    Siemens PLM Software

    Siemens AG 2012. All Rights Reserved.

    Neutral BOM Managementand the Impact on Physical

    Structure

    James Batka

    Software Product Consultant

    http://plmworld.org/

    http://plmworld.org/
  • 7/27/2019 MRO Neutral Structure Management

    2/25

    Siemens PLM Software

    Siemens AG 2012. All Rights Reserved.

    Page 2

    Teamcenter MRO

    Challenges

    Services must manage SBOMindependent of Engineering

    Must include all service parts

    Engineering must maintaincontrol of design

    Remain manageable in size

    Neutral BOM requirements

    BUT

    Some Neutral BOM requirements conflict!

    Creating a neutral BOM for services

    Managing neutral BOM for services

    Exporting and Importing data

    Change Management

    Data Quality

  • 7/27/2019 MRO Neutral Structure Management

    3/25

    Siemens PLM Software

    Siemens AG 2012. All Rights Reserved.

    Page 3

    Teamcenter MRO

    Why use MRO?

    Report describing engine testfailure from the 1980s

    Turbine engine disk failureduring testing

    A disk fragment flew ~ mi,

    through ceiling of office buildingsceiling

    Landed on desk of the testprogram lead engineer

    Hot disk fragment (probably 700

    800 F) burned the engineersdesk top and bounced onto thefloor

  • 7/27/2019 MRO Neutral Structure Management

    4/25

    Siemens PLM Software

    Siemens AG 2012. All Rights Reserved.

    Page 4

    Teamcenter MRO

    Why use MRO?

    Incident investigation found:

    Disk failed due to improper heattreatment

    Heat treatment failed due to bad

    thermal sensor Other disks created using the

    same process were in flight inboth military and commercialaircraft

    The engine company had totrack down and remove alldefective engines from vehiclesand inventory

    MRO:

    Tracks all serial parts enteredinto the system

    Tracks production lot

    membership Tracks the location of both serial

    and lot parts

    What took the engine companyweeks or more of time in the

    1980s could be accomplished ina few minutes with TeamcenterMRO!

  • 7/27/2019 MRO Neutral Structure Management

    5/25

    Siemens PLM Software

    Siemens AG 2012. All Rights Reserved.

    Page 5

    Teamcenter MRO

    Neutral Structure versus Physical Structure

    Authorized

    Neutral

    EngineeringDesign & Development ProductionDelivery & Support

    Physical

    Actual

  • 7/27/2019 MRO Neutral Structure Management

    6/25

    Siemens PLM Software Siemens AG 2012. All Rights Reserved.

    Page 6

    Why use MRO?

    Complexities of managing physical structure

    ED&D eBOMRev A

    Production & Delivery Sustainment

    Rebase

    Modification Retrofit

    eBOMRev BUpgrade

    Brake Rotor

    eBOMRev C

    eBOMRev D

    Upgrade StrutNew Brake

    Pad

    Hull-40 Hull-30Hull-50 Hull-20 Hull-10

  • 7/27/2019 MRO Neutral Structure Management

    7/25Siemens PLM Software Siemens AG 2012. All Rights Reserved.

    Page 7

    Neutral BOM Management for MRO

    Service BOM

    Service BOM

    What is it?

    Requirements

    Part Selection

    Managing SBOM

    Other Considerations

    HD User Experience

    Intelligently Integrated

    Information

    Future-proof Architecture

  • 7/27/2019 MRO Neutral Structure Management

    8/25Siemens PLM Software Siemens AG 2012. All Rights Reserved.

    Page 8

    Service BOM

    What is it?

    As template:Used to generate physical structure

    As reference:Used to highlight missing, extra to design,deviated, and differences between design& reality

    A correct Service BOM is critical to MRO!

    Neutral Structure used by Physical Structure

  • 7/27/2019 MRO Neutral Structure Management

    9/25Siemens PLM Software Siemens AG 2012. All Rights Reserved.

    Page 9

    Service BOM

    What is it?

    EBOM SBOM

    How do you determine what should be included / excluded?How do you manage differences?

    Service BOM differs from the Engineering BOM!

  • 7/27/2019 MRO Neutral Structure Management

    10/25Siemens PLM Software Siemens AG 2012. All Rights Reserved.

    Page 10

    Service BOM

    Requirements and Recommendations

    Requirements:

    Must (eventually) include:

    Options & Variants

    Substitutes

    Upstream BOM changes mustpropagate to SBOM

    Ability to add parts to BOM forservices use (e.g. customer &vendor parts)

    Recommendations:

    Created and managed byservices organization

    Manage changes with formal

    change management process

  • 7/27/2019 MRO Neutral Structure Management

    11/25Siemens PLM Software

    Siemens AG 2012. All Rights Reserved.Page 11

    Service BOM

    Parts to include in SBOM

    Rules for including / excluding parts from SBOM

    DoD Guidelines:

    DoD Instruction 5000.64 (IUID Guidelines)

    Part acquisition >= $5000

    All serially managed parts

    Controlled inventory parts

    Mission essential parts (e.g. essentiality codes 1, 3, 5, 6, & 7)

    DoD Instruction 4130.1-R (SMR Code)

    Reparable parts

    Plus any parts required by customer Plus any assembly higher in the product structure which contains

    any of these parts regardless of whether it satisfies theserequirements

  • 7/27/2019 MRO Neutral Structure Management

    12/25Siemens PLM Software

    Siemens AG 2012. All Rights Reserved.Page 12

    Neutral BOM Management for MRO

    Managing SBOM

    Service BOM

    Managing SBOM

    Multi-Structure Manager

    Independently managed BOMs

    150% BOMOther Considerations

    HD User Experience

    Intelligently Integrated

    Information

    Future-proof Architecture

  • 7/27/2019 MRO Neutral Structure Management

    13/25Siemens PLM Software

    Siemens AG 2012. All Rights Reserved.Page 13

    Managing SBOM

    Teamcenter Multi-Structure Manager

    MSM assists in managing perspectives

    of single BOM

    Plusses:

    Recommended method of managingmultiple BOMs by product development

    Organizations less dependent uponcooperation

    Minuses:

    Requires MSM licenses

    Our team lacked experience with this

    method

    Requires disciplined changed

    management

    Multi-Structure Manager

  • 7/27/2019 MRO Neutral Structure Management

    14/25Siemens PLM Software

    Siemens AG 2012. All Rights Reserved.Page 14

    Managing SBOM

    Independently Managed BOMs

    Duplicate parts created to represent

    a single part

    Plusses:

    Organizations not dependent uponcooperation

    No Teamcenter licenses required Best method for dealing with vendor

    parts

    Minuses:

    Most prone to data errors

    Most duplication of effort

    Requires disciplined change

    management

    EBOM SBOM

  • 7/27/2019 MRO Neutral Structure Management

    15/25Siemens PLM Software

    Siemens AG 2012. All Rights Reserved.Page 15

    Managing SBOM

    150% BOM

    BOM which combines parts into single BOM

    Plusses:

    No Teamcenter licenses required

    Changes within service parts do NOT requireengineering authorization

    Minuses: Requires cooperation between organizations

    Requires disciplined change management

    Other:

    Use part types to enable different security andsearches for EBOM/SBOM parts

    Changes to design require engineeringauthorization good for highly regulatedenvironments

    EBOM + SBOM

  • 7/27/2019 MRO Neutral Structure Management

    16/25Siemens PLM Software

    Siemens AG 2012. All Rights Reserved.Page 16

    Neutral BOM Management for MRO

    Other Considerations

    Service BOM

    Managing SBOM

    Other Considerations

    Maintenance Planning

    Data Export / Import Change Management

    Data Quality

    HD User Experience

    Intelligently Integrated

    Information

    Future-proof Architecture

  • 7/27/2019 MRO Neutral Structure Management

    17/25

    Siemens PLM Software Siemens AG 2012. All Rights Reserved.

    Page 17

    Other Considerations

    Maintenance Planning

    Thoughts on Maintenance Planning:

    For military and highly regulated industries, technical manual andmaintenance planning MUST share source of task information

    Neither Content Management nor Maintenance Planning can

    currently output maintenance planning detail into technical manuals

    Military required to followmost recent technical

    manuals even whenthey are known to be outof date

  • 7/27/2019 MRO Neutral Structure Management

    18/25

    Siemens PLM Software Siemens AG 2012. All Rights Reserved.

    Page 18

    Other Consideration

    Data Export and Import

    PLMXML

    Existing Teamcenter capability

    Can export & import

    Service actions

    Service BOM

    Physical Structure

    Related data

    S1000D

    Existing industry standard

    Intended for the exchange of:

    Service tasks

    Service BOM

    Physical structure

    Related data

    USAF & Army already receivemaintenance data in this format

    A&D companies already delivermaintenance data in this format

    BUT

    Teamcenter cannot (yet) parse S1000D XML

    Teamcenter cannot (yet) produce S1000D documents

    MIL-STD-3031A, DEPARTMENT OF

    DEFENSE STANDARD PRACTICE: ARMY

    BUSINESS RULES FOR S1000D

  • 7/27/2019 MRO Neutral Structure Management

    19/25

    Siemens PLM Software Siemens AG 2012. All Rights Reserved.

    Page 19

    Other Considerations

    Change Management and its role in MRO

    Forward Change Process results in deployment of new designs to

    existing systems

    Retrofit new capability to existing systems

    Upgrade or rebuild system to new standards

    Determines when to update physical structure to new designreference (rebase)

    Reverse change process (Service Discrepancy -> Problem ->

    Change Request -> Change process) can be used to heal data

    errors such as:

    Physical structure mistakes

    Physical structure referencing incorrect SBOM

    Previously undocumented substitute and alternate parts

  • 7/27/2019 MRO Neutral Structure Management

    20/25

    Siemens PLM Software Siemens AG 2012. All Rights Reserved.

    Page 20

    Other Considerations

    Data Quality

    All downstream processes affected by quality of Engineering data

    SBOM Problems SBOM require fixing onlytwo structures:

    Spend time correcting your EBOM / SBOM prior to deploying MRO

    It will pay back your investment many fold over time!

    EBOM & SBOM

    Physical structure problems require

    correcting EBOM, SBOM, and ALL physicalstructures referencing the affected SBOM

    Correcting errors in the EBOM/SBOM isextremely difficult

    Each correction must propagate through theenterprise change management process

    Which cou ld be

    dozens o r more!

    Cant modify released

    revis ions o f a part!

    This could bog th eprocess dow n

  • 7/27/2019 MRO Neutral Structure Management

    21/25

  • 7/27/2019 MRO Neutral Structure Management

    22/25

  • 7/27/2019 MRO Neutral Structure Management

    23/25

    Siemens PLM Software Siemens AG 2012. All Rights Reserved.

    Page 23

    MRO Neutral BOM Management

    Related Sessions

    502 Teamcenter Change Management Overview

    Wednesday / 9:30 AM

    228 MRO Overview

    Wednesday / 1:00 PM

    62 I Need it NOW, I Need it CORRECT

    Wednesday / 1:45 PM

    702 Birds of a Feather

    Wednesday / 4:10 PM

  • 7/27/2019 MRO Neutral Structure Management

    24/25

    Siemens PLM Software Siemens AG 2012. All Rights Reserved.

    Page 24

    MRO Neutral BOM Management

    Related Materials

    Sample US AF Technical Order (AFI) http://www.ngbpdc.ngb.army.mil/pubs/21/afi21-105_angsup_I.pdf

    S1000D

    http://www.s1000d.net/

    http://www.everyspec.com/MIL-STD/MIL-STD+%283000+-+9999%29/MIL-STD-

    3031A_32065/ DoD IUID (DoD Instruction 5000.64)

    http://www.acq.osd.mil/dpap/pdi/uid/index.html

    http://www.dtic.mil/whs/directives/corres/pdf/832004p.pdf

    http://www.acq.osd.mil/dpap/UID/attachments/UIDfaq_extended.doc

    DoD SMR Code (DoD 4130.1-R) http://www.dtic.mil/whs/directives/corres/pdf/414001r.pdf

    http://plmworld.org/http://www.ngbpdc.ngb.army.mil/pubs/21/afi21-105_angsup_I.pdfhttp://www.s1000d.net/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.acq.osd.mil/dpap/pdi/uid/index.htmlhttp://www.dtic.mil/whs/directives/corres/pdf/832004p.pdfhttp://www.acq.osd.mil/dpap/UID/attachments/UIDfaq_extended.dochttp://www.dtic.mil/whs/directives/corres/pdf/414001r.pdfhttp://www.dtic.mil/whs/directives/corres/pdf/414001r.pdfhttp://www.dtic.mil/whs/directives/corres/pdf/414001r.pdfhttp://www.acq.osd.mil/dpap/UID/attachments/UIDfaq_extended.dochttp://www.acq.osd.mil/dpap/UID/attachments/UIDfaq_extended.dochttp://www.dtic.mil/whs/directives/corres/pdf/832004p.pdfhttp://www.dtic.mil/whs/directives/corres/pdf/832004p.pdfhttp://www.dtic.mil/whs/directives/corres/pdf/832004p.pdfhttp://www.acq.osd.mil/dpap/pdi/uid/index.htmlhttp://www.acq.osd.mil/dpap/pdi/uid/index.htmlhttp://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.everyspec.com/MIL-STD/MIL-STD+(3000+-+9999)/MIL-STD-3031A_32065/http://www.s1000d.net/http://www.s1000d.net/http://www.s1000d.net/http://www.ngbpdc.ngb.army.mil/pubs/21/afi21-105_angsup_I.pdfhttp://www.ngbpdc.ngb.army.mil/pubs/21/afi21-105_angsup_I.pdfhttp://www.ngbpdc.ngb.army.mil/pubs/21/afi21-105_angsup_I.pdfhttp://www.ngbpdc.ngb.army.mil/pubs/21/afi21-105_angsup_I.pdfhttp://plmworld.org/http://plmworld.org/
  • 7/27/2019 MRO Neutral Structure Management

    25/25

    Si PLM S ft Siemens AG 2012. All Rights Reserved.

    Thank You!

    Siemens PLM Connection 2012

    Las Vegas, NVMay 7-10

    http://plmworld.org/

    http://plmworld.org/