Project ABC123456 Solvent Recovery Plant Date: 28 Feb 2015 15:48 Pipework MTO for /PIPING Type,"Detail","Material","Tube","Quantity" ,"Text","Text",, ELBO,"ELBOW 45DEG ANSI B16.9 BW","ASTM A234-WPB",0.00,2 ELBO,"ELBOW LR ANSI B16.9 BW","ASTM A234-WPB",0.00,9 FLAN,"FLANGE WN ANSI B16.5 #150.RF","ASTM A105 GR.B",0.00,24 GASK,"GASKET ANSI B16.21 #150.RF","SS & ASB",0.00,1 GASK,"GASKET RF 1.5MM ANSI B16.5 #150","SS & ASB",0.00,21 OLET,"BONNEY THREDOLET NPT #3000","ASTM A53",0.00,4 REDU,"REDU CONC ANSI B16.9 BW","ASTM A234 GR.WPB",0.00,8 TEE,"TEE ANSI B16.9 BW","ASTM A234-WPB",0.00,4 TUBI,"PIPE SCH40 ANSI B36.10","API5L GR.B",48740.57,33 VALV,"VALVE GATE ANSI B16.10 #150.RF","ASTM A216-WCB",0.00,7

MTO_AAN

  • Upload
    aan

  • View
    215

  • Download
    2

Embed Size (px)

DESCRIPTION

mto

Citation preview

MTO_AAN.xlsxProject ABC123456Solvent Recovery PlantDate: 28 Feb 2015 15:48Pipework MTO for /PIPINGType,"Detail","Material","Tube","Quantity","Text","Text",,ELBO,"ELBOW 45DEG ANSI B16.9 BW","ASTM A234-WPB",0.00,2ELBO,"ELBOW LR ANSI B16.9 BW","ASTM A234-WPB",0.00,9FLAN,"FLANGE WN ANSI B16.5 #150.RF","ASTM A105 GR.B",0.00,24GASK,"GASKET ANSI B16.21 #150.RF","SS & ASB",0.00,1GASK,"GASKET RF 1.5MM ANSI B16.5 #150","SS & ASB",0.00,21OLET,"BONNEY THREDOLET NPT #3000","ASTM A53",0.00,4REDU,"REDU CONC ANSI B16.9 BW","ASTM A234 GR.WPB",0.00,8TEE,"TEE ANSI B16.9 BW","ASTM A234-WPB",0.00,4TUBI,"PIPE SCH40 ANSI B36.10","API5L GR.B",48740.57,33VALV,"VALVE GATE ANSI B16.10 #150.RF","ASTM A216-WCB",0.00,7