29
Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

Embed Size (px)

Citation preview

Page 1: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

Mossel Bay Local Municipality

Informal Settlement Upgrading Strategy

Page 2: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

PROJECT PURPOSE

Page 3: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

PROJECT PURPOSE

Page 4: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

INFORMAL SETTLEMENTS

SETTLEMENT NAME Current number of households

Asla Park A 435

Asla Park B 115

Asla Park C 60

Asla Park D 105

Asla Park E 15

Emfuleni 185

Gentswana A 30

Gentswana B 50

Gentswana C 60

PA Camp 25

Sewendelaan 90

Sinethemba 250

Thembani Street 90

Transit Camp 25

Toseplaas 15

Wolwedans A 10

Wolwedans B 30

Brandwacht 15

Page 5: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

METHODOLOGY

Page 6: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

METHODOLOGY

STEP 1: PROJECT INITIATION Inception meeting Study goal and objectives Desktop study of relevant secondary data Implementation plan

STEP 3: RAPID ASSESSMENT AND CATEGORISATION

Consultation with community structures per informal settlement Consultation with relevant municipal & provincial departments Profile assessments of each informal settlement Categorisation & prioritisation: High, short-term, medium, etc.

STEP 2: REFERENCE G

ROU

P CON

SULTA

TION

Constant review and feedback from

NU

SP and Mossel Bay project steering com

mitt

ee

Base maps & locality

maps

Settlement assessments & categorisation

Preliminary prioritisation

STEP 4: UPGRADING STRATEGY & PROGRAMME Contextualise municipality Informal settlement features 3-year informal settlement response plan Institutional arrangements & mechanisms Risks, assumptions, and mitigation actions Medium term expenditure framework Monitoring and evaluation framework

STEP 5: CLOSE OUT REPORT Outputs of listed activities Key decisions and relevant aspects/issues Lessons learnt NUSP recommendations

Identification of informal settlements

Page 7: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

DATA COLLECTION

Page 8: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

PROCESS

Page 9: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

• Settlement pattern, conditions and topography• Top structures and settlement density• Infrastructure services

– Water– Sewerage– Power– Roads

• Community facilities/social services– Education and health care– Government– Recreational and social

• Commercial facilities and public transport network• Physical vulnerabilities and threats

SETTLEMENT SURVEYING

Page 10: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

• Focus group meetings successfully completed during week of 7-11 April

• Discussion topics– Settlement history– Settlement growth and migration patterns– Economy and livelihoods– Community initiatives and projects– Vulnerabilities– Access to services– Community capacitation– Needs and prioritisation– Opportunities– Overall understanding of socio-economic status

COMMUNITY CONSULTATIONS

Page 11: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

RAPID ASSESSMENT SHEETS

Page 12: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

SETTLEMENT CATEGORISATION AND PRIORITISATION

Page 13: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

• Following information captured during the data collection process was utilised to categorise the informal settlements– Location– Number of households– Land ownership– Density– Housing typology– Tenure status– Availability of basic services– Status of roads– Physical/infrastructural and environmental vulnerabilities

• Flow chart followed for determining appropriate informal settlement developmental responses (need for urgent relocation, implementation readiness, availability of alternative sites, etc.

CATEGORISATION PROCESS

Page 14: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

CATEGORIES

CATEGORY DESCRIPTION

A

For current/pending full upgrade (i.e. full services, top-structures, and tenure). Site viable and appropriate for long-term upgrading and project is implementation-ready (land secured or imminent, town planning approvals /township establishment secured or imminent, all project funding secured)

B1

For interim services (interim basic services as a precursor to an eventual full upgrade). Site viable and appropriate for long-term upgrading, BUT project NOT implementation ready (i.e. cannot be expedited in the next year or two e.g. due to lack of available funding, land not yet secured, bulk services not yet in place)

B2For emergency services (basic emergency services with limited or no prospects for full upgrade). Site NOT viable and appropriate for long-term upgrading, but NO urgent need for relocation

C

For relocations (in the case where public health and safety is threatened). Site NOT viable and appropriate for long-term upgrading, AND urgent need for relocation (e.g. material and immediate threat to safety through flooding, slope instability, toxic waste exposure etc.)

Page 15: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

SETTLEMENT CATEGORIES

SETTLEMENT NAME CATEGORY

Asla Park Extension A B1

Asla Park Extension B B1

Asla Park Extension C B1

Asla Park Extension D C and B1

Asla Park Extension E B1

Emfuleni B1 and C

Gentswana A B1 and C

Gentswana B B1 and C

Gentswana C B1

PA Camp B1

Sewendeland B1

Sinethemba B1

Thembani Street B1 and C

Transit Camp B1

Brandwacht B1

Toseplaas B1

Wolwedans A B1

Wolwedans B B1

Page 16: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

PROPOSED UPGRADING PLAN EXAMPLE

16

• WAWIEL EXT 1 & 2 • Proposed interventions

• CATEGORY B2/CIMMEDIATE INTERVENTIONS:• Water – Provide additional temporary storage• tanks to be filled daily (4 tanks in total)• − Sewer – Private pit latrines in place (LLOS),• provide communal pit latrines / portable toilets• − Refuse – provide skips / provide regular service

INTERMEDIATE• Water – provide communal stand pipes• (±3 points)• − Sewer – Provide communal ablution facilities• − Roads – Provide access roads for emergency• vehicles• − Electricity – Provide highmast lighting

16

CLEAR AREA OF

DEVELOPMENT DUE TO

FLOODLINE

Page 17: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

17

PROPOSED UPGRADING PLAN

Page 18: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

18

HOUSING EXAMPLES

• Row houses

• UNIT SIZE: +/- 20 – 30 m²• ERF SIZE: +/- 40 – 45 m²

• Tenements

• UNIT SIZE: Varies• ERF SIZE: +/- 200 – 400 m²

18

Page 19: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

STRATEGY OVERVIEW

Page 20: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

• Part 1 : Introduction– Background and orientation

– Purpose and objectives of NUSP

• Part 2: National and provincial policy context– Legislation, policies and strategies

– Grants, programmes and subsidies

• Part 3: Mossel Bay municipal context– Provincial situation and municipal context

– Local and district municipal objectives and priorities

– Municipal informal settlement dynamics and features

• Part 4: Informal settlement response plan– Main responses for services, tenure and housing

– Detailed settlement response plan

– Description of main responses to promote integration and sustainability

CONTENTS OF STRATEGY

Page 21: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

PART 4: INFORMAL SETTLEMENT RESPONSE PLAN

• Core section in final strategy– Programme of detailed activities for the upgrading process

– Set of interventions in response to the identified needs

– Not only addresses basic infrastructure and tenure interventions, but also

discusses steps required to increase community participation during the

development/formalisation/upgrading process

– Activities, projects and programmes aim to increase the level of integrated

planning and multi-sector delivery for communities

– Link proposed activities, projects and programmes to existing municipal

projects and initiatives

Page 22: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

• Main responses for services, tenure and housing– Application of Phase 1-3 of the UISP (also case-by-case basis)

– Rental options and state-subsidised rental/social housing

– Micro-credit and community savings

– Finance institutions and community savings groups

• Detailed settlement response plan– Overview of settlement categories and the prioritisation process

– Interventions per informal settlement (based on categorisation)

– Land requirements• Developable area per settlement based on site visits, water areas and basic slope analysis

• Area of each informal settlement and the number of households that can be in-situ upgraded

• Size of land identified for relocations and the number of households that can be accommodated

on the land

• Suggestions with regards to relocations based on consultation with the municipality

PART 4: INFORMAL SETTLEMENT RESPONSE PLAN

Page 23: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

• Main responses to promote integration and sustainability– Informal settlement upgrading to be approached in holistic and integrated manner

• Ensure that the outcomes are sustainable

– ISUS for Mossel Bay Local Municipality aimed at development of sustainable

communities on well-located land and in areas with long-term sustainability potential

– Not only requires appropriate responses to physical issues (services and housing), but

also requires appropriate responses to other less tangible factors:• Community participation;

• Local economic development and livelihoods;

• Skills development and economic sector alignment;

• Local spatial plans;

• Key social facilities, support programmes and special needs;

• Accessibility, public transport and non-motorised transport;

• Government sector alignment;

• Promoting densification and urban efficiency; and

• Achieving secure tenure

PART 4: INFORMAL SETTLEMENT RESPONSE PLAN

Page 24: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

• Main responses to promote integration and sustainability– Each factor discussed in terms of:

• Goal based on theoretical background of key elements;• Status based on focus group discussions;• Existing projects or actions; and• Potential projects or actions that should be implemented to supplement and support the

relevant factor and ultimately enhance sustainability

– Proposed projects and actions should be, where possible, combined with

existing projects– Before these projects and actions can be implemented, more research should

be done on optimal ways of implementing these projects• Best suitable role-players • Potential funding sources

– Funding for the suggested projects and actions can be obtained from a variety

of public and private sources depending on the nature of the projects

PART 4: INFORMAL SETTLEMENT RESPONSE PLAN

Page 25: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

• Part 5: Institutional arrangements– Multi-sector committee (task team)

• Part 6: Medium-term expenditure framework– Existing provincial and local budget allocations

– Upgrading MTEF

• Part 7: Risks, assumptions and mitigation actions

• Part 8: Monitoring and evaluation framework– Overall goals and objectives of the ISUP

– Monitoring and evaluation tools

– Indicators

CONTENTS OF STRATEGY

Page 26: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

• Structure that will effectively manage the upgrading and formalisation of

informal settlements

• To be based on what already exists in terms of inter-departmental partnerships

• Consist of key departments and role-payers

• Be augmented by relevant District and Provincial stakeholders and external

advisors (NUSP and NDoHS)

• Important to have collaborative approach to planning and upgrading

• Integration of communities into system by means of representative forums

PART 5: INSTITUTIONAL ARRANGEMENTS

Page 27: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

PART 6: MEDIUM-TERM EXPENDITURE FRAMEWORK

• Based on housing subsidy quantum

• Category B1 settlementsSETTLEMENT NAME ESTIMATED COST RELOCATION COST HOUSEHOLDS TO BE RELOCATED

Asla Park A* R 17 996 140 R 166 634 122 of 435

Asla Park B R 4 713 548 R 0 0 of 115

Asla Park C* R 2 527 535 R 68 293 50 of 60

Asla Park E* R 617 542 R 2 732 2 of 15

Brandwacht R 614 811 R 0 0 of 15

Gentswana C R 2 459 242 R 0 0 of 60

PA Camp (Zone 7)* R 1 058 831 R 34 146 25 of 25

Sewendelaan R 3 688 863 R 0 0 of 90

Sinethemba* R 10 588 305 R 341 463 250 of 250

Toseplaas R 614 811 R 0 0 of 15

Transit (Transand) Camp* R 1 058 831 R 34 146 25 of 25

Wolwedans A* R 423 532 R 13 659 10 of 10

Wolwedans B* R 1 270 597 R 40 976 30 of 30

TOTAL R 47 632 586 R 702 047 514 of 1 145

Page 28: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy

PART 6: MEDIUM-TERM EXPENDITURE FRAMEWORK

• Category C settlements

– Need for relocation calculated based on number of households that can be

accommodated on site after site constraints have been factored in (slope, water

areas, etc.)• Asla Park D – 40% of site is developable, and remainder too small to accommodate all households

• Gentswana A, Gentswana B and Thembani Street – 60% of site is developable, and remainder large

enough to accommodate all households

• Emfuleni - 90% of site is developable, and remainder large enough to accommodate all households

SETTLEMENT NAME ESTIMATED COST RELOCATION COST HOUSEHOLDS TO BE RELOCATED

Asla Park D R 4 392 454 R 88 780 65 of 105

Emfuleni R 7 582 663 R 0 0 of 185

Gentswana A R 1 229 621 R 0 0 of 30

Gentswana B R 2 049 369 R 0 0 of 50

Thembani Street R 3 688 863 R 0 0 of 90

TOTAL R18 942 970 R88 780 65 of 460

Page 29: Mossel Bay Local Municipality Informal Settlement Upgrading Strategy