Upload
mostafa-mohmmed
View
10
Download
0
Embed Size (px)
Citation preview
MOSTAFA M.MANSOUR L
an
gu
age
English
Portuguese
Arabic
LAGO VISTA BD. IMPZ,. Dubai
+971552971313
Professional Experience and Significant Achievement
Electrical substation commissioning Eng. Feb. 09-present
Electricity DUBAI . (DeptTransmission commission
)Authority Water And
Responsible of design , installing , testing and commissioning
Transformer , shunt reactor, aux transformer , cables, GIS switchgear,
MV switchgear, capacitor banks ,interlocks , CT`s, VT`s , AUX relays in
132/11KV & 400/132KV S/S
o Projects achieved
MDCC , INVZ , CPITI ,PILT (SIEMENS)
TELECOM, LSCT (ETA)
ETMR , MSJA, JAFZA ( HYUNDAI)
KWNJ,LBAC,OMTN (ALSTOM)
o Projects in progress
NADA HAMAR ( SIEMENS ), TRMN (ABB)
Reviewing drawings and calculations of Transformer according to IEC and DEWA SDT.
Prepare and review snag banks , specification , testing producers, method of statements and testing report formats
Factory acceptance test 1- Semiens , DERSDEN: power transformer 132/11 KV 2- SEA ITALY : Earthing transformer 11/.4 KV 3- ABB, SWEDEN : Series Reactor 4- Alstom , Finland : 11kv capacitor banks 5- ABB OY, Finland : 132 kv Shunt reactor
Protection commissioning Eng. Mar. 08-feb. 09
DUBAI Transmission protection commissioning (
)AuthorityWater And Electricity
Responsible of testing and commissioning 132/11 KV S/S protection
Relays and AC/DC schemes
Projects achieved
ARML , WADI (SIEMENS)
SUFFOH ( EEE)
MIRDIF ( ETA)
Reviewing protection scheme
Document verification
Prepare and review test format and testing producers
2014
2011
2010
2009
2 | P a g e
Mostafa M.Mansour
LAGO VISTA BD. IMPZ,. Dubai
+971552971313
Electricity EgyptianProtection & testing dep. (
Cairo zone ).-CO.Transmission
Responsible of protection system and scheme upgrade at
66/11KV
Responsible of periodic maintenance and trouble shooting in s/s
Responsible of replace feeder bays to transformer
projects Achived
El gabal el akhdar s/s 2 bays
Blags s/s
El obaa s/s
Responsible of installing and replace 11kv in new s/s
Responsible of installing and commissioning of 11KV new
capacitor banks
Achieved projects:
Misr el gadeda 4 unints
El hagana s/s 4 units
Obaa s/s 5 units
Amria s/s 6 units
Responsible of commissioning new substation
Responsible of protection setting calculation & fault analysis
Cable projects Eng. Aug. 05 Mar. 06
Electricity Egyptianproject dept. (UHV
CAIRO ONE) Cairo zone-CO.Transmission
Responsible of UHV cable erection supervision and
commissioning
Projects achieved
Ain el sierra metro 220 kv circuit
El stad - metro 220kv circuit
Reviewing drawings and ampacity calculations
2008
2007
2006
2005
Protection main. & testing Eng. Mar.06 Mar. 08
3 | P a g e
Mostafa M.Mansour
LAGO VISTA BD. IMPZ,. Dubai
+971552971313
Academic positions and qualifications
Education
University Helwan university/Faculty of engineering/electrical dept.
Degree Bachelor of Electrical Power sys. & Machines
date of graduation July 2005
Accumulated degree Good
G Grade of graduation project Excellent
Professional qualification (Certification and Accreditation)
PMP , KNOWLEDGE VILLAGE Dubai-UAE
PHOTOSHOP 6
MS PROJECT 2010 global knowledge DUBAI- UAE
CAP 501 ABB HV Egypt.
DIGSI 4 Siemens Egypt .
Protection 1, 2, 3,4,5,6 courses EGYPTIAN NATIONAL TRAINING CENTER
Capacitor banks design & installation ABB ARAB EG.
Advance Diploma in protection and circuit breaker , Cairo-Egypt
4 | P a g e
Mostafa M.Mansour
LAGO VISTA BD. IMPZ,. Dubai
+971552971313
2011 2007 2008 2009 2010 2005 2006
DESIGN 8.5 years
Cable 2.5 years
Protection setting cal. & maintenance 2years
Protection commissioning 3years
Transformer reactor SWGR &others testing. 5 years
testesttings .
Planning & management 3 years
Microsoft office over than 13 years
MS project 2010
Present
IEC 61850 & AUTOMATION 1 year
Professional skills
Personal information
Date of birth 25/6/1983
Nationality Egyptian
Car driving Full driving license Egypt & UAE
Marital status Single