2
100 Climate Solutions Project Campaign ~ 2016 REGIONS OF CLIMATE ACTION LED Street lighting Summary Main stakeholders Location and population Mandating Authority : Social and environmental impact Expected project CAPEX : NanPing municipality LED project NanPing municipality is the largest city by area in Fujian province, and is one of the pilot low carbon cities. As part of this process of building a low carbon demonstration city, NanPing welcomes the LED project. Optimize and upgrade the urban public light- ing system; improve local infrastructure and energy efficiency; promote a green circular economy. Nan Ping municipal Development and Re- form Commission Nanping, Fujian province, China 3.04 M inh. Nanping municipality Tbd

NanPing municipality LED project - regions20.org · form Commission Nanping, Fujian province, China 3.04 M inh. Nanping municipality Tbd. Projec aturit FC , Tloia ANh ATbdlofbp STAGE

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

REGIONS OFCLIMATE ACTION

LED Street lighting

Summary

Main stakeholders

Location and population

Mandating Authority :

Social and environmental impact

Expected project CAPEX :

NanPing municipality LED project

NanPing municipality is the largest city by area in Fujian province, and is one of the pilot low carbon cities. As part of this process of building a low carbon demonstration city, NanPing welcomes the LED project.

Optimize and upgrade the urban public light-ing system; improve local infrastructure and energy efficiency; promote a green circular economy.

Nan Ping municipal Development and Re-form Commission

Nanping, Fujian province, China 3.04 M inh.

Nanping municipality

Tbd

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

Project maturity ( IFC / World Bank Categories )

STAGE 1 : Concept Development, Site identification

Number of Lighting points :

Mapping of the street lighting system :

Current installation

Expected energy / expenses savings 

Source of electricity :

STAGE 3 : Feasibility Studies

STAGE 2 : Pre-Feasibility Studies

Pre-feasibility study

Feasibility study

Building permits signed

Identified sources of fundings

Contract with municipality

Environmental impact study

STAGE 5 : Engineering / Construction / Commercial Operation

Comments

Engineering, Procurement and Construction Contractor

Operation and Maintenance Contractor 

STAGE 4 : Permitting / Financing / ContractsSTAGE 1 : Concept Development, Site identification STAGE 2 : Pre-Feasibility Studies STAGE 3 : Feasibility Studies STAGE 4 : Permit t ing / Financing / Contracts STAGE 5 : Engineering/Construction/Commercial Operation

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A