NASA IV&V Facili ty Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director 304-367-8202 [email protected]

NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

Embed Size (px)

Citation preview

Page 1: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

Software Independent Verification and Validation

(IV&V)

NASA IV&V FacilityFairmont, West Virginia

Judith N. BrunerActing Director304-367-8202

[email protected]

Page 2: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

Content

• Why are we discussing IV&V?

• What is IV&V?

• How is IV&V done?

• IV&V process

• Why perform IV&V?

• Summary

• Points of Contact

Page 3: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

Why are we discussing IV&V?

Page 4: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

Setting the Stage

In the 90s, the Commanding General of theArmy’s Operational Test and Evaluation

Agency noted that 90 percent of systems that were not ready for scheduled operational tests

had been delayed by immature software.

Page 5: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility Software “Chaos”

16% Successful- In Budget- On Time- Meets Requirements- User involved

31% Cancelled- Development

53% “Challenged”- Over budget by 189%- Late by 222%

- Missing 39% of Capabilities

Note: For Large Companies- 9% were Successful

- 61.5% Challenged - Over budget by 178% - Late by 230% - Missing 58% of Capabilities- 29.5% were Cancelled

The Standish Group examined 8,380 Software Projects.

Page 6: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

68

Error Densities

68%9%

23%RequirementsSpecification Installation &

Commissioning

Design &Implementation

Page 7: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

Increasing Cost of Changes

(Normalized to Requirements Phase)

The cost to correct an software error multiplies during thedevelopment lifecycle.

Cos

t sc

ale

fact

or

Page 8: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

What is IV&V?

Page 9: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

Independent Verification and Validation (IV&V)

• Independent– Technical: IV&V prioritizes its own efforts

– Managerial: Independent reporting route to Program Management

– Financial: Budget is allocated by program and controlled at high level such that IV&V effectiveness is not compromised

• Verification (Are we building the product right?) – The process of determining whether or not the products of a given phase of the

software development cycle fulfill the requirements established during the previous phase

– Is internally complete, consistent and correct enough to support next phase

• Validation (Are we building the right product?)– The process of evaluating software throughout its development process to ensure

compliance with software requirements. This process ensures:• Expected behavior when subjected to anticipated events

• No unexpected behavior when subjected to unanticipated events

• System performs to the customer’s expectations under all operational conditions

Page 10: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

Independent Verification & Validation

Software IV&V is a systems engineering process employing rigorous methodologies for evaluating the correctness and quality of the software product throughout the software life cycle

Adapted to characteristics of the target program

Page 11: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

How is IV&V done?

Page 12: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

IV&V Activities Throughout Lifecycle

Requirements Phase

•System Reqts Analysis•S/W Reqts Analysis•Interface Analysis•Process Analysis•Technical Reviews & Audits

Design Phase

•Design Analysis•Interface Analysis•Test Program Analysis•Supportability Analysis•Process Analysis•Technical Reviews & Audits

Code Phase

•Code Analysis•Test Program Analysis•Supportability Analysis•Process Analysis•Technical Reviews & Audits

Test Phase

•Test Program Analysis•Independent Test•Supportability Analysis•Technical Reviews & Audits

Verify

Verify

VerifyValidate

Catastrophic/Critical/High Risk Functions ListTraceability AnalysisIssues TrackingMetrics AssessmentLoading AnalysisChange Impact AnalysisSpecial Studies

Page 13: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

FacilityIV&V Life Cycle Functions

• IV&V Process provides tools and analysis procedures appropriate to each phase of the software development life cycle:– Formulation Phase:

• Is development process sound, repeatable, and managed?

– Requirements Phase:• Verify that system and software requirements are correct, complete, traceable and testable

• Analyze system-level requirements: Are test plans and acceptance criteria sufficient to validate system requirements and operational needs?

• Are testing methods sufficient to verify and validate software requirements?

• Are the correct software development, management, and support processes in place?

– Design Phase:• Does the design support the requirements?

• Are test plans and test environments sufficient to verify and validate software and operational requirements?

• Does the design have any characteristics that will cause it to fail under operational scenarios? What solutions are appropriate?

Page 14: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

IV&V Life Cycle Functions (cont.)

• Typical IV&V functions by Software life-cycle phase (cont.):– Coding Phase:

• Does the code reflect the design?

• Is the code correct?

• Verify that test cases trace to and cover software requirements and operational needs

• Verify that software test cases, expected results, and evaluation criteria fully meet testing objectives

• Analyze selected code unit test plans and results to verify full coverage of logic paths, range of input conditions, error handling, etc.

– Test Phase:• Analyze correct dispositioning of software test anomalies

• Validate software test results versus acceptance criteria

• Verify tracing and successful completion of all software test objectives

– Operational Phase:• Verify that regression tests are sufficient to identify adverse impacts of changes

Page 15: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

IV&V Testing Involvement

• IV&V identifies deficiencies in program’s test planning

• Program changes their procedures to address deficiencies vice IV&V independently test

• IV&V may independently test highly critical software using an IV&V testbed– Whitebox

– Stress

– Endurance

– Limit

• Developer motivated to show software works

• IV&V attempts to break software

Page 16: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

IV&V Process

Page 17: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

IV&V Process

Integrates IV&V into programProvides IV&V fundingResolves Exception issues

Reflects IV&V in program mgmt planAgrees to data transfer planReflects agreement in subcontracts

IV&V in phasewith development

Program

Developer

IV&V Assessment

info

rmat

ion

IV&

V p

ropo

sal

agre

emen

tPlanning

Introduce issues at lowest levelAllow developer time to respondIssue resolved

Introduce issues at lowest levelAllow developer time to respondIf no resolution, take issue to program

Requirements

Design

Code

Test

Exception

Normal

CA

RA

res

ults

Defines IV&V scopeand objectives

Planning Execute

Page 18: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

IV&V Scope

• Scope is determined so as to minimize the risk within the Program’s IV&V budget. Effort is based on:– Criticality and risk of system functions performed/managed by

software

– Budget limitations Program’sIV&V budgetSpecifications Program goals Dev plans/schedules

Criticality Analysis andRisk Assessment

Estimateresourcerequirements

Acceptable?Yes IV&V

Plan

Revise scope:- Breadth vs depth- Exceptions

No

Page 19: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility CARA Scoring Methodology

Criticality:

Catastrophic=4Critical=3Moderate=2Low=1

Performance and Operations

Safety

Cost/schedule

Category Rating

Average Criticality

Risk:

Category

High=3

Moderate=2

Low=1

Rating

Complexity

Technology Maturity

Reqts Dfn & Stability

Testability

Developer Experience

Average Risk

CARA score

For each Software Function:Set IV&V Analysis Level (IAL) ThresholdsIAL CARA ScoreNone: 1 < CARA < 2Limited (L): 2 < CARA < 5Focused (F): 5 < CARA < 8Comprehensive (C): 8 < CARA < 12

Page 20: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

CARA Criticality

Sample Criticality Evaluation Criteria

CRITICALITYAreas

CatastrophicImpact Value=4

CriticalImpact Value=3

ModerateImpact Value=2

LowImpact Value=1

Performanceand Operation

Failure could cause loss ofuse of system for extendedtime , loss of capability toperform all missionobjectives. Failure is notameliorated.

Failures could cause loss ofcritical function notresulting in loss of systemuse, lengthy maintenancedowntime, or loss ofmultiple mission objectives.Failure is partiallyameliorated.

Failure could cause loss ofa single mission objectiveor reduction in operationalcapability. Failure is fullyameliorated.

Failure could causeinconvenience ( e.g., rerunof programs, computerreset, manual intervention).

Safety Failure could result in lossof life or system or causesevere personal injury.

Failure could result in nondisabling personal injury,serious occupational illness,or loss of emergencyprocedures.

Failure could result inminor injury.

No safety implications.

DevelopmentCost/Schedule

Failure could result in costoverruns large enough toresult in unachievableoperational capability.

Failure could result in largecost and schedule overruns.Alternate means toimplement function are notavailable.

Failure results in significantschedule delay. Alternatemeans to implementfunction are available but atreduced operationalcapability. Full operationalcapability delayed.

Failure results in minorimpact to cost and schedule.Problems are easilycorrected with insignificantimpact to cost and schedule.

Page 21: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

CARA Risk

Sample Risk Driver Criteria

RISK RISK CATEGORIES AND RATING CRITERIADRIVERS High

Driver Value = 3Moderate

Driver Value = 2Low

Driver Value = 1Complexity ⟨ Highly complex control/logic operations

⟨ Unique devices/complex interfaces⟨ Many interrelated components⟨ Function uses different sensor/effector setin different modes or stages.

⟨ Moderately complex control/logic⟨ May be device dependent⟨ Moderately complex interfaces⟨ Several interrelated components⟨ Function has different behavior indifferent modes or stages.

⟨ Simple control/logic⟨ Not device dependent⟨ Function applies to a singlemode or stage

Maturity ofTechnology

⟨ New/unproven algorithms, languages &support environments

⟨ High probability for redesign⟨ Little or no experience base

⟨ Proven on other systems withdifferent application

⟨ Moderate experience base

⟨ Proven on other systemswith same application

⟨ Mature experience

RequirementsDefinition& Stability

⟨ Rapidly changing, baselines not established⟨ Many organizations required to definerequirements

⟨ Much integration required⟨ High degree of international interaction

⟨ Potential for some changes⟨ Some integration required⟨ Little interaction with internationalcomponents

⟨ Solid requirements - littlepotential for change

⟨ Little to no integrationrequired

⟨ No interaction withinternational components

Testability ⟨ Difficult to test⟨ Requires much data analysis to determineacceptability of results

⟨ Many operational environments and inputs

⟨ Requires some test data analysis todetermine acceptability of results

⟨ Moderate amount of operationalenvironments and inputs

⟨ Acceptability of test resultseasily determined

⟨ Few operationalenvironments and inputs

Page 22: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

FacilityRequirements Analysis IALs

Activity L F C

Verify documentation meets intended purpose, has appropriate detailand all necessary elements

X X X

Validate ability of requirements to meet system needs X X X

Verify Traceability to and from parent requirements X X X

Analyze data/adaptation requirement X X X

Analyze Testability, Qualification requirements X X X

Analyze Data Flow, Control Flow, moding and sequencing X X X

Assess development metrics X X X

Analyze development risks/mitigation plans X X X

Analyze Timing and Sizing requirements X X X

Review developer timing/sizing, loading engineering analysis X X

Perform engineering analysis of key algorithms X X

Review/use developer prototypes or dynamic models X X

Develop alternative static representations (diagrams, tables) X X

Develop prototypes or models X

Perform timing/sizing/loading analysis X

Apply formal methods X

Page 23: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

FacilityDesign Analysis IALs

Activity L F C

Verify documentation meets intended purpose, has appropriate detail andall necessary elements

X X X

Validate ability of design to meet system needs X X X

Verify Traceability to and from requirements X X X

Analyze database design X X X

Analyze design Testability, Qualification requirements X X X

Analyze design Data Flow, Control Flow, moding, sequencing X X X

Analyze control logic, error/exception handling design X X X

Assess design development metrics X X X

Analyze development risks/mitigation plans X X X

Review developer timing/sizing, loading engineering analysis X X

Perform design analysis of select critical algorithms X X

Review/use developer prototypes or dynamic models X X

Develop alternative static representations (diagrams, tables) X X

Develop prototypes or models X

Perform timing/sizing/loading analysis X

Apply formal methods X

Page 24: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

FacilityCode Analysis IALs

Activity L F C

Verify documentation meets intended purpose, has appropriate detail andall necessary elements

X X X

Verify Traceability to and from design X X X

Verify Architectural design compliance (structure, external I/O, & CSCIexecutive moding, sequencing & control)

X X X

Verify supportability and maintainability X X X

Assess code static metrics X X X

Verify CSU & CSC level logical structure and control flow X X X

Verify internal data structures and data flow/usage X X

Verify error and exception handling X X

Verify code & external I/O data consistency X X

Review code compilation results & syntax checking X X

Verify correct adaptation data & ability to reconfigure X X

Verify correct operating system & run time libraries X X

For select algorithms, verify correctness and stability under full range ofpotential input conditions

X

Verify code data compliance with data dictionary X

Verify compliance with coding standards X

Page 25: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

FacilityTest Analysis IALs

Activity L F C

Analyze System level verification requirements to verify that test definition,objectives, plans and acceptance criteria are sufficient to validate systemrequirements and operational needs associated with CCHR Functions

X X X

Verify Software Test Plan qualification testing methods and plans aresufficient to validate software requirements and operational needs

X X X

Verify test cases traceability and coverage of software requirements,operational needs, and capabilities

X X X

Verify software STD test case definition inputs, expected results, andevaluation criteria comply with STP plans and testing objectives

X X X

Analyze correct dispositioning of software test anomalies X X X

Validate software test results compliance with test acceptance criteria X X X

Verify trace and successful completion of all software test case objectives X X X

Verify ability of software test environment plans and designs to meetsoftware testing objectives

X X X

Verify regression tests are sufficient to determine that the software is notadversely affected by changes

X X X

Analyze STD procedures for test setup, execution, and data collection X X

Monitor execution of software testing X X

Analyze select CSC test plans, procedures, and results to verify adequatelogic path coverage, testing of full range of input conditions, error andexception handling, key algorithm stability, and performance in compliancewith the design.

X

Perform life cycle IV&V on software test environment components X

Page 26: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

FacilityIV&V Is Process As Well As

Product Oriented

Software schedules, development tracking,critical path analysis, configuration mgmt

Program processes

Ancillary developments

Simulations, trainers, test environments

Increased probability of success- Good processes allow early error identification and correction- Quality documentation enhances software maintenance

Page 27: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

IV&V Increases Program Awareness

Program

Iden

tifi

cati

on o

f to

p r

isk

sE

val o

f P

rogr

am D

evel

sta

tus

Eva

l of

Pro

gram

Sch

edu

le s

tatu

sWeek Week Week Week MonthIV&V

Sta

tus

Rev

iew

s

Sta

tus

Rev

iew

s

Sta

tus

Rev

iew

s

Sta

tus

Rev

iew

s

Reqts Design

Ph

ase

com

ple

te a

nal

ysis

rep

ort

IV&V is a program level “tool” to efficiently and effectivelymanage software development risk.

Page 28: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

Staffing Paradigm

Developer Site

Program Site

S/W IV&V Facility

Developers IV&V

Pgm Mgmt IV&V

Eyes, Ears, Advocates, &Domain Experts (Validation)

Critical Mass of:- Analysts- Tools

Page 29: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

Why perform IV&V?

Page 30: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

IV&V Benefits

•Better software/systemPerformance

•Higher Confidence in Software Reliability

•Compliance between Specs & Code

•Criteria for ProgramAcceptance

•Better Visibility intoDevelopment

•Better Decision Criteria

•Second Source TechnicalAlternative

•Reduced maintenance cost

•Reduced Frequency ofOperational Change

Technical Management

Page 31: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

Summary

Page 32: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

FacilityIV&V Key Points

• IV&V works with the Project– Goal is project success

• IV&V is an engineering discipline– IV&V processes are defined and tailored to the specific program

– Mission, operations and systems knowledge is used to perform engineering analyses of system components

• IV&V is most effective when started early– 70% of errors found in testing are traceable to problems in the

requirements and design

• IV&V works problems at the lowest possible level– Primarily work via established informal interfaces with the development

organization - working groups, IPTs, etc.

– Elevate issues only when necessary

Page 33: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

IV&V Approach Efficiently Mitigates Risk

• It is not necessary or feasible to perform all IV&V analyses on all software functions

• IV&V resources allocated to reduce overall exposure to operational, development, and cost/schedule risks– Software functions with higher cirticality and development risk receive

enhanced levels of analysis (‘CARA’ process)– Systems analyses performed to reduce costly interface and integration

problems– Process analyses performed to verify ability to produce desired result relative

to program plans, needs and goals• IV&V working interfaces promote timely problem resolution

– Proactive participation on pertinent development teams– Emphasis on early identification of technical problems– Engineering recommendations provided to expedite solution development and

implementation

Page 34: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

Analyses Are Value Added and Complementary- Not Duplicative

• Analyses performed from a systems perspective considering mission needs and system use, hazards and interfaces

– Discipline experts assigned to perform analysis across all life cycle phases

– Horizontal specialty skills are matrixed across IV&V functional teams to verify correct systems integration

– Specialized tools and simulations perform complex analyses

• IV&V testing activities complement developer testing enhancing overall software confidence

– Developer testing focuses on demonstrating nominal behavior, IV&V testing activities try to break the software

• Overall program integration, test and verification approach analyzed for completeness, integrity and effectiveness

Page 35: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

FacilityWhy use NASA IV&V Facility?

Software IV&V, as practiced by the NASA Software IV&V Facility, is a well-defined,

proven, systems engineering discipline designed to reduce the risk in major software

developments.

Page 36: NASA IV&V Facility Software Independent Verification and Validation (IV&V) NASA IV&V Facility Fairmont, West Virginia Judith N. Bruner Acting Director

NASAIV&V

Facility

NASA IV&V FacilityPoints of Contact

• Judy Bruner

Acting Director

304-367-8202

[email protected]

• Bill Jackson

Deputy Director

304-367-8215

[email protected]