FPSO Cidade de Itaguaí MV26Integration @ BrasFels Shipyard
12 Modules Lifting Campaign
Jan 12 – 28, 2015
FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)Lifting dated 23 Jan 2015 => 5P-2 MODULE Transfer from Yard to
Barge After welding completion of 4-additional Pad-eyes
9
FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)
7th Lifting dated 24 Jan 2015 (AM) => 5P- 2 MODULE @Port-side
10
FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)
Module Delivery dated 24 Jan 2015 (AM) => 3P-1 & 2P-1 MODULES
11
FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)
8th Lifting dated 24 Jan 2015 (PM) => 3P-1 MODULE @Port-side
12
FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)
9th Lifting dated 25 Jan 2015 (AM) => 2P-1 MODULE @Port-side
13
FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)
10th Arrival & Lifting dated 25 Jan 2015 (Noon) => 2P-2 MODULE
14
FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)
Bird’s Eye-view => Lifting of Module & Start of Vessel Turning
15
FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)
Vessel Turning with Port-side along Finger Pier dated: 26-Jan-15
16
FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)Shifting of Fwd Crane Boom for access of last 2-modules 2S-3 &
2S-4 11th Lifting dated 27 Jan 2015 => 2S- 3 MODULE @Stbd-side
18
FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)
Replacing Lifting Bars and Gears from 2S-3 to 2S-4 Module lifting Started the last lifting, Module 2S-4 from
Temporary Holding Area
19
FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)
12th and Last Module Lifting dated 28-Jan-15 => 2S-4 MODULE
20