Name MANJIT POWER & PROJECTS PVT.LTD

(Formerly known as Manjit Construction Company)

Head Office 301,3rd Floor E-328 Industrial Area Sector 75,

Sahibzada Ajit Singh Nagar, Punjab -160055

Year of Incorporation Dec 2015( Manjit Construction Company)

Contact Details Er.Baldeep Singh (Director)

091-98555-73202

[email protected]

Er.Supreet Kaur (Director)

09501275621

[email protected]

E-Mail [email protected]

2

Page 3: M/s MANJIT POWER PROJECTS PVT

3

Page 4: M/s MANJIT POWER PROJECTS PVT

4

Page 5: M/s MANJIT POWER PROJECTS PVT

5

Page 6: M/s MANJIT POWER PROJECTS PVT

6

Page 7: M/s MANJIT POWER PROJECTS PVT

ORGANIZATION CHART

7

Page 8: M/s MANJIT POWER PROJECTS PVT

INTRODUCTION

M/s Manjit Power & Projects Private Limited (Formerly known as Manjit

Construction Company) was established in 2015 as an Engineering, Procurement

& Construction. Over the last Five Years the company has diversified and

broadened its scope into EHV Substation and Transmission lines including

Electrical, Instrumentation & Civil Turnkey Projects. With the advent in Solar

PV, The M/s MPPPL footprint stretches across all types of power generation in

India.

We continue to invest in research and development facilities.

M/s MPPPL is now actively involved in the Solar PV Industry as well .

8

Page 9: M/s MANJIT POWER PROJECTS PVT

Turnkey Project Services

M/S MPPPL has been providing Turnkey Solutions to various industry majors

across diverse sectors. Some of our major projects are mentioned below in

their respective categories.

QUALITY ASSURANCE

M/S MPPPL has successfully executed various prestigious assignments for

automation systems and panels. Our services have been supplied to various reputed

companies/projects and have passed through tests and inspection by reputed

organizations and the following completion/quality assurance certificates have

been awarded.

9

Page 10: M/s MANJIT POWER PROJECTS PVT

Name of Projects under Execution in 2019-2020:-

Sr. No. Description Location Client

1

Construction of 2 Nos.of 33/11KV Substation

Buildings and foundations and boundary for

Tripura Electricity Board

Agartala(Tripura)

M/s RKI Industries

Limited (M/s

SRCIL Group)

2

Erection and Commissioning 220/25KV Traction

Substation for Indian Railways

Barnala (Punjab)

M/s Avenair Pvt.Ltd

3

Erection and Commissioning of 66/11KV Substation of MES

Pathankot (Punjab)

M/s HPPL

4. Work Order for MMS Pilling Marking &

Pilling Work for 2MW Ground Mounted

Solar Project in Diwana, Panipat Haryana

Panipat

(Haryana)

M/s SunEdison Infrastructure Limited

5. AC Installation work at NTPC 140 MW Site as per approved BOM

Bilhaur Kanpur (UP)

M/s Vikram Solar

Limited

6 AC & DC Installation work at Northern

Railway 2 MW Site as per approved BOM

Panipat

(Haryana)

M/s SunEdison Infrastructure Limited

7 Work Order for Supply, Erection, Testing

& Commissioning of 33/132KV

Substation for 2.5 MW Solar Power PV Plant at Diwana, Panipat

Panipat

(Haryana)

M/s SunEdison

Infrastructure Limited

Name of Projects Completed in 2019-2020: -

Sr. No. Description Location Client

1

Supply, Erection, Testing & Commissioning of 33

KV Overhead Transmission Line for 100 MW solar power plant.

Tamil Nadu

M/s Renew Power Limited

10

Page 11: M/s MANJIT POWER PROJECTS PVT

Name of Executed projects under M/s Manjit Construction Company: -

Sr.No. Description of Job Location Date of PO Client

1. Construction work of All

Technical control room building

& Switch yard Work 66/11 KV

substation with Testing,

Commissioning of 1x20 MVA Power Transformer bay.

NAWANSH

A HAR

21.12.2017

SHREEM

ELECTRIC LIMITED

2. Survey, Installation &

Commissioning of 11KV & 33 KV

Transmission Line.

Bhanapuli

(Anandpur

Sahib)

18.8.2018

V.K. Gupta

& Associates

(Panchkula)

3. Supply and Installation of Chemical Earthing With horizontal

rod system of 66/11 kv sub-station.

Pathankot 22.03. 2017

Punjab State Power corporation Limited

4. Construction work of All

Technical SHB & Switch yard Work 66/11 KV substation at

Malout.

Survey/Laying of Stubbing/Tower

Erection &Stringing of conductor

of 66 KV Transmission line.

Malout 02/04/16 Nucon Switch gear

Pvt. Ltd.

5. Construction work of All Technical control room building

& Switch yard Work 66/11 KV

substation at Medical College.

Amritsar

10/03/2017

Larsen and Toubro

LTD.

6. Laying of Stubbing/Tower

Erection &Stringing of conductor

of 66 KV Transmission line.

Nabha 27/10/2016

Godrej & Boyce

7. Laying of Stubbing/Tower

Erection &Stringing of conductor

of 66 KV Transmission line.

Pathankot 15/04/2016

Godrej & Boyce

11

Page 12: M/s MANJIT POWER PROJECTS PVT

8. Construction work of All

Technical control room building

& Switch yard Work 66/11 KV

substation.

Pathankot

28/11/2015

9. Erection, Testing,

Commissioning of 66/11 KV Grid Construction Augmentation

of 12.5 MVA Power Transformer

to 20 MVA Power Transformer at PSPCL.

Rajpura

28/11/2014

10. Erection, Testing,

Commissioning of 66/11 KV,20

MVA Additional Power Transformer and other allied works at SAMANA.

Samana

28/11/2015

11. Construction, of 66/11 KV

substation along with associated works at Sangrur

Sangrur

13/03/2015

12. Construction, of 66/11 KV substation along with associated

works at Pathankot

Pathankot

08/04/2015

13. Construction, of 66/11 KV substation along with associated

works Tarantaran

Taran Taran

Sahib 08/04/2015

14. Construction, of 66/11 KV

substation along with associated

works .

Batala 08/04/2015

15. Construction, of 66/11 KV substation along with associated

works.

Gurdaspur 08/04/2015

16. Construction, of all technical building work and technical

switchyard work of 66/11

KV substation at circle office Hoshiarpur

Hoshiarpur

05/05/2015

12

Page 13: M/s MANJIT POWER PROJECTS PVT

13

Page 14: M/s MANJIT POWER PROJECTS PVT

14

Page 15: M/s MANJIT POWER PROJECTS PVT

15

Page 16: M/s MANJIT POWER PROJECTS PVT

16

Page 17: M/s MANJIT POWER PROJECTS PVT

17

Page 18: M/s MANJIT POWER PROJECTS PVT

18

Page 19: M/s MANJIT POWER PROJECTS PVT

OUR ESTEEMED CLIENTELLE

19

Page 20: M/s MANJIT POWER PROJECTS PVT

PHOTO GALLERY

SUBSTATIONS

20

Page 21: M/s MANJIT POWER PROJECTS PVT

PHOTO GALLERY

SOLAR

&

TRANSMISSION LINES

21