Neutral BOM Managementand the Impact on Physical
Structure
James Batka
Software Product Consultant
http://plmworld.org/
http://plmworld.org/7/27/2019 MRO Neutral Structure Management
2/25
Siemens PLM Software
Siemens AG 2012. All Rights Reserved.
Page 2
Teamcenter MRO
Challenges
Services must manage SBOMindependent of Engineering
Must include all service parts
Engineering must maintaincontrol of design
Remain manageable in size
Neutral BOM requirements
BUT
Some Neutral BOM requirements conflict!
Creating a neutral BOM for services
Managing neutral BOM for services
Exporting and Importing data
Change Management
Data Quality
7/27/2019 MRO Neutral Structure Management
3/25
Siemens PLM Software
Siemens AG 2012. All Rights Reserved.
Page 3
Teamcenter MRO
Why use MRO?
Report describing engine testfailure from the 1980s
Turbine engine disk failureduring testing
A disk fragment flew ~ mi,
through ceiling of office buildingsceiling
Landed on desk of the testprogram lead engineer
Hot disk fragment (probably 700
800 F) burned the engineersdesk top and bounced onto thefloor
7/27/2019 MRO Neutral Structure Management
4/25
Siemens PLM Software
Siemens AG 2012. All Rights Reserved.
Page 4
Teamcenter MRO
Why use MRO?
Incident investigation found:
Disk failed due to improper heattreatment
Heat treatment failed due to bad
thermal sensor Other disks created using the
same process were in flight inboth military and commercialaircraft
The engine company had totrack down and remove alldefective engines from vehiclesand inventory
MRO:
Tracks all serial parts enteredinto the system
Tracks production lot
membership Tracks the location of both serial
and lot parts
What took the engine companyweeks or more of time in the
1980s could be accomplished ina few minutes with TeamcenterMRO!
7/27/2019 MRO Neutral Structure Management
5/25
Siemens PLM Software
Siemens AG 2012. All Rights Reserved.
Page 5
Teamcenter MRO
Neutral Structure versus Physical Structure
Authorized
Neutral
EngineeringDesign & Development ProductionDelivery & Support
Physical
Actual
7/27/2019 MRO Neutral Structure Management
6/25
Siemens PLM Software Siemens AG 2012. All Rights Reserved.
Page 6
Why use MRO?
Complexities of managing physical structure
ED&D eBOMRev A
Production & Delivery Sustainment
Rebase
Modification Retrofit
eBOMRev BUpgrade
Brake Rotor
eBOMRev C
eBOMRev D
Upgrade StrutNew Brake
Pad
Hull-40 Hull-30Hull-50 Hull-20 Hull-10
7/27/2019 MRO Neutral Structure Management
7/25Siemens PLM Software Siemens AG 2012. All Rights Reserved.
Page 7
Neutral BOM Management for MRO
Service BOM
Service BOM
What is it?
Requirements
Part Selection
Managing SBOM
Other Considerations
HD User Experience
Intelligently Integrated
Information
Future-proof Architecture
7/27/2019 MRO Neutral Structure Management
8/25Siemens PLM Software Siemens AG 2012. All Rights Reserved.
Page 8
Service BOM
What is it?
As template:Used to generate physical structure
As reference:Used to highlight missing, extra to design,deviated, and differences between design& reality
A correct Service BOM is critical to MRO!
Neutral Structure used by Physical Structure
7/27/2019 MRO Neutral Structure Management
9/25Siemens PLM Software Siemens AG 2012. All Rights Reserved.
Page 9
Service BOM
What is it?
EBOM SBOM
How do you determine what should be included / excluded?How do you manage differences?
Service BOM differs from the Engineering BOM!
7/27/2019 MRO Neutral Structure Management
10/25Siemens PLM Software Siemens AG 2012. All Rights Reserved.
Page 10
Service BOM
Requirements and Recommendations
Requirements:
Must (eventually) include:
Options & Variants
Substitutes
Upstream BOM changes mustpropagate to SBOM
Ability to add parts to BOM forservices use (e.g. customer &vendor parts)
Recommendations:
Created and managed byservices organization
Manage changes with formal
change management process
7/27/2019 MRO Neutral Structure Management
11/25Siemens PLM Software
Siemens AG 2012. All Rights Reserved.Page 11
Service BOM
Parts to include in SBOM
Rules for including / excluding parts from SBOM
DoD Guidelines:
DoD Instruction 5000.64 (IUID Guidelines)
Part acquisition >= $5000
All serially managed parts
Controlled inventory parts
Mission essential parts (e.g. essentiality codes 1, 3, 5, 6, & 7)
DoD Instruction 4130.1-R (SMR Code)
Reparable parts
Plus any parts required by customer Plus any assembly higher in the product structure which contains
any of these parts regardless of whether it satisfies theserequirements
7/27/2019 MRO Neutral Structure Management
12/25Siemens PLM Software
Siemens AG 2012. All Rights Reserved.Page 12
Neutral BOM Management for MRO
Managing SBOM
Service BOM
Managing SBOM
Multi-Structure Manager
Independently managed BOMs
150% BOMOther Considerations
HD User Experience
Intelligently Integrated
Information
Future-proof Architecture
7/27/2019 MRO Neutral Structure Management
13/25Siemens PLM Software
Siemens AG 2012. All Rights Reserved.Page 13
Managing SBOM
Teamcenter Multi-Structure Manager
MSM assists in managing perspectives
of single BOM
Plusses:
Recommended method of managingmultiple BOMs by product development
Organizations less dependent uponcooperation
Minuses:
Requires MSM licenses
Our team lacked experience with this
method
Requires disciplined changed
management
Multi-Structure Manager
7/27/2019 MRO Neutral Structure Management
14/25Siemens PLM Software
Siemens AG 2012. All Rights Reserved.Page 14
Managing SBOM
Independently Managed BOMs
Duplicate parts created to represent
a single part
Plusses:
Organizations not dependent uponcooperation
No Teamcenter licenses required Best method for dealing with vendor
parts
Minuses:
Most prone to data errors
Most duplication of effort
Requires disciplined change
management
EBOM SBOM
7/27/2019 MRO Neutral Structure Management
15/25Siemens PLM Software
Siemens AG 2012. All Rights Reserved.Page 15
Managing SBOM
150% BOM
BOM which combines parts into single BOM
Plusses:
No Teamcenter licenses required
Changes within service parts do NOT requireengineering authorization
Minuses: Requires cooperation between organizations
Requires disciplined change management
Other:
Use part types to enable different security andsearches for EBOM/SBOM parts
Changes to design require engineeringauthorization good for highly regulatedenvironments
EBOM + SBOM
7/27/2019 MRO Neutral Structure Management
16/25Siemens PLM Software
Siemens AG 2012. All Rights Reserved.Page 16
Neutral BOM Management for MRO
Other Considerations
Service BOM
Managing SBOM
Other Considerations
Maintenance Planning
Data Export / Import Change Management
Data Quality
HD User Experience
Intelligently Integrated
Information
Future-proof Architecture
7/27/2019 MRO Neutral Structure Management
17/25
Siemens PLM Software Siemens AG 2012. All Rights Reserved.
Page 17
Other Considerations
Maintenance Planning
Thoughts on Maintenance Planning:
For military and highly regulated industries, technical manual andmaintenance planning MUST share source of task information
Neither Content Management nor Maintenance Planning can
currently output maintenance planning detail into technical manuals
Military required to followmost recent technical
manuals even whenthey are known to be outof date
7/27/2019 MRO Neutral Structure Management
18/25
Siemens PLM Software Siemens AG 2012. All Rights Reserved.
Page 18
Other Consideration
Data Export and Import
PLMXML
Existing Teamcenter capability
Can export & import
Service actions
Service BOM
Physical Structure
Related data
S1000D
Existing industry standard
Intended for the exchange of:
Service tasks
Service BOM
Physical structure
Related data
USAF & Army already receivemaintenance data in this format
A&D companies already delivermaintenance data in this format
BUT
Teamcenter cannot (yet) parse S1000D XML
Teamcenter cannot (yet) produce S1000D documents
MIL-STD-3031A, DEPARTMENT OF
DEFENSE STANDARD PRACTICE: ARMY
BUSINESS RULES FOR S1000D
7/27/2019 MRO Neutral Structure Management
19/25
Siemens PLM Software Siemens AG 2012. All Rights Reserved.
Page 19
Other Considerations
Change Management and its role in MRO
Forward Change Process results in deployment of new designs to
existing systems
Retrofit new capability to existing systems
Upgrade or rebuild system to new standards
Determines when to update physical structure to new designreference (rebase)
Reverse change process (Service Discrepancy -> Problem ->
Change Request -> Change process) can be used to heal data
errors such as:
Physical structure mistakes
Physical structure referencing incorrect SBOM
Previously undocumented substitute and alternate parts
7/27/2019 MRO Neutral Structure Management
20/25
Siemens PLM Software Siemens AG 2012. All Rights Reserved.
Page 20
Other Considerations
Data Quality
All downstream processes affected by quality of Engineering data
SBOM Problems SBOM require fixing onlytwo structures:
Spend time correcting your EBOM / SBOM prior to deploying MRO
It will pay back your investment many fold over time!
EBOM & SBOM
Physical structure problems require
correcting EBOM, SBOM, and ALL physicalstructures referencing the affected SBOM
Correcting errors in the EBOM/SBOM isextremely difficult
Each correction must propagate through theenterprise change management process
Which cou ld be
dozens o r more!
Cant modify released
revis ions o f a part!
This could bog th eprocess dow n
7/27/2019 MRO Neutral Structure Management
21/25
7/27/2019 MRO Neutral Structure Management
22/25
7/27/2019 MRO Neutral Structure Management
23/25
Siemens PLM Software Siemens AG 2012. All Rights Reserved.
Page 23
MRO Neutral BOM Management
Related Sessions
502 Teamcenter Change Management Overview
Wednesday / 9:30 AM
228 MRO Overview
Wednesday / 1:00 PM
62 I Need it NOW, I Need it CORRECT
Wednesday / 1:45 PM
702 Birds of a Feather
Wednesday / 4:10 PM
7/27/2019 MRO Neutral Structure Management
24/25
Siemens PLM Software Siemens AG 2012. All Rights Reserved.
Page 24
MRO Neutral BOM Management
Related Materials
Sample US AF Technical Order (AFI) http://www.ngbpdc.ngb.army.mil/pubs/21/afi21-105_angsup_I.pdf
S1000D
http://www.s1000d.net/
http://www.everyspec.com/MIL-STD/MIL-STD+%283000+-+9999%29/MIL-STD-
3031A_32065/ DoD IUID (DoD Instruction 5000.64)
http://www.acq.osd.mil/dpap/pdi/uid/index.html
http://www.dtic.mil/whs/directives/corres/pdf/832004p.pdf
http://www.acq.osd.mil/dpap/UID/attachments/UIDfaq_extended.doc
DoD SMR Code (DoD 4130.1-R) http://www.dtic.mil/whs/directives/corres/pdf/414001r.pdf
http://plmworld.org/http://www.ngbpdc.ngb.army.mil/pubs/21/afi21-105_angsup_I.pdfhttp://www.s1000d.net/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.acq.osd.mil/dpap/pdi/uid/index.htmlhttp://www.dtic.mil/whs/directives/corres/pdf/832004p.pdfhttp://www.acq.osd.mil/dpap/UID/attachments/UIDfaq_extended.dochttp://www.dtic.mil/whs/directives/corres/pdf/414001r.pdfhttp://www.dtic.mil/whs/directives/corres/pdf/414001r.pdfhttp://www.dtic.mil/whs/directives/corres/pdf/414001r.pdfhttp://www.acq.osd.mil/dpap/UID/attachments/UIDfaq_extended.dochttp://www.acq.osd.mil/dpap/UID/attachments/UIDfaq_extended.dochttp://www.dtic.mil/whs/directives/corres/pdf/832004p.pdfhttp://www.dtic.mil/whs/directives/corres/pdf/832004p.pdfhttp://www.dtic.mil/whs/directives/corres/pdf/832004p.pdfhttp://www.acq.osd.mil/dpap/pdi/uid/index.htmlhttp://www.acq.osd.mil/dpap/pdi/uid/index.htmlhttp://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.s1000d.net/http://www.s1000d.net/http://www.s1000d.net/http://www.ngbpdc.ngb.army.mil/pubs/21/afi21-105_angsup_I.pdfhttp://www.ngbpdc.ngb.army.mil/pubs/21/afi21-105_angsup_I.pdfhttp://www.ngbpdc.ngb.army.mil/pubs/21/afi21-105_angsup_I.pdfhttp://www.ngbpdc.ngb.army.mil/pubs/21/afi21-105_angsup_I.pdfhttp://plmworld.org/http://plmworld.org/7/27/2019 MRO Neutral Structure Management
25/25
Si PLM S ft Siemens AG 2012. All Rights Reserved.
Thank You!