9
Presented to: By: Date: Federal Aviation Administration N90 TUG Brief Teterboro Users Group Michael Porcello July 15, 2015

N90 TUG Brief Administration - Teterboro Users Groupteterborousersgroup.org/wp-content/uploads/2015/07/NY... · 2020. 8. 19. · LTA-N90-20 (TE8) Runway 24 RIJUDY Departure (RNAV).pdf

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: N90 TUG Brief Administration - Teterboro Users Groupteterborousersgroup.org/wp-content/uploads/2015/07/NY... · 2020. 8. 19. · LTA-N90-20 (TE8) Runway 24 RIJUDY Departure (RNAV).pdf

Presented to:

By:

Date:

Federal Aviation AdministrationN90 TUG Brief

Teterboro Users Group

Michael Porcello

July 15, 2015

Page 2: N90 TUG Brief Administration - Teterboro Users Groupteterborousersgroup.org/wp-content/uploads/2015/07/NY... · 2020. 8. 19. · LTA-N90-20 (TE8) Runway 24 RIJUDY Departure (RNAV).pdf

Federal Aviation Administration

RUUDY 5

2

CONCERNS:

• departures delaying turn off the runway direct WENTZ

• aircraft crossing WENTZ above the 1500 ft restriction

Page 3: N90 TUG Brief Administration - Teterboro Users Groupteterborousersgroup.org/wp-content/uploads/2015/07/NY... · 2020. 8. 19. · LTA-N90-20 (TE8) Runway 24 RIJUDY Departure (RNAV).pdf

Federal Aviation Administration

3

Page 4: N90 TUG Brief Administration - Teterboro Users Groupteterborousersgroup.org/wp-content/uploads/2015/07/NY... · 2020. 8. 19. · LTA-N90-20 (TE8) Runway 24 RIJUDY Departure (RNAV).pdf

Federal Aviation Administration

4

RUUDY 5• Changed the way crossing altitudes are depicted

• Evaluating lowering TASCA crossing restriction

• Suggest engaging FMS in lieu of “hand flying” procedure

Page 5: N90 TUG Brief Administration - Teterboro Users Groupteterborousersgroup.org/wp-content/uploads/2015/07/NY... · 2020. 8. 19. · LTA-N90-20 (TE8) Runway 24 RIJUDY Departure (RNAV).pdf

Federal Aviation Administration

TEB QUIET VIS RY 19

• Failed Flight Check due to inability to readily identify Home Depot as a visual reporting point

• Clerical issues with the way approach depicted/described on the plate

• Redesign with new visual reporting point and corrected depiction will push back publication to October 15, 2015

5

Page 6: N90 TUG Brief Administration - Teterboro Users Groupteterborousersgroup.org/wp-content/uploads/2015/07/NY... · 2020. 8. 19. · LTA-N90-20 (TE8) Runway 24 RIJUDY Departure (RNAV).pdf

Federal Aviation Administration

TEB QUIET VIS RY 19

6

ORIGINAL REVISED

Page 7: N90 TUG Brief Administration - Teterboro Users Groupteterborousersgroup.org/wp-content/uploads/2015/07/NY... · 2020. 8. 19. · LTA-N90-20 (TE8) Runway 24 RIJUDY Departure (RNAV).pdf

Federal Aviation Administration

7

TEB QUIET VIS RY 19

Page 8: N90 TUG Brief Administration - Teterboro Users Groupteterborousersgroup.org/wp-content/uploads/2015/07/NY... · 2020. 8. 19. · LTA-N90-20 (TE8) Runway 24 RIJUDY Departure (RNAV).pdf

Federal Aviation Administration

TEB RNAV (GPS) Y RY 19

8

Overlay to ILS 19

Uses same RNAV transition fixes as the ILS 19 and the QUIET VIS RY 19

Publish Oct 15, 2015

Page 9: N90 TUG Brief Administration - Teterboro Users Groupteterborousersgroup.org/wp-content/uploads/2015/07/NY... · 2020. 8. 19. · LTA-N90-20 (TE8) Runway 24 RIJUDY Departure (RNAV).pdf

Federal Aviation Administration

RNAV (GPS) RY 24

9

Includes same transition fixes as the RY 19 approaches

Minimums similar to the VOR RY 24

Pub date October 15, 2015