1
Exclusive Wedge-Lok ® Seal Florestone Saflor Shower Receptors come with an integral drain molded into the receptor, eliminating the need for a separate drain. The exclusive seal is easily installed without special tools. No caulking, no mess, no places to leak. Drain will also accept conventional lead joint. 2" I.P .S. Wedge-Lok ® Seal fits plastic and steel only. For copper waste, specify Josam Jiffy-Joint™ or equal. For cast iron, Josam Jiffy-Joint™ or equal may be required because of OD variance. Specify for copper or cast iron pipe. Molded Receptors Installation Instructions Florestone Saflor ® Molded Receptors Installation Instructions Bottom 2851 Falcon Drive • Madera, CA 93637 T. 559.661.4171 T. 800.446.8827 F. 559.661.2070 florestone.com Water Resistant Backing Finished Wall Covering Sub-Floor 5" dia., 2¼" recess in sub-floor 2" I.P.S., pipe pojects 1½" above sub-floor 1" 5½" 2⅞" 3½" 4¾" READ BEFORE INSTALLATION Improper Installation May Result In Damage To Receptor Ensure that Receptor is installed by licensed professional 1 Integral drain requires minimum 5" diameter by 2 ¼" deep recess in sub-floor for adequate clearance. 2 Sub-floor MUST be flat and level and free of movement and squeaks. Fix any movement and squeaks prior to installation of receptor. 3 Set shower receptor on sub-floor level right to left and front to back. Bottom of ALL receptor ribs must make contact with sub-floor. IF LEVELING SUB-FLOOR IS REQUIRED, use a mortar mix. Apply an appropriate layer of mortar to level the sub-floor surface. Set the receptor in the fresh mortar. Level the receptor right to left and front to back with downward pressure into the mortar (BOTTOM OF ALL RECEPTOR RIBS MUST MAKE CONTACT WITH MORTAR) using a minimum 24" level. Allow mortar to harden before further steps. 4 Install Wedge-Lok seal. Use soapy water to lubricate seal and pipe. 5 Use large head nail or screw directly above tiling flange to secure in place. Do not nail or screw directly into flange as it may cause cracking. 6 Water test receptor for proper drainage upon connection of waste pipe prior to installing walls.

Molded Receptors Installation Instructions Molded Receptors ......Exclusive Wedge-Lok® SealFlorestone Saflor Shower Receptors come with an integral drain molded into the receptor,

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

  • Exclusive Wedge-Lok® Seal

    Florestone Saflor Shower Receptors come with an integral

    drain molded into the receptor, eliminating the need for a

    separate drain. The exclusive seal is easily installed without

    special tools. No caulking, no mess, no places to leak. Drain

    will also accept conventional lead joint.

    2" I.P.S. Wedge-Lok® Seal fits plastic and steel only. For

    copper waste, specify Josam Jiffy-Joint™ or equal. For

    cast iron, Josam Jiffy-Joint™ or equal may be required

    because of OD variance. Specify for copper or cast iron pipe.

    Mold

    ed

    Re

    ce

    pto

    rs I

    nsta

    lla

    tion

    In

    str

    ucti

    on

    s Florestone Saflor®Molded ReceptorsInstallation Instructions

    Bottom

    2851 Falcon Drive • Madera, CA 93637

    T. 559.661.4171 • T. 800.446.8827

    F. 559.661.2070 • florestone.com

    Water Resistant Backing

    Finished Wall Covering

    Sub-Floor

    5" dia., 2¼" recess in sub-�oor2" I.P.S., pipe pojects1½" above sub-�oor

    1"5½"

    2⅞"

    3½"4¾"

    READ BEFORE INSTALLATIONImproper Installation May Result In Damage To ReceptorEnsure that Receptor is installed by licensed professional

    1 Integral drain requires minimum 5" diameter by 2 ¼" deep recess in sub-floor for adequate clearance. 2 Sub-floor MUST be flat and level and free of movement and squeaks. Fix any movement and squeaks prior to installation of receptor.

    3 Set shower receptor on sub-floor level right to left and front to back. Bottom of ALL receptor ribs must make contact with sub-floor.

    IF LEVELING SUB-FLOOR IS REQUIRED, use a mortar mix. Apply an appropriate layer of mortar to level the sub-floor surface. Set the receptor in the fresh mortar. Level the receptor right to left and front to back with downward pressure into the mortar (BOTTOM OF ALL RECEPTOR RIBS MUST MAKE CONTACT WITH MORTAR) using a minimum 24" level. Allow mortar to harden before further steps.

    4 Install Wedge-Lok seal. Use soapy water to lubricate seal and pipe.

    5 Use large head nail or screw directly above tiling flange to secure in place. Do not nail or screw directly into flange as it may cause cracking.

    6 Water test receptor for proper drainage upon connection of waste pipe prior to installing walls.