Multidisciplinary Office BuildingFor Baker Architects
Presented ByPresented By:
The client and the problemThe client and the problem
SolutionSolution Site studySite study Site and building designSite and building design Bridge designBridge design Truss designTruss design Foundation designFoundation design
ConclusionConclusion
IntroductionIntroduction
Design AidsDesign Aids
Point System in 6 CategoriesPoint System in 6 Categories
Sustainable SiteSustainable Site
Water EfficiencyWater Efficiency
Energy and AtmosphereEnergy and Atmosphere
Materials and ResourcesMaterials and Resources
Indoor Environmental QualityIndoor Environmental Quality
Innovation and Design ProcessInnovation and Design Process
Environmental ConsiderationsEnvironmental Considerations
LEEDLEED - Leadership in Energy and Environmental DesignLeadership in Energy and Environmental Design
Erosion ControlErosion Control
Site LayoutSite Layout
Site InvestigationSite Investigation Site surveySite survey Soils investigationSoils investigation Hydrologic and hydraulic analysisHydrologic and hydraulic analysis
Building layout designBuilding layout design Several options createdSeveral options created Client selected preferred designClient selected preferred design
Suspension BridgeSuspension BridgeCable-stay Suspension Bridge
4” Pre-cast Concrete Walkway
Waterproof Canvas Cover 10’ Wide
80’ Long to Span Ravine
Cable-stay System Integrated into Truss Cable-stay foundations
Roof Support SystemRoof Support System
Client-Specified Design
Computer Analysis to Determine Member Sizes
Timber-based design
Cable-stayed system
32 ft wide x 16 ft tall
Made with Plywood and Standard-Sized Timber
Slopes the Roof Line to Complement the Ravine
Roof Support SystemRoof Support System
Cable Stay SystemCable Stay System
Two Focal Points on the North Face of Building
Steel Cable Attached to Top of Trusses
Concrete Foundations
FoundationsFoundations
10’ Retaining Wall10’ Retaining Wall
Continuous FootingContinuous Footing
Cable Stay AnchorsCable Stay Anchors
16’ Masonry Wall Spanning the Buildings North Wall 16’ Masonry Wall Spanning the Buildings North Wall
Translucent Concrete OptionsTranslucent Concrete Options
Masonry WallMasonry Wall
CostCost
Total Cost BreakdownExcavation $ 8100
Suspension Bridge $ 12000
Roof $ 41,200
Foundation $ 50,200
Miscellaneous $ 356,100
Interior (25%) $ 114,000
Total Cost $ 571,000
The client and the problemThe client and the problem
SolutionSolution Site studySite study Site and building designSite and building design Bridge designBridge design Truss designTruss design Foundation designFoundation design
ConclusionConclusion
Questions?Questions?
Site LayoutSite Layout
FoundationFoundation
FoundationFoundation
Misc. CostsMisc. Costs
Truss DimensionsTruss Dimensions