- 64 $36 Med H24 Jefferson MO 141 Corridor improvements from Route 21 to Astra Way, including at Ridgewood Middle School Drive and Old Missouri State Road $1 Med H25 St. Louis Laclede Station corridor Corridor improvements, including accommodating bicycles and pedestrians $41 Med H26 Jefferson I-55 Corridor improvements from Route Z to US 67 $104 Med Highways

MoDOT Sales Tax Medium Priority Project List - May 2014

Embed Size (px)

Citation preview

Page 1: MoDOT Sales Tax Medium Priority Project List - May 2014

East West GatewayWorkshop Two - 5/21/14

MoDOT Sales Tax Candidate Project List

Breakout #1 - Regional Priority: Medium

ID Location Route ProjectEst. 2019

cost (millions $)

Regional Priority Range

H7 St. Louis Route DReplace signalized intersections with grade-separated crossings from I-270 to US 67

$105 Med

H8 St. Louis City I-44 Interchange modifications at the I-55 interchange $87 Med

H9 St. Louis Airport Access

Consolidate and improve airport access - Banshee Rd./Scudder/I-170/Airport/McDonnell

$14 Med

H10 St. Louis City Route H Corridor improvements from I-270 to Hall Street $15 Med

H11 St. Louis I-64 Corridor improvements from Long Road to MO 141 $105 Med

H12 St. Louis I-270 Interchange improvements at MO 364 $17 Med

H13 St. Louis I-44 Corridor improvements from MO 141 to US 67 $170 Med

H14 St. Louis ManchesterRd (Rte.100)

Corridor improvements at Baxter/Sulphur Spring Road, Brentwood Blvd, Big Bend Blvd, Hanley Rd

$185 Med

H15 St. Louis City Route H /Hall St

Improvements from East Grand to Riverview Drive to eliminate flooding $24 Med

H16 St. Charles MO 94 Upgrade to an expressway from I-70 to Route 364 $200 Med

H17 St. Charles I-70 Corridor improvements from Route T/W to I-64 $90 Med

H18 St. Louis City Branch StImprovements from I-70 to Mississippi River levee, including sidewalks and bike lanes

$5 Med

H19 St. Louis Lindbergh tunnel Upgrade IT systems $1 Med

H20 St. Louis I-44 Interchange improvements at Shrewsbury $140 Med

H21 St. Charles US 61 Corridor improvements from I-64 to Lincoln County $93 Med

H22 St. CharlesF, T, TT, W, H, J, C, B, Y,

V

Systematic safety improvements including adding shoulders, widening lanes, correcting curves, adding guardrail, etc.

$66 Med

H23 St. Louis I-270Corridor improvements from MO 100 to I-64 $36 Med

H24 Jefferson MO 141

Corridor improvements from Route 21 to Astra Way, including at Ridgewood Middle School Drive and Old Missouri State Road

$1 Med

H25 St. LouisLaclede Station corridor

Corridor improvements, including accommodating bicycles and pedestrians

$41 Med

H26 Jefferson I-55 Corridor improvements from Route Z to US 67 $104 Med

Hig

hway

s

Page 2: MoDOT Sales Tax Medium Priority Project List - May 2014

East West GatewayWorkshop Two - 5/21/14

MoDOT Sales Tax Candidate Project List

Breakout #1 - Regional Priority: Medium

ID Location Route ProjectEst. 2019

cost (millions $)

Regional Priority Range

T8 St. LouisSt. Louis City

New buses and vans for MetroBus and Call-A-Ride $17 annually Med

T9 St. LouisSt. Louis City

Implement traffic signal priority (TSP) for buses and emergency vehicles $2 Med

T10

St. LouisSt. Louis City

FranklinJefferson

St. Charles

Supplement funding shortfall for the Transportation for Elderly Persons and Persons with Disabilities Program (Section 5310 - paratransit)

$3 Med

T11

St. LouisSt. Louis City

FranklinJefferson

St. Charles

Provide operating funds to supplement the Missouri Elderly and Handicapped Transportation Assistance Program (MEHTAP)

$5 Med

T12 St. LouisSt. Louis City Transit Provide operating funds to support

additional Metro transit services$23

Annually Med

T13 St. LouisSt. Louis City

Address service needs including additional frequency and span of service in underserved markets

$5 annually Med

T14 St. LouisSt. Louis City I-55 Build enhanced express bus

infrastructure $23 Med

T15 St. LouisSt. Louis City 64 Build bus rapid transit (BRT) route on I-

64, Chesterfield to Downtown $40 Med

T16 St. Louis City Central corridor streetcar: Central West End to Downtown $290 Med

T17 St. Louis City Construct a Northside - Florissant Valley MetroLink extension $1,050 Med

T18 St. LouisSt. Louis City

Construct the Southside - South County MetroLink extension $1,150 Med

T19 St. LouisSt. Louis City

High Speed Rail from St. Louis to Chicago ? Med

T20 St. LouisSt. Louis City I-44 Build enhanced express bus

infrastructure $23 Med

�������

Page 3: MoDOT Sales Tax Medium Priority Project List - May 2014

East West GatewayWorkshop Two - 5/21/14

MoDOT Sales Tax Candidate Project List

Breakout #1 - Regional Priority: Medium

ID Location Route ProjectEst. 2019

cost (millions $)

Regional Priority Range

B4 St. LouisSt. Louis City

Mississippi River

Greenway

Chouteau Avenue to Lyons Park Trail, Lyons Park to Sugarloaf Mounds Trail, Sugarloaf to Bellerive Park Trail, Bellerive Park to River des Peres Trail, Jefferson Barracks Park to Sylvan Springs Trail, Sylvan Springs to Cliff Cave Park Trail, Cliff Cave to Bee Tree Park Trail

$35 Med

B5 St. Louis City

Grand Center /

Washington Ave

Theresa to Sheldon Concert Hall $2 Med

B6 St. Louis City Tucker Blvd. Improvements including road diet and median enhancement from Washington to Chouteau

$8 Med

B7 St. Louis City City arterials Sidewalk Improvements along city arterials, including ADA compliance $12 Med

B8 St. Louis City 7th and 8th Street Complete from Pine to Spruce $5 Med

B9 St. Louis City Clark St 8th to Broadway $5 Med

B10 St. Louis City Vandeventer Forest Park Parkway to I-44 $20 Med

B11 St. Louis City Natural Bridge Kingshighway to Grand $6 Med

B12 St. Louis City MLK Grand to Kingshighway $6 Med

B13 St. Louis City Goodfellow I-70 to Natural Bridge Road $3 Med

B14 St. Louis City Laclede's Landing

Improvements including traversable streets, ADA compliant sidewalks, park enhancements & pedestrian connections under MLK Bridge, 1st St., 2nd St., Morgan and Laclede's Landing Blvd.

$9 Med

B15 St. Louis City Centennial Greenway Delmar to Creve Coeur Park Trail $35 Med

B16 St. Louis City Chouteau Greenway Midtown Trail Loop $7 Med

B17 St. Louis City / IL

Old Chain of Rocks Bridge

Bridge Restoration $6 Med

B18 St. Louis City N. Grand I-70 to Natural Bridge Road $6 Med

Bik

e/P

ed

Page 4: MoDOT Sales Tax Medium Priority Project List - May 2014

East West GatewayWorkshop Two - 5/21/14

MoDOT Sales Tax Candidate Project List

Breakout #1 - Regional Priority: Medium

ID Location Route ProjectEst. 2019

cost (millions $)

Regional Priority Range

B19 St. Louis City

Chouteau greenway, Cerre St under EB I-64 ramps/vehicular traffic lanes and a cycle track on south side, bike/ped bridge through I-64/70/44 interchanges from Cerre to Arch grounds, Citygarden connection along 10th from Greenway to Market

$3 Med

B20 St. LouisLaclede Station corridor

Provide access to the South County, Shrewsbury Crestwood and Affton areas in Maplewood

$2 Med

B21 St. LouisNew Ballwin / Dougherty

Ferry

Add bike shoulders, improve and add sidewalks and extend pedestrian lights between New Ballwin Road and Kirkwood

$2 Med

B22 St. Louis City Gravois Add bikeway from St. Louis City Limit to Washington Ave. $3 Med

B23 St. Louis Ladue / Clayton Add paved shoulders $4 Med

B24 St. Louis City Confluence Greenway North Riverfront Phase II $17 Med

B25 St. Louis Bridge- Route 66 Route 66 Bridge Restoration $14 Med

B26 St. Louis Connector Trail

O'Fallon and Fairgrounds Parks to Riverfront Trail $8 Med

B27 St. Louis Connector Trail Etzel to St. Vincent County Park Trail $7 Med

B28 St. LouisSt. Louis City

Maline Greenway UMSL to Riverfront Trail $29 Med

B29 St. Louis CityRiver des

Peres Greenway

Forest Park to Francis Slay Park Trail Lansdowne Trail $10 Med

B30 St. Louis Clayton Add paved shoulders $8 Med

M2 St. Louis City Waterways Municipal River Terminal N Dock consolidated improvements $12 Med

M3 St. Louis City RailConstruct new track from N. Market to Biddle St. to better accommodate MO River Runner trains

$8 Med

M4 St. Charles Aviation Rehabilitate runways at St. Charles County SMARTT airport $2 Med

Mul

timod

alB

ike/

Ped