2
To: Montgomery College Community From: Dr. Tonya R. Mason, Collegewide Dean of Student Success and Rockville Student Affairs Subject: Update on the Counseling and Advising Bldg (CB), Rockville Campus Date: December 10, 2018 As you may recall, the Counseling and Advising Building at the Rockville Campus experienced significant damage this summer due to repeated water intrusion. As a result, the departments located on the first floor of the building: Disability Support Services, Public Safety, and the Maryland Veterans Administration Representative moved to alternate locations during the summer. See the table below. Regarding departments on the second floor, Student Employment Services relocated to the South Campus Instruction Building on November 9, 2018. The Counseling and Advising Department will begin the moving process on Wednesday, December 12, 2018. The Department will be closed December 12 th – 14 th to complete the move and will resume operations on Monday, December 17, 2018 in the Mannakee Building, Suite 220. See the table below for specific details on each office’s new location. Once the Counseling and Advising Building (CB) has been vacated it will remain closed to the public. DEPARTMENT NEW LOCATION RELOCATION DATE & NOTES Counseling & Advising Mannakee (MK), Suite 220 Closed Wednesday, December 12 - 14, 2018 Reopen in MK Building, Suite 220 on Monday, December 17, 2018 at 8:30am Disability Support Services (DSS) Main Office and Counselors DSS Assistive Technology Mannakee (MK), Suite 210 Mannakee (MK), Suite 315E Relocated Summer 2018 Relocated Summer 2018 1

Montgomery College€¦ · Web view1 2 To: Montgomery College Community From: Dr. Tonya R. Mason, Collegewide Dean of Student Success and Rockville Student Affairs Subject: Update

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Montgomery College€¦ · Web view1 2 To: Montgomery College Community From: Dr. Tonya R. Mason, Collegewide Dean of Student Success and Rockville Student Affairs Subject: Update

To: Montgomery College Community

From: Dr. Tonya R. Mason, Collegewide Dean of Student Success and Rockville Student Affairs

Subject: Update on the Counseling and Advising Bldg (CB), Rockville Campus

Date: December 10, 2018

As you may recall, the Counseling and Advising Building at the Rockville Campus experienced significant damage this summer due to repeated water intrusion. As a result, the departments located on the first floor of the building: Disability Support Services, Public Safety, and the Maryland Veterans Administration Representative moved to alternate locations during the summer. See the table below.

Regarding departments on the second floor, Student Employment Services relocated to the South Campus Instruction Building on November 9, 2018. The Counseling and Advising Department will begin the moving process on Wednesday, December 12, 2018. The Department will be closed December 12th

– 14th to complete the move and will resume operations on Monday, December 17, 2018 in the Mannakee Building, Suite 220. See the table below for specific details on each office’s new location.

Once the Counseling and Advising Building (CB) has been vacated it will remain closed to the public.

DEPARTMENT NEW LOCATION RELOCATION DATE & NOTES

Counseling & Advising Mannakee (MK), Suite 220 Closed Wednesday, December 12 - 14, 2018

Reopen in MK Building, Suite 220 on Monday, December 17, 2018 at 8:30am

Disability Support Services (DSS) Main Office and Counselors

DSS Assistive Technology

Mannakee (MK), Suite 210

Mannakee (MK), Suite 315E

Relocated Summer 2018

Relocated Summer 2018

1

Page 2: Montgomery College€¦ · Web view1 2 To: Montgomery College Community From: Dr. Tonya R. Mason, Collegewide Dean of Student Success and Rockville Student Affairs Subject: Update

DSS Academic Support Center

Science Center West (SW), Suite 124 (Within the Ackerman STEM Learning Center)

Relocated Summer 2018

Student Employment Services

South Campus Instruction Building (SB), Suite 008

Relocated November 9, 2018

MDVA (VA Disability Claims)

Mannakee (MK), Suite 251 Relocated Summer 2018

Public Safety Mannakee (MK), Suite 125 Relocated Summer 2018

Mannakee Parking/Transportation: The Mannakee Building is a short 3-5 minute walk from the Counseling and Advising Building (CB). A path to Mannakee Street is accessible from the right side of South Campus Instruction Building (SB). Limited parking is available in the Mannakee Building parking lot. Ample parking is available for students and employees in Lot 13 across the street from the Mannakee Building. The MC Shuttle also stops at the front of the Mannakee Building.

Publicity/Signage: Signage will be posted in strategic locations on the Rockville Campus and on the Montgomery College website. A directory indicating the new locations of all units will also be posted on the entrances to CB.

New Rockville Student Services Building: Once the New Rockville Student Services Building opens in January 2020 (projected date of completion), the displaced Student Affairs departments will move to their final permanent locations.

2