13
Event, Date, Place Name, Surname, Position LIFE Environment

Name, Surname, Position Event, Date, Place LIFE Environment

Embed Size (px)

Citation preview

Page 1: Name, Surname, Position Event, Date, Place LIFE Environment

Event, Date, Place Name, Surname, Position

LIFE Environment

Page 2: Name, Surname, Position Event, Date, Place LIFE Environment

Event, Date, Place Name, Surname, Position

“ … to contribute to the development of innovative and

integrated techniques and methods, and to the further

development of Community environment policy”

Objective

Article 4 of LIFE Regulation

Page 3: Name, Surname, Position Event, Date, Place LIFE Environment

Event, Date, Place Name, Surname, Position

LIFE-Environment projects - 1

• Demonstration projects

• Transferability and dissemination

• Clear link with EU policy/legislation

Page 4: Name, Surname, Position Event, Date, Place LIFE Environment

Event, Date, Place Name, Surname, Position

LIFE-Environment projects - 2

• Around 1,550 projects co-financed since 1992

• Contributing €1,640 million to the development of innovative environmental projects and protection of the environment

• Project duration: usually 1.5 - 3 years

• Total project budget: usually € 1,000,000 - 5,000,000

• Preparatory Action Programme: up to €6,000,000 annually to preparation of projects on selected themes

Page 5: Name, Surname, Position Event, Date, Place LIFE Environment

Event, Date, Place Name, Surname, Position

• Land-use development and planning (319 projects 1992 - 2006)

• Impact of economic activities (487)

• Water management (287)

• Waste management (301)

• Integrated production policy (149)

LIFE-Environment: thematic areas

Proportion of projects by theme (1992 – 2006)

31%

19%

20%10%

20%

Land-use Water

Economic activities Waste

Integrated Product Policy

Page 6: Name, Surname, Position Event, Date, Place LIFE Environment

Event, Date, Place Name, Surname, Position

• Urban environment

• Air quality and noise abatement

• Integrated Coastal Zone Management

Land-use development and planning

Aim

To promote the integration of environmental and

sustainable development considerations into land-use

development and planning

Fields of action

Page 7: Name, Surname, Position Event, Date, Place LIFE Environment

Event, Date, Place Name, Surname, Position

Impact of economic activities

Aim

To minimise the environmental impacts

of economic activities

Fields of action

• Clean technologies

• Integrated environment management

• Reduction of greenhouse gas emissions

• Sustainable tourism

Page 8: Name, Surname, Position Event, Date, Place LIFE Environment

Event, Date, Place Name, Surname, Position

Water management

Aim

To support the protection and improvement

of water resources

Fields of action

• Wastewater treatment

• Water supply – water quality – ground water protection

• Water management at river basin scale

• Diffuse and dispersed pollution sources

Page 9: Name, Surname, Position Event, Date, Place LIFE Environment

Event, Date, Place Name, Surname, Position

Waste management

Aim

The prevention, reuse, recovery and recycling

of waste of all kinds and sound management of

waste streams

Fields of action

• Packaging and plastics

• Hazardous or problematic waste

• Waste important in volume

Page 10: Name, Surname, Position Event, Date, Place LIFE Environment

Event, Date, Place Name, Surname, Position

Aim

To reduce the environmental impact of products through an integrated approach to the production, distribution, consumption and handling at the end of lifetime

Fields of action• Eco-design, eco-efficiency, green financial products

• Eco-labelling

Integrated product policy - 2

Page 11: Name, Surname, Position Event, Date, Place LIFE Environment

Event, Date, Place Name, Surname, Position

• 464 proposals for LIFE-ENV funding

• 50 LIFE-ENV projects selected in…

• 14 countries

• Total investment: €214 million

• EU contribution: €66 million

New projects in 2006

Page 12: Name, Surname, Position Event, Date, Place LIFE Environment

Event, Date, Place Name, Surname, Position

Projects “expected to generate significant income”

can only be funded at 30% of eligible costs

– Can be actual revenue or reduction of operational costs

– Timescale runs beyond close of project

– Includes project partners

– Beneficiary must match Commission’s contribution

– “Go-NoGo exercise”

Land purchase costs are not eligible

LIFE-Environment:specific provisions

Page 13: Name, Surname, Position Event, Date, Place LIFE Environment

Event, Date, Place Name, Surname, Position

• After-LIFE communications plan

• Long-term environmental benefits

• Go/No-Go exercise

LIFE-Environment: specific contractual requirements