Assessment of Modulus of Rubblized PCCP Using Surface Wave TestingPCCP Using Surface Wave Testing
Nenad GucunskiCivil and Environmental Engineering
Center for Advanced Infrastructure and Transportation (CAIT)
47th Annual Mid-Atlantic Quality Assurance WorkshopAtlantic City, NJ - February 5, 2014
Modulus of Rubblized PCCP
Route I-78 Essex and Union CountiesRoute I-78 Essex and Union Counties
CAIT-ICMP 2
Modulus of Rubblized PCCP Route I-78 Essex and Union Counties
CAIT-ICMP 3
Modulus of Rubblized PCCP Route I-78 Essex and Union Counties
CAIT-ICMP 4
Modulus of Rubblized PCCP
Rehabilitation of PCC PavementsPrevailing strategy in NJ has been hot mix• Prevailing strategy in NJ has been hot mix asphalt (HMA) overlays => Reflective cracking
• Alternatives to HMA overlays• Alternatives to HMA overlays– Crack and seat and overlay
Break and seat and overlay– Break and seat and overlay– Rubblization with HMA overlay
CAIT-ICMP 5
Modulus of Rubblized PCCP
OutlineOutline• Objectives and benefits of rubblizationj• Typically used rubblization procedures
– Multi-head breaker (MHB)( )– Resonant-frequency breaker (RFB)
• Evaluation of rubblized PCCP modulus by surface waves
• Moduli comparisons for rubblized PCCP and other base materials
• Conclusions
CAIT-ICMP 6
Modulus of Rubblized PCCP
Obj i f R bbli iObjective of Rubblization
T li i t fl ti ki i th HMA• To eliminate reflective cracking in the HMA overlay by the total destruction of the existing slab actionslab action– Slab is reduced to small pieces and
diminished to a high strength granular basediminished to a high-strength granular base– Restoration of structural capacity is
accomplished with an HMA overlayaccomplished with an HMA overlay
CAIT-ICMP 7
Modulus of Rubblized PCCP
Why Rubblization?Rubblization is a viable rapid and cost effective• Rubblization is a viable, rapid, and cost-effective rehabilitation method for deteriorated PCC pavementspavements
• Rubblization is cost effective when the amount of patching exceeds approximately 10 percent ofof patching exceeds approximately 10 percent of the project area (NJ)
• Lower risk to the owner and/or contractor– Reduced subgrade exposure to moisture damage
CAIT-ICMP 8
Modulus of Rubblized PCCP
Wh R bbli ti ?Why Rubblization?• Rubblization saves timeRubblization saves time
– Typical rubblization process recycles 1 lane mile per day, with no material hauling
– 4X faster than breaking, excavating, hauling and placing DGA using traditional methods
R bbli ti• Rubblization saves money– Approximately 50% cost savings compared to
reconstruction with PCCreconstruction with PCC– Approximately 33% cost saving compared to
reconstruction with HMA
CAIT-ICMP 9
Modulus of Rubblized PCCP
Why Rubblization?• Environmental Benefits• Environmental Benefits
– Water Consumption: 41% Reduction– Energy Consumption: 44% Reductiongy p– CO2 Emissions: 43% Reduction– NOx Emissions: 26% Reduction– PM10 Emissions: 48% Reduction– SO2 Emissions: 40% Reduction– CO Emissions: 38% Reduction
CAIT-ICMP 10
source: RMRC case study of a NHDOT project
Modulus of Rubblized PCCP
Rubblization Procedures (Equipment)Two types of equipment typically used:Two types of equipment typically used:1. Multi-head breaker (MHB)
R bbli ti th h d f lti l h• Rubblization through drops of multiple hammers on the slab
2 Resonant frequency breaker (RFB)2. Resonant frequency breaker (RFB)• Rubblization through application of high (resonant)
frequency energy to the slab through a shoe
CAIT-ICMP 11
Modulus of Rubblized PCCP
M lti H d B k (MHB)Multi-Head Breaker (MHB)
• A self propelled unit with multiple drop• A self-propelled unit with multiple drop-hammers mounted at the rear of the machine.
• Hammers are set in two rows and strike the• Hammers are set in two rows, and strike the pavement approximately every 5 in.
• 1000 to 1500 lb hammers have variable drop1000 to 1500 lb hammers have variable drop heights and variable cycling speeds.
• Can break pavement up to 13 ft wide in aCan break pavement up to 13 ft wide in a single pass.
CAIT-ICMP 12
Modulus of Rubblized PCCP
M lti H d B k (MHB)Multi-Head Breaker (MHB)
• Production level is approximately 1 lane mile• Production level is approximately 1 lane-mile per day.
• Z pattern steel grid roller a vibratory roller• Z-pattern steel grid roller, a vibratory roller with a grid pattern, must be used in conjunction with the MHB to complete theconjunction with the MHB to complete the breaking process.
CAIT-ICMP 13
Modulus of Rubblized PCCP I-78 MP 57
CAIT-ICMP 14
Modulus of Rubblized PCCP I-78 MP 54
CAIT-ICMP 15
Modulus of Rubblized PCCP
CAIT-ICMP 16I-80 Rubblization
Modulus of Rubblized PCCP
Rubblized PCCP – I-78Rubblized PCCP I 78
CAIT-ICMP 17
Modulus of Rubblized PCCP
Rubblized PCCP – I-78Rubblized PCCP I 78
CAIT-ICMP 18
Modulus of Rubblized PCCP Rubblized PCCP - Route I-78
CAIT-ICMP 19
Modulus of Rubblized PCCP
CAIT-ICMP 20
Modulus of Rubblized PCCP Rubblized and Z-Roller Compacted PCCP I 78PCCP – I-78
CAIT-ICMP 21
Modulus of Rubblized PCCP
CAIT-ICMP 22
Modulus of Rubblized PCCP
CAIT-ICMP 23
Modulus of Rubblized PCCP
Rubblized and Compacted PCCP – I-78
CAIT-ICMP 24
Modulus of Rubblized PCCP
CAIT-ICMP 25
Modulus of Rubblized PCCP Cross Section of Rubblized PCCPI 78I-78
CAIT-ICMP 26
Modulus of Rubblized PCCP Cross Section of Rubblized PCCP – I-78
CAIT-ICMP 27
Modulus of Rubblized PCCP
AC Overlaid
Rubblized PCCP with HMA Overlay
AC Overlaid
CAIT-ICMP 28
Modulus of Rubblized PCCP
Resonant Pavement Breaker (RPB)• High frequency vibrations induce high tensionHigh frequency vibrations induce high tension
in the top of the slab causing the slab to fracture along a number of shear planes.
• Breaking pattern is approximately 8 inches wide, and requires 18 to 20 passes to break a 12 foot wide lane12 foot wide lane.
• Resonant breaker hinders traffic flow because the machine encroaches 3 to 5 feet on the adjacent lane when rubblizing the centerline.
• 20,000 lb wheel load and 40,000 to 60,000 lb eight can damage r bbli ed pa ement
CAIT-ICMP 29
weight can damage rubblized pavement.
Modulus of Rubblized PCCP I – 295 Rubblization
CAIT-ICMP 30
Modulus of Rubblized PCCP Surface of I-295 after Rubblization with RPB
CAIT-ICMP 31
Modulus of Rubblized PCCP
Questions Related to RPCCP ModulusQuestions Related to RPCCP Modulus
• What value of the modulus should be used in• What value of the modulus should be used in the (mechanistic-empirical) pavement design?
• How the modulus compares to moduli of• How the modulus compares to moduli of traditional base materials, especially of dense graded aggregate base?g gg g
• What are the means to measure it?
CAIT-ICMP 32
Modulus of Rubblized PCCP
SASW MethodSASW MethodCoherence h
Phase
Wav
elen
gth
Dep
thDISPERSIONCURVE
SHEARMODULUS
PROFILE
IMPACTSOURCE RECEIVER
ARRAY
1 2 3 4
Phase velocity Shear modulus
1 2 3 4
4S2SSS
DISPLACEMENT DISTRIBUTION FOR A SINGLE FREQUENCY COMPONENT
CAIT-ICMP 33
Modulus of Rubblized PCCP
Ultrasonic Surface Wave MethodUltrasonic Surface Wave MethodCoherence th
Phase
Wav
elen
gt
Dep
thDISPERSIONCURVE
YOUNG'SMODULUS
PROFILE
IMPACTSOURCE
RECEIVERS1 2
Phase velocity Young's modulus
Wavelength consideredless than layer thickness1 2
SS
CAIT-ICMP 34
Modulus of Rubblized PCCP
PSPA E l ti f RPCCP M d lPSPA Evaluation of RPCCP Modulus
CAIT-ICMP 35
Modulus of Rubblized PCCP
Dispersion Curve and ModulusDispersion Curve and Modulus
CAIT-ICMP 36
Modulus of Rubblized PCCP
PSPA Reanalysis (RPCCP)PSPA Reanalysis (RPCCP)
CAIT-ICMP 37
Modulus of Rubblized PCCP
PSPA Reanalysis (RPCCP)PSPA Reanalysis (RPCCP)
CAIT-ICMP 38
Modulus of Rubblized PCCP
RPCCP’s Modulus I 78RPCCP’s Modulus – I-78 30003000
2000
2500
a) 2000
2500
a)
1500
000
dulu
s (M
Pa
Average rubblized PCCP I-781500
000
dulu
s (M
Pa
Average rubblized PCCP I-78
500
1000Mod
500
1000Mod
0
500
5442 5444 5446 5448 5450 5452 5454 5456 5458 5460 5462
Typical dense aggregate (DGA) base
0
500
5442 5444 5446 5448 5450 5452 5454 5456 5458 5460 5462
Typical dense aggregate (DGA) base
CAIT-ICMP 39
5442 5444 5446 5448 5450 5452 5454 5456 5458 5460 5462
Station5442 5444 5446 5448 5450 5452 5454 5456 5458 5460 5462
Station
Modulus of Rubblized PCCP Cross Section of Rubblized PCCP
CAIT-ICMP 40
Modulus of Rubblized PCCP
RPCCP’ M d l I 295RPCCP’s Modulus – I-2952500
Lane 1
2000Lane 3
1500
ulus
(MPa
)
500
1000
Mod
0
500
0 200 400 600 800 1000 1200 1400
CAIT-ICMP 41
0 200 400 600 800 1000 1200 1400
Station
Modulus of Rubblized PCCP
Modulus Distribution for Individual SectionsModulus Distribution for Individual Sections
Distribution of Modulus for Individual Projects Test Sections
35.040.045.050.0
[%]
10.015.020.025.030.0
Freq
uency [
0.05.010.0
<300
01‐600
01‐900
1‐12
00
1‐18
00
1‐24
00
1‐30
00
>300
0
30 60 901
120
180
240
Range of Modulus [MPa]
I‐78 I‐296(MP 17)Lanes 1 & 3 I‐295 (MP 54)
CAIT-ICMP 42
I 78 I 296(MP 17)Lanes 1 & 3 I 295 (MP 54)
Modulus of Rubblized PCCP
Modulus of Various Base MaterialsModulus of Various Base MaterialsType of Base Material Modulus of Elasticity in MPa
G l b 220 950Granular base 220-950
Sandy gravel base 170-230
Limestone base 210-3450
Lime stabilized limestone base 8250-9250
Cement stabilized limestone base 17200-23400
Sandy base 28-48 (4-7)
Rubblized PCCP – surface waves (this study) 331-2740
Rubblized PCCP – FWD (Gulen 2001) 480
Rubblized PCCP – FWD (Thompson 1999) 390-1450 ( p )
Rubblized PCCP – FWD (Galal 1999) 620-2400
Rubblized PCCP – FWD (Scullion 2006) 830-11450
Rubblized PCCP FWD (Crovetti 2006) 1380
CAIT-ICMP
Rubblized PCCP – FWD (Crovetti 2006) 1380
Rubblized PCCP – FWD (Von Quintus 2007) 240-820 43
Modulus of Rubblized PCCP
C l iConclusions• Elastic modulus of rubblized PCCP can be
efficiently evaluated using seismic testing.• Modulus is evaluated from the average g
velocity of surface waves (USW method).• Seismic modulus is a low strain modulus,
reductions should be made to describe it as resilient modulus.
• Modulus of RPCCP is higher than modulus of typical granular bases, but lower than modulus of lime or cement stabilized bases
CAIT-ICMP 44
of lime or cement stabilized bases.
Modulus of Rubblized PCCP
C l iConclusions
• Modulus of rubblized PCCP varied between• Modulus of rubblized PCCP varied between 550 and 2800 MPa (80 and 400 ksi), with an average value between 1030 and 1500 MPa g(150 and 217 ksi) for all sections tested.
• Other studies based on FWD evaluation of paved RPCC suggest a modulus between 240 and 11500 MPa (35-1660 ksi).