ICAO-European Union Joint Assistance Project
CCO-CDO Projects Mombasa, Kenya
12 - 14 December 2018
Didier Moukalan
Key Results in the Caribbean
Agenda
Project Informations 1
Summary of Progress 2
Next Steps 4
CCO-CDO Benefits 3
Key Results in the Caribbean
Project Informations
States Action Plans Approval letters from States
MoU signed between ICAO & ASECNA Working missions - ASECNA Headquarters Dakar
CO2 Emissions Reduction Expected
Key Results in the Caribbean
Project Informations CCO and CDO operations allow arriving or departing aircraft to descend or climb continuously, to the greatest extent possible.
1. Continue Descend Operations aircraft employ minimum engine thrust, ideally in a low drag configuration, prior to the final approach fix
2. Continue Climb Operations
aircraft employ optimum climb engine thrust and climb speeds until reaching
their cruising levels.
Key Results in the Caribbean
CCO-CDO Benefits
ATM
Reduction in both flight crew and ATC workload through design of procedures requiring less ATC intervention
Reduced climb and descent restrictions
ENVIRONMENT
Fuel burn reduced
Reduction of CO2 emissions
Potential aircraft noise mitigation
Without any adverse effect on safety
(see ICAO Doc 9993 and ICAO Doc 9931)
Key Results in the Caribbean
Next Steps
JUL JUN MAY MAR APR
Validation, approval and publication phases
Validation
Approval
Publication & evaluation
Phase 2 Phase 3
ATC Training
AUG
Implementation
MAR FEB JAN NOV DEC
Validation, approval & publication phases
Validation
Approval
Publication & evaluation
Phase 2 Phase 3
ATC Training OUA
APR
Implementation
Workplan Revised
Old Workplan