MORE WATERMORE WATERPhase I ReconnaissancePhase I Reconnaissance
ReportReport
C. Mel Lytle, Ph.D.C. Mel Lytle, Ph.D.
Water Resource CoordinatorWater Resource CoordinatorSan Joaquin County Public WorksSan Joaquin County Public Works
Board of Directors UpdateBoard of Directors UpdateFebruary 24, 2004February 24, 2004
Mokelumne River Water & Power Authority
Project HistoryProject History Water Right & FERC Filing 1990Water Right & FERC Filing 1990
Water and hydropower from Mokelumne Water and hydropower from Mokelumne
River – Middle Bar DamRiver – Middle Bar Dam
““Last chance from the Mokelumne”Last chance from the Mokelumne”
Delays due to Regional & State Issues Delays due to Regional & State Issues
Local Cost Share – County, Stockton & Local Cost Share – County, Stockton &
LodiLodi
Phase I Agreement with HDR, Inc. -April Phase I Agreement with HDR, Inc. -April
20032003
Pardee Reservoir
Mokelumne River Water & Power Authority
Regional Location MapRegional Location Map
Middle Bar Reservoir
Stanislaus County
San Joaquin County
Calaveras County
Sacramento County
Amador CountyDee
r Cre
ek
Calaveras River
Califo rnia Aqueduct
Mid Main Canal
North Fork Cosumnes RiverMiddle Fork Cosumnes River
Mormon Slough
Del Puerto Creek
Mokelumne River
Lone Tree Creek
San Joaquin River
Dry Creek
South Fork Dry Creek
Tu
r lo
ck M
ain
Ca n
al
Little Jo
hns
Ri ve
r
Stanislaus R iver
Ro
c k C
ree
k
Mokelu
mne Aqueduc
t
Main CanalD
el P
uerto
Cre
ek
Main
Can
al
Delta Mendota Canal
Hetch Hetchy Aqueduct
Lak e T ab ea ud
Duck Creek Reservoir
Lower River Diversion
Mokelumne River Water & Power Authority
Phase I Reconnaissance Phase I Reconnaissance StudyStudy
Establish Purpose and Need
Screen Project Alternatives
Determine Federal Lead Agency
Identify Agency Concerns
Establish an Environmental Strategy
Duck Creek Site
Mokelumne River Water & Power Authority
Purpose and NeedPurpose and Need
An element in fulfilling the An element in fulfilling the
mission of the Countywide mission of the Countywide
Water Management PlanWater Management Plan
To provide reliable water To provide reliable water
suppliessupplies
To sustain current and future To sustain current and future
economic, social and economic, social and
environmental viabilityenvironmental viability
Mokelumne River Water & Power Authority
Project AlternativesProject Alternatives Approx. 15 Alternatives ReviewedApprox. 15 Alternatives Reviewed
Weight 0 3 3 1 2 1 5
ALTERNATIVE Co
st
pe
r a
cre
-fo
ot
Re
gu
lato
ry
Fe
as
ibil
ity
Po
liti
ca
l F
ea
sib
ilit
y
Fin
an
cia
l F
ea
sib
ilit
y
En
vir
on
men
tal
Fe
as
ibil
ity
Wa
ter
Qu
ali
ty
Be
ne
fits
A
ch
iev
ed
Sc
ore
Re
lati
ve
Ra
nk
ing
Duck Creek Dam and Reservoir Construction - Pardee Reservoir Diversion
H M M H M H H 37 1
Duck Creek Dam and Reservoir Construction – Camanche Reservoir Diversion
H M M H M H H 37 2
Lower Mokelumne River Diversion-Non-Structural L H H H H H L 35 3
Lower Mokelumne River Diversions-Structural L M H M M H M 34 4
Mokelumne River Storage System Reoperation L H M M H H L 31 5
New Hogan Reservoir Diversion with South Gulch Dam and Reservoir Construction
H L M M M H M 29 6
Pardee Dam and Reservoir Replacement/Enlargement
M L L M L H H 28 7
Mokelumne River Water & Power Authority
Duck Creek – Camanche Duck Creek – Camanche DiversionDiversion
Mokelumne River Water & Power Authority
Duck Creek – Pardee Duck Creek – Pardee DiversionDiversion
Mokelumne River Water & Power Authority
Duck Creek Reservoir Duck Creek Reservoir DiversionDiversion
1,000 cfs diversion or 650 million gallons per day
Mokelumne River Water & Power Authority
Duck Creek Dam & Duck Creek Dam & ReservoirReservoir
150,000 acre foot capacity
6 megawatt power capacity
Mokelumne River Water & Power Authority
Lower River DiversionLower River Diversion
Mokelumne River Water & Power Authority
Project EconomicsProject EconomicsDuck Creek Dam and Reservoir Construction
Camanche Reservoir Diversion Pardee Reservoir Diversion
Lower Mokelumne Diversion - Structural
No Hydropower Impacts
Hydropower Impacts
No Hydropower Impacts
Hydropower Impacts
Annual project yield (acre-feet)
49,200 82,300 90,300 82,300 90,300
Annual cost per acre-foot*
$150 $213 $196 $156 $147
Other Countywide Projects:
acre feet/year Cost/acre foot
City of Lodi 6,000 $200
City of Stockton 28,000 $350 (treated)
SEWD Farmington 35,000 $130
SJC - Freeport 44,000 $130 - $320
Mokelumne River Water & Power Authority
Countywide Water Countywide Water ProjectsProjects
Tier I
New Melones Rights
New Hogan Reoperation
Farmington
SSJID/OID Transfer
South County Water Supply
Stockton Delta Diversion
Urban Conservation
Tier II
NSJWCD GW Recharge
Agricultural Conservation
Freeport
Wastewater Reclamation
Mokelumne River
Tier III
South Gulch
American River
Stockton Delta Diversion
SJC Freeport Interconnect
MORE WATER
SEWD Farmington Program
NSJ - GW Recharge
SSJID/OID Transfers
South County Water Supply
Urban Conservation
Potential Potential ProjectsProjects
Feasibility Feasibility PhasePhase
Design/Pilot Design/Pilot PhasePhase
Implementation Implementation PhasePhase
Mokelumne River Water & Power Authority
Regulatory Agency Regulatory Agency ConcernsConcerns
Difficult to address common
elements
Difficult to write a valid
purpose and need
High potential for legal
challenges and delay tactics
Difficult to pass regulatory
permitting phase
Could add time and cost
• EBMUD
• CCWD
• State Water Contractors
• CALFED ISI
• Mokelumne River Association
• Corps
• DF&G
• USFWS
• USEPA
• NOAA Fisheries Mokelumne River Water & Power Authority
Project Development Project Development StrategyStrategy
Phase IIPhase II Engineering & Environ. Prepare Engineering Feasibility Study in parallel with Refined
Water Management Plan
Prepare Program EIR on Water Management Plan
Prepare Project-Specific EIR/EIS
Phase IIIPhase III Engineering & Design
Phase IV Permitting & Construction
Mokelumne River Water & Power Authority
Project ScheduleProject Schedule
Mokelumne River Water & Power Authority
Questions?Questions?
Mokelumne River Water & Power Authority