12
Nam Ton Watershed Cost and Benefit analysis of Irrigation and Agriculture Development

Nam Ton Watershed Group 2 SangHuyToe Cost and Benefit analysis of Irrigation and Agriculture Development

Embed Size (px)

Citation preview

Page 1: Nam Ton Watershed Group 2 SangHuyToe Cost and Benefit analysis of Irrigation and Agriculture Development

Nam Ton Watershed

Cost and Benefit analysis of Irrigation and Agriculture Development

Page 2: Nam Ton Watershed Group 2 SangHuyToe Cost and Benefit analysis of Irrigation and Agriculture Development

2

Layout

Introduction

Background

Singthong District

Hinherb District

Page 3: Nam Ton Watershed Group 2 SangHuyToe Cost and Benefit analysis of Irrigation and Agriculture Development

Introduction

The purpose of the presentation is to show the real situation of watershed implementation in Sangthom and Hinherb provinces and to show the cost and benefit of this watershed project

04/21/23 3

Page 4: Nam Ton Watershed Group 2 SangHuyToe Cost and Benefit analysis of Irrigation and Agriculture Development

04/21/23 4

KfW, GIZ, LMNC, and MRC support the project

project duration is 2010 to 2017 ( 7 years )

project start from 10/2011

project have two portion

( part 1 – cover all project measures within the project area by Lao Government and the local people )

( part 2 – MRC facilitates regional water resources development and pilots replicable development solutions

Background

Page 5: Nam Ton Watershed Group 2 SangHuyToe Cost and Benefit analysis of Irrigation and Agriculture Development

04/21/23 5

Background (Cont’)

Nom Tom Watershed is part of the lower Mekong Basin and direct tributary to the Mekong River

the project area comprises of 43 villages in Hinheup and Sangthong districts

project area is 80,000 ha

total population is 32,000

propose irrigation site, 8 ( 1, rehabilitation and 7 new )

Page 6: Nam Ton Watershed Group 2 SangHuyToe Cost and Benefit analysis of Irrigation and Agriculture Development

04/21/23 6

Sangthong District

Page 7: Nam Ton Watershed Group 2 SangHuyToe Cost and Benefit analysis of Irrigation and Agriculture Development

04/21/23 7

The On Going Issue

District propose to the project on supporting for gate construction at the mouth of Nam Ton river

The dam will protect the upstream from flood meanwhile it also block fish from travelling from Mekong River to Nam Ton river

Shifting cultivation Soil degradation Deforestation

Page 8: Nam Ton Watershed Group 2 SangHuyToe Cost and Benefit analysis of Irrigation and Agriculture Development

8

New Sluice gate above junction

prevent entering water from Mekong River in high water season

can be used to control flood

can be used to irrigate rice field in dry season

•Block fish migration

Page 9: Nam Ton Watershed Group 2 SangHuyToe Cost and Benefit analysis of Irrigation and Agriculture Development

04/21/23 9

Recommendation

To ensure the sustainability of fish caught in this area, in the designing phase of water gate/dam, the fish ladder/ fish stair should carefully design

Shifting cultivation Plan rotation, and Perennial tree

Fish Ladder

Page 10: Nam Ton Watershed Group 2 SangHuyToe Cost and Benefit analysis of Irrigation and Agriculture Development

04/21/23 10

Hinherb District

Background

Flat land: 10% Mountainous: 90% Population: 5900 Irrigated area: 14ha Yield production: 2.8T/Ha Main income: rice plantation

Page 11: Nam Ton Watershed Group 2 SangHuyToe Cost and Benefit analysis of Irrigation and Agriculture Development

04/21/23 11

The On Going Issue

Lack of irrigation systemErosion is continue on the poor existing irrigation system

Upland agriculture system by applying water harvesting onto the mountainous area (forest conservation should also consider) 5 potential irrigation system are propose

Recommendation & Solution

Page 12: Nam Ton Watershed Group 2 SangHuyToe Cost and Benefit analysis of Irrigation and Agriculture Development

04/21/23 12

THNAK YOU FOR YOUR ATTENTIONTHANK YOU FOR YOUR ATTENTION