15
ENGINEERING INDUSTRIAL TRAINING PROPEL NETWORK SDN. BHD. (09 JUNE 2014-29 AUGUST 2014) NAME: NASRUL HAFIZI NORHASHIM MATRIC NO: 1125633 COURSE: MECHARONICS ENGINEERING SUPERVISOR: PN. SALINAWATI LEMAN

nasrul presentation

Embed Size (px)

Citation preview

Page 1: nasrul presentation

ENGINEERING INDUSTRIAL TRAININGPROPEL NETWORK SDN. BHD.

(09 JUNE 2014-29 AUGUST 2014)

NAME: NASRUL HAFIZI NORHASHIM

MATRIC NO: 1125633

COURSE: MECHARONICS ENGINEERING

SUPERVISOR: PN. SALINAWATI LEMAN

Page 2: nasrul presentation

OVERVIEW

COMPANY BACKGROUND

TIMELINE (TASK)

WORK INVOLVED

LEARNING OUTCOME

CONCLUSION

Page 3: nasrul presentation

PROPEL NETWORK

SDN. BHD

No 84-1 & 84-2, Jalan Sungai BurungAA32/AA, Seksyen 32, Bukit Rimau, 40460 Shah Alam, Selangor

Propel Network Sdn. Bhd. provides Radio Frequency Network Planning and Optimization for wireless communication industry such as GSM, WCDMA, CDMA, WiMAX, LTE and 4G, 3G, 2G.

Serving a list of multi-national companies (MNC) and wireless network operators such as Digi, YES 4G.

Page 4: nasrul presentation

ORGANIZATION

CEOMr. Leong WM

PROJECT MANAGERMr. Hew

SENIOR ENGINEERMr. Stanly

ENGINEERDRIVE TEST

INTERNSHIPRegional Coordinator

-Northern-Easthern

SENIOR ENGINEERMr Chin Wei

ENGINEERDRIVE TEST

INTERNSHIPRegional Coordinator

-Central-Southern

PROJECT MANAGER (YTL)Mr Ryan

SENIOR ENGINEERMr Hisham

ENGINEERDRIVE TEST

INTERNSHIPRegional Coordinator

-Northern-Easthern-Central

-Southern

Page 5: nasrul presentation

TIMELINE/TASK

• Audit / Tuning

• Single Site Verification (SSV)

• Cluster Coverage Verification Test

• Cluster Acceptance Test (Key Performance Index (KPI) Test)

Page 6: nasrul presentation

Audit / Tuning

Require Rigger to climb towards antenna

Audit : First time tuning based on the readings on database provided by vendor

Tuning : next changes on azimuth or tilting of the antenna

This job can only be done by riggers

Page 7: nasrul presentation

Tower/Pole

Tower Monopole

Tree

Monopole

Rooftop Building

Page 8: nasrul presentation

Single Site

Verification (SSV)

Ping Test

Handover Test

VoIP call test

Network Entry Test

Throughput Test:

- Downlink test

- Uplink test

Page 9: nasrul presentation

Cluster Coverage

Verification Test

The team assigned for this task will be given route to be drive.

The results of the drive are important for Optimizer team to do optimizing progress.

This task will be done repeatedly until the coverage satisfied for Key Performance Index (KPI).

Usually the problematic area need for several verification test.

Page 10: nasrul presentation

Key Performance Index

(KPI) Test

Involve Coverage upload/ download & VoIP Call monitoring.

Ready for market after pass Key Performance Index (KPI).

Page 11: nasrul presentation

TOOLS & SETUP

Page 12: nasrul presentation

SOFTWARES

XCAL-X

mWiMAX Connection

Manager

Page 13: nasrul presentation

EXPECTATION

Learn & gain knowledge about recent development in wireless communication industry.

Get involved in YTL WiMAX 4G project.

Research current event and issues in the telecommunication industry.

Gain experience in handling task :

- SSV field test (Single Site Verification)

- Cluster drive test or Key Performance Index (KPI).

- Reports

Page 14: nasrul presentation

CONCLUSION

• Need very detail work for make it successful, example the procedure, Verify, baseline, optimize, performsnce index

• Hands-on and practical knowledge's that could be applied to the working environment.

• Gain experience and professional skills regarding telecommunication and networking industry.

Page 15: nasrul presentation

THANK YOU