Mohammad Alauddin Deputy Secretary Power Division Ministry of Power, Energy & Mineral Resources Govt. of the People’s Republic of Bangladesh [email protected] December 19, 2013

Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur

Mohammad AlauddinDeputy Secretary

Power Division

Ministry of Power, Energy & Mineral Resources

Govt. of the People’s Republic of [email protected]

December 19, 2013

Page 2: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur

December 19, 2013

Total area of about 147,570 sq. km

Between 20°34΄ & 26°38΄ North

Latitude 88°01΄ & 92°41΄ East

Longitude

Population of 153.6 million with a

growth rate of 1.37% [2011]

GDP per capita US$ 838 (FY 2012-13 )

GDP Growth Rate 6.03

Source : Bangladesh Economic Review 2013.

Page 3: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur

Power Sector: At a Glance

3

Installed Capacity (MW) 10213

Electricity Growth 9% (FY-2013);12 % (FY-2012)

Max. Generation (MW) 6,675[12 July 13]

Total Consumers (Million) 14.2

Transmission Lines (ckt km) 9, 300

Distribution Lines (km) 2,90,000

Per Capita Generation (kWh) 321

Access to Electricity 62%[including 7% RE]

Source : Bangladesh Power Development Board[BPDB]

Page 4: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur

Present Generation Capacity (November’13)

4

S

L

Source Installed Generation Capacity (MW) Sector

1. BPDB 4186 Public

58%

2. APSCL 777

3. EGCB 622

4. NWPGCL 300

5. RPCL 77

Subtotal 5,962

1. IPPs 1655 Private

42%2. 15 YR. Rental 167

3. 3/5 YR. Rental 1929

4. Power Import 500

Subtotal 4,251

Total 10,213

Source : BPDB

Page 5: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur

December 19, 2013

88

3

68

1

1,0

31

1,2

02

1,2

56

1,3

87

1,5

38

1,8

17

2,0

16

2,2

36

2,5

29

2,8

85

3,2

61

3,7

68

4,3

02

4,5

60

5,3

08

6,2

14

6,7

59

7,3

45

7,8

57

8,4

50

8,7

46

9,2

95

10

,26

6

10

,90

1

11

,24

3

12

,19

4

13

,63

8

14

,73

9

16

,25

5

17

,44

5

18

,45

8

20

,30

2

21

,40

8

22

,97

8

23

,26

8

24

,94

6

26

,53

3

29

,24

7

31

,35

5

35

,11

8

38

,22

9

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,0001

97

0-7

1

19

72

-7

3

19

74

-7

5

19

76

-7

7

19

78

-7

9

19

80

-8

1

19

82

-8

3

19

84

-8

5

19

86

-8

7

19

88

-8

9

19

90

-9

1

19

92

-9

3

19

94

-9

5

19

96

-9

7

19

98

-9

9

20

00

-0

1

20

02

-0

3

20

04

-0

5

20

06

-0

7

20

08

-0

9

20

10

-1

1

20

12

-1

3

Net Energy Generation in GWh

Net Generation in Bangladesh

Source : BPDB

Page 6: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur

c

10,000MW

20,000MW

30,000MW

2010

Gas82%

Oil 9%

Coal 5%

Installed Capacity 7300 MW

2021

Gas55%

Installed Capacity 24000 MW

Coal 20%

Others 15%

Oil 10%

Source: Power Sector Master Plan[PSMP] 2010

2030

Installed Capacity38,700 MW

Coal50%

Oil 10%

Others 15%

“Others” including

Renewable Energy

Gas25%

Page 7: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur

Sl. No. Sources

Capacity(MW)

Probable Location (s)

1Domestic Coal Imported Coal

11,250 8,400

North West Region at Mine MouthChittagong and Khulna

2Domestic Gas/LNG

8,850Gas -Near Load Centers

LNG- Near Coastal Area

3 Nuclear 4,000 Rooppur

4 Regional Grid 3,500

Bahrampur - Bheramara, Silchar -Fenchuganj, Purnia-Bogra-Bongaigaon, Myanmar - Chittagong

5Others (Oil, Hydro & Renewable)

2,700Near Load Centers

Total 38,700

Primary Fuel Sources by 2030

Source: PSMP 2010

Page 8: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur

Fuel Diversity & Sustainable Supply of Fuel

Private Sector Participation

Harnessing Renewable Energy Resources

Demand Side Management (DSM) & Energy

Efficiency Improvement Program

Regional Co-operation on Cross Border Power Trade

December 19, 2013

Page 9: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur

FENCHUGANJ

SILCHARFENCHUGANJ

BHERAMARA

BAHARAMPUR

BAHARAMPURBHERAMARA

PURNEABARAPUKURIA

Possible Regional Grid Interconnection

MYANMARCHITTAGONG

BONGAIGAONBARAPUKURIA

500MW [2013-]

500MW [2018-]

Page 10: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur

MoU on 11.01.2010 for co-operation in power sector.

Grid Connectivity

Exchange of Power

Joint Technical Team proposed an interconnection

between Bheramara & Baharampur. Establishment of

400 KV, 100 km double circuit line & back-to-back

HVDC station at Bheramara.

10

Bangladesh-India Grid Interconnection

Page 11: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur

December 19, 2013

Page 12: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur

Main Components (BD part)

i) 27.35 km 400 kV double circuit transmission line

ii) 400 kV Back-to-Back HVDC station at Bheramara

iii) 4.5 km LILO of double circuit Ishurdi-Khulna

230kV line at Bheramara.

Main Components (Indian part)

i) 73.5 km 400 kV double circuit transmission line

ii) 400 kV switching station at Baharampur.

December 19, 2013

Page 13: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur

Project Cost (BD part)

i) F. E = Tk 910.71 Crore[111.06 Million USD] (ADB)

ii) L. C = Tk 669.12 Crore (GoB+PGCB)

Total =Tk 1,579.83 Crore

Project Cost (Indian part)

Total = Rs 160.32 Crore

December 19, 2013

Page 14: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur

400 kV Transmission Line (BD Part)

Contract Signed : 30-Dec-2010

Contractor : Cobra, Spain

Consultant : PGCIL, India

Target of Completion : May, 2013

Actual Completion : 30th June, 2013

Line Energization : 30th August, 2013

December 19, 2013

Page 15: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur

Back-to-Back HVDC Station

Contract Signed : March 29, 2011

Target of Completion : July, 2013

Test Power Flow : September 27, 2013

Inauguration : October 5, 2013

COD for 175 MW : October 5, 2013

COD for 500 MW: December 4, 2013

December 19, 2013

Page 16: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur

PPA 1 : 250 MW (25 yrs. with delivery starting 2013)

NVVN (NTPC trading arm) signed a PPA with BPDB

in February 28, 2012.

Round the clock power supply.

Power allocation by GoI from discretionary share of

NTPC projects.

Tariff at regulated rate + trading margin + wheeling

costs

16

PPA

Page 17: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur

PPA 2 : 250 MW (3 yrs. with delivery starting in 2013)

PTC India Ltd. signed a PPA with BPDB in

November 14, 2013.

Round the clock power supply.

Tariff= Non-escalable capacity charge + Non-

escalable energy charge

17

PPA

Page 18: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur

Expand energy development beyond boundaries.

Link potential sources to markets.

Facilitate investment to serve a regional market

Lower operational costs & improve the supply mix.

Address demand supply imbalance & improve

reliability of supply

Eventually contributes towards development of an

Asian “energy highway.”

Page 19: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur