Background of Project

Description of Project

Introduction of Each Package

Message

Background of Project

North – South longitudinal arterial in the country as the most important transport infrastructure of the national economy

An integral part of international gateway – “East-West Corridor” connecting Thailand through Laos to Danang Port and Dung Quat Industrial Zone

Important role of National Highway No. 1

Background of Project The Haivan pass section of the

National Highway No. 1

Background of Project Traffic on Haivan pass

Results of Origin-Destination Survey during July 2002

Ho Chi Minh

Hanoi

20 % of traffic volumes are between Ho Chi Minh City - Hanoi

Danang

Hue 30 % of traffic volumes are between Danang - Hue

Description of Project

Begins at Km. 894+000 near Lang Co Town (Thua Thien–Hue Province)

Ends at Km. 914+450 just north of Danang City

Runs across the Haivan Pass peak at with an elevation of 475m, with a distance of 20.45 km

Haivan Pass section is a very low standard highway. In spite of many efforts of Vietnamese government on upgrading this section, it is still a dangerous highway to drive and many lives lost each year in accidents on this section

The Haivan pass section of the National Highway No. 1

Description of Project

Estimated Total Amount: USD 143,375,000

Implementation Program: Design stage: July 1998 – July 1999Tendering stage: June 1999 – presentConstruction stage: October 2000 – April 2005

Design Standards: TCVN (Vietnam), JHPC (Japan) and AASHTO-1994 (USA)

Design Life: Permanent

Design Speed: 80 km/h

Design Load: H30 – XB80

Construction Contract Packages: 9 packages

Project Outline

Description of Project

Financing Agency:Japan Bank for International Cooperation (JBIC) L/A No. VNIV-5, March 26, 1997, Loan Amount JPY 5.5 billion L/A No. VNVI-5, March 30, 1999, Loan Amount JPY 10.0 billion L/A No. VNIX-4, March 29, 2002, Loan Amount JPY 3.359 billion

Executing Agency:Ministry of Transport and Communication (MOT)Represented by Project Management Unit 85 (PMU85)

ConsultantJoint Venture of Nippon Koei Co., Ltd (Japan) and Louis Berger International Inc.

(USA) In association with Transport Engineering Design Incorporation (TEDI) Vietnam

Organization Structure

Description of Project

1. Total Project Length: 12,182 m2. Number of Traffic Lanes: 2 lanes 3. Tunnel Construction:Main Tunnel: 6,274m long, 2 lanes (3.75m wide/each) , 89.0 m2

Evacuation Tunnel: 6,286m long, 15.5 m2

Ventilation Adit: 1895m long, 36.2 m2

4. Bridge Construction: 8 bridges, 1,653 in total length5. Highway Construction: 4,273m in total length

Major Features

Description of Project Contract Packages

Name Title ContractorAmount

(1000 USD)Period

(month)

Construction Services 14 724

PKIA

North Tunnel Section JV Hazama – Cienco 6 43 256 48

PKIB North Tunnel Section JV Dong Ah – Song Da 27 863 48

PKIIA Lang Co Bridge SectionJV Thang Long – Truong Son 4 633 30

PKIIB Southern Highway SectionJV Cienco 1 – Lung Lo – Vinawaco 3 920 30

PKIII Electrical WorksJO of ABB – Kinden – Vinainco 20 686 26

PKIV Mechanical WorksMatsushita – Itochu Consortium 23 055 32

PKV110/22kV Substation and 110kV Transmission Line

JO of ABB – Kinden – Vinainco 7 256 18

PKVIProcurement of Maintenance Vehicles 2 000

PKVIIInfrastructure Development in the Resettlement Areas

Construction Company No. 185 413 08

TOTAL 133 082

Description of Project Implementation Program

Tunnel Civil 1A

Works 1B

Road and 2A

Bridge Works 2B

Package I I :

Package I :

2005

Package VI I :Infrastructure Development in the

1998

Consulting Services

Package I I I : Electrical Works

Package IV: Mechanical WorksPackage V: 110/22kV Substation and 110kV Trans. LinePackage VI :Procurement of Maintenance Vehicles

200420031999 2000 2001 2002

Description of Project Location of Contract Packages

Package IA – North Tunnel Section

North Tunnel Portal

Package IA – North Tunnel Section

Front Cut Away Section

Package IA – North Tunnel Section

Cut Away Section

Package IA – North Tunnel Section

Name of Contractor: Hazama (Japan) – Cienco 6 (Vietnam) Joint Venture

Contract Amount: US$ 43,256,000

Contract Period: 48 months (10/2000 – 10/2004)

Contract Chronicle:

Contract Signing Date: August 17, 2000

Notice of Proceed: September 01, 2000

Commencement of Works: October 01, 2000

Location: Sta. 1+515 to Sta. 5+500

Contract Data and Chronicle

Package IA – North Tunnel Section

Package IA – North Tunnel Section

A 3,857m long 2-lane main tunnel with 73.26 m2 cross-section

A 3,857m long evacuation tunnel with 15.47 m2 cross-section parallel to the mail tunnel

Two (02) vehicular cross-passageways with 15.47 m2

cross-section, and seven (07) pedestrian cross-passageways with 8.12 m2 cross-section

A 1,810m long tunnel ventilation adit with 36.20 m2

cross-section

Two 153 meters long each, by-pass type electrostatic precipitator tunnels (north & central) with 57.69m2 cross-section

A 128 meters 2-lane tunnel approach

A 403 meters long access road to adit building

A 80m2, one-story substation structure (building only)

A north tunnel portal plaza and a ventilation adit portal plaza

Scope of Work

Package IB – South Tunnel Section

South Tunnel Portal Area

Package IB – South Tunnel Section

Front Cut Away Section

Package IB – South Tunnel Section

South Tunnel Portal

Package IB – South Tunnel Section

Name of Contractor: Dong Ah (Korea) – Song Da (Vietnam) Joint Venture

Contract Amount: US$ 27,863,000

Contract Period: 48 months (10/2000 – 10/2004)

Contract Chronicle:

Contract Signing Date: August 17, 2000

Notice of Proceed: September 01, 2000

Commencement of Works: October 01, 2000

Location: Sta. 5+500 to Sta. 8+125

Contract Data and Chronicle

Package IB – South Tunnel Section

Package IB – South Tunnel Section

A 2,417 meters long 2-lane main tunnel with 73.26m2 cross-section

A 2,429m long evacuation tunnel with 15.47 m2 cross-section parallel to the mail tunnel

Two (02) vehicular cross-passageways with 15.47 m2

cross-section, and four (04) pedestrian cross-passageways with 8.12 m2 cross-section

A 153 meters long by-pass type electrostatic precipitator tunnels (south) with 57.69m2 cross-section

A 208 meters 2-lane tunnel approach

A 817 meters long access road to high water reservoir

A 1,400m2, one-story, vehicular maintenance building

A south tunnel portal plaza

A 58.45 meters long, 2-lane, 2-span post-tensioned girder bridge

Scope of Work

Package IIA – Lang Co Bridge Section

Lang Co Bridge Area

Package IIA – Lang Co Bridge Section

Lang Co Bridge

Package IIA – Lang Co Bridge Section

Name of Contractor: Thang Long – Truong Son Joint Venture

Contract Amount: US$ 4,633,000

Contract Period: 30 months (07/2001 – 12/2003)

Contract Chronicle:

Contract Signing Date: May 03, 2001

Notice of Proceed: June 01, 2001

Commencement of Works: July 01,2001

Location: Sta. –1+8650 to Sta. 1+515

Contract Data and Chronicle

Package IIA – Lang Co Bridge Section

Lang Co Bridge, 876.390 meters total length;

Two lane roadway, 782.610 meters total length

A northern toll plaza; and

Construction of 187m2 area enclosed car port

Scope of Work

Package IIB – Southern Highway Section

General View of Construction Site

Package IIB – Southern Highway Section

Bridge in Design

Package IIB – Southern Highway Section

Bridge in Design

Package IIB – Southern Highway Section

Name of Contractor: Cienco 1 – Lung Lo - Vinawaco Joint Venture

Contract Amount: US$ 3,920,000

Contract Period: 32 months (07/2001 – 03/2004)

Contract Chronicle:

Contract Signing Date: May 28, 2001

Notice of Proceed: June 26, 2001

Commencement of Works: July 26,2001

Location: Sta. 8+125 to Sta. 12+047

Contract Data and Chronicle

Package IIB – Southern Highway Section

Scope of Work

Six bridges, totaling 959.390 meters length; in which

Bridge No. 2 : 334m

Bridge No. 3 : 33 m

Bridge No. 4 : 175 m

Bridge No. 5 : 133 m

Bridge No. 6 : 150 m

Bridge No. 7 : 133 m

Two lane roadway, totaling 2963.067 meters length

A southern toll plaza

Package III – Electrical Works

Medium Voltage Switchboard

Package III – Electrical Works

SCADA System

Package III – Electrical Works

RTU used for Power Distribution Monitoring System

Package III – Electrical Works

Name of Contractor: JO of ABB – Kinden - VINAINCO

Contract Amount: US$ 20,686,000

Contract Period: 26 months (02/2003 – 04/2005)

Contract Chronicle:

Pre-bid Conference: April 18, 2001

Bid Opening Date: June 26, 2001

Bid Evaluation: June 27 – July 11, 2001

Contract Data and Chronicle

Package III – Electrical Works

Scope of Work

Electrical Systems : Medium Voltage System

MV/LV Substations

MV Power Distribution Lines Low Voltage Switchboards

Low Voltage Switchboards

LV Power Distribution Lines

Interior Tunnel Lighting System

Exterior (Road and Area) Lighting System

Power Supply for the Ventilation and Water Supply Systems CCTV System Lighting Control System Fire Alarm and Detection System Telecom System Traffic Control System Radio Rebroadcast System Tunnel Power Distribution Monitoring and Control System Main Supervised Control and Data Acquisition (SCADA) System

Package IV – Mechanical Works

Ventilation System

Package IV – Mechanical Works

Jet Fans for Tunnel Ventilation

Package IV – Mechanical Works

Motor Control Center of Ventilation System

Package IV – Mechanical Works

Name of Contractor: Matsushita – Itochu Consortium

Contract Amount: US$ 23,055,000

Contract Period: 36 months (03/2002 – 03/2005)

Contract Chronicle:

Contract Signing Date: January 18, 2002

Notice of Proceed: February 12, 2002

Commencement of Works: March 12, 2002

Commencement of Works: November 01, 2002

Contract Data and Chronicle

Package IV – Mechanical Works

Scope of Work

Water Supply and Treatment System consisting of

Water catchment and pre-treatment system

Pump station and treatment system

High water reservoir

Fire suppression pipe with hydrans

Tunnel Ventilation System consisting of

Three (03)sets of electrostatic precipitator

Two (02)sets of air supply fans and exhaust fans

Thirty-two (32) sets of jet fans

Ventilation control system

Ventilation building

Package V – 110/22kV Substation and 110kV Transmission Line

Power Transformer

Package V – 110/22kV Substation and 110kV Transmission Line

GIS 110 KV, 2500 KA – 40 MA

Package V – 110/22kV Substation and 110kV Transmission Line

Diesel Generator 1000 KW

Package V – 110/22kV Substation and 110kV Transmission Line

Name of Contractor: Joint Operation of ABB – Kinden - Vinainco

Contract Amount: US$ 7,256,000

Contract Period: 18 months (12/2001 – 06/2003)

Contract Chronicle:

Contract Signing Date: September 15, 2001

Notice of Proceed: October 18, 2001

Commencement of Works: December 21, 2001

Contract Data and Chronicle

Package V – 110/22kV Substation and 110kV Transmission Line

Scope of Work

Construction of 110/22 KV indoor substation and tunnel control system

Design, manufacture, install, erect and commission a 110/22KV Gas Insulated Switchgear (GIS) substation and substation control center

Design, manufacture, install, erect and commission a 110 Transmission Line

Package VI – Procurement of Maintenance Vehicles

Aerial Platform Truck

Package VI – Procurement of Maintenance Vehicles

Road Sweeper

Package VI – Procurement of Maintenance Vehicles

Water Sprinkler Truck

Package VI – Procurement of Maintenance Vehicles

Contract Data and Scope of Work

Contract Amount: US$ 2,000,000 (estimated)

The equipment and vehicles to be supplied

1. Tunnel Superintendent Staff Car : 03 units

2. Patrol Car : 02 units

3. Road Maintenance Vehicle (Van Type) : 02 units

4. Road Maintenance Vehicle (Station Wagon Type) : 01 unit

5. Water Sprinkler Truck : 01 unit

6. Road Sweeper : 01 unit

7. Vacuum Cleaner with High Pressure Washer : 01 unit

8. Sign Truck : 01 unit

9. Lift Truck : 01 unit

10. Aerial Platform Truck : 01 unit

11. Multi Service Vehicle with Side Wall Cleaning Attachment : 01 unit

12. Cargo Truck with 3-ton Crane : 01 unit

13. Wrecker Truck : 01 unit

14. Ambulance Car (Van Type) : 01 unit

15. Fire Fighting Car (Pickup Truck Type) : 01 unit

16. Workshop Equipment and Tools : 01 lot

Package VII – Infrastructure of Resettlement Area

Construction of Drainage System – November 2001

Package VII – Infrastructure of Resettlement Area

Construction of Embankment – November 2001

Package VII – Infrastructure of Resettlement Area

Construction of Treatment Reservoir – November 2001

Package VII – Infrastructure of Resettlement Area

Name of Contractor: Construction Company No. 185

Contract Amount: US$ 413,000

Contract Period: 8 months (09/2001 – 04/2002)

Contract Chronicle:

Contract Signing Date: June 09, 2001

Notice of Proceed: August 01, 2001

Commencement of Works: August 31, 2001

Issuance of Taking-over Certificate: April 29, 2002

Contract Data and Chronicle

Package VII – Infrastructure of Resettlement Area

Scope of Work

Construction of Internal Road

Construction of Embankment

Construction of Water Supply System

Construction of Drainage System

Construction of Electricity System

Construction of Treatment Reservoir

Construction of Kindergarten

ConclusionConclusion

This Presentation is made for purpose to give out a basic

introduction of Haivan Pass Tunnel Construction Project

Hoping that this Presentation will be of some help toward better

implementation of the Project

Homepage of Project: http://haivan.cup.com