Upload
mohd-ghazi
View
10
Download
0
Embed Size (px)
Citation preview
Mohd Ghazi (Mechanical Engineer) Project/Design/Planning/Analysis (HVAC/MEP/FIRE)
Industry Type: Oil and Gas/Power/EPC/Energy/Constructions
Email: [email protected] +966545512679 (Saudi Arabia) +919711698030 (India)
Objective: To be at a leading position in company of repute where my contribution to the company is appreciated, technical
cum managerial skill is utilized in challenging assignment, while bringing up personal and professional development.
Career Summary 8+ years of experience in Design, planning, Execution, Testing and Commissioning strategies. Design, Planning, Execution, Monitoring, Control, Testing Commissioning and Handover
For Residential and Commercial projects HVAC Systems, Cooling & Heat Load Estimation/Calculations, Design Of Ventilation & Air Distribution, Design Of Chilled Water System, Duct Sizing Calculation, Chilled/Hot Water Pipe Layouts, Pressure drop calculations, Pump head calculation, Static Pressure Calculation, HVAC Survey, AHU, Duct, Pump and Chillers Sizing & Selection, Detailing and installation of (chillers, AHU’S, PU’S, FCU’S, CU’S). Fire Fighting Systems, Water Distribution System, Exhaust Fans, Smoke Purging Fans, Fire Alarm and Detection System, FM200 Fire Suppression system, CO2 Fire Suppression system, Package Unit, HVAC Panels, DDC Panel, HVAC package units,
Sufficiently Handling of Multiple Subcontractors of MEP (Fire Fighting, HVAC, Civil and Low Voltage) throughout the project from Initiation to finalization, Ensures Contractor’s compliance with Quality Assurance and EHS procedures, Evaluation of Contractor’s Payments application certificates.
Review, Analysis and Approval:-HVAC system design, HVAC Materials, CO2 & FM200 fire suppression System, Fire Alarm detection & control system, Plumbing and drainage Systems, FF & FA System Materials, OHTC, Telecom Shelters, HVAC Electric Duct heater, Indoor Lighting, Submersible and Oil Pumps,
Detail Project Engineering, planning & overall monitoring of execution of all electromechanical work. Monitor the progress of the work against the approved contractor schedule of works, Prepare work procedure and execution sequence for all critical activities Coordinate with site personnel during execution of work Material, Manpower and equipment planning for daily work activities Preparation and Continues Monitoring of KPIs, forecast s_curves, daily weekly and monthly work plans, preparation of detailed scheduling, fixing target for major quantities
Visited consultants & clients for conducting techno-commercial meetings, Coordinating schedule & progress review meeting with clients and weekly progress presentations, Preparation of Progress reports, Interaction and compliance of client & consult ant requirements, Technical Bids, Evaluations and Technical Specifications
Knowledge of various international codes like ASHRAE, SMACNA, NFPA, ISHRAE, ASME, ASMT, IS, BIS, IPC, AWWA, TESP(NG)
Testing and commissioning of all the mechanical/electrical equipment and sign off the relevant documents for acceptance.
Certificate of Completion Design Planning Procedure, Design Controls Integrated, Design Procurement and Field Operation, Designer Time Guidelines, Managing a Project Schedule, Project Risk Management, PMACS Project Management, PMO Project Planning, Supplier Relationships.
Excellent working experience with Ms-Office, Autocad, Catia, HAP, Elite, MSP, Primavera, LEED.
Company Position Client Projects Name JD GE Grid Solution (SAU)- Madina (Saudi Arabia) Jan 2016 To till
Project Professional (MEP)
Saudi Electricity
Company OR
National Grid
380KV SUBSTATIONS:- AlSalam (Madina), Al-Madaya 110 KV S/S SUBSTATIONS:- KEC1, KEC2, Tiyam-2, Al-Bayda-2, Uhad, Al-Balad, Al-Bawadi, Al-Barakka, Al-Tuwal, AL-Bida Ext. 132KV S/S:- 8166, 8172, 8068, 8608, 8222, 8130, Jizan, Sabiya, Addard, Baish Addarb, Namerah, Majarda, Albirk JP Green City, JIIT at Noida, Leisure Valley, KRM University
Al-Othaim Mall, Al-Sadhan Mall, KFS, FTTH, VDSL Survey, DC Power Batteries Replacement, RDNE Replacement of Data network Equipment’s, CFDED’s complete fundamental engineering detailed design (Civil, Electrical and Mechanical).
Design, Execution, testing, Commissioning and Handover
Alstom Grid (SAR)- Madina (Saudi Arabia) Aug 2014 To Dec 2015
MEP Design And Execution
MTMM-Mohammad Turki MOTT MACDONALD Engineering Consultant- Jeddah Oct 2013 To July 2014
MEP Design Analyst
Design Analysis, Approval & Rectifications (MEP)
Vikas Associates Pvt Ltd- Noida (India) June 2011 To Oct 2013
MEP Engineer JP Green Developer
HVAC & MEP (Design & Installation)
Bazy Trading and Contracting Co. Ltd- Riyadh (Saudi Arabia) Jan 2009 To April 2011
HVAC Engineer STC, Mobily Zain and Saudi Aramco Oil
HVAC & MEP (Design & Installation)
Crown Plaza Today Hotel (IHG Group)- Gurgaon (India) Jul 2008 To Jan 2009
HVAC Maintenance Engineer
International Hotel Group
HVAC Maintenance
Degree Curriculum Project Information Computer Skills Project title (Major): Design and Selection of Air Conditioning Description of the project: We Design and Selection of Air Conditioning system of VRV type as per as the requirements of the all Classrooms of mechanical Engineering department of Jamia Millia Islamia University at New Delhi. Project title (Minor): Estimation and Costing of Air Conditioning Description of the project: We did the Estimation and Costing for Air Conditioning for all Class Rooms of Mechanical Engineering of Jamia Millia Islamia University at New Delhi 110025
Worked On Ms-Project Planning, P6, HAP and Risk Project Management. Good Knowledge of MS OFFICE (Word, Excels, Power Point, Access and Outlook etc) Good knowledge of AUTOCAD, CATIA and PROE etc. Good knowledge of computer Hardware’s, Troubleshooting and Designing software’s. Excellently working with all OS (Win XP (98 to 2007), Vista,Win 7/8 /10 and Intranet & Networking
Industrial Visits and Professional TrainingsAttended two months summer training in Mother Son Sumi Pvt Ltd, Noida in 2007 (INDIA).Attended Safety Orientation Program organized by Saudi Aramco Oil (Saudi Arabia) Work Permit receiver from Saudi Aramco Oil 2011. Certificate of Completion (Spirit and Letter Basic: Overview/Induction Training, Controllership, Improper Payments, Conflict of Interest, Supplier Relationships, Competition Law, Fair Employment Practice, Working with government) In 2016. GE Certificate of Completion (E-Learning High Risk Activity, E-Ethics, EHS Fundamental, Introduction to Open Reporting) in 2015 from Alstom University.
PERSONAL DETAILS Educational Qualifications
B Tech (Mechanical) from Jamia Millia Islamia University (INDIA) in 2008 with 1st division.
10th and 12th from Jamia Senior Secondary School (Jamia Millia Islamia-New delhi) in 2001 & 2003.
DOB
01/02/1987
Strength & SkillsHardworking, regularity and punctuality are the keys to success. Ready to accept any challenges and very enthusiastic to solve a problem, Quick grasping and retaining new updates, information and procedure. Excellent competency in English language & PC skills. Ability to work under stress Possess team spirit with pleasant manner to develop & maintain good working relationship. Easily relocate to any location and Ambitious to achieve career goals. Good in interpersonal, presentation, analytical skills and team leading
Father’s name Mohd Mohiuddin
Marital status Unmarried
Sex Male
Religious Islam
Driving license (LMV)
India and Saudi Arabia
Passport Data J1120893 Valid Till 28-02-2020.
Availability within 01-Month
Hobbies Plantation and listening Music
LANGUAGES English Arabic Urdu/Hindi Extra-Curriculum Achievement ROCK CLIMBING certificate received from National Adventure Council (India). Flag hoisting certificate, Gold Medal, and “A” certificate received from NCC in 2001. Listening Music and Reading Scripture and Culture.
Read Excellent Excellent Excellent
Speak Excellent Initial Excellent
Write Excellent Initial Excellent
Using 15 years 06 Years 23 years
DeclarationI Mohd Ghazi clarify that all the information mentioned above is Correct as per as my knowledge.
Date: - 18th December 2016
Place: - New Delhi (India) Signature:-
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Advanced International Trade Compliance (ITC) Overview English Completed on 9/17/2016
_____________________________________________________________
Page 1 of 1SumTotal
9/17/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=18...
GHAZI, MOHD
has successfully completed the online course module for
Confined & Permit Space Entry Authorized
Date of issue: 21 November 2016
This is to certify that
Chapter
Page 1 of 1Confined & Permit Space Entry Authorized
11/21/2016http://content.mylearning.ge.com/TemplateV2/course.html?CRSE=CSAI&CHAP=1&LAN...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
CONFINED SPACE AUTHORIZED INITIAL Completed on 11/21/2016
_____________________________________________________________
Page 1 of 1SumTotal
11/24/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=1...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
GEHC_GQP_10.01.002 Design Controls Integrated Design Planning (DOC0505542 Rev4)
Completed on 12/9/2016
_____________________________________________________________
Page 1 of 1SumTotal
12/10/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=1...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
OEC PR11014 Design Planning Procedure, Rev9 Completed on 12/9/2016
_____________________________________________________________
Page 1 of 1SumTotal
12/10/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=1...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Constructability 4- Design, Procurement and Field Operation Phases (1)
Completed on 12/9/2016
_____________________________________________________________
Page 1 of 1SumTotal
12/10/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=1...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Designer Time Guidelines Completed on 12/6/2016
_____________________________________________________________
Page 1 of 1SumTotal
12/6/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=35...
5/2/2015 Certificate
https://alstom.adobeconnect.com/_a847585302/ehsfundamentalsen/default/content/resources/certificate.html 1/1
Mohd Ghazi
ALSTOM EHS Fundamentals
5/2/2015
GHAZI, MOHD
has successfully completed the online course module for
Fall Protection – Competent Person
Date of issue: 21 November 2016
This is to certify that
Chapter
Page 1 of 1Fall Protection – Competent Person
11/21/2016http://content.mylearning.ge.com/TemplateV2/course.html?CRSE=FPCP&CHAP=1&LAN...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Fall Protection Competent Person Completed on 11/21/2016
_____________________________________________________________
Page 1 of 1SumTotal
11/24/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=3...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
08.118 HPI DCAR PMACS Project Management Completed on 12/6/2016
_____________________________________________________________
Page 1 of 1SumTotal
12/10/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=6...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Introduction to Open Reporting Completed on 1/25/2016
_____________________________________________________________
Page 1 of 1SumTotal
7/18/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=18188...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
LOCKOUT/TAGOUT AUTHORIZED Completed on 11/20/2016
_____________________________________________________________
Page 1 of 1SumTotal
11/24/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=1...
GHAZI, MOHD
has successfully completed the online course module for
Lockout/Tagout Authorized
Date of issue: 20 November 2016
This is to certify that
Chapter
Page 1 of 1Lockout/Tagout Authorized
11/20/2016http://content.mylearning.ge.com/TemplateV2/course.html?CRSE=LOTO&CHAP=1&LA...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Nuclear CP-19-116 Project Risk Management Completed on 12/7/2016
_____________________________________________________________
Page 1 of 1SumTotal
12/10/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=3...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Nuclear NSAI-20-04 Work Planning Completed on 12/6/2016
_____________________________________________________________
Page 1 of 1SumTotal
12/10/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=3...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Nuclear Read Acknowledgement Completed on 12/7/2016
_____________________________________________________________
Page 1 of 1SumTotal
12/10/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=1...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Spirit and Letter Basic: Conflict of Interest Completed on 11/13/2016
_____________________________________________________________
Page 1 of 1SumTotal
11/13/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=8...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Spirit & Letter Annual Acknowledgement – New Hires Completed on 1/25/2016
_____________________________________________________________
Page 1 of 1SumTotal
7/18/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=17297...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Spirit & Letter Annual Acknowledgement Completed on 1/25/2016
_____________________________________________________________
Page 1 of 1SumTotal
7/18/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=16949...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Spirit and Letter Basic: Conflict of Interest Completed on 8/1/2016
_____________________________________________________________
Page 1 of 1SumTotal
8/1/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=821...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Spirit and Letter Basic: Controllership Completed on 7/18/2016
_____________________________________________________________
Page 1 of 1SumTotal
7/18/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=12202...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Spirit and Letter Basic: Improper Payments Completed on 3/27/2016
_____________________________________________________________
Page 1 of 1SumTotal
3/27/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=82183...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Spirit and Letter Basic: Improper Payments Completed on 3/27/2016
_____________________________________________________________
Page 1 of 1SumTotal
7/18/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=82749...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Spirit and Letter Basic: Overview/Induction Training Completed on 12/19/2015
_____________________________________________________________
Page 1 of 1SumTotal
7/18/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=49194...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Spirit and Letter Basic: Supplier Relationships Completed on 7/18/2016
_____________________________________________________________
Page 1 of 1SumTotal
7/18/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=12185...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Spirit and Letter Basic: Competition Law Completed on 6/20/2016
_____________________________________________________________
Page 1 of 1SumTotal
7/18/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=82185...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Spirit and Letter Basic: Improper Payments Completed on 3/27/2016
_____________________________________________________________
Page 1 of 1SumTotal
3/27/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=82749...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Spirit and Letter Basic: Fair Employment Practices Completed on 8/1/2016
_____________________________________________________________
Page 1 of 1SumTotal
8/1/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=121...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Managing a Project Schedule Pre Exam Completed on 12/6/2016
_____________________________________________________________
Page 1 of 1SumTotal
12/6/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=21...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Planning Screens SCM Completed on 12/6/2016
_____________________________________________________________
Page 1 of 1SumTotal
12/10/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=2...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
08.118 HPI DCAR PMACS Project Management Completed on 12/6/2016
_____________________________________________________________
Page 1 of 1SumTotal
12/6/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=66...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
PMO Project Planning Completed on 12/9/2016
_____________________________________________________________
Page 1 of 1SumTotal
12/10/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=2...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
Quality QMS and QP13 Acknowledgement Completed on 12/6/2016
_____________________________________________________________
Page 1 of 1SumTotal
12/6/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=35...
Certificate of Completion
This certifies that
Mohd Ghazi
has successfully completed
01.081_ Wipro GE Pest Control Process_ DOC1536102 Completed on 8/1/2016
_____________________________________________________________
Page 1 of 1SumTotal
8/1/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=163...