MyOcean2 First Annual Meeting – 17-18 April 2013
WP2.3
Service Engineering
MyOcean2 First Annual Meeting – Cork /16-17 April 2013
Service engineering
- “WHAT”: Define a solution that answers Service Definition (Products & all user interfaces)
- “HOW” : Methodology to reach the defined solution
Service Engineering Main Objectives (1/4)
MyOcean2 First Annual Meeting – 17-18 April 2013
Provide methods and means to be sure that MyOcean partners share the same...
- Understanding of Users needs & Stakeholders expectations
- Vision of solution (technical and process parts)
- Methodology to reach MyOcean Solution - (Operation + Development + Project) x (Technical + Processes)
Service Engineering Main Objectives (2/4)
Service Engineering Main Objectives (3/4)
MyOcean2 First Annual Meeting – 17-18 April 2013
About sub-systems:
- Allocate requirements to sub-systems (42 PUs, 24 DUs, 1 CIS)
- Mainly at interfaces with other sub-systems
- Organize and make Integration of sub-systems
- Organize and make Verification and Validation of the integrated solution
Service Engineering Main Objectives (4/4)
MyOcean2 First Annual Meeting – 17-18 April 2013
- Define and Allocate roles to service desks, service managers, product managers, ...
- Organize continuous improvement of these Operational processes
- Work with project management on Project & Development processes
About processes:
Service EngineeringPartnership
WP2.3Service
Engineering
Technical ActivitiesWP2.3.1
Interface with PMO for technical management tasks
WP2.3.2
CLS
Edisoft
CLS
CLS
System engineering
Serviceengineering Testing
Altamira
Altamira Edisoft
WP2 – WP2.1 leadService Evolution, management and support
Mercator-Ocean
WP2.2Service
Definition
WP2.4Service
transition
WP2.5Service operation,
Service Desk
WP2.5Service
monitoring
Service EngineeringPartnership
WP2.3Service
Engineering
Technical ActivitiesWP2.3.1
Interface with PMO for technical management tasks
WP2.3.2
CLS
Edisoft
CLS
CLS
System engineering
Serviceengineering Testing
Altamira
Altamira Edisoft
WP2 – WP2.1 leadService Evolution, management and support
Mercator-Ocean
WP2.2Service
Definition
WP2.4Service
transition
WP2.5Service operation,
Service Desk
WP2.5Service
monitoring
After more than 3 years,
Top-Level Engineering activities
are really shared between
MyOcean Partners
Achievements (1/5)
DU: Download / Visualization Service Management Tools :
tools to manage incidents, user requests, CRM, …
Processes for Service Desks Incident Mngt, … All processes needed for service
management
Product Management Product Quality Management
PU Product Validation tools
Products User Interface Services
MyOcean Operational System
Auto
mat
edO
pera
tiona
l Pr
oces
ses
User point of view
Achievements (2/5)
Impact on Testing, Transition, Release
Achievement (3/5)
Failure impact analysis
Þ Very strong constraints on Central Authentication System
Þ Need of a central service desk and tool (CRM) to manage user requests and be sure that someone has answered
Þ ...
MyOcean2 First Annual Meeting – 17-18 April 2013
Operational processesGood improvement of OPM (Operational Process Manual)
Still relying on ITIL recommendations, With strong implication of all process owners
Good V3 sub-system acceptance (mid January 2013)Good level of deliverables (product quality report, system description, test reports on interfaces, ...)Most V3 systems ready for V3 tests and integration while V2 ones operational
Information to analyse change impactsImprovement of system description,Description of product dependencies.
Achievements (4/5)
MyOcean2 First Annual Meeting – 17-18 April 2013
Improvement of product organization and search functionality. It is a collective task impossible in such time without specification, organization, share and understanding of the same objective.
Users !Service Definition, Product managers, Technical teams in charge of DUs, CIS team, Service managers, Transition team, Communication,Service DeskUsers
Achievements (5/5)
Next Steps (1/4)No new functionality
About the solution : No new functionality but improvement of existing
Improve performances (Download and View too slow) Requirements and OLA
Not yet within SLA
Increase efficiency and integration of main functions interfaces (Search-Discovering – View-Download) while keeping geographical distributed architecture
Increase technical cooperation with SeaDataNet
Next Steps (2/4)
About schedule:
Provide top-level requirements sooner:
• To prepare and animate discussion at Executive Committee,
• To allocate requirements in time to sub-systems,
• To be on time at V4 Top-level PDR.
Next Steps (3/4)Method and organization
Improve Tests to find inconsistencies between • Specification, • Information provided to users (catalogue, PUM, QUID),• and .... the reality.
Improve Integration & Verification tests and phase organization:
• Too long for double production, double dissemination,
• Not enough time at top-level to tests every things Þ Improving testing organization
Þ Be more strict on sub-system acceptances
Þ Reduce release content
More minor releases and a Smaller major release
Next Steps (4/4)Method and organization
Improvement of release management (WP1 with Engineering support)
• Take advantage that now (V3), it is easy to modify catalogue content
• Define all different transition types (with Service Transition team & Product managers) :
• what is a new product, a product upgrade, • with double production, with double dissemination, with double
catalogue entries, • Associated tests need according to release type, ...
Keep constructive relationships with High level review groups, with EC evaluators and external experts.
Thank you