2
MOHAMMAD HASAN Registered as Electrical technician Address : Damascus city , Syria Phone:+963936249588 E-mail:[email protected] Qualificatio n More than six years of extensive Combine Cycle Power Plant operation experience in Deir ali 1 ( TXP program control ) Three years gas turbine operation experience in Deir ali 2 (symphony_harmony program control ) Gas Turbine / Steam Turbine / Water Treatment operation experience. One year instrument calibration of major plant equipment - Gas Turbine (MATKAV94.3A GAS TURBINE )in Deir ali 2 Processing of Permit and Lock-out and Tag-out to Work Systems. Career summary July 2006: University of Damascus–Graduated technical of Science electrical January - February 2008: SIEMENS Power Generation, Saarbrucken, Germany – CCPP Power Systems Training January 2009 - confirm the successful in the extended operation training about steam turbine in GANDAR station January – April 2013 : training instrument calibration of major plant equipment Gas Turbine by MATKA company (in Syria) skill Proficient in Microsoft Office 2007–Word, Excel, Power Point and AUTO CAD.

moh

Embed Size (px)

Citation preview

Page 1: moh

MOHAMMAD HASAN

Registered as Electrical technician

Address : Damascus city , Syria

Phone:+963936249588

E-mail:[email protected]

Qualification

More than six years of extensive Combine Cycle Power Plant operation experience in Deir ali 1 ( TXP program control )

Three years gas turbine operation experience in Deir ali 2 (symphony_harmony program control )

Gas Turbine / Steam Turbine / Water Treatment operation experience.

One year instrument calibration of major plant equipment - Gas Turbine (MATKAV94.3A GAS TURBINE )in Deir ali 2

Processing of Permit and Lock-out and Tag-out to Work Systems.

Career summary

July 2006: University of Damascus–Graduated technical of Science electrical

January - February 2008: SIEMENS Power Generation, Saarbrucken, Germany – CCPP Power Systems Training

January 2009 - confirm the successful in the extended operation training about steam turbine in GANDAR station

January – April 2013 : training instrument calibration of major plant equipment Gas Turbine by MATKA company (in Syria)

skill Proficient in Microsoft Office 2007–Word, Excel, Power Point and AUTO CAD.

Personal information

Nationality : Palestinian Male,30 yrs old 12\09\1985 date of birth Married

Page 2: moh