Upload
norris
View
46
Download
0
Tags:
Embed Size (px)
DESCRIPTION
MTE Conclusions for 2011. Dummy septum studies Hybrid MTE Observation of islands at 2 GeV Observations of field stability Acknowledgements : M. Buzio, OP-PS crew, R. Steerenberg. S. Gilardoni, M. Giovannozzi, C. Hernalsteens, A. Lachaize, B. Vandorpe. Milestones (from IEFC 21/10/11). - PowerPoint PPT Presentation
Citation preview
MTE Conclusions for 2011MTE Conclusions for 2011
S. Gilardoni, M. Giovannozzi, C. S. Gilardoni, M. Giovannozzi, C. Hernalsteens, A. Lachaize, B. VandorpeHernalsteens, A. Lachaize, B. Vandorpe
Dummy septum studiesDummy septum studies
Hybrid MTEHybrid MTE
Observation of islands at 2 GeVObservation of islands at 2 GeV
Observations of field stabilityObservations of field stability
AcknowledgementsAcknowledgements: M. Buzio, OP-PS crew, R. : M. Buzio, OP-PS crew, R. SteerenbergSteerenberg
13/01/201213/01/2012 11MG - IEFC meetingMG - IEFC meeting
Milestones (from IEFC 21/10/11)Milestones (from IEFC 21/10/11)
End of 2011End of 2011Studies and measurements to confirm feasibility of dummy septum solution Studies and measurements to confirm feasibility of dummy septum solution (ABP/OP/TE-ABT).(ABP/OP/TE-ABT).
Studies almost complete.Studies almost complete.
Measurements: time lost for failure of SMH42. Encouraging results obtained Measurements: time lost for failure of SMH42. Encouraging results obtained with ions. Completions of measurements in March/April (agreed with ABT with ions. Completions of measurements in March/April (agreed with ABT experts).experts).
Prototype magnetic measurements of high-order multipoles of PS main Prototype magnetic measurements of high-order multipoles of PS main magnets (ABP/TE-MSC).magnets (ABP/TE-MSC).
Hardware ready.Hardware ready.
No possibility to find suitable time slot during POPS test at end of 2011. No possibility to find suitable time slot during POPS test at end of 2011. Re-Re-scheduled during hardware tests period in 2012.scheduled during hardware tests period in 2012.
Preliminary beam tests of hybrid MTE (ABP/OP): Preliminary beam tests of hybrid MTE (ABP/OP): DoneDone
Additional work done: Additional work done: Observation of islands at 2 GeVObservation of islands at 2 GeV
Observation of field stabilityObservation of field stability
13/01/201213/01/2012 22MG - IEFC meetingMG - IEFC meeting
Milestones (from IEFC 21/10/11)Milestones (from IEFC 21/10/11)
Q1 2012: Q1 2012: Finalisation of studies of hybrid MTE (ABP)Finalisation of studies of hybrid MTE (ABP)
Q2 2012: Q2 2012: Finalisation beam studies of hybrid MTEFinalisation beam studies of hybrid MTE
Conclusions from fluctuations studies (hopefully)Conclusions from fluctuations studies (hopefully)
NB: to continue the tests even after the failure of NB: to continue the tests even after the failure of SMH42, ions were used. Several users were set-up SMH42, ions were used. Several users were set-up with ions (e.g., a clone of TOF) thanks to the efforts with ions (e.g., a clone of TOF) thanks to the efforts
of the OP-PS crew.of the OP-PS crew.
13/01/201213/01/2012 33MG - IEFC meetingMG - IEFC meeting
Dummy septum studies - IDummy septum studies - I
To make transverse space for the blade of the To make transverse space for the blade of the dummy septum in SS15dummy septum in SS15
Move outwards the MTE beam (light blue)Move outwards the MTE beam (light blue)
Move inwards the TOF beam (green)Move inwards the TOF beam (green)
13/01/201213/01/2012 44MG - IEFC meetingMG - IEFC meeting
Isl. Slow bump
Nominal TOF
Modified fast bump
Dummy septum studies - IIDummy septum studies - II
Strategy to reduce amplitude at SS15Strategy to reduce amplitude at SS15Reduce slow bump in SS15Reduce slow bump in SS15
Optimise strength of extraction kicker KFA71Optimise strength of extraction kicker KFA71
It turned out that KFA4 (used for MTE – extraction of fifth It turned out that KFA4 (used for MTE – extraction of fifth turn) was useful in gaining transverse space in SS15 turn) was useful in gaining transverse space in SS15 while reducing amplitude in SS09 (where losses were while reducing amplitude in SS09 (where losses were observed with protons).observed with protons).
13/01/201213/01/2012 55MG - IEFC meetingMG - IEFC meeting
SS09SS09
SS15SS15
With KFA4With KFA4With KFA4With KFA4
Without KFA4Without KFA4
Without KFA4Without KFA4
Dummy septum studies - IIIDummy septum studies - III
13/01/201213/01/2012 66MG - IEFC meetingMG - IEFC meeting
Without KFA4Without KFA4
With KFA4With KFA4
SS15SS15
• 3.6 mm gain
• RMS: 0.5 mm (KFA71) and 1.5 mm (KFA71 and 04)
Dummy septum studies - IVDummy septum studies - IV
Main results:Main results:Space gained ≈ 7 mm Space gained ≈ 7 mm
Measurements to be repeated with protons to increase Measurements to be repeated with protons to increase statistics and check lossesstatistics and check losses
13/01/201213/01/2012 77MG - IEFC meetingMG - IEFC meeting
Dummy septum
Improved TOF
Modified fast bump for MTE
Hybrid MTE - IHybrid MTE - I
Tests performed:Tests performed:Slow bump: combine bumps in SS16 and SS31Slow bump: combine bumps in SS16 and SS31
13/01/201213/01/2012 88MG - IEFC meetingMG - IEFC meeting
Original bump 31: not Original bump 31: not closed due to magnets closed due to magnets in seriesin seriesNew bump New bump
perfectly closed perfectly closed (also from (also from measurements)measurements)
Hybrid MTE - IIHybrid MTE - II
Tests performed:Tests performed:Tune control during rise of slow bump and QKEsTune control during rise of slow bump and QKEs
13/01/201213/01/2012 99MG - IEFC meetingMG - IEFC meeting
Huge tune Huge tune variation. Difficult variation. Difficult to measure (too to measure (too fast for standard fast for standard tools).tools).
Partial correction using F8L. Partial correction using F8L. Potential issues:Potential issues:
Tune change in vertical plane. Tune change in vertical plane.
Correct response of the circuit.Correct response of the circuit.
Hybrid MTE - IIIHybrid MTE - III
Tests performed:Tests performed:
Kicked beam into islandKicked beam into islandFast tune change induces Fast tune change induces fast islands’ movement. fast islands’ movement. The beam kicked inside The beam kicked inside does not follow and does not follow and filamentsfilaments
13/01/201213/01/2012 1010MG - IEFC meetingMG - IEFC meeting
No tune correctionNo tune correction
Best tune correctionBest tune correction
Accurate measurement Accurate measurement and correction of fast and correction of fast tune change are the top tune change are the top priority for 2012 tests. priority for 2012 tests.
Observation of islands at 2 GeV - IObservation of islands at 2 GeV - I
Proposed to probe trapping reproducibility for very Proposed to probe trapping reproducibility for very different conditions with respect to nominal (below different conditions with respect to nominal (below transition).transition).
Found islands in V-plane!Found islands in V-plane!
Linear coupling is responsible for this unexpected Linear coupling is responsible for this unexpected behaviour.behaviour.
13/01/201213/01/2012 1111MG - IEFC meetingMG - IEFC meeting
H-planeH-plane V-planeV-plane
Observation of islands at 2 GeV - IIObservation of islands at 2 GeV - II
Campaign of coupling measurement launched.Campaign of coupling measurement launched.
Different energies probed from ions injection to 14 GeV. Different energies probed from ions injection to 14 GeV.
Data analysis is in progress.Data analysis is in progress.
NB: coupling at injection is used to control instabilities NB: coupling at injection is used to control instabilities for LHC beam. for LHC beam.
13/01/201213/01/2012 1212MG - IEFC meetingMG - IEFC meeting
2 GeV2 GeV
PreliminaryPreliminary
Observations of field stability - IObservations of field stability - I
These measurements are a complement of These measurements are a complement of measurement of islands’ position vs. time.measurement of islands’ position vs. time.
They provide additional insight of B-field They provide additional insight of B-field components stability.components stability.
13/01/201213/01/2012 1313MG - IEFC meetingMG - IEFC meeting0.217
0.218
0.219
0.22
0.221
0.222
0.223
0.224
0.225
0.226
0 100 200 300 400 500 600
QH QH fit exp
B = 12650 GB = 12650 G
0.2205
0.221
0.2215
0.222
0.2225
0.223
0.2235
0 100 200 300 400 500 600
Series1 QH fit exp
B = 7000 GB = 7000 G
2010 measurement campaign by B. Vandorpe2010 measurement campaign by B. Vandorpe
Observations of field stability - IIObservations of field stability - II
13/01/201213/01/2012 1414MG - IEFC meetingMG - IEFC meeting
0.22
0.225
0.23
0.235
0.24
0.245
0.25
0.255
0.26
700 800 900 1000 1100 1200 1300 1400
Qh Without Qh Fast Qh Basic
-5
0
5
10
15
20
25
30
35
40
0 500 1000 1500 2000 2500
WFNI Basic WFNP Basic WFW Basic
WFNI Fast WFNP Fast WFW Fast
2011 measurement 2011 measurement campaign by B. campaign by B.
VandorpeVandorpe
B = 6666 GB = 6666 G B = 6666 GB = 6666 G
0.215
0.216
0.217
0.218
0.219
0.22
0.221
0.222
0.223
0.224
0.225
-25 -15 -5 5 15 25
Qh Basic = f(MRP)C1000C1050C1100C1200C1300C1400C1500C1600C1700
0.227
0.228
0.229
0.23
0.231
0.232
0.233
0.234
0.235
0.236
0.237
-25 -15 -5 5 15 25
Qh Fast = f(MRP) C1000C1050C1100C1200C1300C1400C1500C1600C1700
Observations of field stability - IIIObservations of field stability - III
Direct magnetic measurements will provide more Direct magnetic measurements will provide more insight in the behaviour of the PS main magnets insight in the behaviour of the PS main magnets (planned for hardware test period).(planned for hardware test period).
Large amount of data available for analysis and Large amount of data available for analysis and discussion with various experts: it would be discussion with various experts: it would be worthwhile organising a half-day discussion (as worthwhile organising a half-day discussion (as proposed by R. Steerenberg) in January/February.proposed by R. Steerenberg) in January/February.
13/01/201213/01/2012 1515MG - IEFC meetingMG - IEFC meeting