1
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 25+41 HDD ENTRY/EXIT N40.082832 W75.717335 HDD EXIT/ENTRY N40.079035 W75.709717 GEOTECH SB-01 GEOTECH SB-02 GEOTECH SB-03 200 300 400 500 600 200 300 400 500 600 -1+00 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 DRIVEWAY 5+19 DRIVEWAY 7+10 DRIVEWAY 5+19 HDD EXIT/ENTRY 25+41 EL.398' 1576' 202' 331' 10° STA. 22+15 EL. 341' STA. 19+37 EL. 316' STA. 15+68 EL. 325' 114' 40' GRADE MILFORD RD 2+31 HIGHVIEW RD 16+99 28' STA. 17+35 EL. 316' R=1600' L=278' S=279' EDGE OF RD 17+17 SANITARY 17+16 FIBER OPTIC 16+30 TELEPHONE 16+75 EDGE OF RD 16+83 WATER 16+86 8" SUNOCO PIPELINE 17+07 36' DRIVEWAY 8+48 OVERHEAD POWER 1+99 OVERHEAD POWER 2+10 EDGE OF RD 2+10 OVERHEAD POWER 3+51 EDGE OF RD 3+31 LITTLE CONESTOGA RD 2+89 WATER 2+72 APPROXIMATE BEDROCK GEOTECH SB-02 12+36, 34' RT GEOTECH SB-03 23+38, 40' LT HDD ENTRY/EXIT 0+00 EL.490' GEOTECH SB-01 1+88, 61' LT EDGE OF WETLAND H17 CL STREAM S-H10 23+25 EDGE OF WETLAND H17 CL STREAM S-H11 22+80 36' OVERHEAD POWER 7+43 OVERHEAD POWER 5+33 LEGEND PERMANENT ROW TEMPORARY CONSTRUCTION ROW TEMPORARY WORKSPACE TEMPORARY ACCESS ROAD PERMANENT ACCESS ROAD SPOIL SPACE ONLY PROPOSED HDD PROPOSED 20" PIPELINE PROPOSED 16" PIPELINE HDD ENTRY-EXIT PEM WETLANDS PSS WETLANDS PFO WETLANDS -INCH HORIZONTAL DIRECTIONAL DRILL REF. DRAWING EROSION & SEDIMENT PLAN AERIAL SITE PLAN PLAN VIEW PROFILE VIEW NO. DESCRIPTION DATE BY CHK DATE REVISIONS DATE APP NOTES Sunoco Logistics Partners L.P. SUNOCO PIPELINE, L.P. 1. ALL COORDINATES SHOWN ARE IN LATITUDE AND LONGITUDE. ALL MSL ELEVATIONS ARE NAD83 2. STATIONING IS BASED ON HORIZONTAL DISTANCES. 3. ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP ARE NOT RESPONSIBLE FOR LOCATION OF FOREIGN UTILITIES SHOWN IN PLOT PLAN OR PROFILE. THE INFORMATION SHOWN HEREON IS FURNISHED WITHOUT LIABILITY ON THE PART OF ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP, FOR ANY DAMAGES RESULTING FROM ERRORS OR OMISSIONS THEREIN. 4. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CONTACT ONE CALL AT 811 PRIOR TO DIGGING. 5. SUNOCO EMERGENCY HOTLINE NUMBER IS #1-800-786-7440. PENNSYLVANIA PIPELINE PROJECT DESIGN AND CONSTRUCTION: 1. CONTRACTOR SHALL FIELD VERIFY DEPTH OF ALL EXITING UTILITIES SHOWN OR NOT SHOWN ON THIS DRAWING. 2. THE MINIMUM SEPARATION DISTANCE FROM EXISTING SUBSURFACE UTILITIES SHALL NOT BE LESS THAN 10 FEET AS MEASURED FROM THE OUTSIDE EDGE OF THE UTILITY TO OUTSIDE OF PROPOSED PIPELINE. 3. DESIGNED IN ACCORDANCE WITH CFR 49 195 & ASME B31.4 4. CROSSING PIPE SPECIFICATION: HDD HORZ. LENGTH (L=): HDD PIPE LENGTH (S=): 16" x 0.438" W.T., X-70, API5L, PSL2, ERW, BFW COATING: 14-16 MILS FBE WITH 30-35 MIL ARO (POWERCRETE R95) 5. INTERNAL DESIGN PRESSURE 1480 PSIG (SEAM FACTOR 1.0, DESIGH FACTOR 0.50). 6. INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL (HDD). 7. PIPELINE WARNING MARKERS SHALL BE INSTALLED ON BOTH SIDES OF ALL ROAD, RAILWAY, AND STREAM CROSSINGS. 8. CARRIER PIPE NOT ENCASED. 9. PIPE / AMBIENT TEMPERATURE MUST BE NO LESS THAN 30°F DURING PULLBACK WITHOUT PRIOR WRITTEN APPROVAL FROM THE ENGINEER. 10. CONDUCT 4-HOUR PRE-INSTALLATION HYDROTEST OF HDD PIPE STRING TO MINIMUM 1850 PSIG. 11. SEE SUNOCO PENNSYLVANIA PIPELINE PROJECT ESRI WEBMAP FOR ACCESS ROAD ALIGNMENT. 12. SUNOCO PIPELINE, L.P.'S HORIZONTAL DIRECTIONAL DRILL INADVERTENT RETURN CONTINGENCY PLAN WILL BE IMPLEMENTED AT ALL TIMES. 13. SUNOCO PIPELINE, L.P.'S EROSION AND SEDIMENTATION CONTROL PLAN WILL BE IMPLEMENTED AT ALL TIMES. TO TO DWG NO DWG NO DESCRIPTION 16 08/31/15 05/10/16 LITTLE CONESTOGA ROAD 1"=250' PA-CH-0100.0000-RD-16 CHESTER COUNTY, PA - UWCHLAN TOWNSHIP S3-0290-16 A ISSUED FOR BID MRS RMB AWW 08/31/15 03/15/16 08/31/15 09/25/15 ES-6.27 EP1 REVISED PER PADEP COMMENTS JTW RMB AAW 05/10/16 SHEET 17 05/10/16 EP MRS RMB AAW 03/15/16 ES-6.29 03/15/16 B ADDED GEOTECH INFO MRS RMB AAW 09/25/15 SHEET 16 09/25/15 2541' 2557' 0 FEET 125 125 250 PA-CH-0110.0000 PA-CH-0099.0000 20" PROPOSED PIPELINE 8" SUNOCO PIPELINE HIGHVIEW RD LITTLE CONESTOGA RD MILFORD RD 16" PROPOSED PIPELINE PA-CH-0109.0000-TAR PA-CH-0108.0001 PA-CH-0108.0000 PA-CH-0106.0000-ABTE PA-CH-0107.0000 PA-CH-0106.0000 PA-CH-0105.0000 PA-CH-0104.0000 PA-CH-0103.0000 PA-CH-0102.0000 PA-CH-0100.0000 PA-CH-0101.0000 PA-CH-0100.0100 PA-CH-0099.0000-ABTS PA-CH-0101.0000-ABTE PA-CH-0101.0000-ABTE2 PA-CH-0101.0000-ABTE3 NOTE: REFER TO TEST BORING LOG S3-0290 FOR COMPLETE SOIL MATERIAL DESCRIPTION -NG EL. 499' GEOTECH SB-01 -TOPSOIL (0' - 0.3') -SM (0.3' - 30.0') -COMPLETION DEPTH EL. 469' -CL (1.0' - 6.5') -NG EL. 390' GEOTECH SB-03 -TOPSOIL (0' - 1.0') -SM (6.5' - 30.0') -COMPLETION DEPTH EL. 360' -GROUNDWATER (16.0') -NG EL. 460' GEOTECH SB-02 -TOPSOIL (0' - 0.7) -SM (0.7' - 7.0') -COMPLETION DEPTH EL. 448' -GNEISS (7.0' - 12.0')

N40.079035 N40.082832 W75.709717 W75.717335 25+41 1+00 2+00 3+00 4+00 5+00 6+00 …files.dep.state.pa.us/RegionalResources/SERO/SEROPortalFiles... · 0+00 1+00 2+00 3+00 4+00 5+00

Embed Size (px)

Citation preview

Page 1: N40.079035 N40.082832 W75.709717 W75.717335 25+41 1+00 2+00 3+00 4+00 5+00 6+00 …files.dep.state.pa.us/RegionalResources/SERO/SEROPortalFiles... · 0+00 1+00 2+00 3+00 4+00 5+00

0+

00

1+

00

2+

00

3+

00

4+

00

5+

00

6+

00

7+

00

8+

00

9+

00

10

+0

0

11

+0

0

12

+0

0

13

+0

0

14

+0

0

15

+0

0

16

+0

0

17

+0

0

18

+0

0

19

+0

0

20

+0

0

21

+0

0

22

+0

0

23

+0

0

24

+0

0

25

+0

0

25

+4

1

HDD ENTRY/EXIT

N40.082832

W75.717335

HDD EXIT/ENTRY

N40.079035

W75.709717

GEOTECH SB-01

GEOTECH SB-02

GEOTECH SB-03

200

300

400

500

600

200

300

400

500

600

-1+00 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00

DR

IV

EW

AY

5+

19

DR

IV

EW

AY

7+

10

DR

IV

EW

AY

5+

19

HD

D E

XIT

/E

NT

RY

25+

41

EL.398'

1576'

202'

331'

10°

STA. 22+15

EL. 341'

STA. 19+37

EL. 316'

STA. 15+68

EL. 325'

114'

40'

GRADE

MILF

OR

D R

D

2+

31

HIG

HV

IE

W R

D

16+

99

28'

STA. 17+35

EL. 316'

R=1600'

L=278'

S=279'

ED

GE

O

F R

D

17+

17

SA

NIT

AR

Y

17+

16

FIB

ER

O

PT

IC

16+

30

TE

LE

PH

ON

E

16+

75

ED

GE

O

F R

D

16+

83

WA

TE

R

16+

86

8" S

UN

OC

O P

IP

ELIN

E

17+

07

36'

DR

IV

EW

AY

8+

48

OV

ER

HE

AD

P

OW

ER

1+

99

OV

ER

HE

AD

P

OW

ER

2+

10

ED

GE

O

F R

D

2+

10

OV

ER

HE

AD

P

OW

ER

3+

51

ED

GE

O

F R

D

3+

31

LIT

TLE

C

ON

ES

TO

GA

R

D

2+

89

WA

TE

R

2+

72

APPROXIMATE BEDROCK

GE

OT

EC

H S

B-02

12+

36, 34' R

T

GE

OT

EC

H S

B-03

23+

38, 40' LT

HD

D E

NT

RY

/E

XIT

0+

00

EL.490'

GE

OT

EC

H S

B-01

1+

88, 61' LT

ED

GE

O

F W

ET

LA

ND

H

17

CL S

TR

EA

M S

-H

10

23+

25

ED

GE

O

F W

ET

LA

ND

H

17

CL S

TR

EA

M S

-H

11

22+

80

36'

OV

ER

HE

AD

P

OW

ER

7+

43

OV

ER

HE

AD

P

OW

ER

5+

33

LEGEND

PERMANENT ROW

TEMPORARY CONSTRUCTION ROW

TEMPORARY WORKSPACE

TEMPORARY ACCESS ROAD

PERMANENT ACCESS ROAD

SPOIL SPACE ONLY

PROPOSED HDD

PROPOSED 20" PIPELINE

PROPOSED 16" PIPELINE

HDD ENTRY-EXIT

PEM WETLANDS

PSS WETLANDS

PFO WETLANDS

-INCH HORIZONTAL DIRECTIONAL DRILL

REF. DRAWING

EROSION & SEDIMENT PLAN

AERIAL SITE PLAN

PLAN VIEW

PROFILE VIEW

NO. DESCRIPTION DATEBY CHK DATE

REVISIONS

DATEAPP

NOTES Sunoco LogisticsPartners L.P.

SUNOCO PIPELINE, L.P.

1. ALL COORDINATES SHOWN ARE IN LATITUDE AND LONGITUDE. ALL MSL ELEVATIONS ARE NAD83

2. STATIONING IS BASED ON HORIZONTAL DISTANCES.

3. ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP ARE NOT RESPONSIBLE FOR LOCATION

OF FOREIGN UTILITIES SHOWN IN PLOT PLAN OR PROFILE. THE INFORMATION SHOWN HEREON IS

FURNISHED WITHOUT LIABILITY ON THE PART OF ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE,

LP, FOR ANY DAMAGES RESULTING FROM ERRORS OR OMISSIONS THEREIN.

4. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CONTACT ONE CALL AT 811 PRIOR TO

DIGGING.

5. SUNOCO EMERGENCY HOTLINE NUMBER IS #1-800-786-7440.

PENNSYLVANIA PIPELINE PROJECT

DESIGN AND CONSTRUCTION:

1. CONTRACTOR SHALL FIELD VERIFY DEPTH OF ALL EXITING UTILITIES SHOWN OR NOT SHOWN ON

THIS DRAWING.

2. THE MINIMUM SEPARATION DISTANCE FROM EXISTING SUBSURFACE UTILITIES SHALL NOT BE LESS

THAN 10 FEET AS MEASURED FROM THE OUTSIDE EDGE OF THE UTILITY TO OUTSIDE OF PROPOSED

PIPELINE.

3. DESIGNED IN ACCORDANCE WITH CFR 49 195 & ASME B31.4

4. CROSSING PIPE SPECIFICATION:

HDD HORZ. LENGTH (L=):

HDD PIPE LENGTH (S=):

16" x 0.438" W.T., X-70, API5L, PSL2, ERW, BFW

COATING: 14-16 MILS FBE WITH 30-35 MIL ARO (POWERCRETE R95)

5. INTERNAL DESIGN PRESSURE 1480 PSIG (SEAM FACTOR 1.0, DESIGH FACTOR 0.50).

6. INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL (HDD).

7. PIPELINE WARNING MARKERS SHALL BE INSTALLED ON BOTH SIDES OF ALL ROAD, RAILWAY, AND

STREAM CROSSINGS.

8. CARRIER PIPE NOT ENCASED.

9. PIPE / AMBIENT TEMPERATURE MUST BE NO LESS THAN 30°F DURING PULLBACK WITHOUT PRIOR

WRITTEN APPROVAL FROM THE ENGINEER.

10. CONDUCT 4-HOUR PRE-INSTALLATION HYDROTEST OF HDD PIPE STRING TO MINIMUM 1850 PSIG.

11. SEE SUNOCO PENNSYLVANIA PIPELINE PROJECT ESRI WEBMAP FOR ACCESS ROAD ALIGNMENT.

12. SUNOCO PIPELINE, L.P.'S HORIZONTAL DIRECTIONAL DRILL INADVERTENT RETURN CONTINGENCY PLAN

WILL BE IMPLEMENTED AT ALL TIMES.

13. SUNOCO PIPELINE, L.P.'S EROSION AND SEDIMENTATION CONTROL PLAN WILL BE IMPLEMENTED AT ALL

TIMES.

TO

TO

DWG NO DWG NO DESCRIPTION

16

08/31/15

05/10/16

LITTLE CONESTOGA ROAD

1"=250'

PA-CH-0100.0000-RD-16

CHESTER COUNTY, PA - UWCHLAN TOWNSHIP

S3-0290-16

A ISSUED FOR BIDMRS RMB AWW08/31/15

03/15/16

08/31/15

09/25/15

ES-6.27

EP1 REVISED PER PADEP COMMENTSJTW RMB AAW05/10/16

SHEET 17

05/10/16

EP MRS RMB AAW03/15/16

ES-6.29

03/15/16

B ADDED GEOTECH INFOMRS RMB AAW09/25/15

SHEET 16

09/25/15

2541'

2557'

0

FEET

125 125 250

PA-CH-0110.0000

PA-CH-0099.0000

20" PROPOSED PIPELINE

8" SUNOCO PIPELINE

H

I

G

H

V

I

E

W

R

D

L

I

T

T

L

E

C

O

N

E

S

T

O

G

A

R

D

MILF

OR

D R

D

16" PROPOSED PIPELINE

PA-CH-0109.0000-TAR

PA-CH-0108.0001

PA-CH-0108.0000

PA-CH-0106.0000-ABTE

PA-CH-0107.0000

PA-CH-0106.0000

PA-CH-0105.0000

PA-CH-0104.0000

PA-CH-0103.0000

PA-CH-0102.0000

PA-CH-0100.0000

PA-CH-0101.0000

PA-CH-0100.0100

PA-CH-0099.0000-ABTS

PA-CH-0101.0000-ABTE

PA-CH-0101.0000-ABTE2

PA-CH-0101.0000-ABTE3

NOTE: REFER TO TEST BORING LOG S3-0290

FOR COMPLETE SOIL MATERIAL DESCRIPTION

-NG EL. 499'

GEOTECH SB-01

-TOPSOIL (0' - 0.3')

-SM (0.3' - 30.0')

-COMPLETION

DEPTH EL. 469'

-CL (1.0' - 6.5')

-NG EL. 390'

GEOTECH SB-03

-TOPSOIL (0' - 1.0')

-SM (6.5' - 30.0')

-COMPLETION

DEPTH EL. 360'

-GROUNDWATER (16.0')

-NG EL. 460'

GEOTECH SB-02

-TOPSOIL (0' - 0.7)

-SM (0.7' - 7.0')

-COMPLETION

DEPTH EL. 448'

-GNEISS (7.0' - 12.0')