Welcome: Thank you for attending This live Presentation

will be recorded The Presenter(s) cannot

see or hear you If you have a question,

you can submit it to the project team during the presentation

Answers will be provided by the project team after the presentation

There is a 20-30 second video delay, so please be patient

2Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge)

Page 3: Municipality of Meaford Replacement of Bridge No. 015

Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge) 3

Introduction

BRIAN WICKENHEISER, P. ENG. P.E.• Bridges & Structures Group Lead• 25 Years of Experience• 100+ Bridge Replacement &

Rehabilitation Projects

JAMES C BALDWIN, P. ENG.• Structural Engineer & Project Manager• 10 Years of Experience• Bridge/Large Span Culvert Replacement

& Rehabilitation

Page 4: Municipality of Meaford Replacement of Bridge No. 015

Agenda Project Background Planned Improvements Construction Impacts, including FAQs Next Steps Question Period

4Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge)

Page 5: Municipality of Meaford Replacement of Bridge No. 015

Project Background

Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge) 5

Page 6: Municipality of Meaford Replacement of Bridge No. 015

Project Location

6Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge)

Located on Sideroad 3, approx. 1.7 km west of Grey Road 29

Page 7: Municipality of Meaford Replacement of Bridge No. 015

Existing Structure

Built in the1940 Single span, concrete rigid frame structure Total deck length of 16.3 metres Provides two 3.65 m lanes, carrying vehicular traffic over the Bighead River Average Annual Traffic Volume of less than 100 vehicles per day (i.e. low

volume)

7Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge)

Page 8: Municipality of Meaford Replacement of Bridge No. 015

Structure Condition Structure is 80 years old Various elements have deteriorated

Cracking, spalling, disintegration, exposed rebar

Due to its deteriorating condition, it was posted with a 12 tonne load limit in 2017

2020 Bridge Condition Index (BCI) rating was calculated to be 25.4 (out of 100), one of the lowest in the Municipality

Lifecycle cost analysis concluded the structure is beyond economic rehabilitation

Options considered: permanently close the structure or replace Municipality decided to replace the structure

8Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge)

Page 9: Municipality of Meaford Replacement of Bridge No. 015

Planned Improvements

Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge) 9

Page 10: Municipality of Meaford Replacement of Bridge No. 015

Options Considered Bridge and Approach Roadway Cross-Section

Lane width, shoulder width, bridge side clearance

Bridge Type FRP, Timber, concrete rigid frame, concrete deck on concrete or steel

girders (integral or semi-integral configuration) Various culvert configurations

Bridge Geometry Perpendicular to the road, skewed

Bridge Barrier F-shape with railing, three-tube railing on curb (with end wall)

10Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge)

Page 11: Municipality of Meaford Replacement of Bridge No. 015

Proposed Improvements

11Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge)

Bridge and Approach Roadway Cross-Section Lane width – 3.25 m Shoulder width – 1.0 m Bridge side clearance – 1.0 m Total road and bridge platform – 8.5 m

Page 12: Municipality of Meaford Replacement of Bridge No. 015

Proposed Improvements

12Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge)

Bridge TypeConcrete deck on prestressed concrete box girders (with semi-

integral configuration to support a skewed geometry)Driven pile foundation

Bridge Geometry 35° skew, to minimize span and match watercourse alignment

Bridge Barrier Three-tube railing on curb (with end wall) Steel beam guiderail will be installed on approaches

Page 13: Municipality of Meaford Replacement of Bridge No. 015

Proposed Structure Elevation View

13Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge)

Page 14: Municipality of Meaford Replacement of Bridge No. 015

Proposed Structure 3D View

14Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge)

Page 15: Municipality of Meaford Replacement of Bridge No. 015

Construction Impacts

Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge) 15

Page 16: Municipality of Meaford Replacement of Bridge No. 015

Impacts of Construction Road Closure and Detour

The road will be fully closed for a period of 6 months A detour route will be set up, using 4th Concession South, Sideroad

6, and Grey Road 29

16Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge)

Page 17: Municipality of Meaford Replacement of Bridge No. 015

Impacts of Construction Tree Removals

Removal of vegetation will be required to permit construction

Permission to Enter/AccessRequired north and south of structure to repair scour and erosion of

watercourse banks

Raise in Road Profile Improve road geometry/sightlines

Minor Shift in Road Alignment

Field Entrance Relocations

17Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge)

Page 18: Municipality of Meaford Replacement of Bridge No. 015

Frequently Asked Questions What are the construction timelines?

Construction is anticipated to commence in June of 2021 and be complete by November 2021 (pending tendering, agency approvals, budget, and Council approval)

What are the construction costs?Construction costs are anticipated to be approximately $1.6M

Will the load limit be removed with the new bridge in place? The new bridge has been designed for loading in accordance with

the Canadian Highway Bridge Design Code (CHBDC), so the load limit can be removed at the Municipality’s discretion

18Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge)

Page 19: Municipality of Meaford Replacement of Bridge No. 015

Frequently Asked Questions What if I have a concern during construction?

Contact either the Municipality’s Project Manager or Ainley Group Contract Administrator/Inspector (contact information will be provided)

Common concerns:• Dust, mud • Noise, vibration

What if I have a concern once the work is complete and the Contractor has left? The project will have a two-year warranty period

19Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge)

Page 20: Municipality of Meaford Replacement of Bridge No. 015

Next Steps

Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge) 20

Page 21: Municipality of Meaford Replacement of Bridge No. 015

Next Steps Agency Approvals (GSCA, TC) Tendering and Award of the Contract Construction Commencement

Remember: During construction, please be patient; exercise care and caution in the area

Questions can be sent to:

21Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge)

Joel SaundersCapital Projects Coordinator –Linear ProjectsMunicipality of [email protected] ext. 1319

James C Baldwin, P. Eng.Structural Engineer & Project ManagerAinley [email protected] ext. 228

Page 22: Municipality of Meaford Replacement of Bridge No. 015

Question Period

Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge) 22

Page 23: Municipality of Meaford Replacement of Bridge No. 015

Please Note: The Live Presentation has ended Questions can still be submitted through the online platform until

7:00 p.m. and answers will be provided by the Project Team Comments can also be submitted to the Project Team

23Municipality of Meaford | Replacement of Bridge No. 015 (Gillies Bridge)

Joel SaundersCapital Projects Coordinator –Linear ProjectsMunicipality of [email protected] ext. 1319

James C Baldwin, P. Eng.Structural Engineer & Project ManagerAinley [email protected] ext. 228

THANK YOU FOR PARTICIPATING!